Advanced Regulatory Document Search (RDS)

Back to the search page

 

Search Results for: Records - Applicant:"Thunder Bay Hydro Electricity Distribution Inc. - Electricity Distributor" - Displaying 217 Records on this Page

sort icon Sorting your search results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.

info iconCase information
Click the case number to view details for that proceeding.

case numberCase Number file nameFile Name document typeDocument Type issued dateIssued By OEB received dateReceived By OEB issued / received dateDate Issued / Received
EB-2018-0124 document icon Synergy North Corporation_Certificate and Articles of Amalgamation_20190102 Correspondence 2019-01-02 2019-01-02
EB-2018-0069 document icon TBH_2019-IRM-Rate-Generator-Model-20190328 Rate Model 2019-03-28 2019-03-28
EB-2018-0069 document icon Dec_Rate Order_Synergy North PRICE CAP_20190328 Rate Order 2019-03-28 2019-03-28
EB-2018-0069 document icon Dec_Rate Order_Synergy North PRICE CAP_20190328 Decision 2019-03-28 2019-03-28
EB-2018-0069 document icon Draft_DRO_Synergy_North_20190221 Correspondence 2019-02-21 2019-02-21
EB-2018-0069 document icon TBH_EB20180069_2019-IRM-Rate-Generator-Model-.XLSB Correspondence 2019-02-21 2019-02-21
EB-2018-0069 document icon draft_DRO_cvrLtr_Synergy North_20190221 Correspondence 2019-02-21 2019-02-21
EB-2018-0069 document icon SynergyNorth_Thunder Bay_Responses_20190204 Correspondence 2019-02-05 2019-02-05
EB-2018-0069 document icon Follow up OEBSTAFF_Questions_Thunder Bay_20190204 Correspondence 2019-02-05 2019-02-05
EB-2018-0069 document icon SynergyNorth_Thunder Bay_Responses_20190131 Correspondence 2019-01-31 2019-01-31
EB-2018-0069 document icon Synergy_North_ltr_2019 IRM_contact update_20190125 Correspondence 2019-01-25 2019-01-25
EB-2018-0069 document icon OEBSTAFF_Questions_Thunder Bay_20180118 Correspondence 2019-01-18 2019-01-18
EB-2018-0069 document icon TBH_IRM-Rate-Generator-Model-20181016.XLSB Correspondence 2019-01-18 2019-01-18
EB-2018-0124 document icon OEBltr_Thunder Bay_Kenora_Amalgamation_20190111 Correspondence 2019-01-11 2019-01-11
EB-2018-0124 document icon licence_ed_Synergy North Corp_20190111 Licence 2019-01-11 2019-01-11
EB-2018-0124 document icon dec_order_ThunderBay_Kenora MAADs_20181115 Decision and Order 2018-11-15 2018-11-15
EB-2018-0069 document icon TBHEDI_2019_GA_Analysis_EB-2018-0069_20181025 Correspondence 2018-10-26 2018-10-26
EB-2018-0069 document icon Case Information Ltr_Thunder Bay_2019_IRM_20181025 Correspondence 2018-10-25 2018-10-25
EB-2018-0069 document icon Ack_ltr_ThunderBay_20181017 Acknowledgement Letter 2018-10-17 2018-10-17
EB-2018-0069 document icon TBHEDI_2019_IRM_Rate_Application_20181016 Application and Evidence 2018-10-16 2018-10-16
EB-2018-0069 document icon TBHEDI_2019 IRM Rate Application Letter_20181016 Application and Evidence 2018-10-16 2018-10-16
EB-2018-0069 document icon TBH_EB20180069GA_Analysis_Workform_20181016 Application and Evidence 2018-10-16 2018-10-16
EB-2018-0069 document icon TBH_EB20180069_Account-1595-Workform-20181016 Application and Evidence 2018-10-16 2018-10-16
EB-2018-0069 document icon TBH_EB20180069_2019-IRM-Rate-Generator-Model-20181016 Application and Evidence 2018-10-16 2018-10-16
EB-2018-0069 document icon 2019-IRM-Rate-Generator-Model-20181016 Application and Evidence 2018-10-16 2018-10-16
