Search Results for: Records - Case Number=EB-2017-0194 - 267 Records Found

SORTING YOUR SEARCH RESULTS
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



CASE INFORMATION
Click the case number to view details for that proceeding.

 Case Number  File Name  Document Type  Issued By OEB  Received By OEB Date Issued/Received
EB-2017-0194  HONI_LTR_20181119 Correspondence 2018-11-19 2018-11-19
EB-2017-0194  MFN_ltr_response HONI reply submission_20181113 Correspondence 2018-11-13 2018-11-13
EB-2017-0194  NextBridge_ReplyARG_20181110_Corrected Applicant Reply Argument 2018-11-12 2018-11-12
EB-2017-0194  NextBridge_ReplyARG_20181109 Applicant Reply Argument 2018-11-12 2018-11-12
EB-2017-0194  HONI_Reply submission_0181109 Applicant Reply Argument 2018-11-09 2018-11-09
EB-2017-0194  Ack Ltr_letter of comment_M Gravelle MPP_20181107 Acknowledgement Letter 2018-11-07 2018-11-07
EB-2017-0194  Thunder Bay_MPP_correspondence_20181025_Redacted Comments 2018-10-25 2018-10-25
EB-2017-0194  Thunder Bay_MPP_correspondence_20181016 Comments 2018-10-16 2018-10-16
EB-2017-0194  MECP_Response ltr to OEB_20181106 Correspondence 2018-11-06 2018-11-06
EB-2017-0194  OEBltr_HONI_NB_East West Tie_20181106 Correspondence 2018-11-06 2018-11-06
EB-2017-0194  HONI_Ltr_EWT_LSL_20181106 Correspondence 2018-11-06 2018-11-06
EB-2017-0194  OEBResponse_Township of Terrace Bay_HONI_Nextbridge Combined_20181102 Correspondence 2018-11-02 2018-11-02
EB-2017-0194  Township of Terrace Bay_letter of comment_20181101 Comments 2018-11-02 2018-11-02
EB-2017-0194  OEB Staff_sub_NextBridge_Hydro One_20181031_Revised Submission 2018-11-01 2018-11-01
EB-2017-0194  VECC Submission_EWT Combined Proceeding_20181101 Submission 2018-11-01 2018-11-01
EB-2017-0194  OEB Letter to MECP_EWT_LSL_20181101 Correspondence 2018-11-01 2018-11-01
EB-2017-0194  OEB Staff_sub_NextBridge_Hydro One_20181031(2) Submission 2018-10-31 2018-10-31
EB-2017-0194  MECP_LTR_EWT_LSL_20181101 Correspondence 2018-10-31 2018-10-31
EB-2017-0194  CCC_FinalArgument_EWT_HON_NB_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  BFN_ Final Submission_Combined Hearing_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  BFN_CvrLtr_Submission_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  PWU_SUB_transmission line_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  SEC_NB_HON_EWT_LSL_FinalArgument_20181031_Redacted Submission 2018-10-31 2018-10-31
EB-2017-0194  MNO_SUB_EWT_LSL_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  BLP_BookofAuthorities_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  BLP_FinalSUB_2018103 Submission 2018-10-31 2018-10-31
EB-2017-0194  IESO_Submission_EWT_LSL_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  IESO_CvrLtr_Submisson_EWT_LSL_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  NextBridge_ReplyARG_20181031 Applicant Reply Argument 2018-10-31 2018-10-31
EB-2017-0194  Anwaatin_SUB_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  HONI_Response to NextBridge_20181031 Applicant Reply Argument 2018-10-31 2018-10-31
EB-2017-0194  BZA_FinalSUB2_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  LLFN_SUB_EWT_LSL_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  MFN_Argument_EWT_LSL_20181031 Submission 2018-10-31 2018-10-31
