Advanced Regulatory Document Search (RDS)

Search Results for: Records - Case Number=EB-2017-0024 - 209 Records Found

SORTING YOUR SEARCH RESULTS
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



CASE INFORMATION
Click the case number to view details for that proceeding.

 Case Number  File Name  Document Type  Issued By OEB  Received By OEB Date Issued/Received
EB-2017-0024  AMPCO_cost claim_20180511 Cost Claim 2018-05-23 2018-05-23
EB-2017-0024  Alectra_CostsObj_20180517 Cost Claim Objection 2018-05-17 2018-05-17
EB-2017-0024  CCC_CostClaim_Alectra2018_20180516 Cost Claim 2018-05-16 2018-05-16
EB-2017-0024  BOMA_Cost_Claim_20180510 Cost Claim 2018-05-10 2018-05-10
EB-2017-0024  Sec_Cost Claim_20180510 Cost Claim 2018-05-10 2018-05-10
EB-2017-0024  VECC Cost Claim_ Alectra_20180509 Cost Claim 2018-05-09 2018-05-09
EB-2017-0024  Decision_Rate Order_Alectra_20180503 Rate Order 2018-05-03 2018-05-03
EB-2017-0024  Decision_Rate Order_Alectra_20180503 Decision 2018-05-03 2018-05-03
EB-2017-0024  Alectra_Attach 11_DRO_IRM model BRZ_20180427 Rate Model 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 21_DRO ReplySUB_Foregone Revenue Calculation_All RZs_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 20_DRO ReplySUB_ICM Model_ERZ_20180427. Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 18_DRO ReplySUB_IRM model_ERZ_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 14_DRO ReplySUB_IRM model_PRZ_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_ReplySUB_Attach 11_DRO Reply_Cost_Allocation 2018_Model_V3_4_HRZ_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 6_DRO Reply_Cost_Allocation 2018_Model_V3_4_HRZ_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 5_DRO Reply_Bill Impacts_Tariff Sheet_HRZ_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 3_DRO Reply_PILs Workform 2018_HRZ_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 2a_DRO Reply_2018 Cost of Power Calculation_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_Attach 2_DRO Reply_ Revenue Requirement Work Form 2018_V7.02_HRZ_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra_DRO Reply 2018 Tariff of Rates and Charges_All RZs_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  AlectraUtilities_DRF_RO_ReplySUB_20180427 Submission 2018-04-27 2018-04-27
EB-2017-0024  Alectra Utilities OEB Staff DRO Submission_20180423 Submission 2018-04-23 2018-04-23
EB-2017-0024  Attach 22_DRO_Renewable Generation Calculation_All RZs Rate Model 2018-04-16 2018-04-16
EB-2017-0024  Attach 21_DRO_Foregone Revenue Calculation_All RZs Rate Model 2018-04-16 2018-04-16
EB-2017-0024  Attach 20_DRO_ICM Model_ERZ Rate Model 2018-04-16 2018-04-16
EB-2017-0024  Attach 19_DRO_LRAMVA Workform_ERZ Rate Model 2018-04-16 2018-04-16
EB-2017-0024  Attach 18a_DRO_RGM_ERZ Rate Model 2018-04-16 2018-04-16
EB-2017-0024  Attach 18_DRO_IRM model_ERZ Rate Model 2018-04-17 2018-04-17
EB-2017-0024  Attach 16_DRO_ICM Model_PRZ.xlsm Rate Model 2018-04-16 2018-04-16
EB-2017-0024  Attach 15_DRO_LRAMVA Workform_PRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 14_DRO_IRM model_PRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 12_DRO__ICM Model_BRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 11a_DRO_RGM_BRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 11_DRO_IRM model BRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 9_DRO_LRAMVA Workform_HRZ Draft Rate Order 2018-04-17 2018-04-17
EB-2017-0024  Attach 8_DRO_RTSR Work Form_HRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 6_DRO_Cost_Allocation 2018_Model_V3_4_HRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 5_DRO_Bill Impacts_Tariff Sheet_HRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 4_DRO_IRM Model HRZ Draft Rate Order 2018-04-17 2018-04-17
