Advanced Regulatory Document Search (RDS)

Search Results for: Records - Case Number=EB-2018-0028 - 224 Records Found

SORTING YOUR SEARCH RESULTS
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



CASE INFORMATION
Click the case number to view details for that proceeding.

 Case Number  File Name  Document Type  Issued By OEB  Received By OEB Date Issued/Received
EB-2018-0028  SEC_TCQ_EnergyPlus_10c_20190111 Interrogatories to Intervenor 2019-01-11 2019-01-11
EB-2018-0028  SEC_TCQ_EnergyPlus_20190101 Interrogatories to Intervenor 2019-01-11 2019-01-11
EB-2018-0028  2019 EnergyPlus_Cost_Allocation_Model_No Standby_TMMC_4_20190109 Interrogatory Response from Applicant 2019-01-09 2019-01-09
EB-2018-0028  EnergyPlus_IRResponse to TMMC_Clarification Question_3_cor_20190109 Interrogatory Response from Applicant 2019-01-09 2019-01-09
EB-2018-0028  EnergyPlus_Appendix IR-TMMC-14 Hourly Data_Response 1 2 5 _2018_08_30_20190109 Interrogatory Response from Applicant 2019-01-09 2019-01-09
EB-2018-0028  EnergyPlus_IRResponse to TMMC IRR_12_13_14_20190109 Interrogatory Response from Applicant 2019-01-09 2019-01-09
EB-2018-0028  EnergyPlus_IRR_Filing of Info_ Confidentiality_20190109 Interrogatory Response from Applicant 2019-01-09 2019-01-09
EB-2018-0028  Dec_Confidentiality Request_20181221 Decision 2018-12-21 2018-12-21
EB-2018-0028  po7_EnergyPlus_20181221 Procedural Order 2018-12-21 2018-12-21
EB-2018-0028  OEB Staff_SUB_EnergyPlus_Settlement Proposal_20181219 Submission 2018-12-19 2018-12-19 2018-12-19
EB-2018-0028  EnergyPlus_APPL_2019 EvidenceUpdate_20181212 Application and Evidence 2018-12-13 2018-12-13
EB-2018-0028  EnergyPlus_APPL_2019 Additional Evidence Letter_20181212 Application and Evidence 2018-12-13 2018-12-13
EB-2018-0028  2019 EnergyPlus Load profile model 2006 Hydro One data for 2019_Settle_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Test_year_Income_Tax_PILs_Workform_V1 - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Tariff_Schedule_Model-CND - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Tariff_Schedule_Model-BCP - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Rev_Reqt_Work_Form - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Load Forecast Model - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus GA-Analysis-Workform - Consolidated - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus DVA Continuity_Schedule_CoS - Consolidated - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Cost_Allocation_Model - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Chapter2_Appendices - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Chapter 5 Appendix - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus Benchmarking-Spreadsheet-Forecast-Model - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019 EnergyPlus ACM_Model_OEB - Settlement_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019_EnergyPlus Settlement_Proposal_Appendix_E_Redacted_EB_2018_0028_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  2019_EnergyPlus Settlement Proposal_EB_2018_0028_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  EnergyPlus_Settlement Agreement Cover Letter EB_2018_0028_20181212 Settlement Proposal 2018-12-12 2018-12-12
EB-2018-0028  EnergyPlus_Ltr_Settlement Update_No3_20181130 Correspondence 2018-11-30 2018-11-30
EB-2018-0028  OEB Ltr_Settlement Process_EnergyPlus_20181130 Correspondence 2018-11-30 2018-11-30
EB-2018-0028  Dec_Interim Rates_PO6_EnergyPlus_20181127 Procedural Order 2018-11-27 2018-11-27
EB-2018-0028  Dec_Interim Rates_PO6_EnergyPlus_20181127 Interim rate order 2018-11-27 2018-11-27
EB-2018-0028  TMMC_Response to OEB Staff SUB_Request for Confidentiality_20181126 Correspondence 2018-11-26 2018-11-26
EB-2018-0028  EnergyPlus_Response to Sub Confidentiality_20181123 Submission 2018-11-23 2018-11-23
