 Case Number  File Name  Document Type  Issued By OEB  Received By OEB Date Issued/Received
EB-2019-0018  BOMA_SUB_Alectra Rates_20190919 Submission 2019-09-19 2019-09-19
EB-2019-0018  OEBLtr_Alectra Utilities_Tech Conf_20190919 Correspondence 2019-09-19 2019-09-19
EB-2019-0018  PO3_Alectra Utilities_M-Factor_20190917 Procedural Order 2019-09-17 2019-09-17
EB-2019-0018  Alectra Utilities_SUB_Capitalization Policy_20190916 Submission 2019-09-16 2019-09-16
EB-2019-0018  SEC_SUB_Alectra Utilities IRM_20190916 Submission 2019-09-16 2019-09-16
EB-2019-0018  Alectra_IRR_cvrltr_MFactor_Revised_20190913 Interrogatory Response from Applicant 2019-09-16 2019-09-16
EB-2019-0018  Alectra_IRR_SEC_55_Long Term Planned SR Capital_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  OEBStaff_SUB_Alectra Utilities IRM_20190913 Submission 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_SEC-55_LongTermPlannedSRCapital_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_G-Staff-8_Attach 1 M-factor Revenue Requirement_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_G-Staff-8_Attach 2 V5_2020_ACM_ICM_Model - PRZ_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_G-Staff-8_Attach 3 V5_2020_ACM_ICM_Model - BRZ_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_G-Staff-8_Attach 4 V5_2020_ACM_ICM_Model - ERZ_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_G-Staff-8_Attach 5 V5_2020_ACM_ICM_Model - GRZ_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_G-Staff-8_Attach 6 V5_2020-ACM_ICM Model - HRZ_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_SEC-54_Attach 1_Annual Capital Investment_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_SEC-53_Attach 1_XLPE Cable by Type_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_AMPCO-61_Attach 1_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_AMPCO-60_Attach 1_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_AMPCO-57_Attach 1_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_AMPCO-29_Attach 1_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_AMPCO-28_Attach 1_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_AMPCO-26_Attach 1_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_MANA_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_OEBStaff_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_EnergyProbe_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_CCC_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_AMPCO_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_DRC_MFactor_Part 2_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_DRC_MFactor_Part 1_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra Utilities_LTR_IRR_M-Factor_Confidentiality Request_20190913 Correspondence 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_VECC_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_SEC_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_PWU_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_VECC_MFactor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  Alectra_IRR_BOMA_M Factor_20190913 Interrogatory Response from Applicant 2019-09-13 2019-09-13
EB-2019-0018  dec_order_Alectra Utilities_20190905 Decision and Order 2019-09-05 2019-09-05
EB-2019-0018  Alectra_ARG Chief_Addendum_IRM_Attach 1_RGM_GRZ_20190905 Applicant Argument in Chief 2019-09-05 2019-09-05
EB-2019-0018  Alectra_ARG Chief_Addendum_IRM_20190905 Applicant Argument in Chief 2019-09-05 2019-09-05
EB-2019-0018  dec_Confidentiality_Alectra Utilities_20190830 Decision 2019-08-30 2019-08-30
EB-2019-0018  Alectra Utilities_ReplySUB_Confidentiality_IRR_IRM_20190828 Submission 2019-08-28 2019-08-28
EB-2019-0018  Alectra_ARG Chief_IRM_20190826 Applicant Argument in Chief 2019-08-26 2019-08-26
