EB-2020-0040
|
dec_order_costs_NPEI_20210301
|
Decision and Order on Cost Awards
|
2021-03-01
|
|
2021-03-01
|
EB-2020-0040
|
DRC_Cost_Claim_20210218
|
Cost Claim
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0040
|
SEC_NPEI_CostClaim_20210218
|
Cost Claim
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0040
|
VECC Cost Claim EB 2020-0040 NPEI _20210218
|
Cost Claim
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0040
|
dec_and Rate Order_NPEI_20210204
|
Decision and Order
|
2021-02-04
|
|
2021-02-04
|
EB-2020-0040
|
NPEI_LTR_(request for confidentiality)_20210128
|
Participation Request Letter
|
|
2021-01-28
|
2021-01-28
|
EB-2020-0040
|
PO2_NiagaraPeninsula_20210122
|
Procedural Order
|
2021-01-22
|
|
2021-01-22
|
EB-2020-0040
|
Microsoft Word - Confidentiality Letter-(2021-01-07)(43010097.1)
|
Correspondence
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
DRC_LTR_Name_Change_20210112
|
Correspondence
|
|
2021-01-12
|
2021-01-12
|
EB-2020-0040
|
OEB_ltr_Niagara Peninsula_Presentation_Cancel_20210115
|
Correspondence
|
2021-01-15
|
|
2021-01-15
|
EB-2020-0040
|
OEB staff submission_Niagara Peinsula settlement_20210113
|
Submission
|
|
2021-01-13
|
2021-01-13
|
EB-2020-0040
|
DRC_LTR_Name_Change_20210112
|
Correspondence
|
|
2021-01-12
|
2021-01-12
|
EB-2020-0040
|
NPEI_Settlement_Proposal_with Appendices_20210107
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Clarification_Responses_With_Appendices_20210107
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_Embedded Distributor Bill Impacts_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2021_Proposed Tariff of Rates and Charges_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2021_DVA_Continuity_Schedule_CoS_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2021_Appendix 2-Z_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_PILS Settlement proposal_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2021_Test_year_Income_Tax_PILs_With Reduction_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_Weather Normalization Regression Model_2021_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_Tariff_Schedule_and_Bill_Impact_Model_2021_COS_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_OEB_Appendix 2-R Loss Factors_Separate_Filing_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_NPEI Hydro One data scaled to 2021_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2021_RTSR_Workform_with Embedded Distributor_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2021_NPEI_LRAMVA_Workform_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2020_Rev_Reqt_Work_Form_201210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2020_Filing_Requirements_Chapter2_Appendices_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2020_Cost_Allocation_Model_v3.7_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Settlement_2021_Test_year_Income_Tax_PILs_Without Reduction_20210105
|
Settlement Proposal
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
NPEI_LtrSUB_Confidentiality_20210107
|
Submission
|
|
2021-01-07
|
2021-01-07
|
EB-2020-0040
|
NPEI_Settlement Proposal Extension Request_20210105
|
Correspondence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0040
|
OEB LTR_Deferral of Filing_20210106
|
Correspondence
|
2021-01-06
|
|
2021-01-06
|
EB-2020-0040
|
OEB_Corres_DRC_Niagara Peninsula DRC_20201215
|
Correspondence
|
2020-12-15
|
|
2020-12-15
|
EB-2020-0040
|
DRC_LTR_Issues_List_20201210
|
Correspondence
|
|
2020-12-10
|
2020-12-10
|
EB-2020-0040
|
DRC_DecUndertaking_20201207
|
Declaration and Undertakings
|
|
2020-12-07
|
2020-12-07
|
EB-2020-0040
|
SEC_NPEI_DU_MR_20201207
|
Declaration and Undertakings
|
|
2020-12-07
|
2020-12-07
|
EB-2020-0040
|
dec_issues list_confid__int_rate_order_20201204
|
Decision and Order
|
2020-12-04
|
|
2020-12-04
|
EB-2020-0040
|
Proposed Issues List EB-2020-0040 Niagara Peninsula Energy_20201126
|
Correspondence
|
|
2020-11-26
|
2020-11-26
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2-SEC-22_20201124
|
Interrogatory Response from Applicant
|
|
2020-11-24
|
2020-11-24
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2-SEC-9_20201124
|
Interrogatory Response from Applicant
|
|
2020-11-24
|
2020-11-24
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR Corrected_2021_Test_year_Income_Tax_PILs_20201124
|
Interrogatory Response from Applicant
|
|
2020-11-24
|
2020-11-24
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_Rev_Reqt_Work_Form_2021_COS_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_OEB_Appendix 2-R Loss Factors_Separate_Filing_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_Tariff_Schedule_of_Rates_and_Charges_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_Tariff_Schedule_and_Bill_Impact_Model_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_RTSR_Workform_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_Embedded Distributir_Bill Impact_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2020_Filing_Requirements_Chapter2_Appendices_11192020
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2020_Cost_Allocation_Model_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IR Responses_11192020
