Advanced Regulatory Document Search (RDS)

Search Results for: Records - Case Number=EB-2016-0085 - 283 Records Found

SORTING YOUR SEARCH RESULTS
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



CASE INFORMATION
Click the case number to view details for that proceeding.

 Case Number  File Name  Document Type  Issued By OEB  Received By OEB Date Issued/Received
EB-2016-0085  VECC Cost Claim EB 2016-0085 Innpower_20180510 Cost Claim 2018-05-10 2018-05-10
EB-2016-0085  Final_Rate_Order_InnPower_20180503 Rate Order 2018-05-03 2018-05-03
EB-2016-0085  2017_Filing_Requirements_Chapter2_Appendices TC.xlsm Draft Rate Order 2018-04-24 2018-04-24
EB-2016-0085  InnPower Draft Rate Order_EB-2016-0085_201800424_Corrected.pdf Draft Rate Order 2018-04-24 2018-04-24
EB-2016-0085  InnPower_Revised Draft Rate Order_20180424 Draft Rate Order 2018-04-25 at 9:16 AM
EB-2016-0085  2017_Tariff_Schedule_and_Bill_Impact_Model_EB-2016-0085 TC_20180423Rev.xlsm Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  InnPower_EB-2016_0086_Test_year_Income_Tax_PILs_Workform TC.xlsm Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  InnPower_2017_DVA Continuity Schedule CoS v2_20180409.xlsx Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  InnPower_2017 Load Forecast_TC.xlsx Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  InnPower 2018 Draft Tariff _OEB_EB-2016-0085_20180423Rev.xlsx Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  Final Forgone Revenue Rate Rider Calculation_20180423Rev.xlsx Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  2017_RTSR_Workform TC.xlsm Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  2017_Rev_Reqt_Work_Form_V7 TC.xlsm Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  2017_Cost_Allocation_Model_V3.4 TC PAWG 38.82.xlsm Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  InnPower Draft Rate Order_EB-2016-0085_201800423.pdf Draft Rate Order 2018-04-23 2018-04-23
EB-2016-0085  OEBStaff_Revised DRO_SUB_InnPower_20180417 Submission 2018-04-17 2018-04-17
EB-2016-0085  Innpower RRWF Model for EB-2016-0085_20180413 Submission 2018-04-17 at 9:55 AM
EB-2016-0085  CostClaim_SEC_InnPower appl_20180413 Cost Claim 2018-04-13 2018-04-13
EB-2016-0085  2017_Rev_Reqt_Work_Form_V7 TC_20180413 Draft Rate Order 2018-04-13 2018-04-13
EB-2016-0085  SEC InnPower DRO Submissions_20180411 Submission 2018-04-11 2018-04-11
EB-2016-0085  PO9_InnPower_20180411 Procedural Order 2018-04-11 2018-04-11
EB-2016-0085  2017_Rev_Reqt_Work_Form_V7 1 TC.xlsm Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  InnPower_EB-2016_0086_Test_year_Income_Tax_PILs_Workform TC.xlsm Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  InnPower_2017_DVA Continuity Schedule CoS v2_20180409.xlsx Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  InnPower_2017 Load Forecast_TC.xlsx Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  Final Forgone Revenue Rate Rider Calculation.xlsx Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  2017_Tariff_Schedule_and_Bill_Impact_Model_EB-2016-0085 TC_20180409REV.xlsm Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  DRO_InnPower_EB-2016-0085_20180409.xlsx Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  2017_RTSR_Workform TC.xlsm Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  2017_Filing_Requirements_Chapter2_Appendices TC.xlsm Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  2017_Cost_Allocation_Model_V3.4 TC PAWG 38.82.xlsm Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  InnPower Draft Rate Order_EB-2016-0085_20180409 Draft Rate Order 2018-04-10 2018-04-10