EB-2018-0124 document icon TBHEDI_ReplySUB_MAADs_20181011 Submission 2018-10-11 2018-10-11
EB-2018-0124 document icon OEB Staff_SUB_TBAY Kenora_MAADs_20180927 Submission 2018-09-27 2018-09-27
EB-2018-0124 document icon PO2_Thunder Bay_Kenora_MAADs_20180913 Procedural Order 2018-09-13 2018-09-13
EB-2018-0124 document icon TBHEDI_Addl IRR_MAADs_20180911 Interrogatory Response from Applicant 2018-09-11 2018-09-11
EB-2018-0124 document icon TBHEDI_MAADs_IRR_20180816 Interrogatory Response from Applicant 2018-08-16 2018-08-16
EB-2018-0124 document icon OEBStaff_IR_Thunder Bay_Kenora Hydro MAADs_20180803 Interrogatories to Applicant 2018-08-03 2018-08-03
EB-2018-0124 document icon PO 1_Thunder Bay_Kenora MAADs_20180723 Procedural Order 2018-07-23 2018-07-23
EB-2018-0124 document icon Thunder Bay_Kenora Hydro_Affidavits_MAADs_20180628 Affidavits of Service 2018-06-28 2018-06-28
EB-2018-0124 document icon Thunder Bay_cvrltr_Affidavit_MAADs_20180628 Affidavits of Service 2018-06-28 2018-06-28
EB-2018-0124 document icon Notice_Thunder Bay Kenora_MAADs_French_20180622 Notice 2018-06-22 2018-06-22
EB-2018-0124 document icon Notice_Thunder Bay Kenora_MAADs_Eng_20180622 Notice 2018-06-22 2018-06-22
EB-2018-0124 document icon lod_Thunder Bay Kenora_MAADs_20180622 Letter of Direction 2018-06-22 2018-06-22
EB-2018-0124 document icon TBHEDI_Ltr to OEB_20180509 Correspondence 2018-05-09 2018-05-09
EB-2018-0124 document icon OEBltr_incomplete_TBHEDI_Kenora MAADs_20180504 Correspondence 2018-05-04 2018-05-04
EB-2017-0250 document icon app_info_ltr_LTLT Thunder Bay_HONI_20180426 Correspondence 2018-04-26 2018-04-26
EB-2018-0124 document icon ack_ltr_Thunder Bay_MAAD_20180423 Acknowledgement Letter 2018-04-23 2018-04-23
EB-2018-0124 document icon Thunder Bay_MAADs APPL Part 2_Kenora_20180412 Application and Evidence 2018-04-12 2018-04-12
EB-2018-0124 document icon Thunder Bay_MAADs APPL_Kenora_20180412 Application and Evidence 2018-04-12 2018-04-12
EB-2017-0075 document icon TBH_rev_2018 IRM Rate Generator Model_20180328 Rate Model 2018-03-28 2018-03-28
EB-2017-0075 document icon OEBLtr_Thunder Bay_Revised Rate Order_20180328 Rate Order 2018-03-28 2018-03-28
EB-2017-0075 document icon dec_rate order_Thunder Bay_2018 IRM_20180322 Rate Order 2018-03-22 2018-03-22
EB-2017-0075 document icon dec_rate order_Thunder Bay_2018 IRM_20180322 Decision and Order 2018-03-22 2018-03-22
EB-2017-0075 document icon dec_rate order_Thunder Bay_2018 IRM Rate Generator Model_20180322 Rate Model 2018-03-22 2018-03-22
EB-2017-0075 document icon TBH_2018 IRM Rate Generator Model_20180308 Correspondence 2018-03-08 2018-03-08
EB-2017-0075 document icon draft_dec_order_Thunder Bay_2018 IRM_20180308 Correspondence 2018-03-08 2018-03-08
EB-2017-0075 document icon draft_dec_order_cvrltr_Thunder Bay_2018 IRM_20180308 Correspondence 2018-03-08 2018-03-08
EB-2017-0075 document icon TBH_2018 IRM Rate Generator Model_20180603 Application and Evidence 2018-03-06 2018-03-06
EB-2017-0075 document icon TBHEDI_IRM Rate Generator Model_20180201 Interrogatory Response from Applicant 2018-02-01 2018-02-01
EB-2017-0075 document icon TBHEDI_GA Analysis Workform V2_20180201 Interrogatory Response from Applicant 2018-02-01 2018-02-01
EB-2017-0075 document icon TBHEDI_IRR_2018 IRM_20180202 Interrogatory Response from Applicant 2018-02-01 2018-02-01
EB-2017-0075 document icon OEB staff questions_Thunder Bay_20180117 Interrogatories to Applicant 2018-01-17 2018-01-17