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_Weather Normalization Regression Model_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_Hydro One data scaled to 2021_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_NPEI_LRAMVA_Workform_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninunsula_Energy_Inc_IRR_2021_Test_year_Income_Tax_PILS_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninunsula_Energy_Inc_IRR_2021_Test_year_Income_Tax_PILS_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_Rev_Reqt_Work_Form_2021_COS_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_OEB_Appendix 2-R Loss Factors_Separate_Filing_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_Hydro One data scaled to 2021_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_Tariff_Schedule_of_Rates_and_Charges_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_Embedded Distributir_Bill Impact_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara _Peninsula_Energy_Inc_IRR_OEB_Appendix 2-Z Commodity Expense 2021 Version_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara _Peninsula_Energy_Inc_IRR_OEB_Appendix 2-Z Commodity Expense 2021 Version_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_Weather Normalization Regression Model_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_Tariff_Schedule_and_Bill_Impact_Model_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_RTSR_Workform_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_NPEI_LRAMVA_Workform_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2021_DVA_Workform_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2020_Filing_Requirements_Chapter2_Appendices_11192020
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IRR_2020_Cost_Allocation_Model_20201119
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_IR Responses_11192020
|
Interrogatory Response from Applicant
|
|
2020-11-19
|
2020-11-19
|
EB-2020-0040
|
MBazeley_letter of comment_Redacted_20201104
|
Letter of Comment
|
|
2020-11-04
|
2020-11-04
|
EB-2020-0040
|
VECC_IRQ_NPEI0040_20201030
|
Interrogatories to Applicant
|
|
2020-10-30
|
2020-10-30
|
EB-2020-0040
|
SEC_NPEI_IR_2-SEC-22_20201030
|
Interrogatories to Applicant
|
|
2020-10-30
|
2020-10-30
|
EB-2020-0040
|
SEC_NPEI_IR_20201030
|
Interrogatories to Applicant
|
|
2020-10-30
|
2020-10-30
|
EB-2020-0040
|
DRC_IR_NPEI_20201030
|
Interrogatories to Applicant
|
|
2020-10-30
|
2020-10-30
|
EB-2020-0040
|
HONI_IR_NPEI_20201030
|
Interrogatories to Applicant
|
|
2020-10-30
|
2020-10-30
|
EB-2020-0040
|
OEB staff Niagara Peninsula IRs_20201028
|
Interrogatories to Applicant
|
|
2020-10-28
|
2020-10-28
|
EB-2020-0040
|
RChartrand_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
RAmyot_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
JCampbell_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
LMurphy_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
CConte_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
SDhah_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
SMay_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
EPerry_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
LPintea_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
MParker_letter of comment_Redacted_20200922
|
Letter of Comment
|
|
2020-09-22
|
2020-09-22
|
EB-2020-0040
|
JJackson_letter of comment_Redacted_20200922
|
Letter of Comment
|
|
2020-09-22
|
2020-09-22
|
EB-2020-0040
|
CLavallee_letter of comment_Redacted_20200922
|
Letter of Comment
|
|
2020-09-22
|
2020-09-22
|
EB-2020-0040
|
CClark_letter of comment_Redacted_20200922
|
Letter of Comment
|
|
2020-09-22
|
2020-09-22
|
EB-2020-0040
|
PGiblet_letter of comment_Redacted_20200922
|
Letter of Comment
|
|
2020-09-22
|
2020-09-22
|
EB-2020-0040
|
CBrewster_letter of comment_Redacted_20201009
|
Letter of Comment
|
|
2020-10-09
|
2020-10-09
|
EB-2020-0040
|
SSzeker_letter of comment_Redacted_20201009
|
Letter of Comment
|
|
2020-10-09
|
2020-10-09
|
EB-2020-0040
|
MFazzari_letter of comment_Redacted_20200929
|
Letter of Comment
|
|
2020-09-29
|
2020-09-29
|
EB-2020-0040
|
AHeidebrecht_letter of comment_Redacted_20200929
|
Letter of Comment
|
|
2020-09-29
|
2020-09-29
|
EB-2020-0040
|
LBerry_letter of comment_Redacted_20200929
|
Letter of Comment
|
|
2020-09-29
|
2020-09-29
|
EB-2020-0040
|
Anne Nelson_letter of comment_Redacted_20200929
|
Letter of Comment
|
|
2020-09-29
|
2020-09-29
|
EB-2020-0040
|
JGromadzki_letter of comment_Redacted_20201001
|
Letter of Comment
|
|
2020-10-01
|
2020-10-01
|
EB-2020-0040
|
ABemben_letter of comment_Redacted_20201009
|
Letter of Comment
|
|
2020-10-09
|
2020-10-09
|
EB-2020-0040
|
PO1_NPEI_20201013
|
Procedural Order
|
2020-10-13
|
|
2020-10-13
|
EB-2020-0040
|
Ack Ltr_letter of comment_PElia_20201006.pdf
|
Acknowledgement Letter
|
2020-10-06
|
|
2020-10-06
|
EB-2020-0040
|
PElia_letter of comment_redacted_20201003
|
Letter of Comment
|
|
2020-10-02
|
2020-10-02
|
EB-2020-0040
|
DRC_IntrvREQ_CostREQ_NPEI_20201002
|
Intervenor Request Letter
|
|
2020-10-02
|
2020-10-02
|
EB-2020-0040
|
RDiCienzo_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-10-18
|
2020-10-18
|