EB-2016-0085  OEB staff Forgone Revenue Rate Rider Calculation.xlsx Submission 2018-04-02 2018-04-02
EB-2016-0085  OEBStaff_DRO_SUB_InnPower_20180402 Submission 2018-04-02 2018-04-02
EB-2016-0085  InnPower_EB-2016_0086_Test_year_Income_Tax_PILs_Workform TC Draft Rate Order 2018-03-28 2018-03-28
EB-2016-0085  2017_Rev_Reqt_Work_Form_V7 TC Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  InnPower_2017 Load Forecast_TC Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  InnPower_2017_DVA Continuity Schedule CoS v2_03212018 Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  DRO_InnPower_EB-2016-0085_20180326 Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  2017_Tariff_Schedule_and_Bill_Impact_Model_EB-2016-0085 TC_20180322 Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  2017_RTSR_Workform TC Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  InnPower Draft Rate Order_EB-2016-0085_20180326 Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  Foregone Revenue Rate Rider Calculation Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  2017_Filing_Requirements_Chapter2_Appendices TC Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  2017_Cost_Allocation_Model_V3.4 TC PAWG 38.82 Draft Rate Order 2018-03-26 2018-03-26
EB-2016-0085  OEB_Ltr_Delay Filing DRO_InnPower_20180326 Correspondence 2018-03-26 2018-03-26
EB-2016-0085  InnPower_Letter_20180323 Correspondence 2018-03-23 2018-03-23
EB-2016-0085  dec_order_InnPower_20180308 Decision and Order 2018-03-08 2018-03-08
EB-2016-0085  InnPower_Letter_EB-2016-0085_20180301.pdf Correspondence 2018-03-01 2018-03-01
EB-2016-0085  InnPower_ReplySUB_20180223.pdf Submission 2018-02-23 2018-02-23
EB-2016-0085  po8_InnPower_20180214 Procedural Order 2018-02-14 2018-02-14
EB-2016-0085  OEB Staff Submission_Innpower Settlement_EB-2016-0085_20180209 Submission 2018-02-09 2018-02-09
EB-2016-0085  InnPower_APPL_Pole Attachment_EB-2016-0085_20180209.XLSX Submission 2018-02-09 2018-02-09
EB-2016-0085  InnPower_SettlementProposal_20180202 Settlement Proposal 2018-02-02 2018-02-02
EB-2016-0085  InnPower_SettlementProposal_20180202 Settlement Proposal 2018-02-02 2018-02-02
EB-2016-0085  OEB_Ltr_Delay Filing Settlement_InnPower_20180201 Correspondence 2018-02-01 2018-02-01
EB-2016-0085  InnPower_Letter_20180131 Correspondence 2018-01-31 2018-01-31
EB-2016-0085  OEB Letter_InnPower_20180109 Correspondence 2018-01-09 2018-01-09
EB-2016-0085  OEB Letter_InnPower_ClarifQu_20180102 Correspondence 2018-01-02 2018-01-02
EB-2016-0085  FW: EB-2016-0085: InnPower Corporation - 2017 Rate Application - Pole Attachment Rate - Request for Supplemental Interrogatories Correspondence 2018-01-02 2018-01-02
EB-2016-0085  InnPower_IRR_PO7_20171218 Interrogatory Response from Applicant 2017-12-18 2017-12-18
EB-2016-0085  InnPower_APPL_Pole Attachment_20171218 Interrogatory Response from Applicant 2017-12-18 2017-12-18
EB-2016-0085  revised_Rogers_Interrogatories to OEB_20171204 Interrogatories to Applicant 2017-12-04 2017-12-04
EB-2016-0085  SEC_InnPower_PoleAttachment_IR_20171204 Interrogatories to Applicant 2017-12-04 2017-12-04
EB-2016-0085  OEB staff_InnPower Interrogatories_Pole Attach_20171204 Interrogatories to Applicant 2017-12-04 2017-12-04