EB-2018-0028  EnergyPlus_Ltr_Settlement Update_No2_20181123 Correspondence 2018-11-23 2018-11-23
EB-2018-0028  PO5_EnergyPlus_20181116 Procedural Order 2018-11-16 2018-11-16
EB-2018-0028  EnergyPlus_Ltr_Settlement Update_20181115 Correspondence 2018-11-15 2018-11-15
EB-2018-0028  OEBStaff_SUB_Confidentiality_EnergyPlus_TMMC_20181113 Submission 2018-11-13 2018-11-13 2018-11-13
EB-2018-0028  OEBStaff_CovLtr_SUB_Confidentiality_EnergyPlus_TMMC_20181113 Submission 2018-11-13 2018-11-13 2018-11-13
EB-2018-0028  Girvin CCC_Declaration and Undertaking_EnergyPlus_scanned_20181107 Declaration and Undertakings 2018-11-07 2018-11-07
EB-2018-0028  REDACTED_CONF_TMMC_REVISED_EVD-JP20181101 Intervenor Evidence 2018-11-01 2018-11-01
EB-2018-0028  TMMC_Cov Ltr_REVISED_EVD-JP_20181101 Intervenor Evidence 2018-11-01 2018-11-01
EB-2018-0028  PO4_Dec_Issues List_EnergyPlus_cor_20181031 Procedural Order 2018-10-31 2018-10-31
EB-2018-0028  PO4_Dec_Issues List_EnergyPlus_cor_20181031 Decision and Order 2018-10-31 2018-10-31
EB-2018-0028  REDACTED TMMC_IRR_EVD_OEBStaff 1b_20181029 Interrogatory Response from Intervenor 2018-10-29 2018-10-29
EB-2018-0028  TMMC_Cvr Ltr_TMMC IRR_BOARDSTAFF1b_20181029 Interrogatory Response from Intervenor 2018-10-29 2018-10-29
EB-2018-0028  TMMC_clarrification questions to EnergyPlus_20180917 Interrogatories to Applicant 2018-09-17 2018-09-17
EB-2018-0028  OEB Staff_Ltr_EnergyPlus_Proposed Issues List_20181026 Submission 2018-10-26 2018-10-26 2018-10-26
EB-2018-0028  TMMC_IRR_EVD_SEC_20181025 Interrogatory Response from Intervenor 2018-10-25 2018-10-25
EB-2018-0028  REDACTED TMMC_IRR_EVD_VECC_20181025 Interrogatory Response from Intervenor 2018-10-25 2018-10-25
EB-2018-0028  REDACTED TMMC_IRR_EVD_EnergyPlus20181025 Interrogatory Response from Intervenor 2018-10-25 2018-10-25
EB-2018-0028  REDACTED TMMC_IRR_EVD_OEBStaff20181025 Interrogatory Response from Intervenor 2018-10-25 2018-10-25
EB-2018-0028  TMMC_IRR_EVD CovLtr_20181025 Interrogatory Response from Intervenor 2018-10-25 2018-10-25
EB-2018-0028  REDACTED_TMMC_Revised Confidential EVD_JP_20181025 Intervenor Evidence 2018-10-24 2018-10-24
EB-2018-0028  TMMC_CvrLtr_Revised Confidential EVD-JP_20181024 Intervenor Evidence 2018-10-24 2018-10-24
EB-2018-0028  OEB_Ltr_TMMC Extension Request_20181024 Correspondence 2018-10-24 2018-10-24
EB-2018-0028  TMMC_Request_Ltr_Late filing of Response Staff-TMMC_1b_20181023 Correspondence 2018-10-23 2018-10-23
EB-2018-0028  TMMC_ReplySUB_EnergyPlus_OEB Staff_SEC_20181023 Submission 2018-10-23 2018-10-23
EB-2018-0028  EnergyPlus_Ltr_SUB_Confidentiality_20181019 Submission 2018-10-19 2018-10-19
EB-2018-0028  EnergyPlus_Stebbing_LTR of Comment Reply_20181017 Correspondence 2018-10-17 2018-10-17
EB-2018-0028  SEC_SUB__Ltr_EnergyPlus_TMMC Evd_Confidentiality_20181016 Submission 2018-10-16 2018-10-16
EB-2018-0028  OEBStaff_SUB_Confidentiality_20181016 Submission 2018-10-16 2018-10-16
EB-2018-0028  OEBSTaff_CvrLtr_SUB_Confidentiality_20181016 Submission 2018-10-16 2018-10-16
EB-2018-0028  SEC_IR_EVD_TMMC_20181011 Interrogatories to Intervenor 2018-10-11 2018-10-11
EB-2018-0028  REDACTED_EnergyPlus_IR_TMMC_20181011 Interrogatories to Intervenor 2018-10-11 2018-10-11
EB-2018-0028  VECC_IR_EVD_TMMC_20181011 Interrogatories to Intervenor 2018-10-11 2018-10-11
EB-2018-0028  OEB Staff_IR_EVD_TMMC_20181011 Interrogatories to Intervenor 2018-10-11 2018-10-11 2018-10-11
EB-2018-0028  OEB Staff_IR CvrLtr_EVD_TMMC_20181011 Interrogatories to Intervenor 2018-10-11 2018-10-11 2018-10-11
EB-2018-0028  William Harper_Declaration and Undertaking_EnergyPlus_20181009 Declaration and Undertakings 2018-10-09 2018-10-09
EB-2018-0028  PO3_EnergyPlus_20181005 Procedural Order 2018-10-05 2018-10-05