EB-2017-0194  HONI_ltr_EWT_LSL_20181030 Correspondence 2018-10-30 2018-10-30
EB-2017-0194  HONI_LTR_EWT_LSL_20181029 Correspondence 2018-10-29 2018-10-29
EB-2017-0194  Thunder Bay_MPP_correspondence_20181025_Redacted Comments 2018-10-25 2018-10-25
EB-2017-0194  HONI_ARGChief_20181022 Applicant Argument in Chief 2018-10-22 2018-10-22
EB-2017-0194  NextBridge_ARGChief_20181022 Applicant Argument in Chief 2018-10-22 2018-10-22
EB-2017-0194  OEB Staff Summary of the Evidence on Costs_EWT_LSL_Exhi K4 2_20181009 Exhibits 2018-10-09 2018-10-09
EB-2017-0194  Thunder Bay_MPP_correspondence_20181016 Correspondence 2018-10-16 2018-10-16
EB-2017-0194  OEB correspondence _EWT_LSL_20181015 Correspondence 2018-10-15 2018-10-15
EB-2017-0194  NextBridge_UndertakingResponse_J6 1_20181015 Undertaking Responses 2018-10-15 2018-10-15
EB-2017-0194  HONI_UndertakingResponse_JT4 1__20181015 Undertaking Responses 2018-10-15 2018-10-15
EB-2017-0194  Nextbridge Chart_Exhi K7 1_20181012 Exhibits 2018-10-12 2018-10-12
EB-2017-0194  NextBridge_Number 8 Operations Maintenance_Exhi K6 2_20181011 Exhibits 2018-10-11 2018-10-11
EB-2017-0194  Environmental assessmentact act_RSO1990_Exhi K7 2_20181012 Exhibits 2018-10-12 2018-10-12
EB-2017-0194  Transcripts_Volume 7_EWT_LSL_combined hearing_20181012 Transcripts 2018-10-12 2018-10-12
EB-2017-0194  HONI_UndertakingResponse_JT4 1_20181012 Undertaking Responses 2018-10-12 2018-10-12
EB-2017-0194  Addendum to the 2017 Updated Assessment_Exhi K4 4_20181011 Exhibits 2018-10-11 2018-10-11
EB-2017-0194  EWT LP response to OEB Staff IR_Exhi K4 3_20181011 Exhibits 2018-10-11 2018-10-11
EB-2017-0194  OEB Staff Summary of the Evidence on Costs_EWT_LSL_Exhi K4 2_20181009 Exhibits 2018-10-09 2018-10-09
EB-2017-0194  NextBridge_Undertaking J5 1_breakdown timing__20181012 Undertaking Responses 2018-10-12 2018-10-12
EB-2017-0194  Transcripts_Volume 6_EWT_LSL_Combined hearing_20181011 Transcripts 2018-10-11 2018-10-11
EB-2017-0194  HONI_Compendium for Cross-Examination_Exhi K6 1_20181011 Exhibits 2018-10-11 2018-10-11
EB-2017-0194  VECC Compendium_NextBridge_Exhi K6 4_20181011 Exhibits 2018-10-11 2018-10-11
EB-2017-0194  Transcripts_Volume 5_EWT_LSL_combined hearing_20181010 Transcripts 2018-10-10 2018-10-10
EB-2017-0194  BZA_Appendix 2 1X_Indigenous consultation and record log table_Exhi 5 3_20181010 Exhibits 2018-10-10 2018-10-10
EB-2017-0194  PWU_Compendium_EWT_LSL_combined hearing_Exhi K6 3_20181010 Exhibits 2018-10-10 2018-10-10
EB-2017-0194  NextBridge_Project Spend cost table to Date_20181008 Exhibits 2018-10-10 2018-10-10
EB-2017-0194  SEC_EWTLSL_NextBridgePanel_NB_Exhi K5 1__20181010 Exhibits 2018-10-10 2018-10-10
EB-2017-0194  BZA_Compendium of Docs for Next Bridge Cross Exam_20181010 Exhibits 2018-10-10 2018-10-10
EB-2017-0194  Transcripts_Volume 4_revised_EWT_LSL_Combined hearing_20181009 Transcripts 2018-10-09 2018-10-09
EB-2017-0194  HONI_list of documents for cross examination_20181009 Exhibits 2018-10-09 2018-10-09
EB-2017-0194  HONI_ltr_NextBridge_docs for cross examination_20181009 Correspondence 2018-10-09 2018-10-09
EB-2017-0194  VECC Panel 1 Hydro One LSL Compendium_Exhi K4 1_20181009 Exhibits 2018-10-09 2018-10-09