EB-2016-0085  OEBStaff_IR_InnPower_EB-2016-0085_20171204 Interrogatories to Applicant 2017-12-04 2017-12-04
EB-2016-0085  VECC_3rdIRQ_InnPower_EB-2016-0085_20171204 Interrogatories to Applicant 2017-12-04 2017-12-04
EB-2016-0085  InnPower_APPL_Pole Attachment_20171127 Application and Evidence 2017-11-28 2017-11-28
EB-2016-0085  InnPower_APPL_Pole Attachment_updated Appendix 2-H_20171127 Application and Evidence 2017-11-27 2017-11-27
EB-2016-0085  InnPower_ReplySUB_20171113 Submission 2017-11-13 2017-11-13
EB-2016-0085  dec_PO7_InnPower_20171110 Procedural Order 2017-11-10 2017-11-10
EB-2016-0085  dec_PO7_InnPower_20171110 Decision 2017-11-10 2017-11-10
EB-2016-0085  Rogers_SUB_response_20171101 Submission 2017-11-01 2017-11-01
EB-2016-0085  VECC Letter_Pole Attachment and MicroFIT_20171101 Submission 2017-11-01 2017-11-01
EB-2016-0085  InnPower_SUB_Pole Attachment_microFIT Charges_20171101 Submission 2017-11-01 2017-11-01
EB-2016-0085  OEBstaff_Sub_Pole_microFIT_InnPower_20171101.pdf Submission 2017-11-01 2017-11-01
EB-2016-0085  SEC_InnPower_PO6_Comments_20171101.pdf Submission 2017-11-01 2017-11-01
EB-2016-0085  Rogers_SUB_Response to OEB_20171101.PDF Submission 2017-11-01 2017-11-01
EB-2016-0085  VECC_Sub_InnPower_20171031.pdf Submission 2017-10-31 2017-10-31
EB-2016-0085  Side by Side Revenue Requirement with notes_20171030.xlsx Submission 2017-10-31 2017-10-31
EB-2016-0085  Customers per FTE 20171030.xlsx Submission 2017-10-31 2017-10-31
EB-2016-0085  Compensation per FTE 20171030.xlsx Submission 2017-10-31 2017-10-31
EB-2016-0085  SEC Final Argument 20171030 with Appendices Final Argument 2017-10-30 2017-10-30
EB-2016-0085  Corrected_OEBstaff_Sub_InnPower_20171026 Submission 2017-10-26 2017-10-26
EB-2016-0085  InnPower_Cross Reference Document_20171011 Undertaking Responses 2017-10-11 2017-10-11
EB-2016-0085  InnPower_EX_K2.2_20171004 Exhibits 2017-10-04 2017-10-04
EB-2016-0085  InnPower_EX_K1.5_20171004 Exhibits 2017-10-04 2017-10-04
EB-2016-0085  InnPower_EX_K1.3_20171004 Exhibits 2017-10-04 2017-10-04
EB-2016-0085  InnPower_EX_K1.2_20171004 Exhibits 2017-10-04 2017-10-04
EB-2016-0085  PO6_InnPower_20171010 Procedural Order 2017-10-10 2017-10-10
EB-2016-0085  J2.4 Contribution depreciation and Deferred Revenue Update App. 2-BA and....xlsx Undertaking Responses 2017-10-06 2017-10-06
EB-2016-0085  InnPower_Ex_J1.8_2017_DVA Continuity Schedule CoS v2_20171006.xlsx Undertaking Responses 2017-10-06 2017-10-06
EB-2016-0085  InnPower_ARGChief_20171006 Applicant Argument in Chief 2017-10-06 2017-10-06
EB-2016-0085  InnPower_Ex_J1.9_2017 Load Forecast_20171006 Undertaking Responses 2017-10-06 2017-10-06
EB-2016-0085  InnPower_Ex_J1.8_2017_DVA Continuity Schedule CoS v2_20171006 Undertaking Responses 2017-10-06 2017-10-06
EB-2016-0085  InnPower_Ex_J1.1-J2.6_Undertaking Responses_20171006 Undertaking Responses 2017-10-06 2017-10-06
EB-2016-0085  PO5_InnPower_20171005 Procedural Order 2017-10-05 2017-10-05
EB-2016-0085  InnPower_undertakings list_oral hearing_20171003 Undertaking List 2017-10-05 at 11:46 AM
EB-2016-0085  InnPower_exhibit list_oral hearing_20171005 Exhibit List 2017-10-05 at 11:48 AM
EB-2016-0085  InnPower_hearing transcript - Volume 2_20171004 Transcripts 2017-10-04 2017-10-04
EB-2016-0085  InnPower_hearing transcript_Volume 1 Public Redacted_20171003 Transcripts 2017-10-03 2017-10-03
EB-2016-0085  InnPower_Ex_1.4_20171004 Exhibits 2017-10-04 2017-10-04