EB-2017-0024  Attach 3_DRO_PILs Workform 2018_HRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 2a_DRO_2018 Cost of Power Calculation Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Attach 2_DRO_ Revenue Requirement Work Form 2018_V7.02_HRZ Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  AlectraUtilitiesCorporation_DRO_2018EDR_ATTACH 10-22_20180416 Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  Alectra_DraftRateOrder_20180416 Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  AlectraUtilitiesCorporation_DRO_2018EDR_ATTACH 1-9_20180416 Draft Rate Order 2018-04-16 2018-04-16
EB-2017-0024  OEB_Errata_Ltr_dec_order_Alectra_20180406 Decision and Order 2018-04-06 2018-04-06
EB-2017-0024  dec_order_Alectra_rev_20180406 Decision and Order 2018-04-06 2018-04-06
EB-2017-0024  dec_order_Alectra_20180405 Decision and Order 2018-04-05 2018-04-05
EB-2017-0024  Alectra_ReplySUB_20180130 Submission 2018-01-30 2018-01-30
EB-2017-0024  BOMA_ArgumentSUB_20170117 Submission 2018-01-17 2018-01-17
EB-2017-0024  VECC_ArgumentSUB_ALECTRA_20180116 Submission 2018-01-17 2018-01-17
EB-2017-0024  PWU_ArgumentSUB_Alectra_20180116 Submission 2018-01-16 2018-01-16
EB-2017-0024  AMPCO_ArgumentSUB_Alectra_20170116 Submission 2018-01-17 2018-01-17
EB-2017-0024  SEC_ArgumentSUB_Alectra_20180116 Submission 2018-01-17 2018-01-17
EB-2017-0024  CCC_ArgumentSUB_Alectra_20180116 Submission 2018-01-17 2018-01-17
EB-2017-0024  OEBStaff_ArgumentSUB_Alectra_20180116 Submission 2018-01-17 2018-01-17
EB-2017-0024  OEB_BOMASubmissionDelay_20180116 Correspondence 2018-01-16 2018-01-16
EB-2017-0024  Alectra_ARG Chief_20171222 Applicant Argument in Chief 2017-12-22 2017-12-22
EB-2017-0024  dec_partial_accounting order_Alectra_20171220 Decision 2017-12-20 2017-12-20
EB-2017-0024  VECC_change in Counsel_20171220 Correspondence 2017-12-20 2017-12-20
EB-2017-0024  JT2.19_Attach 1_Updated Table 55 Material Projects ERZ 2017_2022_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-8_Attach 3_LRAMVA Workform ERZ SL_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-8_Attach 2_LRAMVA Workform PRZ SL_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-8_Attach 1_LRAMVA Workform HRZ SL_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-5_PRZ-Staff-5_Attach 2_IRM RGM PowerStream RZ_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff 3_Attach 1_IRM Model Horizon Utilities RZ_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-5_PRZ-Staff-5_Attach 2_IRM Model PowerStream RZ_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-2_Attach 1_IRM Model Enersource RZ_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-5_Attachment1_GA Workform_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JTStaff-1 - 2018 Cost of Power Calculation_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JT2.20_Attach_ERZ-AMPCO-17-Appendix D_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JT2.16_Attach_ERZ-AMPCO-6_AppendixB_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  JT2.11_Attach_PRZ-AMPCO-18_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  AlectraUtilities_TCUndertakings_20171215 Undertaking Responses 2017-12-15 2017-12-15
EB-2017-0024  VECC_Alectra0024_SubDefAccts_20171208 Submission 2017-12-08 2017-12-08
EB-2017-0024  Alectra_Submission re Capitalization Accounts_20171208 Submission 2017-12-07 2017-12-07
EB-2017-0024  SEC_Submission_20171208 Submission 2017-12-07 2017-12-07
EB-2017-0024  BOMA_Submission_20171207 Submission 2017-12-07 2017-12-07
EB-2017-0024  Alectra-Staff Submission on Recording Details_20171207 Submission 2017-12-07 2017-12-07
EB-2017-0024  Transcript_Day 2_Alectra Utilities_TC_2071201 Transcripts 2017-12-01 2017-12-01
EB-2017-0024  Transcript_day1_Alectra Utilities_TC_20171130.doc Transcripts 2017-11-30 2017-11-30
EB-2017-0024  Alectra_OEB Staff TC Clarifications_20171128 Submission 2017-11-28 2017-11-28