EB-2017-0194  BZA_Compendium_Cross-examination_Material_IESO_Exhi K4 5_20181009 Exhibits 2018-10-09 2018-10-09
EB-2017-0194  NextBridge_September 28 2018_ ltr from Ministry of Environment_20181005 Exhibits 2018-10-05 2018-10-05
EB-2017-0194  NextBridge_August 3 2018_ltr _Min of Tourism_20181005 Exhibits 2018-10-05 2018-10-05
EB-2017-0194  HONI_UndertakingResponses_JT2 1_JT3 1_20181005 Undertaking Responses 2018-10-05 2018-10-05
EB-2017-0194  Transcripts_Volume 3_EWT_LSL_Combined Oral Hearing_20181004 Transcripts 2018-10-04 2018-10-04
EB-2017-0194  OEBltr_Response_Minister of Energy_EWT Combined_20181003 Correspondence 2018-10-04 2018-10-04
EB-2017-0194  Letter_Minister of Energy_EWT Combined_20181002 Correspondence 2018-10-02 2018-10-02
EB-2017-0194  Dwijen Bharad_Letter of Comment_20181002_Redacted Comments 2018-10-02 2018-10-02
EB-2017-0194  MNO_Ltr_HONI_EWT_LSL_20181004 Exhibits 2018-10-04 2018-10-04
EB-2017-0194  Anwaatin_Hydro One Panel Compendium_Exhi K3 2_20181003 Exhibits 2018-10-03 2018-10-03
EB-2017-0194  Transcripts_Volume 2_EWT_LSL_Combined Oral Hearing_20181003 Transcripts 2018-10-03 2018-10-03
EB-2017-0194  SEC_EWTLSL_HydroOnePanel_Compendium_Rev_Exhi K2 2_20181003 Exhibits 2018-10-03 2018-10-03
EB-2017-0194  HONI_ltr_EWT_LSL_20181003 Correspondence 2018-10-03 2018-10-03
EB-2017-0194  Anwaatin_Hydro One Panel Compendium_20181003 Exhibits 2018-10-03 2018-10-03
EB-2017-0194  SEC_EWTLSL_HydroOnePanel_Compendium_Exhi K2 2_20181002 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  Transcripts_Volume 1_EWT_LSL_Combined Oral Hearing_20181002 Transcripts 2018-10-02 2018-10-02
EB-2017-0194  BZA_Compendium_Cross-examination_Exhi K3 1_20181002 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  BLP_Compendium_Cross-examination_Exhi K2 3_20181002 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  HONI_Kartiga Thavaraj_dec_undertaking_20181002 Declaration and Undertakings 2018-10-02 2018-10-02
EB-2017-0194  SNC-Lavalin_Janet Oh dec-undertaking_20181002 Declaration and Undertakings 2018-10-02 2018-10-02
EB-2017-0194  IESO_UpdatedIRR_NB6_20181002 Interrogatory Response from Intervenor 2018-10-02 2018-10-02
EB-2017-0194  MNO_Provisional_Compendium_Cross-Examination_Exhi K2 1_20181002 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  OEBResponse_President_Sioux Lookout CC_HONI_Nextbridge Combined_20181002 Correspondence 2018-10-02 2018-10-02
EB-2017-0194  OEBResponse_Quad Council_HONI_Nextbridge Combined_20181002 Correspondence 2018-10-02 2018-10-02
EB-2017-0194  NextBridge Compendium for Cross-Examination of Hydro One_Volume 1_Exhi K1 1_20181002 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  NextBridge Compendium for Cross-Examination of Hydro One_Volume 2_Exhi K1 2_20181002 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  NextBridge_B-15-1 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  NextBridge_Exhibit JT2.19 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  NextBridge_HONI_IR response to Board Staff 17 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  NextBridge_HONI_IR response to NB 24 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  NextBridge_HONI_IR response to NB 44 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  NextBridge_PO2_UpperCanada_HONI_20180301 Exhibits 2018-10-02 2018-10-02