EB-2016-0085  InnPower_Ex_K1.1_20171004 Exhibits 2017-10-04 2017-10-04
EB-2016-0085  InnPower_Ex2.1_20171004 Exhibits 2017-10-04 2017-10-04
EB-2016-0085  SEC Compendium with photos_20171002 Pre-Hearing Material 2017-10-03 2017-10-03
EB-2016-0085  InnPower 0085 OM&A Compendium _20171002 Pre-Hearing Material 2017-10-03 2017-10-03
EB-2016-0085  InnPower 0085 CapEx Hearing Compendium_20171002 Pre-Hearing Material 2017-10-03 2017-10-03
EB-2016-0085  InnPower 0085 Cost of Capital Compendium_20171002 Pre-Hearing Material 2017-10-03 2017-10-03
EB-2016-0085  dec_Confidentiality_Intervenor REQ_InnPower_20171002 Decision 2017-10-02 2017-10-02
EB-2016-0085  Rogers_IntrvREQ_EB-2016-0085_20170927 Intervenor Request Letter 2017-09-27 2017-09-27
EB-2016-0085  OEBstaff_Sub_InnPower_20170927 Submission 2017-09-27 2017-09-27
EB-2016-0085  InnPower_Ex_JT2.4_Updated_Load_Forecast_Evidence_20170920 Undertaking Responses 2017-09-21 2017-09-21
EB-2016-0085  InnPower_Ex_JT1.28_KT1.6_Updated_2015_GA_Reasonability_Test_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  InnPower_Ex_JT1.28_KT1.6_2015_Reconciliation_Worksheet_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  InnPower_Ex_JT1.10_Customer_Letters_Redacted_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  InnPower_EB-2016_0086_Test_year_Income_Tax_PILs_Workform TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  InnPower_2017 Load Forecast_TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  Benchmarking_Spreadsheet_Forecast_TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  2017_Tariff_Schedule_and_Bill_Impact_Model_EB-2016-0085 TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  2017_RTSR_Workform TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  2017_Rev_Reqt_Work_Form_V7 1 TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  2017_Filing_Requirements_Chapter2_Appendices TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  2017_DVA_Continuity_Schedule_CoS_v2_7 TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  2017_Cost_Allocation_Model_V3.4 TC_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  InnPower_JT1.1-JT28_20170920 Undertaking Responses 2017-09-20 2017-09-20
EB-2016-0085  Cover Letter_Corrected DO - InnPower_20170921 Correspondence 2017-09-21 2017-09-21
EB-2016-0085  Corrected EB-2016-0085_PO4 and Decision on Issues List_20170921 Correspondence 2017-09-21 2017-09-21
EB-2016-0085  PO4_InnPower_Decision on Issues List_20170920 Procedural Order 2017-09-20 2017-09-20
EB-2016-0085  InnPower_Affidavit_20170915 Affidavits of Service 2017-09-15 2017-09-15
EB-2016-0085  InnPower_LTR_20170914 Correspondence 2017-09-14 2017-09-14
EB-2016-0085  Exhibit_KT1.6_20170912 Exhibits 2017-09-12 2017-09-12
EB-2016-0085  Exhibit_KT2.7_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.7_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.6_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.6_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.5_20170914 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.5_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.4_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.3_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.2_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT2.1_20170913 Exhibits 2017-09-13 2017-09-13
EB-2016-0085  Exhibit_KT1.5_20170912 Exhibits 2017-09-12 2017-09-12