EB-2017-0075 document icon Case Information Letter_Thunder Bay_2018 IRM_20171222 Correspondence 2017-12-22 2017-12-22
EB-2016-0105 document icon dec_order_cost_awards_Thunder Bay_20171128 Decision and Order on Cost Awards 2017-11-28 2017-11-28
EB-2017-0075 document icon AckLtr_TBHEDI 2018 IRM_20171107 Acknowledgement Letter 2017-11-07 2017-11-07
EB-2017-0075 document icon TBHEDI_Proposed Tariff Rates and Charges_20171106 Application and Evidence 2017-11-06 2017-11-06
EB-2017-0075 document icon TBHEDI_IRM Rate Generator Model_20171106 Application and Evidence 2017-11-06 2017-11-06
EB-2017-0075 document icon TBHEDI_GA Analysis Workform_20171106 Application and Evidence 2017-11-06 2017-11-06
EB-2017-0075 document icon TBHEDI_2018 IRM APPL_20171106 Application and Evidence 2017-11-06 2017-11-06
EB-2017-0075 document icon TBHEDI_APPL 2018 IRM_cvrltr_20171106 Application and Evidence 2017-11-06 2017-11-06
EB-2016-0105 document icon AMPCO_Cost Claim_TBHEDI_20171016_signed.pdf Cost Claim 2017-10-24 2017-10-24
EB-2016-0105 document icon AMPCO_Cost Claim_Receipts_TBHEDI_20171020 Cost Claim 2017-10-20 2017-10-20
EB-2016-0105 document icon Final_Rate_Order_TBHEDI_20171019 Rate Order 2017-10-19 2017-10-19
EB-2016-0105 document icon AMPCO_Cost Claim_TBHEDI_20171017 Cost Claim 2017-10-17 2017-10-17
EB-2016-0105 document icon SEC_Cost Claim_TBHEDI_20171012 Cost Claim 2017-10-12 2017-10-12
EB-2016-0105 document icon TBHEDI_Proposed Tariff Rates and ChargesV2_20171010 Submission 2017-10-10 2017-10-10
EB-2016-0105 document icon TBHEDI_Reply Submission_20171010 Submission 2017-10-10 2017-10-10
EB-2016-0105 document icon OEB Staff_SUB_TBEDI DRO Final_20171003 Submission 2017-10-03 2017-10-03
EB-2016-0105 document icon VECC_Cost Claim_TBHEDI CoS_20170929 Cost Claim 2017-09-29 2017-09-29
EB-2016-0105 document icon TBHEDI_Proposed Tariff Rates and Charges_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_Draft Rate Order_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_BA_2017 Foregone Revenue Calc_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_BA_2017 DIVA Calc_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_BA_2017 Bill Impact Model_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_2017 RTSR_WF_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_BA_2017 Tax PiLS_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_BA_2017 Cost Allocation_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_BA_2017 RRWF_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon TBHEDI_DRO_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105 document icon dec_order_Thunder Bay Hydro CoS_20170921 Decision and Order 2017-09-21 2017-09-21
EB-2016-0105 document icon TBHEDI_ReplySUB_20170728 Submission 2017-07-28 2017-07-28
EB-2016-0105 document icon VECC_Sub_TBHEDI_20170715 Final Argument 2017-07-14 2017-07-14
EB-2016-0105 document icon AMPCO_Sub_TBHEDI_20170715 Final Argument 2017-07-15 2017-07-15
EB-2016-0105 document icon OEB Staff_SUB_TBHEDI_20170714 Submission 2017-07-14 2017-07-14
EB-2016-0105 document icon SEC_Final ARG_TBHED_20170714 Final Argument 2017-07-14 2017-07-14