EB-2017-0194  Hearing Schedule Combined Oct 2-3-4-9-11-12-2018 Correspondence 2018-10-02 2018-10-02
EB-2017-0194  HONI_LSL_UpdatedIRRS_20181001 Interrogatory Response from Applicant 2018-10-02 2018-10-02
EB-2017-0194  NextBridge_Declaration_Undertaking_D.Stevens_20181002 Declaration and Undertakings 2018-10-02 2018-10-02
EB-2017-0194  RSMIN_comments_20181001 Comments 2018-10-01 2018-10-01
EB-2017-0194  NextBridge_OEB_Minimum Technical Requirement for OEWTL_20181001 Exhibits 2018-10-01 2018-10-01
EB-2017-0194  NextBridge_SNC Lavlin_class action_2012 Exhibits 2018-10-01 2018-10-01
EB-2017-0194  NextBridge_Interim Condensed _FS__Q2 report_Exhi K1 3_20181001 Exhibits 2018-10-01 2018-10-01
EB-2017-0194  NextBridge_Galloping tutorial_2007.ppt Exhibits 2018-10-01 2018-10-01
EB-2017-0194  NextBridge_Cover Letter_Cross Examination Materials_20181001 Exhibits 2018-10-01 2018-10-01
EB-2017-0194  John McGrath_Letter of Comment_20181001_Redacted Comments 2018-10-01 2018-10-01
EB-2017-0194  Quad Council_letter of comment_20181001 Comments 2018-10-01 2018-10-01
EB-2017-0194  IESO_Ltr_CVs_EWT_LSL_20181001 Correspondence 2018-10-01 2018-10-01
EB-2017-0194  NextBridge_LTR_Confidential Interrogatories Cover Letter_20181001 Correspondence 2018-10-01 2018-10-01
EB-2017-0194  PO8_HONI_UCT Combined_20181001 Procedural Order 2018-10-01 2018-10-01
EB-2017-0194  LLFN_Declaraion and undertaking_20180928 Declaration and Undertakings 2018-09-28 2018-09-28
EB-2017-0194  NextBridge_ReplyARG_20180928 Submission 2018-09-28 2018-09-28
EB-2017-0194  BLP_LTR_EWT-LSL_20180928 Correspondence 2018-09-28 2018-09-28
EB-2017-0194  SEC_HONI_Nextbridge_Corr_20180928 Correspondence 2018-09-28 2018-09-28
EB-2017-0194  NextBridge_Letter_Access_Confidential_Materials _20180928 Correspondence 2018-09-28 2018-09-28
EB-2017-0194  HONI_Declaration and Undertaking_Robert Warren_20180928 Declaration and Undertakings 2018-09-28 2018-09-28
EB-2017-0194  HONI_EWT_LSL_Ltr Re ConfidentialDocuments_20180928 Correspondence 2018-09-28 2018-09-28
EB-2017-0194  HONI_Ltr to OEB_EWT_LSL_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  Anwaatin_DecUndertaking_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  NextBridge_Declaration and Undertakings_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  BZA_DEC_Undertaking_MM_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  BZA_DEC_Undertaking_EE_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  BZA_CvrLtr_DecUnd_EWT_LSL_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  NextBridge_Confidentiality_OBJ_20180927 Submission 2018-09-27 2018-09-27
EB-2017-0194  OEB_ltr_NextBridge_reply submissions_deadline extension_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  OEBResponse_TBCC_HONI_Nextbridge Combined_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  OEBResponse_Sioux Lookout CC_HONI_Nextbridge Combined_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  OEBResponse_NOMA_HONI_Nextbridge Combined_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  OEBResponse_FFCC_HONI_Nextbridge Combined_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  OEBResponse_Common Voice NW_HONI_Nextbridge Combined_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  OEBResponse_City of TB_HONI_Nextbridge Combined_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  OEBResponse_CEDC_HONI_Nextbridge Combined_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  BLP_LTR_Conf_Undertaking_EWT-LSL_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  MNO_ltr_EWT_LSL_20180927 Correspondence 2018-09-27 2018-09-27