EB-2016-0085  Exhibit_KT1.4_20170912 Exhibit List 2017-09-12 2017-09-12
EB-2016-0085  Exhibit_KT1.3_20170912 Exhibits 2017-09-12 2017-09-12
EB-2016-0085  Exhibit_KT1.2_20170912 Exhibits 2017-09-12 2017-09-12
EB-2016-0085  Exhibit_KT1.1_20170912 Exhibits 2017-09-12 2017-09-12
EB-2016-0085  InnPower_transcript_vol2_TC20170913 Transcripts 2017-09-13 2017-09-13
EB-2016-0085  Issues List EB-2016-0085 InnPower_20170914 Correspondence 2017-09-14 2017-09-14
EB-2016-0085  InnPower_Ltr_ConfidentialityREQ_20170911 Correspondence 2017-09-13 2017-09-13
EB-2016-0085  InnPower_transcript_vol1_TC_20170912 Transcripts 2017-09-12 2017-09-12
EB-2016-0085  VECC_TCQ_InnPower0085_20170908 Cross Examination Material 2017-09-08 2017-09-08
EB-2016-0085  VECC TCQ-Attachment A_20170908 Cross Examination Material 2017-09-08 2017-09-08
EB-2016-0085  Technical Conference Topics_InnPower_20170908 Cross Examination Material 2017-09-08 2017-09-08
EB-2016-0085  VECC TCQ-Attachment C_20170908 Cross Examination Material 2017-09-08 2017-09-08
EB-2016-0085  EB-2016-0085_VECC TCQ-Attachment B_20170908 Cross Examination Material 2017-09-08 2017-09-08
EB-2016-0085  InnPower_TC_WitnessCVs_20170907 Cross Examination Material 2017-09-07 2017-09-07
EB-2016-0085  9.0-Staff-68 GA Reasonability Test_20170803 Interrogatory Response from Applicant 2017-09-05 2017-09-05
EB-2016-0085  InnPower_2017 Load Forecast_IRR_20170803 Interrogatory Response from Applicant 2017-09-05 2017-09-05
EB-2016-0085  InnPower_2017 Load Forecast_IRR_20170803 Interrogatory Response from Applicant 2017-09-05 2017-09-05
EB-2016-0085  PO3_InnPower_20170901 Procedural Order 2017-09-01 2017-09-01
EB-2016-0085  InnPower_LTR_Procedural Matters_20170828 Correspondence 2017-08-28 2017-08-28
EB-2016-0085  SEC correspondence_20170824 Correspondence 2017-08-24 2017-08-24
EB-2016-0085  INNPower_PC_Letter_re_Specific_service_charge_20170823 Correspondence 2017-08-23 2017-08-23
EB-2016-0085  InnPower Response IRR_EB-2016-0085_20170804 Renamed Interrogatory Response from Applicant 2017-08-08 2017-08-08
EB-2016-0085  InnPower IRR Letter_EB-2016-0085_20170804 Interrogatory Response from Applicant 2017-08-08 2017-08-08
EB-2016-0085  InnPower IRR Procedural Order 2_EB-2016-0085_20170804 Interrogatory Response from Applicant 2017-08-08 2017-08-08
EB-2016-0085  InnPower IRR Letter_EB-2016-0085_20170804 Interrogatory Response from Applicant 2017-08-04 2017-08-04
EB-2016-0085  2017_DVA_Continuity_Schedule_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  InnPower_EB-2016_0086_Tax_PILs_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  InnPower_EB-2016_0086_Tax_PILs_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  InnPower Proposed Tariff IRR EB-2016-0085_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  InnPower 2017_Cost_Allocation_Model_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  InnPower 2017_Cost_Allocation_Model_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  2017_RTSR_Workform_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  2017_RTSR_Workform_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  2017_Rev_Reqt_Work_Form_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  2017_Rev_Reqt_Work_Form_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  2017_Filing_Requirements_Chapter2_Appendices_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  2017_Filing_Requirements_Chapter2_Appendices_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  2017_DVA_Continuity_Schedule_IRR_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085   IPC IRR to SEC Preliminary Interrogatories_20170803 Interrogatory Response from Applicant 2017-08-03 2017-08-03
