Search Results for: Records - Case Number=EB-2016-0105 - 172 Records Found

SORTING YOUR SEARCH RESULTS
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



CASE INFORMATION
Click the case number to view details for that proceeding.

 Case Number  File Name  Document Type  Issued By OEB  Received By OEB Date Issued/Received
EB-2016-0105  dec_order_cost_awards_Thunder Bay_20171128 Decision and Order on Cost Awards 2017-11-28 2017-11-28
EB-2016-0105  AMPCO_Cost Claim_TBHEDI_20171016_signed.pdf Cost Claim 2017-10-24 2017-10-24
EB-2016-0105  AMPCO_Cost Claim_Receipts_TBHEDI_20171020 Cost Claim 2017-10-20 2017-10-20
EB-2016-0105  Final_Rate_Order_TBHEDI_20171019 Rate Order 2017-10-19 2017-10-19
EB-2016-0105  AMPCO_Cost Claim_TBHEDI_20171017 Cost Claim 2017-10-17 2017-10-17
EB-2016-0105  SEC_Cost Claim_TBHEDI_20171012 Cost Claim 2017-10-12 2017-10-12
EB-2016-0105  TBHEDI_Proposed Tariff Rates and ChargesV2_20171010 Submission 2017-10-10 2017-10-10
EB-2016-0105  TBHEDI_Reply Submission_20171010 Submission 2017-10-10 2017-10-10
EB-2016-0105  OEB Staff_SUB_TBEDI DRO Final_20171003 Submission 2017-10-03 2017-10-03
EB-2016-0105  VECC_Cost Claim_TBHEDI CoS_20170929 Cost Claim 2017-09-29 2017-09-29
EB-2016-0105  TBHEDI_Proposed Tariff Rates and Charges_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_Draft Rate Order_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_BA_2017 Foregone Revenue Calc_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_BA_2017 DIVA Calc_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_BA_2017 Bill Impact Model_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_2017 RTSR_WF_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_BA_2017 Tax PiLS_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_BA_2017 Cost Allocation_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_BA_2017 RRWF_20170922 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  TBHEDI_DRO_20170928 Draft Rate Order 2017-09-28 2017-09-28
EB-2016-0105  dec_order_Thunder Bay Hydro CoS_20170921 Decision and Order 2017-09-21 2017-09-21
EB-2016-0105  TBHEDI_ReplySUB_20170728 Submission 2017-07-28 2017-07-28
EB-2016-0105  VECC_Sub_TBHEDI_20170715 Final Argument 2017-07-14 2017-07-14
EB-2016-0105  AMPCO_Sub_TBHEDI_20170715 Final Argument 2017-07-15 2017-07-15
EB-2016-0105  OEB Staff_SUB_TBHEDI_20170714 Submission 2017-07-14 2017-07-14
EB-2016-0105  SEC_Final ARG_TBHED_20170714 Final Argument 2017-07-14 2017-07-14
EB-2016-0105  TBHEDI_Undertaking Response_J3.1_3.4_20170705 Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105  TBHEDI_2017_RRWF_OHV2_Undertaking Response_20170706 Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105  TBHED_OH_Undertakings2_20170706_ Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105  TBHEDI_Undertaking Responses_20170705 Undertaking Responses 2017-07-06 2017-07-06
EB-2016-0105  TBHEDI_ARGChief_20170705 Applicant Argument in Chief 2017-07-06 2017-07-06
EB-2016-0105  PO6_Thunder Bay Hydro_20170704 Procedural Order 2017-07-04 2017-07-04
EB-2016-0105  Transcripts_Thunder Bay_Vol 3_20170630 Transcripts 2017-06-30 2017-06-30
EB-2016-0105  TBHEDI_Undertakings J2.1 to J2.3_20170630 Undertaking Responses 2017-06-30 2017-06-30
EB-2016-0105  Transcript_Thunder Bay_Vol 2_20170629 Transcripts 2017-06-29 2017-06-29
EB-2016-0105  Exhibit_K2.2_AMPCO_Compendium_Capital_TBHEDI_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105  Exhibit_K2.4_SEC_Compendium_Thunder Bay_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105  VECC_Compendium_OM&A_TBHDI_20170629 Correspondence 2017-06-28 2017-06-28
EB-2016-0105  Exhibit_K3.4_VECC_Compendium_Cost of Capital_TBHDI_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105  Exhibit_K2.3_VECC_Compendium_Capital Expenditures_TBHDI_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105  Exhibit K2.1_OEB Staff_Compendium_Thunder Bay_20170629 Exhibits 2017-06-28 2017-06-28