EB-2017-0194  PWU_DEC_Undertaking_RS_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  PWU_DEC_Undertaking_BK_20180926 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  PWU_DEC_Undertaking_AB_20180926 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  PWU_CvrLtr_DecUnd_EWT_LSL_20180927 Declaration and Undertakings 2018-09-27 2018-09-27
EB-2017-0194  CCC_MRB_Confidentiality_declaration_undertaking_20180926 Declaration and Undertakings 2018-09-26 2018-09-26
EB-2017-0194  SEC_UCT_EWT_LSL_DecUnd_MR_201800926 Declaration and Undertakings 2018-09-26 2018-09-26
EB-2017-0194  NextBridge_LTR_ Development Costs Reply Extension_20180926 Correspondence 2018-09-26 2018-09-26
EB-2017-0194  PO7_HONI_UCT Combined_20180926 Procedural Order 2018-09-26 2018-09-26
EB-2017-0194  dec_order_cost awards_HONI_Lake Superior Motion_20180926 Decision and Order on Cost Awards 2018-09-26 2018-09-26
EB-2017-0194  NextBridge_Exhibit_A-3-1_updated_20180926 Exhibits 2018-09-26 2018-09-26
EB-2017-0194  NextBridge_LTR_EWT-LSL_20180926 Correspondence 2018-09-26 2018-09-26
EB-2017-0194  HONI_CombinedHearing_CVs_20180925 Correspondence 2018-09-25 2018-09-25
EB-2017-0194  NextBridge_Additional IRR_Combined_20180924 Interrogatory Response from Applicant 2018-09-24 2018-09-24
EB-2017-0194  I-05-22-01.xlsm Interrogatory Response from Applicant 2018-09-24 2018-09-24
EB-2017-0194  HONI_LSL_IRRS_TAB3-TAB11_20180924 Interrogatory Response from Applicant 2018-09-24 2018-09-24
EB-2017-0194  HONI_LSL_IRRS_TAB2_20180924 Interrogatory Response from Applicant 2018-09-24 2018-09-24
EB-2017-0194  HONI_LSL_IRRS_TAB1_PART3_20180924 Interrogatory Response from Applicant 2018-09-24 2018-09-24
EB-2017-0194  HONI_LSL_IRRS_TAB1_PART2_20180924 Interrogatory Response from Applicant 2018-09-24 2018-09-24
EB-2017-0194  HONI_LSL_IRRS_TAB1_PART1_20180924 Interrogatory Response from Applicant 2018-09-24 2018-09-24
EB-2017-0194  IESO_IRRs_EWT_LSL_20180924 Interrogatory Response from Intervenor 2018-09-24 2018-09-24
EB-2017-0194  IESO_CvrLtr_IRRs_EWT_LSL_20180924 Interrogatory Response from Intervenor 2018-09-24 2018-09-24
EB-2017-0194  Anwaatin_LTR_IntrvREQ Revision_20180924 Intervenor Request Letter 2018-09-24 2018-09-24
EB-2017-0194  PO6_HONI_UCT Combined_20180921 Procedural Order 2018-09-21 2018-09-21
EB-2017-0194  Anwaatin_IntrvREQ_20180920 Intervenor Request Letter 2018-09-20 2018-09-20
EB-2017-0194  OEB Staff_sub_NextBridge Development Costs_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  VECC_ SUB_NextBridge_ Development_Costs_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  CCC_SUB_NextBridge_Development_Costs_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  MNO_SUB_NextBridge_Development_Costs_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  HONI_SUB_NextBridge_Development_Costs_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  SEC_Nextbridge_DevCosts_Sub_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  BZA_SUB_Nextbridge_Development_Costs_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  PO5_HONI_UCT Combined_20180919 Procedural Order 2018-09-19 2018-09-19