EB-2019-0018  OEBStaff_SUB_Confidentiality_Alectra Utilities_20190826 Submission 2019-08-26 2019-08-26
EB-2019-0018  DRC_Declaration and Undertaking_Alectra Utilities_20190822 Declaration and Undertakings 2019-08-22 2019-08-22
EB-2019-0018  PWU_dec_Undertaking_AB_Alectra Rates_20190821 Declaration and Undertakings 2019-08-22 2019-08-22
EB-2019-0018  PWU_DEC_Undertaking_BK_Alectra Rates20190821 Declaration and Undertakings 2019-08-22 2019-08-22
EB-2019-0018  PWU_DEC_Undertaking_RS_Alectra Rates_20190822 Declaration and Undertakings 2019-08-22 2019-08-22
EB-2019-0018  PWU_Ltr Dec_Undertaking_Alectra Rates_20190822 Declaration and Undertakings 2019-08-22 2019-08-22
EB-2019-0018  MANA_ltr_Alectra Utilities_IR_20190821 Correspondence 2019-08-21 2019-08-21
EB-2019-0018  OEB Reply_EGI Intrv REQ_Alectra_20190820 Correspondence 2019-08-20 2019-08-20
EB-2019-0018  Alectra_Ltr_MANA IR_Response_20190820 Correspondence 2019-08-20 2019-08-20
EB-2019-0018  PO2_Alectra Utilities_Rates_20190820 Procedural Order 2019-08-20 2019-08-20
EB-2019-0018  CCC_IR_Alectra_MFactor_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  DRC_IR_Alectra_MFactor_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  PWU_IR_Alectra_MFactor_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_PRZ-Staff-7 -Attach 1_LRAMVA Workform PRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_PRZ-Staff-2_Attach 1_GA Workform PRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_HRZ-Staff-8_Attach 1_ LRAMVA Workform HRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_HRZ-Staff-4_Attach 2_RGCRP Rate Rider Calculation_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_HRZ-Staff-4_Attach 1_RGCRP HRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_HRZ-Staff-3_Attach 1_ GA Workform HRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-6_Attach 1_2017 CDM Final Verified Results_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-6 Attach 2_2017 CDM Trueup_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1-Attach 10-Tariff-PRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1-Attach 9-Tariff-HRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1-Attach 8-Tariff-GRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1-Attach 7-Tariff-ERZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1-Attach 6-Tariff-BRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1_Attach 5_RGM PRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1_Attach 4_RGM HRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1_Attach 3_RGM GRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1_Attach 2_RGM ERZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_ERZ-Staff-5_Attach 1_LRAMVA Workform ERZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_G-Staff-1_Attach 1_RGM BRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_GRZ-Staff-5_Attach 1_GA Workform GRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_ERZ-Staff-1_Attach 1_GA Workform ERZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_BRZ-Staff-7_Attach 1_RGCRP_BRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_BRZ-Staff-6_Attach 1_LRAMVA Workform BRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_BRZ-Staff-4_Attach 1_GA Workform BRZ_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  VECC_IR_Alectra M-Factor_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  OEBStaff_IR_Alectra Utilities_Mfactor_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_IRR_OEB Staff_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_IRR_EnergyProbe_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra_IRR_BOMA_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra Utilities_IRR_cvrltr_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  Alectra Utilities_Ltr_IRR_IRM_Confidentiality Request_20190816 Interrogatory Response from Applicant 2019-08-16 2019-08-16