EB-2016-0085  OEB_Ltr_IRR_Delay Response_InnPower_20170721 Correspondence 2017-07-21 2017-07-21
EB-2016-0085  InnPower_LTR_ IRR_Filing Delay_20170720 Correspondence 2017-07-20 2017-07-20
EB-2016-0085  OEB response_InnPower_IRR Extn REQ_20170711 Correspondence 2017-07-11 2017-07-11
EB-2016-0085  InnPower_LTR_ IRR_Filing Delay_20170707 Correspondence 2017-07-07 2017-07-07
EB-2016-0085  OEB_Extension_Ltr2_IRR_20160628 Correspondence 2017-06-28 2017-06-28
EB-2016-0085  InnPower_LTR_ IRR_Filing Delay_20170627 Correspondence 2017-06-27 2017-06-27
EB-2016-0085  Extension_Ltr_IRR_20160626 Correspondence 2017-06-26 2017-06-26
EB-2016-0085  InnPower_Request Letter_EB-2016-0085_20170623 Correspondence 2017-06-23 2017-06-23
EB-2016-0085  VECC_2ndIRQ_InnPower0085_201706013 Interrogatories to Applicant 2017-06-13 2017-06-13
EB-2016-0085  BdStaff_IR_InnPower_SSC_20170613 Interrogatories to Applicant 2017-06-13 2017-06-13
EB-2016-0085  BdStaff_Cvrltr_IRs_InnPower_SSC_20170613 Interrogatories to Applicant 2017-06-13 2017-06-13
EB-2016-0085  SEC_InnPower_PoleAttachment_IR_20170613 Interrogatories to Applicant 2017-06-13 2017-06-13
EB-2016-0085  VECC_IRs_InnPower0085_20170602 Interrogatories to Applicant 2017-06-05 2017-06-05
EB-2016-0085   SEC Interrogatories with Attachments_20170605 Interrogatories to Applicant 2017-06-05 2017-06-05
EB-2016-0085  GA Reasonability Test Interrogatories to Applicant 2017-05-30 2017-05-30
EB-2016-0085  BdStaff_IR_InnPower_20170530 Interrogatories to Applicant 2017-05-30 2017-05-30
EB-2016-0085  BdStaff_Cvrltr_IRs_InnPower_20170530 Interrogatories to Applicant 2017-05-30 2017-05-30
EB-2016-0085  PO2_Innpower_20170526 Procedural Order 2017-05-26 2017-05-26
EB-2016-0085  PO1_Innpower Corp_CoS_20170516 Procedural Order 2017-05-16 2017-05-16
EB-2016-0085  InnPower 2017_Cost_Allocation_Model_20170511 Submission 2017-05-11 2017-05-11
EB-2016-0085  InnPower 2017_Cost_Allocation_Model_20170511 Submission 2017-05-11 2017-05-11
EB-2016-0085  InnPower_Proposed Tariff_EB-2016-0085_20170508 Application and Evidence 2017-05-10 2017-05-10
EB-2016-0085  InnPower_Proposed Tariff_EB-2016-0085_20170508 Application and Evidence 2017-05-10 2017-05-10
EB-2016-0085  InnPower_EB-2016-0085_Chapter2_Appendices_20170509 Application and Evidence 2017-05-10 2017-05-10
EB-2016-0085  InnPower_EB-2016-0085_Chapter2_Appendices_20170509 Application and Evidence 2017-05-10 2017-05-10
EB-2016-0085  InnPower_EB-2016-0085_Amended Application_20170508 Application and Evidence 2017-05-10 2017-05-10
EB-2016-0085  InnPower 2017 Load Forecast EB-2016-0086_20170509 Application and Evidence 2017-05-10 2017-05-10
EB-2016-0085  2017_Tariff_Schedule_and_Bill_Impact_Model_EB-2016-0085_20170508 Application and Evidence 2017-05-10 2017-05-10
EB-2016-0085  InnPower_RRWF_EB-2016-0085_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower_RRWF_EB-2016-0085_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower_EDDVAR_EB-2016-0085_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower_EDDVAR_EB-2016-0085_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower_EB-2016_0086_Tax_PILs_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower_Benchmarking_Model_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower_Benchmarking_Model_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower_Benchmarking_Model_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  eInnPower_updated evidence Letter_EB-2016-0085_20170508 Application and Evidence 2017-05-08 2017-05-08