EB-2017-0194  Intervention List_East West Tie_20180919 Intervention List 2018-09-19 2018-09-19
EB-2017-0194  BLP_SUB_Nextbridge_Development_Costs_20180919 Submission 2018-09-19 2018-09-19
EB-2017-0194  LL#58FN_EVD_20180914 Intervenor Evidence 2018-09-14 2018-09-14
EB-2017-0194  Memo_GRT_TOR_HONI_20180912 Correspondence 2018-09-12 2018-09-12
EB-2017-0194  ack_receipt_TOR_HONI_review by GRT_20180912 Correspondence 2018-09-12 2018-09-12
EB-2017-0194  LL#58FN_IR_HONI_20180912 Interrogatories to Applicant 2018-09-12 2018-09-12
EB-2017-0194  LL#58FN_IR_NextBridge_20180912 Interrogatories to Applicant 2018-09-12 2018-09-12
EB-2017-0194  OEB_Staff_IR_IESO_EWT_LSL_20180912 Interrogatories to Intervenor 2018-09-12 2018-09-12
EB-2017-0194  ELLCA_IR_HONI_20180912 Interrogatories to Applicant 2018-09-12 2018-09-12
EB-2017-0194  SEC_HONI_Nextbridge_IESO_IRs_20180912 Interrogatories to Applicant 2018-09-12 2018-09-12
EB-2017-0194  BZA_IR_IESO_20180912 Interrogatories to Intervenor 2018-09-12 2018-09-12
EB-2017-0194  HONI_LSL_Affidavit_of_Service_20180912 Affidavits of Service 2018-09-12 2018-09-12
EB-2017-0194  CCC_IR_IESO_20180912 Interrogatories to Intervenor 2018-09-12 2018-09-12
EB-2017-0194  PWU_IR_IESO_20180912 Interrogatory Response from Intervenor 2018-09-12 2018-09-12
EB-2017-0194  NextBridge_ARGChief_Development_Costs_20180911 Argument 2018-09-10 2018-09-10
EB-2017-0194  MFN_Intrv_REQ_20180907 Intervenor Request Letter 2018-09-07 2018-09-07
EB-2017-0194  PO4_HONI_UCT_Combined_20180907 Procedural Order 2018-09-07 2018-09-07
EB-2017-0194  East Loon Lake Campers Assoc_Intrv_Req_20180904 Intervenor Request Letter 2018-09-04 2018-09-04
EB-2017-0194  HONI_ToR_LSL_20180905 Correspondence 2018-09-05 2018-09-05
EB-2017-0194  PO3_HONI_UCT_Combined_20180831 Procedural Order 2018-08-31 2018-08-31
EB-2017-0194  OEB staff_IR_NextBridge_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  OEB staff_IR_HONI_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  CCC_IR_to HONI_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  VECC_IR_to NextBridge_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  VECC_IR_to HONI_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  HONI_IR_to NextBridge_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  BZA_IR_HONI_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  BZA_IR_Nextbridge_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  IESO_IR_Hydro One_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  IESO_IR_NextBridge_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  BLP_IR_HONI_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  MNO_IR_to_Nextbridge_HONI_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  SEC_HONI_Nextbridge_IRs_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  PWU_IR_HONI_20180830 Interrogatories to Applicant 2018-08-30 2018-08-30
EB-2017-0194  Long Lake 58FN_IntrvREQ_20180829 Intervenor Request Letter 2018-08-29 2018-08-29