EB-2019-0018  AMPCO_IR_61_Attachment 1_Alectra Rates_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  AMPCO_IR_60 _Attachment 1_Alectra Rates_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  AMPCO_IR_58 Appendix A._20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  AMPCO_IR_M-Factor_Alectra Rates_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  PWU_IR_M Factory_Alectra Rates_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  MANA_Suppl IR_Alectra MFactor_20190816 Interrogatories to Applicant 2019-08-16 2019-08-16
EB-2019-0018  BOMA_Dec_Undertaking_Alectra_20190815 Declaration and Undertakings 2019-08-15 2019-08-15
EB-2019-0018  BOMA_IR_Alectra_M Factor_20190815 Interrogatories to Applicant 2019-08-15 2019-08-15
EB-2019-0018  SEC_IR_Alectra_M Factor_GS over 50 Impacts_20190813 Interrogatories to Applicant 2019-08-13 2019-08-13
EB-2019-0018  SEC_IR_Alectra_M Factor_20190813 Interrogatories to Applicant 2019-08-13 2019-08-13
EB-2019-0018  Enbridge_LTR_Late IntrvREQ_20190812 Intervenor Request Letter 2019-08-12 2019-08-12
EB-2019-0018  OEB_reply_DRC_Intervention_20190812 Correspondence 2019-08-12 2019-08-12
EB-2019-0018  Alectra Utilities_ReplySUB_Capitalization Policy_20190809 Submission 2019-08-09 2019-08-09
EB-2019-0018  DRC_Ltr_Intrv Obj_Reply_20190807 Intervenor Request Objection 2019-08-07 2019-08-07
EB-2019-0018  Transcript_Alectra Presentation_20190807 Transcripts 2019-08-07 2019-08-07
EB-2019-0018  Alectra_Presentation Slides_KP1.1_20190807 Application and Evidence 2019-08-07 2019-08-07
EB-2019-0018  Alectra_Response_DRC IntrvREQ_20190802 Intervenor Request Objection 2019-08-02 2019-08-02
EB-2019-0018  CCC_SUB_Alectra Capitalization Issue_20190730 Submission 2019-07-31 2019-07-31
EB-2019-0018  OEB Reply_DRC Intrv Obj Reply_20190730 Correspondence 2019-07-30 2019-07-30
EB-2019-0018  EnergyProbe_SUB_Capitalization Issue_Alectra_20190729 Submission 2019-07-29 2019-07-29
EB-2019-0018  SEC_SUB_Capitalization_Alectra_20190729 Submission 2019-07-29 2019-07-29
EB-2019-0018  VECC_SUB_Alectra Utilities_20190729 Submission 2019-07-29 2019-07-29
EB-2019-0018  MANA_IR_Alectra Utilities_20190729 Interrogatories to Applicant 2019-07-29 2019-07-29
EB-2019-0018  Energy Probe_IR_Alectra Utilities_20190729 Interrogatories to Applicant 2019-07-29 2019-07-29
EB-2019-0018  OEBStaff_Sub_Alectra Utilities_Capitalization Policy_20190729 Submission 2019-07-29 2019-07-29
EB-2019-0018  BOMA_SUB_PRELIM_QUESTIONS_Alectra Utilities_20190729 Submission 2019-07-29 2019-07-29
EB-2019-0018  OEBStaff_IR_Alectra Utilities_20190729 Interrogatories to Applicant 2019-07-29 2019-07-29
EB-2019-0018  BOMA_IR_Alectra Rates_20190729 Interrogatories to Applicant 2019-07-29 2019-07-29
EB-2019-0018  DRC_LTR_Intrv_Obj_Reply_20190726 Correspondence 2019-07-26 2019-07-26
EB-2019-0018  PWU_SUB_Alectra Rates_20190729 Submission 2019-07-29 2019-07-29
EB-2019-0018  OEB Ltr_Presentation Day_Alectra_20190726 Correspondence 2019-07-26 2019-07-26
EB-2019-0018  OEB Ltr_MANA_IntrvEvd_Alectra_20190725 Correspondence 2019-07-25 2019-07-25
EB-2019-0018  B Kemp_Letter of Comment_20190714_Redacted Letter of Comment 2019-07-14 2019-07-14
EB-2019-0018  dec_Confidentiality_Alectra Utilities_20190724 Decision 2019-07-24 2019-07-24
EB-2019-0018  Peter Eline Homan_Ltr of Comment_Alectra Rates_20190719_Redacted Letter of Comment 2019-07-19 2019-07-19
EB-2019-0018  OEB Reply_PWU_Late IntrvREQ_Alectra_20190723 Correspondence 2019-07-23 2019-07-23
EB-2019-0018  MANA_LTR_IntervenorEvidence_20190722 Correspondence 2019-07-22 2019-07-22