EB-2018-0028  TMMC_Ltr_Request for confidentiality_Sch_JP-5_ErngyPlus_20181001 Correspondence 2018-10-01 2018-10-01
EB-2018-0028  EnergyPlus_Ltr_Confidentiality Undertaking_20181001 Declaration and Undertakings 2018-10-01 2018-10-01
EB-2018-0028  EnergyPlus_Ltr_Confidentiality Undertaking_20181001 Correspondence 2018-10-01 2018-10-01
EB-2018-0028  John Vellone_Declaration and Undertaking_EnergyPlus_20180928 Declaration and Undertakings 2018-09-28 2018-09-28
EB-2018-0028  Bruce Bacon_Declaration and Undertaking_EnergyPlus_20180928 Declaration and Undertakings 2018-09-28 2018-09-28
EB-2018-0028  Redacted_TMMC_EVD_Evidence of M Collis_EnergyPlus_ 20180927 Intervenor Evidence 2018-09-27 2018-09-27
EB-2018-0028  Redacted_TMMC_EVD_Evidence of J Pollock _EnergyPlus_20180927 Intervenor Evidence 2018-09-27 2018-09-27
EB-2018-0028  TMMC CvrLtr_EVD_EnergyPlus_Written_Evidence_Confidentiality Request_ 20180927 Intervenor Evidence 2018-09-27 2018-09-27
EB-2018-0028  REDACTED_Stebbing_LtrComment_EnergyPlus_20180924 Letter of Comment 2018-09-24 2018-09-24
EB-2018-0028  ATTACH 3_SUB_EnergyPlus_Ex2_DSP_Appendix D_CBRE June Update_20180921 Submission 2018-09-21 2018-09-21
EB-2018-0028  ATTACH 2_SUB_EnergyPlus to TMMC Response April 23 2018_20180921 Submission 2018-09-21 2018-09-21
EB-2018-0028  ATTACH 1_SUB_TMMC Letter to EnergyPlus April 19 Letter_20180921 Submission 2018-09-21 2018-09-21
EB-2018-0028  EnergyPlus_SUB_Ltr_Confidentiality REQ_ 20180921 Submission 2018-09-21 2018-09-21
EB-2018-0028  EnergyPlus EB_2018_0028_Response to Clarification Question TMMC_5_20180920 Interrogatory Response from Applicant 2018-09-20 2018-09-20
EB-2018-0028  PO2_EnergyPlus_20180920 Procedural Order 2018-09-20 2018-09-20
EB-2018-0028  EnergyPlus_2019 Letter Confidential Clarification Questions_20180919 Interrogatory Response from Applicant 2018-09-19 2018-09-19
EB-2018-0028  EnergyPlus_ 2019 CvrLtr_ Responses to TMMC Clarification Questions_20180919 Interrogatory Response from Applicant 2018-09-19 2018-09-19
EB-2018-0028  Redacted_EnergyPlus Response to TMMC_Clarification Questions_20180919 Interrogatory Response from Applicant 2018-09-19 2018-09-19
EB-2018-0028  TMMC_Ltr_Req_for Extension_Revised Clarification Questions_EnergyPlus_20180919 Interrogatories to Applicant 2018-09-19 2018-09-19
EB-2018-0028  9_Staff_97_Response b_GA_Analysis_Workform_Questions_2018071_CND_20180914 Interrogatory Response from Applicant 2018-09-18 2018-09-18
EB-2018-0028  9_Staff_97_Response b_GA_Analysis_Workform_Questions_20180713_BCP_20180914 Interrogatory Response from Applicant 2018-09-18 2018-09-18
EB-2018-0028  EnergyPlus_LTR_Clarification Questiond Reply_EnergyPlus_20180918 Interrogatory Response from Applicant 2018-09-18 2018-09-18
EB-2018-0028  SEC_EnergyPlus_Declaration Undertaking_MR_20180918 Declaration and Undertakings 2018-09-18 2018-09-18
EB-2018-0028  TMMC_LTR_Intention_to_file_Written_Evid_EnergyPlus_20180917 Correspondence 2018-09-17 2018-09-17
EB-2018-0028  EnergyPlus_CvrLtr_2019 Confidential Filing IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  Redacted_EnergyPlus_IRR_TMMC_20180914Final_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_CvrLtr_2019 IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Load Forecast Model__3 VECC 19 c_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Load Forecast Model__3 VECC 19 a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Benchmarking-Spreadsheet-Forecast-Model_IR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2006-2010 Final OPA CDM Results Brant County Power Inc 3-VECC-21 a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus ACM Model-IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2006-2010 Final OPA CDM Results Brant County Power Inc 3-VECC-21 a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Chapter2 