EB-2016-0085  InnPower Community_Meeting_Summary_20170502 Correspondence 2017-05-02 2017-05-02
EB-2016-0085  InnPower_Letter of Amendment_Innpower_20170425 Correspondence 2017-04-25 2017-04-25
EB-2016-0085  InnPower-Letter of Amendment_EB-2016-0085-20170417 Correspondence 2017-04-18 2017-04-18
EB-2016-0085  InnPower_Affidavit_EB-2016-0085_20170417 Affidavits of Service 2017-04-18 2017-04-18
EB-2016-0085  InnPower - Letter of Comments - Evening Community Meeting_REDACTED_20170309 Letter of Comment 2017-03-20 2017-03-20
EB-2016-0085  InnPower - Letter of Comments - Afternoon Community Meeting_20170309_Redacted Letter of Comment 2017-03-20 2017-03-20
EB-2016-0085  InnPower_Affidavit_20170407 Affidavits of Service 2017-04-07 2017-04-07
EB-2016-0085  Ack Ltr_letter of comment_Coleman_20170406 Acknowledgement Letter 2017-04-06 2017-04-06
EB-2016-0085  Ltr_comment_Coleman_20170406_Redacted Letter of Comment 2017-04-06 2017-04-06
EB-2016-0085  SEC Preliminary Interrogatories 20170405 Interrogatories to Applicant 2017-04-05 2017-04-05
EB-2016-0085  Ack Ltr_letter of comment_PRyan_20170324 Acknowledgement Letter 2017-03-24 2017-03-24
EB-2016-0085  LtrComment_Pat Ryan - Submission_Afternoon Community Meeting_Redacted_20170309 Letter of Comment 2017-03-23 at 3:21 PM
EB-2016-0085  Ack Ltr_letter of comment_NCholewa_20170324 Acknowledgement Letter 2017-03-24 2017-03-24
EB-2016-0085  Ltr_comment_NCholewa_20170323_Redacted Letter of Comment 2017-03-23 2017-03-23
EB-2016-0085  Ack Ltr_letter of comment_MBoddy_20170320 Acknowledgement Letter 2017-03-20 2017-03-20
EB-2016-0085  MBoddy_Ltr_Comment_REDACTED_20170316 Letter of Comment 2017-03-16 2017-03-16
EB-2016-0085  InnPower_LTR_Response_to_SEC_20170317 Correspondence 2017-03-17 2017-03-17
EB-2016-0085  Goodchild_Ltr_comment_REDACTED_20170316 Letter of Comment 2017-03-16 2017-03-16
EB-2016-0085  Ack Ltr_letter of comment_Goodchild_20170316 Acknowledgement Letter 2017-03-16 2017-03-16
EB-2016-0085  BVanderpost_ltr_comment_REDACTED_20170315 Letter of Comment 2017-03-15 2017-03-15
EB-2016-0085  Ack Ltr_letter of comment_Vanderpost_20170316 Acknowledgement Letter 2017-03-16 2017-03-16
EB-2016-0085  Jenssen Brown_ltr_comment_REDACTED_20170310 Letter of Comment 2017-03-10 2017-03-10
EB-2016-0085  Ack Ltr_letter of comment_Jenssen Brown_20170314 Acknowledgement Letter 2017-03-14 2017-03-14
EB-2016-0085  Ack Ltr_letter of comment_Gariepy_20170314 Acknowledgement Letter 2017-03-14 2017-03-14
EB-2016-0085  Gariepy_ltr_Comment_REDACTED_20170313 Letter of Comment 2017-03-14 2017-03-14
EB-2016-0085  VECC N of I EB 2016-0085 InnPower_20170313 Intervenor Request Letter 2017-03-13 2017-03-13
EB-2016-0085  DPetras_ltr_comment_20170310_Redacted Letter of Comment 2017-03-10 2017-03-10
EB-2016-0085  Ack Ltr_letter of comment_DPetras_20170310 Acknowledgement Letter 2017-03-10 2017-03-10
EB-2016-0085  KLiebing_Ltr_comment_20170310 Letter of Comment 2017-03-10 2017-03-10
EB-2016-0085  Ack Ltr_letter of comment_DCoo_20170310 Acknowledgement Letter 2017-03-10 2017-03-10
EB-2016-0085  DCoo_Ltr_Comment_20170310 Letter of Comment 2017-03-10 2017-03-10
