From: Peter
Fallis [mailto:fallaw@bmts.com]
Sent: October 23, 2007 6:44 PM
To: 'MacDonald, Nicole'; BoardSec;
Jake.Brooks@appro.org; David.Butters@appro.org; Tom.Brett@gowlings.com;
bruceview@sympatico.ca; glen.e.macdonald@HydroOne.com;
brian.armstrong@brucepower.com; gvegh@mccarthy.ca;
Kathryn.ironmonger@town.erin.on.ca; ron.collins@enbridge.com;
cherry.blackwood@enbridge.com; Karen.france@sympatico.ca;
peter.bettle@brookfieldpower.com; ckeizer@ogilvyrenault.com;
carl.burrell@ieso.ca; john.rattray@ieso.ca; d.mclaren@the-matrix.ca;
b.lawton@sympatico.ca; neil.currie@ofa.on.ca; tony.petrella@opg.com;
jgibbons@pollutionprobe.org; murray.klippenstein@klippensteins.ca;
basil.alexander@klippensteins.ca; sprackett@pwu.ca; bkidane@era-inc.ca;
jkwik@era-inc.ca; Richard.Stephenson@paliareroland.com; swaque@blgcanada.com;
ecooke@blgcanada.com; Virginia@virginiamaclean.com; pmcmahon@uniongas.com;
sandy_o'connor@transalta.com; rking@ogilvyrenault.com;
margaret_duzy@transcanada.com; TCE_Regulatory@transcanada.com;
angela_avery@transcanada.com; kevin@hanoverlaw.ca; d.woelfle@bmts.com;
wblake@tributeresources.com; peterbbudd@rogers.com; DavidMacIntosh@nextcity.com;
TomAdams@nextcity.com; awellenreiter@wellenreiter.ca;
dschlissel@synapse-energy.com; petelanz@lanzalotta.com; tom.brett@gowlings.com;
qmross@rossfirm.com; mdauria@sympatico.ca; fsperduti@blgcanada.com;
Aristides49@aol.com; apape@pstlaw.ca; 'Nettleton, Gord'
Subject: RE: Hydro One Bruce to Milton
Project EB-2007-0050
October
23rd, 2007
Gordon Nettleton,
Esq
Oslers (
Counsel for Hydro One
Networks Inc. (HONI).
Dear
Sir:
We have received your
October 23rd letter to the OEB.
Your letter references
OEB Procedural Order No. # 2 as establishing the timetable. Procedural
Order No. # 2 has no relevance to the issues of your letter.
Procedural Order No. #
2 was issued by the OEB on June 21st, 2007, and the only reason for
that Order by the Board was to unilaterally abridge the date of Leave to
Construct Application Motion EB-2007-0050 from Tuesday June
26th to Monday June 25th, 2007 when the Early Access Application
Motion EB-2005-0051 was otherwise scheduled to be heard, so that both matters
would be herd at the same time.
Procedural Order No. #
3 issued on July 11th, 2007 set out the submission time for the
written interrogatories in Board Order No. 6 therein as Tuesday October, 30th,
2007. Board Order # 7 therein, requires HONI to file COMPLETE RESPONSES
to the written interrogatories with the Board and deliver all responses to
all the Interveners on or before November 13th,
2007.
Please confirm to
everyone on the circulation list that the corrected reference is to Procedural
Order No. # 3 and not Procedural Order No. # 2, and that you consent to the
adjournment of the entirety of the Interrogatory phases of the Application
EB-2007-0050 until such later date as the OEB may subsequently determine.
The Fallis Group has,
by letter, requested a written response from the OEB by noon on Wednesday,
October 22, 2007 at the outside. Would you please indicate to the Board that you
are in agreement with that request. This letter is being circulated to your
entire e-mail list and we have attached a copy of the written letter request
that we caused to be made to the OEB yesterday which had only limited
circulation.
PETER
T. FALLIS
Fallis
Fallis & McMillan
Barristers
& Solicitors
N0G
1R0
tel
519-369-2515
fax:
519-369-2522
E-Mail:
fallaw@bmts.com
********************************************************************
This
e-mail message is privileged, confidential and subject to
copyright. Any
unauthorized use or disclosure is prohibited.
Le contenu du présent
courriel est privilégié, confidentiel et
soumis à des droits d'auteur. Il est
interdit de l'utiliser ou
de le divulguer sans
autorisation.
********************************************************************