EB-2017-0024  Dec_Issues List_PO3_Alectra_20171117 Decision 2017-11-17 2017-11-17
EB-2017-0024  Dec_Issues List_PO3_Alectra_20171117 Procedural Order 2017-11-17 2017-11-17
EB-2017-0024  BOMA_Correspondence_20171110 Submission 2017-11-10 2017-11-10
EB-2017-0024  City of Hamilton_Hearing_Issues List_20171110 Correspondence 2017-11-10 2017-11-10
EB-2017-0024  CCC_Alectra_Sub_ProcessIssues_20171110 Submission 2017-11-10 2017-11-10
EB-2017-0024  SEC_Sub_re Hearing _20171110 Submission 2017-10-11 2017-10-11
EB-2017-0024  CoH Letter_Sub_201711-10 Submission 2017-11-10 2017-11-10
EB-2017-0024  AMPCO_LTR_Hearing_20171110.pdf Submission 2017-11-10 2017-11-10
EB-2017-0024  VECC_Oral Issues Submission_20171110 Submission 2017-11-10 2017-11-10
EB-2017-0024  Alectra_LTR_Form Of Hearing_20171110.pdf Correspondence 2017-11-10 2017-11-10
EB-2017-0024  OEB_Ltr_AlectraltrWrittenvsOralIssues_20171110 Correspondence 2017-11-10 2017-11-10
EB-2017-0024  Alectra_LTR_Draft_Issues_List_20171106 Correspondence 2017-11-06 2017-11-06
EB-2017-0024  Alectra_ltr_Redraft issues list_20171106 Correspondence 2017-11-06 2017-11-06
EB-2017-0024  Alectra_SettlementLtr_20171103 Correspondence 2017-11-03 2017-11-03
EB-2017-0024  Alectra_Ltr_Submissions_on IssuesList_20171103 Draft Rate Order 2017-11-06 2017-11-06
EB-2017-0024  CoH _Submissions On issues list_20171103 Submission 2017-11-03 2017-11-03
EB-2017-0024  BOMA_submission on issues list_20171103 Submission 2017-11-03 2017-11-03
EB-2017-0024  CCC_Submission on Issues List_20171103 Submission 2017-11-03 2017-11-03
EB-2017-0024  AMPCO_Submission on Draft Issues List_20171103 Submission 2017-11-03 2017-11-03
EB-2017-0024  VECC_Issues List Submission_Alectra 20171103 Submission 2017-11-03 2017-11-03
EB-2017-0024  SEC_Issues List Submissions_20171103 Submission 2017-11-03 2017-11-03
EB-2017-0024  BdStaff_Alectra ltr Revised Draft Issues List__20171103 Submission 2017-11-03 2017-11-03
EB-2017-0024  Alectra_CORR_Re Settlement Conference_20171103 Correspondence 2017-11-03 2017-11-03
EB-2017-0024  City of Hamilton_Letter_20171024 Correspondence 2017-10-24 2017-10-24
EB-2017-0024  SEC_ Supp_Interrogatories_20171025 Interrogatories to Applicant 2017-10-24 2017-10-24
EB-2017-0024  PO2_Alectra_20171024 Procedural Order 2017-10-24 2017-10-24
EB-2017-0024  BOMA_DEC_UND_20171024 Declaration and Undertakings 2017-10-24 2017-10-24
EB-2017-0024  OEB Staff_Issues list_ Alectra_20171018 Submission 2017-10-18 2017-10-18
EB-2017-0024  dec on Appeal_intervenor status_20171013 Decision 2017-10-13 2017-10-13
EB-2017-0024  ERZ-AMPCO-3_Attach 1_2018 Capital Project Listing Enersource RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  ERZ-AMPCO-9_Attachment_1_Live _Model_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  ERZ-AMPCO-13_Live Model_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  ERZ-Staff-19_Attach 1_LRAMVA Work Form Enersource RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-1_Attach 1_GA Workform_Brampton Rate Zone_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-2_Attach 2_IRM RGM PowerStream RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-2_Attach 2_IRM Model PowerStream RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-2_Attach 1_IRM RGM Brampton RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-2_Attach 1_IRM Model Brampton RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-1_Attach 4_GA Workform_PowerStream Rate Zone_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-1_Attach 3_GA Workform_Horizon Utilities Rate Zone_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-1_Attach 2_GA Workform_Enersource Rate Zone_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-2_Attach 3_IRM Model Enersource RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  G-Staff-2_Attach 3_IRM RGM Enersource RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  