EB-2017-0194  NextBridge_Interrogatories_to_IESO_20180829 Interrogatories to Intervenor 2018-08-29 2018-08-29
EB-2017-0194  NextBridge_Interrogatories_to_HONI_20180828 Interrogatories to Applicant 2018-08-28 2018-08-28
EB-2017-0194  BZA_ltr_OEB_re_PO1_20180827 Correspondence 2018-08-27 2018-08-27
EB-2017-0194  PO2_HONI_UCT_Combined_20180827 Procedural Order 2018-08-27 2018-08-27
EB-2017-0194  NextBridge_IRR_Development Costs_20180824 Interrogatory Response from Applicant 2018-08-24 2018-08-24
EB-2017-0194  HONI_Letter to OEB re ltc application_20180823 Correspondence 2018-08-23 2018-08-23
EB-2017-0194  SEC_NextbridgeHydroOne_Ltr_PO1_20180816 Correspondence 2018-08-16 2018-08-16
EB-2017-0194  Board Staff_IRs_EWT_20180814 Interrogatories to Applicant 2018-08-14 2018-08-14
EB-2017-0194  SEC_Nextbridge_UT_IRs_20180814 Interrogatories to Applicant 2018-08-14 2018-08-14
EB-2017-0194  HONI_IRs_EWT_20180814 Interrogatories to Applicant 2018-08-14 2018-08-14
EB-2017-0194  CCC_IR_20180814_EB-2017-0182 Interrogatories to Applicant 2018-08-14 2018-08-14
EB-2017-0194  PO 1_HONI_UCT Combined_20180813 Procedural Order 2018-08-13 2018-08-13
EB-2017-0194  NextBridge_Cost ClaimOBJ_20180802 Cost Claim Objection 2018-08-02 2018-08-02
EB-2017-0194  OEB Letter_extention of time_20180731 Correspondence 2018-07-31 2018-07-31
EB-2017-0194  R Warren_response PO 6 _20180730 Correspondence 2018-07-30 2018-07-30
EB-2017-0194  Letter regarding NB Undertaking Responses_20180727 Correspondence 2018-07-27 2018-07-27
EB-2017-0194  PO 6 UpperCanada_HONI_20180727 Procedural Order 2018-07-27 2018-07-27
EB-2017-0194  Addendum to the 2017 Updated Assessment for the EWT Need_20180726 Correspondence 2018-07-26 2018-07-26
EB-2017-0194  IESO_CvrLtr__IESO Impact Analysis_20180726 Correspondence 2018-07-26 2018-07-26
EB-2017-0194  NextBridge_Undertaking Responses_20180723 Undertaking Responses 2018-07-23 2018-07-23
EB-2017-0194  NextBridge_EWT_Report_20180723 Submission 2018-07-23 2018-07-23
EB-2017-0194  Hydro One_letter to OEB_development costs_20180720 Correspondence 2018-07-20 2018-07-20
EB-2017-0194  NextBridge Letter to OEB_Undertaking Response_20180713 Correspondence 2018-07-13 2018-07-13
EB-2017-0194  NextBridge_Ex_JT1.1_Page 2_Corrected_20180712 Undertaking Responses 2018-07-12 2018-07-12
EB-2017-0194  Exhibit KD1.2 SEC_Nextbridge_DevCosts_Compendium Exhibits 2018-07-05 2018-07-05
EB-2017-0194  Transcripts_Oral Hearing_EWT_20180705 Transcripts 2018-07-06 2018-07-06
EB-2017-0194  Exhibit KD1.3 VECC Compendium NextBridge DevCosts_20180705 Exhibits 2018-07-05 2018-07-05
EB-2017-0194  Exhibit KD1.1 OEB Staff Compendium_EWT_20180705 Exhibits 2018-07-05 2018-07-05
EB-2017-0194  Updated Undertaking response NextBridge JT 1 8_20180704 Undertaking Responses 2018-07-04 2018-07-04
EB-2017-0194  NextBridge_CVs_Updated_20180704 Exhibits 2018-07-04 2018-07-04
EB-2017-0194  HONI ltr Min of Environment_EWT_20180629 Correspondence 2018-06-29 2018-06-29
EB-2017-0194  PO 5 UpperCanada_HONI_EWT_20180626 Procedural Order 2018-06-26 2018-06-26
EB-2017-0194  NextBridge_Undertaking Responses_20180620(2) Undertaking Responses 2018-06-20 2018-06-20
EB-2017-0194  NextBridge_Undertaking Responses_20180601 Undertaking Responses 2018-06-01 2018-06-01