EB-2016-0105 document icon TBHEDI_Undertaking Response_J3.1_3.4_20170705 Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105 document icon TBHEDI_2017_RRWF_OHV2_Undertaking Response_20170706 Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105 document icon TBHED_OH_Undertakings2_20170706_ Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105 document icon TBHEDI_Undertaking Responses_20170705 Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105 document icon TBHEDI_ARGChief_20170705 Applicant Argument in Chief 2017-07-06 2017-07-06
EB-2016-0105 document icon PO6_Thunder Bay Hydro_20170704 Procedural Order 2017-07-04 2017-07-04
EB-2016-0105 document icon Transcripts_Thunder Bay_Vol 3_20170630 Transcripts 2017-06-30 2017-06-30
EB-2016-0105 document icon TBHEDI_Undertakings J2.1 to J2.3_20170630 Undertaking Responses 2017-06-30 2017-06-30
EB-2016-0105 document icon Transcript_Thunder Bay_Vol 2_20170629 Transcripts 2017-06-29 2017-06-29
EB-2016-0105 document icon Exhibit_K2.2_AMPCO_Compendium_Capital_TBHEDI_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105 document icon Exhibit_K2.4_SEC_Compendium_Thunder Bay_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105 document icon VECC_Compendium_OM&A_TBHDI_20170629 Correspondence 2017-06-28 2017-06-28
EB-2016-0105 document icon Exhibit_K3.4_VECC_Compendium_Cost of Capital_TBHDI_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105 document icon Exhibit_K2.3_VECC_Compendium_Capital Expenditures_TBHDI_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105 document icon Exhibit K2.1_OEB Staff_Compendium_Thunder Bay_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105 document icon TBHEDI_EVD Update_4_AMPCO-23_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105 document icon TBHEDI_EVD Update_App 2-D_2-KA_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105 document icon TBHEDI_EVD Update_2 VECC-13_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105 document icon TBHEDI_EVD Update_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105 document icon TBHEDI_EVD Update_Cvrltr_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105 document icon TBHEDI_IRR_Tsimberg Report_20170621 Interrogatory Response from Applicant 2017-06-21 2017-06-21
EB-2016-0105 document icon VECC_ltr_Addl Counsel_Thunder Bay_20170605 Correspondence 2017-06-05 2017-06-05
EB-2016-0105 document icon AMPCO_IR_TBHEDI_20170602 Interrogatories to Applicant 2017-06-02 2017-06-02
EB-2016-0105 document icon VECC_Supp IR_Thunder Bay Hydro_20170601 Interrogatories to Applicant 2017-06-01 2017-06-01
EB-2016-0105 document icon SEC_Suppl IR_Thunder Bay CoS_20170530 Interrogatories to Applicant 2017-05-30 2017-05-30
EB-2016-0105 document icon OEB Staff_IR_Thunder Bay Hydro_Expert Report_20170530 Interrogatories to Applicant 2017-05-30 2017-05-30
EB-2016-0105 document icon Tsimberg Report_TBHEDI_20170512 Correspondence 2017-05-12 2017-05-12
EB-2016-0105 document icon Transcript_Thunder Bay_Vol 1_20170420 Transcripts 2017-04-20 2017-04-20
EB-2016-0105 document icon dec_Settlement P_PO 5_Thunder Bay Hydro_20170504 Procedural Order 2017-05-04 2017-05-04
EB-2016-0105 document icon dec_Settlement P_PO 5_Thunder Bay Hydro_20170504 Decision 2017-05-04 2017-05-04
EB-2016-0105 document icon VECC_Ltr_Change in Counsel_Thunder Bay_20170428 Correspondence 2017-04-28 2017-04-28
EB-2016-0105 document icon Thunder Bay Hydro_SettlementP_20170427 Settlement Proposal 2017-04-27 2017-04-27
EB-2016-0105 document icon Thunder Bay Hydro_cvrltr_SettlementP_20170427 Settlement Proposal 2017-04-27 2017-04-27