Appendices Updated for June 30_18 YTD_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Load Forecast Model__3 VECC 19 a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Load Forecast Model__3 VECC 19 c_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Load profile model 2006 Hydro One data for 2019_IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus Proposed Embedded Dist Charge Calculation_IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus_Cost_Allocation_Model 7 Staff 76 b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus_Rev_Reqt_Work_Form_1 Staff 2_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_RTSR_Workform_20180712-CND-8-Staff-87a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_RTSR_Workform_20180712-CND_2017 RRR-8-Staff-87b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_RTSR_Workform_20180712-BCP-8-Staff-87a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_RTSR_Workform_20180712-BCP_2017 RRR-8-Staff-87b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_EnergyPlus_RTSR_Harmonized-8-Staff-87a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_EnergyPlus_Chapter 5 Appendix_IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_EnergyPlus_Chapter 2 Appendices_IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_DVA_Continuity_Schedule_CoS_20180712 - Consolidate-9-Staff-96b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_DVA_Continuity_Schedule_CoS_20180712 - CND-9-Staff-96b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019_DVA_Continuity_Schedule_CoS_20180712 - BCP-9-Staff-96b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2019 EnergyPlus_Test_year_Income_Tax_PILs_Workform_V1 _4 Staff 74 a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  Account-1595-Workform-20180718-EnergyPlus-Consolidated-9-Staff-100a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  Account-1595-Workform-20180718-EnergyPlus-CND-9-Staff-100b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  Account-1595-Workform-20180718-EnergyPlus-BCP-9-Staff-100b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  20180516 APPROVED CDM Plan Amendment 4.0 March 2018 REV-V.2.2_IRR_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_2019_Tariff_Schedule_Model-BCP-1-Staff-3_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_2017 Final Verified Annual LDC CDM Program Results_20180629_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_2016 Final Verified Annual LDC CDM Program Results_20170630_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2011-2014 Final Results Report_HC CNDHI 3-VECC-21 b_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2006-2010 Final OPA CDM Results CNDHI 3-VECC-21 a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  2006-2010 Final OPA CDM Results Brant County Power Inc 3-VECC-21 a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  Appendix 2-Staff-15h EnergyPlus Class D Breakdown by Area - 2018 09 06_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  GA-Analysis-Workform - Consolidated-9-Staff-97cii_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  GA-Analysis-Workform - CND-9-Staff-97a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  GA-Analysis-Workform - BCP-9-Staff-97a_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_CND_OEB LRAMVA workform v3.52_1 Staff 64_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_BCP_OEB LRAMVA work form v3.52_1 Staff 64_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_Response_Letters of Comment_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_IRR_OEB Staff_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_IRR_SEC_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_IRR_HYDRO ONE_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_IRR_CCC_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_IRR_BPI_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  Dec_Confidentiality Request_EnergyPlus_20180914 Decision 2018-09-14 2018-09-14