EB-2016-0105  TBHEDI_EVD Update_4_AMPCO-23_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105  TBHEDI_EVD Update_App 2-D_2-KA_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105  TBHEDI_EVD Update_2 VECC-13_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105  TBHEDI_EVD Update_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105  TBHEDI_EVD Update_Cvrltr_20170621 Application and Evidence 2017-06-21 2017-06-21
EB-2016-0105  TBHEDI_IRR_Tsimberg Report_20170621 Interrogatory Response from Applicant 2017-06-21 2017-06-21
EB-2016-0105  VECC_ltr_Addl Counsel_Thunder Bay_20170605 Correspondence 2017-06-05 2017-06-05
EB-2016-0105  AMPCO_IR_TBHEDI_20170602 Interrogatories to Applicant 2017-06-02 2017-06-02
EB-2016-0105  VECC_Supp IR_Thunder Bay Hydro_20170601 Interrogatories to Applicant 2017-06-01 2017-06-01
EB-2016-0105  SEC_Suppl IR_Thunder Bay CoS_20170530 Interrogatories to Applicant 2017-05-30 2017-05-30
EB-2016-0105  OEB Staff_IR_Thunder Bay Hydro_Expert Report_20170530 Interrogatories to Applicant 2017-05-30 2017-05-30
EB-2016-0105  Tsimberg Report_TBHEDI_20170512 Correspondence 2017-05-12 2017-05-12
EB-2016-0105  Transcript_Thunder Bay_Vol 1_20170420 Transcripts 2017-04-20 2017-04-20
EB-2016-0105  dec_Settlement P_PO 5_Thunder Bay Hydro_20170504 Procedural Order 2017-05-04 2017-05-04
EB-2016-0105  dec_Settlement P_PO 5_Thunder Bay Hydro_20170504 Decision 2017-05-04 2017-05-04
EB-2016-0105  VECC_Ltr_Change in Counsel_Thunder Bay_20170428 Correspondence 2017-04-28 2017-04-28
EB-2016-0105  Thunder Bay Hydro_SettlementP_20170427 Settlement Proposal 2017-04-27 2017-04-27
EB-2016-0105  Thunder Bay Hydro_cvrltr_SettlementP_20170427 Settlement Proposal 2017-04-27 2017-04-27
EB-2016-0105  TBHEDI_SettlementP_Blackline_20170427 Settlement Proposal 2017-04-27 2017-04-27
EB-2016-0105  PO4_Thunder Bay_20170421 Procedural Order 2017-04-21 2017-04-21
EB-2016-0105  TBHEDI_Expert Witness_Tsimberg_publications and appearances_20170419 Application and Evidence 2017-04-19 2017-04-19
EB-2016-0105  VECC_Ltr_Additional Counsel_TBHEDI_20170420 Correspondence 2017-04-19 2017-04-19
EB-2016-0105  Yury Tsimberg_Long Resume_Witness Panel_TBHEDI_20170419 Application and Evidence 2017-04-19 2017-04-19
EB-2016-0105  PO3_ThunderBay Hydro_20170418 Procedural Order 2017-04-18 2017-04-18
EB-2016-0105  AMPCO_LTR_TBHEDI_New Evidence_20170417 Correspondence 2017-04-17 2017-04-17
EB-2016-0105  TBHEDI_Ltr_Expert Witness_20170417 Correspondence 2017-04-17 2017-04-17
EB-2016-0105  VECC_ExpertWitness_TBH_20170417 Correspondence 2017-04-17 2017-04-17
EB-2016-0105  SEC_Ltr_Thunder Bay_Expert Witness_20170413 Correspondence 2017-04-13 2017-04-13
EB-2016-0105  OEB Staff_SUB_SettlementP_TBHEDI_20170407 Submission 2017-04-07 2017-04-07
EB-2016-0105  TBHEDI_KinectricsLtr_20170324 Correspondence 2017-04-06 2017-04-06
EB-2016-0105  TBHEDI_Ltr_OralHearing_20170406 Correspondence 2017-04-06 2017-04-06
EB-2016-0105  TBHEDI_SettlementP_cvrltr_20170331 Settlement Proposal 2017-03-31 2017-03-31
EB-2016-0105  TBHEDI_SettlementP_20170331 Settlement Proposal 2017-03-31 2017-03-31
EB-2016-0105  B Thunder Bay Hydro 2017 Load Forecast Settlement_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  A Thunder Bay Hydro 2017 Load Forecast Settlement No Manual CDM Adj_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  Thunder Bay 2017_Cost_Allocation_Model_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  TBHEDI_2017_RRWF_SC_tax_unlocked_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  TBHEDI_2017_LRAMVA_Work_Form_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  TBHEDI_2017_DVA_Continuity_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  TBHEDI_Bill_Impact_Model_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  TBHEDI_Tax_PILs_Workform_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  TBHEDI_Chapter2_Appendices_SC_20170331 Application and Evidence 2017-03-31 2017-03-31
EB-2016-0105  interim rate order_PO 2_Thunder Bay_20170329 Procedural Order 2017-03-29 2017-03-29
EB-2016-0105  interim rate order_PO 2_Thunder Bay_20170329 Interim rate order 2017-03-29 2017-03-29
EB-2016-0105  Thunder Bay_Request to Delay_Settlement Proposal_20170329 Correspondence 2017-03-28 2017-03-28
EB-2016-0105  OEBltr_Thunder Bay_SettlementProp_20170324 Correspondence 2017-03-24 2017-03-24