EB-2016-0105 document icon TBHEDI_SettlementP_Blackline_20170427 Settlement Proposal 2017-04-27 2017-04-27
EB-2016-0105 document icon PO4_Thunder Bay_20170421 Procedural Order 2017-04-21 2017-04-21
EB-2016-0105 document icon TBHEDI_Expert Witness_Tsimberg_publications and appearances_20170419 Application and Evidence 2017-04-19 2017-04-19
EB-2016-0105 document icon VECC_Ltr_Additional Counsel_TBHEDI_20170420 Correspondence 2017-04-19 2017-04-19
EB-2016-0105 document icon Yury Tsimberg_Long Resume_Witness Panel_TBHEDI_20170419 Application and Evidence 2017-04-19 2017-04-19
EB-2016-0105 document icon PO3_ThunderBay Hydro_20170418 Procedural Order 2017-04-18 2017-04-18
EB-2016-0105 document icon AMPCO_LTR_TBHEDI_New Evidence_20170417 Correspondence 2017-04-17 2017-04-17
EB-2016-0105 document icon TBHEDI_Ltr_Expert Witness_20170417 Correspondence 2017-04-17 2017-04-17
EB-2016-0105 document icon VECC_ExpertWitness_TBH_20170417 Correspondence 2017-04-17 2017-04-17
EB-2016-0105 document icon SEC_Ltr_Thunder Bay_Expert Witness_20170413 Correspondence 2017-04-13 2017-04-13
EB-2016-0105 document icon OEB Staff_SUB_SettlementP_TBHEDI_20170407 Submission 2017-04-07 2017-04-07
EB-2016-0105 document icon TBHEDI_KinectricsLtr_20170324 Correspondence 2017-04-06 2017-04-06
EB-2016-0105 document icon TBHEDI_Ltr_OralHearing_20170406 Correspondence 2017-04-06 2017-04-06
EB-2016-0105 document icon TBHEDI_SettlementP_cvrltr_20170331 Settlement Proposal 2017-03-31 2017-03-31
EB-2016-0105 document icon TBHEDI_SettlementP_20170331 Settlement Proposal 2017-03-31 2017-03-31
EB-2016-0105 document icon B Thunder Bay Hydro 2017 Load Forecast Settlement_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon A Thunder Bay Hydro 2017 Load Forecast Settlement No Manual CDM Adj_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon Thunder Bay 2017_Cost_Allocation_Model_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon TBHEDI_2017_RRWF_SC_tax_unlocked_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon TBHEDI_2017_LRAMVA_Work_Form_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon TBHEDI_2017_DVA_Continuity_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon TBHEDI_Bill_Impact_Model_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon TBHEDI_Tax_PILs_Workform_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon TBHEDI_Chapter2_Appendices_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105 document icon interim rate order_PO 2_Thunder Bay_20170329 Procedural Order 2017-03-29 2017-03-29
EB-2016-0105 document icon interim rate order_PO 2_Thunder Bay_20170329 Interim rate order 2017-03-29 2017-03-29
EB-2016-0105 document icon Thunder Bay_Request to Delay_Settlement Proposal_20170329 Correspondence 2017-03-28 2017-03-28
EB-2016-0105 document icon OEBltr_Thunder Bay_SettlementProp_20170324 Correspondence 2017-03-24 2017-03-24
EB-2016-0105 document icon TBHEDI_Response_Letter of Comment_20170320_Redacted Acknowledgement Letter 2017-03-20 2017-03-20