EB-2019-0018  AlectraUtilities_SUB_Capitalization Policy_20190719 Submission 2019-07-19 2019-07-19
EB-2019-0018  Alectra_ReplySUB_Confidentiality_20190717 Submission 2019-07-17 2019-07-17
EB-2019-0018  OEBStaff_Sub_Alectra Utilities Confidentiality_20190710.pdf Submission 2019-07-10 2019-07-10 2019-07-10
EB-2019-0018  PWU_INT_REQ_Alectra Rates_20190710 Intervenor Request Letter 2019-07-10 2019-07-10
EB-2019-0018  PO1_Alectra Rates_20190709 Procedural Order 2019-07-09 2019-07-09
EB-2019-0018  CCC_INT_REQ_20190702 Intervenor Request Letter 2019-07-02 2019-07-02
EB-2019-0018  A D Silva_Letter of Comment__REDACTED_20190626 Letter of Comment 2019-06-26 2019-06-26
EB-2019-0018  T Makhoul_Letter of Comment_REDACTED_20190626 Letter of Comment 2019-06-26 2019-06-26
EB-2019-0018  S Smith_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  S Smith_Letter of Comment_2_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  S Ali_Letter of Comment_REDACTED_20190703 Letter of Comment 2019-07-03 2019-07-03
EB-2019-0018  P Tretter_Letter of Comment_REDACTED_20190628 Letter of Comment 2019-06-28 2019-06-28
EB-2019-0018  P Jacome_Letter of Comment__REDACTED_20190704 Letter of Comment 2019-07-04 2019-07-04
EB-2019-0018  N Scotland_Letter of Comment_REDACTED_20190627 Letter of Comment 2019-06-27 2019-06-27
EB-2019-0018  M Liu_Letter of Comment_REDACTED_20190626 Letter of Comment 2019-06-26 2019-06-26
EB-2019-0018  L Kannan_Letter of Comment_REDACTED__20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  JP Schoch_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  J Frangella_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  J Bruce_Letter of Comment_REDACTED_20190628 Letter of Comment 2019-06-28 2019-06-28
EB-2019-0018  J Bruce_Letter of Comment_2_REDACTED_20190628 Letter of Comment 2019-06-28 2019-06-28
EB-2019-0018  J Abbey_Letter of Comment_REDACTED_20190627 Letter of Comment 2019-06-27 2019-06-27
EB-2019-0018  H Raufie_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  E Mohotoo_Letter of Comment_REDACTED_20190627 Letter of Comment 2019-06-27 2019-06-27
EB-2019-0018  E Gow_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  D Melling_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  D McMillan_Letter of Comment_REDACTED_20190628 Letter of Comment 2019-06-28 2019-06-28
EB-2019-0018  B Lalonde_Letter of Comment_REDACTED_20190706 Letter of Comment 2019-07-06 2019-07-06
EB-2019-0018  A Witham_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  A Sumano_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  A Sefton_Letter of Comment_REDACTED_20190702 Letter of Comment 2019-07-02 2019-07-02
EB-2019-0018  AlectraUtilities_LTR_Presentation Day Request_20190529.pdf Correspondence 2019-05-29 2019-05-29
EB-2019-0018  MANA_Corres_INT_REQ_RESP_20190703 Correspondence 2019-07-03 2019-07-03
EB-2019-0018  Alectra Utilities_Corres_Intervenor Requests_20190703 Correspondence 2019-07-03 2019-07-03
EB-2019-0018  Alectra_Affidavit_20190702.pdf Affidavits of Service 2019-07-02 2019-07-02
EB-2019-0018  DRC_IntrvREQ_CostREQ_REV_Alectra Rates_20190703 Intervenor Request Letter 2019-07-03 2019-07-03
EB-2019-0018  AMPCO_INT REQ_Alectra_20190702.pdf Intervenor Request Letter 2019-07-02 2019-07-02
EB-2019-0018  MANA_INT_REQ_Alectra_20190702 Intervenor Request Letter 2019-06-28 2019-06-28
EB-2019-0018  VECC_INT_REQ_Alectra_20190625 Intervenor Request Letter 2019-06-25 2019-06-25
EB-2019-0018  SEC_INT_REQ_Alectra Rates_20190624 Intervenor Request Letter 2019-06-24 2019-06-24
EB-2019-0018  BOMA_INT REQ_CostEligREQ_Alectra Rates_20190621 Intervenor Request Letter 2019-06-21 2019-06-21
EB-2019-0018  EP_INT_REQ_Alectra Rates_20190620 Intervenor Request Letter 2019-06-20 2019-06-20