EB-2016-0105  TBHEDI_Response_Letter of Comment_20170320_Redacted Acknowledgement Letter 2017-03-20 2017-03-20
EB-2016-0105  2011-2014 CDM Persistence Report_IESO_TBH_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  2015 Verified IESO Results_TBH-20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  December 2016_PPC Report_2016-12_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  Final 2015 Annual Verified Results Report - Annual Persistence_TBH_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  CDM 2015-2020 Plan by Rate Class_ April 2016 _ v4_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  TBHEDI_2017_LRAMVA_Work_Form_IR2_20170319.xlsx Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  TBHEDI_2017_DVA_Continuity_IR2_20170319.xlsm Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  TBHEDI_IR2_Followup Questions_ IR2_20170319.pdf Interrogatory Response from Applicant 2017-03-19 2017-03-19
EB-2016-0105  TBHEDI_RRWF_EB-2016-0105-Tax_Unlocked_IR2_20170320.xlsx Interrogatory Response from Applicant 2017-03-20 2017-03-20
EB-2016-0105  TBHEDI_LTR_Settlement_Update_20170308 Correspondence 2017-03-08 2017-03-08
EB-2016-0105  OEB-TBHltrPresDay Cancel_20170228 Correspondence 2017-02-28 2017-02-28
EB-2016-0105  TBHEDI_LTR_Settlement Update_20170224 Submission 2017-02-24 2017-02-24
EB-2016-0105  Confirmation of Supporting Document Submission for Thunder Bay Hydro Electricity Distribution Inc Submission 2017-02-24 2017-02-24
EB-2016-0105  TBHEDI_LTR_Settlement Update_20170224 Correspondence 2017-02-24 2017-02-24
EB-2016-0105  VECC_Ltr_SEC request_Thunder Bay_20170222 Correspondence 2017-02-22 2017-02-22
EB-2016-0105  SEC_Request to hold hearing in Thunder Bay_20170221 Correspondence 2017-02-21 2017-02-21
EB-2016-0105  SEC_Followup Questions_20170210 Interrogatories to Applicant 2017-02-10 2017-02-10
EB-2016-0105  decision_IssuesList_TBH_20170210 Decision 2017-02-10 2017-02-10
EB-2016-0105  VECC_PreADRQuestions_TBH105_20170207 Correspondence 2017-02-07 2017-02-07
EB-2016-0105  TBHEDI_LTR_City of Thunder Bay Ltr_20170207.pdf Correspondence 2017-02-07 2017-02-07
EB-2016-0105  TBEDI_ProposedIssuesList_final Submission 2017-02-03 2017-02-03 2017-02-03
EB-2016-0105  OEB_Corresp_TBHltrIssuesListDelay__20170201 Correspondence 2017-02-01 2017-02-01
EB-2016-0105  TBHltrIssuesListDelay__final_20170131 Correspondence 2017-01-31 2017-01-31 2017-01-31
EB-2016-0105  TBHEDI_EB_2016_0105_2017_RRWF_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-30 2017-01-30
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Test_year_Income_Tax_PILs_Workform_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105  Thunder Bay 2017_Cost_Allocation_Model_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105  TBHEDI_EB_2016_0105_2017_DVA_Continuity_IR1_20170131.xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Tariff_Schedule_and_Bill_Impact_Model_IR1_20170131..xlsm Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105  TBHEDI_EB_2016_0105_2017_LRAMVA_Work_Form_IR1_20170131.xlsx Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105  Thunder Bay_IRR_Signed letter_20170131.pdf Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105  TBHEDI_IRR_20170131 Interrogatory Response from Applicant 2017-01-31 2017-01-31
EB-2016-0105  Henry Wojak_Letter of Comment _20170104_Redacted Letter of Comment 2017-01-04 2017-01-04
EB-2016-0105  Carol Tessier_Letter of Comment _20161207_Redacted Letter of Comment 2016-12-07 2016-12-07
EB-2016-0105  H_Wojak_Ack Ltr_letter of comment_20170113 Acknowledgement Letter 2017-01-13 2017-01-13
EB-2016-0105  C_Tessier_Ack Ltr_letter of comment_20170113 Acknowledgement Letter 2017-01-13 2017-01-13
EB-2016-0105  Community Engagement Report - Final_20170109 Correspondence 2017-01-09 2017-01-09 2017-01-09
EB-2016-0105  H Wojak_Ltr of Comment_ThunderBay_20170104_Redacted Letter of Comment 2017-01-04 2017-01-04