EB-2016-0105 document icon 2011-2014 CDM Persistence Report_IESO_TBH_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon 2015 Verified IESO Results_TBH-20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon December 2016_PPC Report_2016-12_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon Final 2015 Annual Verified Results Report - Annual Persistence_TBH_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon CDM 2015-2020 Plan by Rate Class_ April 2016 _ v4_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon TBHEDI_2017_LRAMVA_Work_Form_IR2_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon TBHEDI_2017_DVA_Continuity_IR2_20170319.xlsm Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon TBHEDI_IR2_Followup Questions_ IR2_20170319.pdf Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105 document icon TBHEDI_RRWF_EB-2016-0105-Tax_Unlocked_IR2_20170320.xlsx Interrogatory Response from Applicant 2017-03-20 2017-03-20
EB-2016-0105 document icon TBHEDI_LTR_Settlement_Update_20170308 Correspondence 2017-03-08 2017-03-08
EB-2016-0105 document icon OEB-TBHltrPresDay Cancel_20170228 Correspondence 2017-02-28 2017-02-28
EB-2016-0105 document icon TBHEDI_LTR_Settlement Update_20170224 Submission 2017-02-24 2017-02-24
EB-2016-0105 document icon Confirmation of Supporting Document Submission for Thunder Bay Hydro Electricity Distribution Inc Submission 2017-02-24 2017-02-24
EB-2016-0105 document icon TBHEDI_LTR_Settlement Update_20170224 Correspondence 2017-02-24 2017-02-24
EB-2016-0105 document icon VECC_Ltr_SEC request_Thunder Bay_20170222 Correspondence 2017-02-22 2017-02-22
EB-2016-0105 document icon SEC_Request to hold hearing in Thunder Bay_20170221 Correspondence 2017-02-21 2017-02-21
EB-2016-0105 document icon SEC_Followup Questions_20170210 Interrogatories to Applicant 2017-02-10 2017-02-10
EB-2016-0105 document icon decision_IssuesList_TBH_20170210 Decision 2017-02-10 2017-02-10
EB-2016-0105 document icon VECC_PreADRQuestions_TBH105_20170207 Correspondence 2017-02-07 2017-02-07
EB-2016-0105 document icon TBHEDI_LTR_City of Thunder Bay Ltr_20170207.pdf Correspondence 2017-02-07 2017-02-07
EB-2016-0105 document icon TBEDI_ProposedIssuesList_final Submission 2017-02-03 2017-02-03 2017-02-03
EB-2016-0105 document icon OEB_Corresp_TBHltrIssuesListDelay__20170201 Correspondence 2017-02-01 2017-02-01
EB-2016-0105 document icon TBHltrIssuesListDelay__final_20170131 Correspondence 2017-01-31 2017-01-31 2017-01-31
EB-2016-0105 document icon TBHEDI_EB_2016_0105_2017_RRWF_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-30 2017-01-30
EB-2016-0105 document icon TBHEDI_EB_2016_0105_2017_Test_year_Income_Tax_PILs_Workform_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105 document icon Thunder Bay 2017_Cost_Allocation_Model_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105 document icon TBHEDI_EB_2016_0105_2017_DVA_Continuity_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105 document icon TBHEDI_EB_2016_0105_2017_Tariff_Schedule_and_Bill_Impact_Model_IR1_20170131..xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105 document icon TBHEDI_EB_2016_0105_2017_LRAMVA_Work_Form_IR1_20170131.xlsx Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105 document icon Thunder Bay_IRR_Signed letter_20170131.pdf Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105 document icon TBHEDI_IRR_20170131 Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105 document icon Henry Wojak_Letter of Comment _20170104_Redacted Letter of Comment 2017-01-04 2017-01-04
EB-2016-0105 document icon Carol Tessier_Letter of Comment _20161207_Redacted Letter of Comment 2016-12-07 2016-12-07
EB-2016-0105 document icon H_Wojak_Ack Ltr_letter of comment_20170113 Acknowledgement Letter 2017-01-13 2017-01-13