HRZ-Staff-2_Attach 1_2018 Annual Filing COP Calculation_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  HRZ-Staff-14_Final_Attachment_LRAMVA_Work_Form - Horizon Utilities RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  HRZ-Staff-18_Attach 1_IRM Model Horizon Utilities RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  PRZ-AMPCO-6_Attach 1_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  PRZ-Staff-21_Attach 1_LRAMVA Work Form PowerStream RZ_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  ERZ-Staff-18_Attach 2_2011-2014 Enersource Persistence Savings_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  ERZ-Staff-18_Attach 1_2011-2014 Final Results Report Enersource_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra_IRR_BOMA_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra_IRR_Board Staff_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra_IRR_VECC_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra_IRR_AMPCO_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra_IRR-COH_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra Utilities_ Cover Letter IRR_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra_IRR_CCC_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  Alectra_IRR_SEC_20171011 Interrogatory Response from Applicant 2017-10-11 2017-10-11
EB-2017-0024  OEB Staff Interrogatories_Alectra_20170918 Interrogatories to Applicant 2017-09-18 2017-09-18
EB-2017-0024  AMPCO_IR_Alectra_20170920_rev.pdf Interrogatories to Intervenor 2017-09-27 2017-09-27
EB-2017-0024  City of Hamilton_Support of PWU IntrvREQ_Alectra_20170921 Correspondence 2017-09-21 2017-09-21
EB-2017-0024  BOMA_ltr_Corrections to IR_Alectra_20170921 Interrogatories to Applicant 2017-09-21 2017-09-21
EB-2017-0024  ERZ-AMPCO-17-Appendix D_20170921 Interrogatories to Applicant 2017-09-21 2017-09-21
EB-2017-0024  ERZ-AMPCO-10-Appendix C_20170921 Interrogatories to Applicant 2017-09-21 2017-09-21
EB-2017-0024  ERZ-AMPCO-IR-6-Appendix B_20170921 Interrogatories to Applicant 2017-09-21 2017-09-21
EB-2017-0024  PRZ-AMPCO-18-Appendix A_20170921 Interrogatories to Applicant 2017-09-21 2017-09-21
EB-2017-0024  AMPCO_IR_Alectra_20170920 Interrogatories to Applicant 2017-09-21 2017-09-21
EB-2017-0024  CCC_IR_Alectra 2018 Rates_20170921 Interrogatories to Applicant 2017-09-21 2017-09-21
EB-2017-0024  VECC_IR_Alectra_20170919 Interrogatories to Applicant 2017-09-20 2017-09-20
EB-2017-0024  BOMA_IR_Alectra_20170920 Interrogatories to Applicant 2017-09-20 2017-09-20
EB-2017-0024  City of Hamilton_IR_Alectra_20170920 Interrogatories to Applicant 2017-09-20 2017-09-20
EB-2017-0024  SEC_IRS_Alectra_20170920 Interrogatories to Applicant 2017-09-19 2017-09-19
EB-2017-0024  PWU_Notice of Appeal_20170918 Notice of Appeal 2017-09-18 2017-09-18
EB-2017-0024  OEB _Reply Ltr_PWU_20170915 Correspondence 2017-09-15 2017-09-15
EB-2017-0024  OEB _Reply Ltr_PWU_20170915 Correspondence 2017-09-15 2017-09-15
EB-2017-0024  PO1_Alectra_Revised_20170915 Procedural Order 2017-09-15 2017-09-15
EB-2017-0024  CELPg2_ Intervenor Status Request Denial Review _20170915 Correspondence 2017-09-15 2017-09-15
EB-2017-0024  CELPg1_ Intervenor Status Request Denial Review _20170915 Correspondence 2017-09-15 2017-09-15
EB-2017-0024  PWU_LTR_Alectra_20170912.pdf Correspondence 2017-09-12 2017-09-12
EB-2017-0024  PO1_Alectra_20170908 Procedural Order 2017-09-08 2017-09-08
EB-2017-0024  PWU_IntrvREQ_20170830 Intervenor Request Letter 2017-08-30 2017-08-30
EB-2017-0024  ALECTRA_LTR_20170829 Correspondence 2017-08-29 2017-08-29
EB-2017-0024  VECC_IntvRqst_20170829 Intervenor Request Letter 2017-08-29 2017-08-29
EB-2017-0024  AMPCO_INTReq_Alectra_20170828 Intervenor Request Letter 2017-08-29 2017-08-29
EB-2017-0024  CCC_IntvRqst_ALECTRA_2018Rates_20170829.pdf Intervenor Request Letter 2017-08-28 2017-08-28