EB-2016-0105  VECC_IR_ThunderBayHydro_20161228 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105  AMPCO_LTR_IR_TBHEDI_20161228 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105  AMPCO_IR_TBHEDI_20161228 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105  SEC_IR_Rate and Bill Comparison 2016 Final Rates_Thunder Bay_20161227 Interrogatories to Applicant 2016-12-28 2016-12-28
EB-2016-0105  SEC_IR_Thunder Bay_20161227 Interrogatories to Applicant 2016-12-27 2016-12-27
EB-2016-0105  OEB Staff_IR_ThunderBayHydro_20161220 Interrogatories to Applicant 2016-12-20 2016-12-20 2016-12-20
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Generic_LRAMVA_Work_Form_rev1_20161213 Application and Evidence 2016-12-13 2016-12-13
EB-2016-0105  po1_TBEDI_rev1_20161205 Procedural Order 2016-12-07 2016-12-07
EB-2016-0105  D Chiupka_Letter of Comment _Redacted_20161124 Letter of Comment 2016-11-24 2016-11-24
EB-2016-0105  D Koroscil_Letter of Comment _Redacted-20161124 Letter of Comment 2016-11-24 2016-11-24
EB-2016-0105  D Koroscil_Ack Ltr_letter of comment_20161202 Letter of Comment 2016-12-02 2016-12-02
EB-2016-0105  AMPCO_INT_REQ_20161125 Intervenor Request Letter 2016-11-25 2016-11-25
EB-2016-0105  TBHEDI_Affidavit_EB-2016-0105_20161117.pdf Affidavits of Service 2016-11-17 2016-11-17
EB-2016-0105  noh_Thunder Bay_20161109 Notice of Hearing 2016-11-09 2016-11-09
EB-2016-0105  lod_noh_Thunder Bay_20161109 Letter of Direction 2016-11-09 2016-11-09
EB-2016-0105  SEC_INT_REQ_20161103.pdf Intervenor Request Letter 2016-11-03 2016-11-03
EB-2016-0105  VECC_INT_REQ_20161014 Intervenor Request Letter 2016-10-14 2016-10-14
EB-2016-0105  TBHEDI_Exhibit _1_EB-2016-0105_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105  AMENDED TBHEDI_Cover Letter_EB-2016-0105_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105  AMENDED TBHEDI_Cover Letter_EB-2016-0105_20160826_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105  TBHEDI_COS_Application_Letter_COS_OEB_2016_0105_2016.09.09_20161005.pdf Application and Evidence 2016-10-05 2016-10-05
EB-2016-0105  TBHEDI_Exhibit _7_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105  TBHEDI_Exhibit _6_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105  TBHEDI_Exhibit _5_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105  TBHEDI_Exhibit _3_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-14 2016-09-14
EB-2016-0105  Ack_Letter_ThunderBayHydro_20160913 Acknowledgement Letter 2016-09-13 2016-09-13
EB-2016-0105  TBHEDI_Exhibit _2_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_Exhibit _9_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_Exhibit _8_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017__COS_Checklist_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_ProposedTarriff_09.09.2016_1.0347.xlsx Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_2016_0105_Benchmarking_Spreadsheet_Forecast_Model_09.09.2016.xlsx Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Tariff_Schedule_and_Bill_Impact_Model_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Cost_Allocation_Model_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_Exhibit _1_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_COS_Application_Letter_COS_OEB_2016_0105_2016.09.09.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_Exhibit _2_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_Exhibit _4_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  Appendix2-B_TBHEDI_DSP_Exhibit_2_EB_2016_0105.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_LoadForecastModel_09.09.2016.xlsx Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Filing_Requirements_Chapter2_Appendices_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_Exhibit _1_EB-2016-0105_20160909.pdf Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_RTSR_Workform_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Test_year_Income_Tax_PILs_Workform_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_DVA_Continuity_Schedule_CoS_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  TBHEDI_EB_2016_0105_2017_Rev_Reqt_Work_Form_09.09.2016.xlsm Application and Evidence 2016-09-09 2016-09-09
EB-2016-0105  Thunder Bay Hydro_Delay in Filing_20160826 Correspondence 2016-08-26 2016-08-26