EB-2016-0105 document icon C_Tessier_Ack Ltr_letter of comment_20170113 Acknowledgement Letter 2017-01-13 2017-01-13
EB-2016-0105 document icon Community Engagement Report - Final_20170109 Correspondence 2017-01-09 2017-01-09 2017-01-09
EB-2016-0105 document icon H Wojak_Ltr of Comment_ThunderBay_20170104_Redacted Letter of Comment 2017-01-04 2017-01-04
EB-2016-0105 document icon VECC_IR_ThunderBayHydro_20161228 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105 document icon AMPCO_LTR_IR_TBHEDI_20161228 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105 document icon AMPCO_IR_TBHEDI_20161228 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105 document icon SEC_IR_Rate and Bill Comparison 2016 Final Rates_Thunder Bay_20161227 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105 document icon SEC_IR_Thunder Bay_20161227 Interrogatories to Applicant 2016-12-27 2016-12-27
EB-2016-0105 document icon OEB Staff_IR_ThunderBayHydro_20161220 Interrogatories to Applicant 2016-12-20 2016-12-20 2016-12-20
EB-2016-0105 document icon TBHEDI_EB_2016_0105_2017_Generic_LRAMVA_Work_Form_rev1_20161213 Application and Evidence 2016-12-13 2016-12-13
EB-2016-0105 document icon po1_TBEDI_rev1_20161205 Procedural Order 2016-12-07 2016-12-07
EB-2016-0105 document icon D Chiupka_Letter of Comment _Redacted_20161124 Letter of Comment 2016-11-24 2016-11-24
EB-2016-0105 document icon D Koroscil_Letter of Comment _Redacted-20161124 Letter of Comment 2016-11-24 2016-11-24
EB-2016-0105 document icon D Koroscil_Ack Ltr_letter of comment_20161202 Letter of Comment 2016-12-02 2016-12-02
EB-2016-0105 document icon AMPCO_INT_REQ_20161125 Intervenor Request Letter 2016-11-25 2016-11-25
EB-2016-0105 document icon TBHEDI_Affidavit_EB-2016-0105_20161117.pdf Affidavits of Service 2016-11-17 2016-11-17
EB-2016-0105 document icon noh_Thunder Bay_20161109 Notice of Hearing 2016-11-09 2016-11-09
EB-2016-0105 document icon lod_noh_Thunder Bay_20161109 Letter of Direction 2016-11-09 2016-11-09
EB-2016-0105 document icon SEC_INT_REQ_20161103.pdf Intervenor Request Letter 2016-11-03 2016-11-03
EB-2016-0105 document icon VECC_INT_REQ_20161014 Intervenor Request Letter 2016-10-14 2016-10-14
EB-2016-0105 document icon TBHEDI_Exhibit _1_EB-2016-0105_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105 document icon AMENDED TBHEDI_Cover Letter_EB-2016-0105_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105 document icon AMENDED TBHEDI_Cover Letter_EB-2016-0105_20160826_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105 document icon TBHEDI_COS_Application_Letter_COS_OEB_2016_0105_2016.09.09_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105 document icon TBHEDI_Exhibit _7_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105 document icon TBHEDI_Exhibit _6_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105 document icon TBHEDI_Exhibit _5_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105 document icon TBHEDI_Exhibit _3_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105 document icon Ack_Letter_ThunderBayHydro_20160913 Acknowledgement Letter 2016-09-13 2016-09-13
EB-2016-0105 document icon TBHEDI_Exhibit _2_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105 document icon TBHEDI_Exhibit _9_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105 document icon TBHEDI_Exhibit _8_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09