EB-2017-0024  City of Hamilton_intvRqst_20170828 Intervenor Request Letter 2017-08-28 2017-08-28
EB-2017-0024  BOMA_Correspondence_20170828 Correspondence 2017-08-28 2017-08-28
EB-2017-0024  Affidavit_ Alectra_20170821 Affidavits of Service 2017-08-21 2017-08-21
EB-2017-0024  BOMA_IntREQ_CostEligREQ_20170821 Intervenor Request Letter 2017-08-21 2017-08-21
EB-2017-0024  NoA_ALECTRA_EN_Dated_20170817 Notice 2017-08-18 2017-08-18
EB-2017-0024  NoA_ALECTRA_FR_Dated_20170817 Notice 2017-08-18 2017-08-18
EB-2017-0024  LOD_ALECTRA_IRM_20170817 Letter of Direction 2017-08-17 2017-08-17
EB-2017-0024  AlextraUtilitiesCorp_APPL_Attach50_2018 Enersource_ 20170707 Application and Evidence 2017-07-20 at 10:18 AM
EB-2017-0024  AlectraUtilitiesCorporation_APPL_2018EDR_Attch 46-49_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  SEC_IntvnRqst_20170711 Intervenor Request Letter 2017-07-11 2017-07-11
EB-2017-0024  Ack_ltr__Alectra_10170711 Acknowledgement Letter 2017-07-11 2017-07-11
EB-2017-0024  Capredoni_IntvnRQST_20170710 Intervenor Request Letter 2017-07-10 2017-07-10
EB-2017-0024  Attachment 31 - ICM Model_PowerStream RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 28 - LRAMVA_Work_Form_v 2_PowerStream RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 26 - IRM Model_PowerStream RZ_2017-0707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 11 LRAMVA_Work_Form_v 2_Horizon Utilities RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 10 ESM Rate Rider Model_Horizon Utilties RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 9 RTSR Work Form_Horizon Utilities RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 7 Cost_Allocation 2018_Model_V3_4_Horizon Utilities RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 6b - IRM Model_Horizon Utilities RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 6a- Bill Impacts_Tariff Sheet_Horizon Utilities RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 5 PILs Workform 2017_V1.02_Horizon Utilities RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 4 Revenue Requirement Work Form 2018_V7.02_Horizon Utilties RZ_2017-0707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 45 ICM Model Enersource RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 42 LRAMVA Work Form Enersource RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 39 IRM Model Enersource RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 18 - ICM Model_Brampton RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  Attachment 17 - IRM Model_Brampton RZ_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 1-7_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach52_2018EDR_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 51_2018EDR_20170707 Application and Evidence 2017-07-10 2017-07-10
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 42-45_2018EDR_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_2018EDRAttch 36-41__20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_2018EDR_Attach 34-35_20170707 Application and Evidence 2017-07-07 at 3:37 PM
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 33_2018EDR_20170707 Application and Evidence 2017-07-07 at 3:53 PM
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 29-32_2018EDR_20170707 Application and Evidence 2017-07-07 at 3:53 PM
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 23-28_2018EDR_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attch 8-10_2018EDR_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 11-13_2018EDR_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_Attach 14-22_2018EDR_20170707 Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_Tarrif Sheet_Attach 1-7_2018EDR_20170707.pdf Application and Evidence 2017-07-07 2017-07-07
EB-2017-0024  AlectraUtilitiesCorporation_APPL_2018EDR_20170707 Application and Evidence 2017-07-07 2017-07-07