EB-2018-0028  EnergyPlus_IRR_VECC_20180914 Interrogatory Response from Applicant 2018-09-14 2018-09-14
EB-2018-0028  OEBStaff_IR_EnergyPlus_20180815 Interrogatories to Applicant 2018-08-15 2018-08-15
EB-2018-0028  cvr ltr_OEBStaff_IR_EnergyPlus_20180815 Interrogatories to Applicant 2018-08-15 2018-08-15
EB-2018-0028  TMMC_IR_EnergyPlus_20180820 Interrogatories to Applicant 2018-08-21 2018-08-21
EB-2018-0028  CCC_IR_EnergyPlus2019_20180821 Interrogatories to Applicant 2018-08-21 2018-08-21
EB-2018-0028  Brantford_Energyplus_IR_20180820 Interrogatories to Applicant 2018-08-20 2018-08-20
EB-2018-0028  SEC_IR_EnergyPlus_20180820 Interrogatories to Applicant 2018-08-20 2018-08-20
EB-2018-0028  VECC_IR_EnergyPlus_20180820 Interrogatories to Applicant 2018-08-20 at 1:27 PM
EB-2018-0028  HONI_IR_EnergyPlus_20180817 Interrogatories to Applicant 2018-08-17 2018-08-17
EB-2018-0028  Community_Meeting_Summary_EnergyPlus_20180813 Correspondence 2018-08-13 2018-08-13
EB-2018-0028  TMMC_Sub_Confidentialty_filings_EnergyPlus_20180809 Submission 2018-08-09 at 2:32 PM
EB-2018-0028  EnergyPlus_ReplySub_Confidentiality filings_20180803 Submission 2018-08-03 2018-08-03
EB-2018-0028  CCC_Sub_EnergyPlus_Confidential filings_20180801 Submission 2018-08-01 2018-08-01
EB-2018-0028  SEC_Sub_EnergyPlus_Confidential filings_20180731 Submission 2018-07-31 2018-07-31
EB-2018-0028  OEB Staff_Sub_EnergyPlus_Confidential filings_20180731 Submission 2018-07-31 2018-07-31
EB-2018-0028  VECC_Sub_obj_EnergyPlus_Confidential filings_20180731 Submission 2018-07-31 2018-07-31
EB-2018-0028  po1_EnergyPlus_20180726 Procedural Order 2018-07-26 2018-07-26
EB-2018-0028  EnergyPlus_Exh1_Resp_Additional Cust Questions_April10 2018_Redacted_20180716 Application and Evidence 2018-07-16 2018-07-16
EB-2018-0028  EnergyPlus_Exh1_Resp_Additional Cust Questions_April102018_covltr_20180716 Application and Evidence 2018-07-16 2018-07-16
EB-2018-0028  LDrew_Ltr_Comment_EnergyPlus_redacted_20180711 Letter of Comment 2018-07-11 2018-07-11
EB-2018-0028  BSmith_Ltr_Comment_EnergyPlus_redacted_20180711 Letter of Comment 2018-07-11 2018-07-11
EB-2018-0028  MMitchell_Ltr_Comment_EnergyPlus_redacted_20180704 Letter of Comment 2018-07-04 2018-07-04
EB-2018-0028  SHill_Ltr_Comment_EnergyPlus_redacted_20180704 Letter of Comment 2018-07-04 2018-07-04
EB-2018-0028  EnergyPlus_Resp_APPrO_Cost Eligibility_20180704 Correspondence 2018-07-04 2018-07-04
EB-2018-0028  APPrO_ReplyLtr_Cost Eligibility_EnergyPlus_20180628 Correspondence 2018-06-28 2018-06-28
EB-2018-0028  RPhillips_Ltr_Comment_EnergyPlus_Redacted_20180601 Letter of Comment 2018-06-01 2018-06-01
EB-2018-0028  TSorrentino_Ltr_Comment_EnergyPlus_redacted_20180601 Letter of Comment 2018-06-01 2018-06-01
EB-2018-0028  EnergyPlus_Ltr_APPrO_Cost Award Eligibility_20180627 Cost Claim Objection 2018-06-26 2018-06-26
EB-2018-0028  APPrO_IntrvREQ_EnergyPlus_20180619 Intervenor Request Letter 2018-06-19 2018-06-19
EB-2018-0028  EnergyPlus_Brant County_OEB LRAMVA_Work Form_v3_1_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  CCC_IntrvREQ_EnergyPlus_2019 Rates_20180620 Intervenor Request Letter 2018-06-20 2018-06-20
EB-2018-0028  CME_IntervReq_EnergyPlus_20180618 Intervenor Request Letter 2018-06-18 2018-06-18
EB-2018-0028  Brantford Power_IntervReq_EnergyPlus_20180618 Intervenor Request Letter 2018-06-18 2018-06-18
EB-2018-0028  TMMC_IntervReq_EnergyPlus20180618 Intervenor Request Letter 2018-06-18 2018-06-18
EB-2018-0028  VECC_IntervReq_EnergyPlus_20180613 Intervenor Request Letter 2018-06-13 2018-06-13
EB-2018-0028  EnergyPlus_Affidavit 20180606 Affidavits of Service 2018-06-06 2018-06-06