EB-2016-0085  Ack Ltr_letter of comment_TSanders_20170309 Acknowledgement Letter 2017-03-09 2017-03-09
EB-2016-0085  TSanders_ltr_Comment_2016-0085 Letter of Comment 2017-03-09 2017-03-09
EB-2016-0085  KLiebing_Ltr_comment_20170308 Letter of Comment 2017-03-08 2017-03-08
EB-2016-0085  LSanders_ltr_comment_REDACTED_20170307 Letter of Comment 2017-03-07 2017-03-07
EB-2016-0085  Ack Ltr_letter of comment_LSanders_20170308 Acknowledgement Letter 2017-03-07 2017-03-07
EB-2016-0085  SEC_corresp_InnPower_20170307 Correspondence 2017-03-07 2017-03-07
EB-2016-0085  SEC Notice of Intervention_20170307 Intervenor Request Letter 2017-03-07 2017-03-07
EB-2016-0085  Ack Ltr_letter of comment_KZegota_20170307 Acknowledgement Letter 2017-03-07 2017-03-07
EB-2016-0085  KZegota_Ltr_comment_REDACTED_20170307 Letter of Comment 2017-03-07 2017-03-07
EB-2016-0085  Ack Ltr_letter of comment_Klaus_20170307 Acknowledgement Letter 2017-03-07 2017-03-07
EB-2016-0085  Klaus_ltr_comment_REDACTED_20170307 Letter of Comment 2017-03-07 2017-03-07
EB-2016-0085  Ack Ltr_letter of comment_PMahon_20170307 Acknowledgement Letter 2017-03-07 2017-03-07
EB-2016-0085  PMahon_ltr_comment_Hydro OEB present_20170307 Letter of Comment 2017-03-07 2017-03-07
EB-2016-0085  Ack Ltr_letter of comment_SBA_20170306 Acknowledgement Letter 2017-03-06 2017-03-06
EB-2016-0085  SBA response to InnPower rate application_20170305 Letter of Comment 2017-03-06 2017-03-06
EB-2016-0085  Ack Ltr_letter of comment_MPhilpott_20170303 Acknowledgement Letter 2017-03-03 2017-03-03
EB-2016-0085  MPhilpott_ltr_comment_REDACTED_20170228 Letter of Comment 2017-02-28 2017-02-28
EB-2016-0085  Ack Ltr_letter of comment_WWarnica_20170303 Letter of Comment 2017-03-03 2017-03-03
EB-2016-0085  WWarnica_ltr_comment_REDACTED_20470302 Letter of Comment 2017-03-02 2017-03-02
EB-2016-0085  LOD_Innpower_20170222 Letter of Direction 2017-02-22 2017-02-22
EB-2016-0085  Notice_Innpower_20170222 Notice 2017-02-22 2017-02-22
EB-2016-0085  InnPower_EB-2016-0085_Supplemental Filing_20170118 Application and Evidence 2017-01-18 2017-01-18
EB-2016-0085  InnPower_EB-2016-0085_Exhibit 2_20170116_Revised Submission 2017-01-17 2017-01-17
EB-2016-0085  InnPower_EB-2016-0085_Supplemental Filing_20170116 Submission 2017-01-17 2017-01-17
EB-2016-0085  Interim Rate Order _InnPower_20161221 Rate Order 2016-12-21 2016-12-21
EB-2016-0085  Ack Letter_InnPower_20161206 Acknowledgement Letter 2016-12-06 2016-12-06
EB-2016-0085  InnPower_LRAMVA 2011-2014_EB-2016-0085_20161128 Application and Evidence 2016-11-28 2016-11-28
EB-2016-0085  InnPower_LRAMVA 2011-2014_EB-2016-0085_20161128 Application and Evidence 2016-11-28 2016-11-28
EB-2016-0085  InnPower_EB-2016_0085_Test_year_Income_Tax_PILs_Workform_20161128 Application and Evidence 2016-11-28 2016-11-28
EB-2016-0085  InnPower_EB-2016_0085_Test_year_Income_Tax_PILs_Workform_20161128 Application and Evidence 2016-11-28 2016-11-28
EB-2016-0085  InnPower_2017_Tariff_Schedule_and_Bill_Impact_Model_EB-2016-0085_20161128 Application and Evidence 2016-11-28 2016-11-28
EB-2016-0085  InnPower_2017_Tariff_Schedule_and_Bill_Impact_Model_EB-2016-0085_20161128 Application and Evidence 2016-11-28 2016-11-28
EB-2016-0085  InnPower_2017_EDDVAR_EB-2016-0085_20161128 Application and Evidence 2016-11-28 2016-11-28
EB-2016-0085  InnPower_2017_EDDVAR_EB-2016-0085_20161128 Application and Evidence 2016-11-28 2016-11-28