EB-2017-0194  NextBridge_Cover Letter_transcript corrections_20180601 Correspondence 2018-06-01 2018-06-01
EB-2017-0194  MFN_letter of comment_Hydro One_LtC_Wawa_20180529 Letter of Comment 2018-05-29 2018-05-29
EB-2017-0194  PO 4_UpperCanada_HONI_20180518 Procedural Order 2018-05-18 2018-05-18
EB-2017-0194  BZA_IntrvREQ_20180509 Intervenor Request Letter 2018-05-09 2018-05-09
EB-2017-0194  Township of White River_comments_NextBridgeConstruct_20170507 Correspondence 2018-05-07 2018-05-07
EB-2017-0194  Transcript_ East West Tie_Technical Conference_Redacted_20170507 Transcripts 2018-05-07 2018-05-07
EB-2017-0194  MNO_ Declaration and Undertaking for J Wilson_20180503 Declaration and Undertakings 2018-05-03 2018-05-03
EB-2017-0194  MNO_Declaration and Undertaking for M Strachan_20180503 Declaration and Undertakings 2018-05-03 2018-05-03
EB-2017-0194  MNO_Declaration and Undertaking for J Madden_20180503 Declaration and Undertakings 2018-05-03 2018-05-03
EB-2017-0194  NextBridge_CVs_Updated ExhibitList_20180503 Submission 2018-05-03 2018-05-03
EB-2017-0194  NextBridge Detailed Schedule in Response to Procedural Order No. 3_20180503 Submission 2018-05-03 2018-05-03
EB-2017-0194  I.B.NextBridge.STAFF.7_Attachment 2_Unredacted_Updated_20180503 Submission 2018-05-03 2018-05-03
EB-2017-0194  I.B.NextBridge.STAFF.7_Attachment 3_Redacted_Updated_20180503 Submission 2018-05-03 2018-05-03
EB-2017-0194  NextBridge Cover Letter_response to Procedural Order No. 3_20180503 Submission 2018-05-03 2018-05-03
EB-2017-0194  OEB ltr_EWT_resHONI_20180503 Correspondence 2018-05-03 2018-05-03
EB-2017-0194  NextBridge_Letter_Responding to Hydro One Letter_East West Tie_20180501 Correspondence 2018-05-01 2018-05-01
EB-2017-0194  HONI_ltr_Requesting Change of Date for Tech Conf_20180501 Correspondence 2018-05-01 2018-05-01
EB-2017-0194  PO 3_UpperCanada_HONI_ConfidDecision_20180427 Procedural Order 2018-04-27 2018-04-27
EB-2017-0194  VECC_IntervReq_H1_EastWestTieStation_20180412 Intervenor Request Letter 2018-04-12 2018-04-12
EB-2017-0194  NextBridge Cover Letter_updated IR responses_20180321_Redacted Interrogatory Response from Applicant 2018-03-21 2018-03-21
EB-2017-0194  I.B.NextBridge.STAFF.7_Attachment 3_REDACTED_Updated_20180314 Interrogatory Response from Applicant 2018-03-21 2018-03-21
EB-2017-0194  I.B.NextBridge.STAFF.7_Attachment 2_REDACTED_Updated_2010314 Interrogatory Response from Applicant 2018-03-21 2018-03-21
EB-2017-0194  I.B.NextBridge.CCC.8_Attachment_REDACTED_Updated_20180314 Interrogatory Response from Applicant 2018-03-21 2018-03-21
EB-2017-0194  SEC Request for Access to Confidential Information_20180315 Correspondence 2018-03-15 2018-03-15
EB-2017-0194  NextBridge_Updated Evidence_20180314 Submission 2018-03-14 2018-03-14
EB-2017-0194  JGirvan.Declaration.EWTProceeding_20180312 Declaration and Undertakings 2018-03-12 2018-03-12
EB-2017-0194  PO2_UpperCanada_HONI_20180301 Procedural Order 2018-03-01 2018-03-01
EB-2017-0194  NextBridge_Supplemental Affidavit _2_20180202 Affidavits of Service 2018-02-02 2018-02-02
EB-2017-0194  NextBridge_Supplemental Affidavit _1_20180202 Affidavits of Service 2018-02-02 2018-02-02
EB-2017-0194  NextBridge_Cover Letter_Supplemental Affidavit_20180202 Affidavits of Service 2018-02-02 2018-02-02