EB-2019-0018  NoA_dated_Alectra Rates_20190620 Notice 2019-06-20 2019-06-20
EB-2019-0018  NoA_dated_Alectra Rates_20190620_FR Notice 2019-06-20 2019-06-20
EB-2019-0018  NoA_Alectra Rates_20190618_FR Notice of Application 2019-06-18 2019-06-18
EB-2019-0018  NoA_Alectra Rates_20190618 Notice of Application 2019-06-18 2019-06-18
EB-2019-0018  LoD_Alectra Rates_20190618 Letter of Direction 2019-06-18 2019-06-18
EB-2019-0018  Complete Letter_Alectra_2020 Rates_20190611 Correspondence 2019-06-11 2019-06-11
EB-2019-0018  Alectra_APPL_Ex 5_Attach 40 1595 Workform GRZ_20190611 Application and Evidence 2019-06-11 2019-06-11
EB-2019-0018  Alectra_APPL_Ex 5_Attach 39 1595 Workform BRZ_20190611 Application and Evidence 2019-06-11 2019-06-11
EB-2019-0018  Alectra_APPL_Ex 5_Attach 38 1595 workform HRZ_20190611 Application and Evidence 2019-06-11 2019-06-11
EB-2019-0018  Alectra_APPL_Ex 5_Attach 37 GA Workform GRZ_20190611 Application and Evidence 2019-06-11 2019-06-11
EB-2019-0018  Alectra_APPL_Ex 5_Attach 35 GA Workform HRZ_20190611 Application and Evidence 2019-06-11 2019-06-11
EB-2019-0018  Alectra_APPL_Ex 5_Attach 36 GA Workform BRZ_20190611 Application and Evidence 2019-06-11 2019-06-11
EB-2019-0018  Ackltr_Alectra Rates_20190530 Acknowledgement Letter 2019-05-30 2019-05-30
EB-2019-0018  AlectraUtilities_LTR_Confidentiality Request_20190529 Correspondence 2019-05-29 2019-05-29
EB-2019-0018  Alectra_APPL_Ex 5_Attach 33 LRAMVA WorkForm ERZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 32 LRAMVA WorkForm PRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 31 LRAMVA WorkForm BRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 30 LRAMVA WorkForm HRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 29 RGCRP GRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 28 RGCRP ERZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 27 RGCRP PRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 26 RGCRP BRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 25 RGCRP HRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 24 1595 Workform ERZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 23 GA Workform ERZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 22 GA Workform PRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 16 IRM Model GRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 15 IRM Model ERZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 14 IRM Model PRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 13 IRM Model BRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 12 IRM Model HRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 11 Table of Allocations 2018 HRZ ESM_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 10 ESM Rate Rider Model HRZ_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 09 Table of Allocations 2017 HRZ ESM_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  Alectra_APPL_Ex 5_Attach 03 M-factor Revenue Requirement_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  AlectraUtilities_APPL_Ex 5-Attach 1-34_v. 7 of 7_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  AlectraUtilities_APPL_Ex 4-Apx L-P_v. 6 of 7_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  AlectraUtilities_APPL_Ex 4-Apx G-K_v. 5 of 7_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  AlectraUtilities_APPL_Ex 4-Apx F_v. 4 of 7_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  AlectraUtilities_APPL_Ex 4-Apx B-E_v. 3 of 7_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  AlectraUtilities_APPL_Ex 4-Apx A_ v. 2 of 7_20190528 Application and Evidence 2019-05-28 2019-05-28
EB-2019-0018  AlectraUtilities_APPL_Ex 1-3_v. 1 of 7_20190528. Application and Evidence 2019-05-28 2019-05-28