EB-2018-0028  SEC_IntervReq_EnergyPlus_20180605 Intervenor Request Letter 2018-06-05 2018-06-05
EB-2018-0028  HONI_IntervReq_EnergyPlus_20180601 Intervenor Request Letter 2018-06-01 2018-06-01
EB-2018-0028  Notice_EnergyPlus_2019 Cos_20180528 Notice of Application 2018-05-28 2018-05-28
EB-2018-0028  LoD_EnergyPlus_2019 Cos_20180528 Letter of Direction 2018-05-28 2018-05-28
EB-2018-0028  EnergyPlus_2016 Annual_LDC_CDM Program Results_Report_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh2_APP 2-1_DSP_Pt2_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  AckLtr_EnergyPlus_20180502 Acknowledgement Letter 2018-05-02 2018-05-02
EB-2018-0028  EnergyPlus_Ltr_filing_2019 CoS_APPL_20180221 Correspondence 2018-02-27 2018-02-27
EB-2018-0028  EnergyPlus_Final 2015 Annual Verified Results Report-Annual Persistence_Cambridge_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Final 2015 Annual Verified Results Report - Annual Persistence_Brant County_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_CND OEB LRAMVA workform v3_1_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019_Tariff_Schedule_Model-CND_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Tariff_Schedule_Model-BCP_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 RTSR_Workform CND_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019_RTSR_Workform BCP_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 RTSR_Harmonized_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 DVA_Continuity_Schedule_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Chapter2_Appendices_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Test_year_Income_Tax_PILs_Workform_V1_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019_Rev_Reqt_Work_Form_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019_Filing_Checklist_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Cost_Allocation_Model_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019_Proposed Embedded Dist Charge Calculation_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Load profile model 2006 Hydro One data for 2019_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019_Load Forecast Model_V3_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Bill Impact_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Benchmarking-Spreadsheet-Forecast-Model_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 ACM_Model_OEB_2019_4_20_II_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 Account 1555 and 1557 Rate Rider_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnegyPlus_2011-2014 Persistence Report_Brant County Power_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2011-2014 Final Results Report_HCCambridge and North Dumfries Hydro Inc_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_01_2018 Participation and Cost Report_DEC_2018 01_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 9_DVA_CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 8_Rate Design_CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 7_Cost Allocation_CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 6_Revenue Requirement_CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 5_Cost of Capital _CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 4_OMA_CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 3_Revenues_CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_Exh 2_Excl_ APP 2-1 DSP_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPLus_Exh 1_Admin_CoS APPL_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 CoS_Master_Table of Contents_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 CoS_covltr_redacted exhibits_20180430 Application and Evidence 2018-04-30 2018-04-30
EB-2018-0028  EnergyPlus_2019 CoS_covltr_20180430 Application and Evidence 2018-04-30 2018-04-30