EB-2020-0040
|
FCastle_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
JAnderson_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
SRebrovich_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
JPaton_letter of comment_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
VECC N of I EB-2020-0040 NPEI Sept 29-2020.pdf
|
Intervenor Request Letter
|
|
2020-09-29
|
2020-09-29
|
EB-2020-0040
|
SAuld_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
ABoyd_letter of comment_Redacted_20200918
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
BWoodruff_Letter of comment_Redacted_20200928
|
Letter of Comment
|
|
2020-09-28
|
2020-09-28
|
EB-2020-0040
|
KCooper_letter of comment_20200928_Redacted
|
Letter of Comment
|
|
2020-09-28
|
2020-09-28
|
EB-2020-0040
|
MFraser_letter of comment_20200929_Redacted
|
Letter of Comment
|
|
2020-09-28
|
2020-09-28
|
EB-2020-0040
|
Ack Ltr_letter of comment_FMGhafghazi_20200922
|
Acknowledgement Letter
|
2020-09-22
|
|
2020-09-22
|
EB-2020-0040
|
FMGhafghazi_Ltr of Comment_NPEI_20200918_Redacted
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
BWinstanley_letter of comment_Redacted_20200918
|
Letter of Comment
|
2020-09-22
|
2020-09-18
|
2020-09-22
|
EB-2020-0040
|
Ack Ltr_letter of comment_BWinstanley_20200922
|
Acknowledgement Letter
|
2020-09-22
|
|
2020-09-22
|
EB-2020-0040
|
DShadwell_Letter of comment_20200918_Redacted
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
Ack Ltr_letter of comment_DShadwell_20200922
|
Acknowledgement Letter
|
2020-09-22
|
|
2020-09-22
|
EB-2020-0040
|
SP_letter of comment_20200918_Redacted
|
Letter of Comment
|
2020-09-22
|
2020-09-18
|
2020-09-22
|
EB-2020-0040
|
Ack Ltr_letter of comment_SP_20200922
|
Letter of Comment
|
2020-09-22
|
|
2020-09-22
|
EB-2020-0040
|
Ack Ltr_letter of comment_JGirl_20200922
|
Acknowledgement Letter
|
2020-09-18
|
|
2020-09-18
|
EB-2020-0040
|
JGirl_letter of comment_Redacted_20200922
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
DHole_letter of comment_Redacted_20200921
|
Letter of Comment
|
|
2020-09-18
|
2020-09-18
|
EB-2020-0040
|
Ack Ltr_letter of comment_DHole_20200922
|
Acknowledgement Letter
|
2020-09-22
|
|
2020-09-22
|
EB-2020-0040
|
HONI_NPEI_Intervenor_Status_Request_20200921
|
Intervenor Request Letter
|
|
2020-09-21
|
2020-09-21
|
EB-2020-0040
|
NPEI_Affidavit of Service_20200917
|
Affidavits of Service
|
|
2020-09-17
|
2020-09-17
|
EB-2020-0040
|
SEC_NPEI_INT_REQ_20200917
|
Intervenor Request Letter
|
|
2020-09-17
|
2020-09-17
|
EB-2020-0040
|
Notice_Niagara Peninsula_20200910
|
Notice
|
2020-09-10
|
|
2020-09-10
|
EB-2020-0040
|
OEB Completeness Letter_NiagaraPeninsula_20200910
|
Correspondence
|
2020-09-10
|
|
2020-09-10
|
EB-2020-0040
|
lod_Niagara Peninsula_20200910
|
Letter of Direction
|
2020-09-10
|
|
2020-09-10
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2011-2015 LDC CDM Program Persistence Results Report_20200831
|
Application and Evidence
|
|
2020-09-08
|
2020-09-08
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_CDM_2011-2014 All Persistence_20200831
|
Application and Evidence
|
|
2020-09-08
|
2020-09-08
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_CDM_2017 Final Verified Annual LDC CDM Program Results_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_CDM_2016 Final Verified Annual LDC CDM Program Results_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_CDM_2015 Annual Verified Results rprt annual Persistence_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_CDM_2011-2014 Final Results Report_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_DVA_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Rev_Reqt_Work_Form_20200818
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Filing_Requirements_Chapter2_Appendices_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2015_PILs_Workform_Accelerated CCA_2020_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_1595_Analysis_Workform_1.0_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_8_20200831_updated
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_4_20200831_updated
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_1_20200831_updated
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_GA_Analysis_Workform_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_GA_Analysis_Workform_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_CDM_ Participation and Cost Report_2019 04_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_Tariff_Schedule_and_Bill_Impact_Model_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021 Tariff Schedule of Rates and Charges_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_RTSR_Workform_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Cost_Allocation_Model_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2015_PILs_Workform_Original_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2015_PILs_Workform_Accelarated CCA_2019_20200831
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_9_20200831_updated
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Ltr_Response to Incomplete Letter_20200902
|
Application and Evidence
|
|
2020-09-02
|
2020-09-02
|
EB-2020-0040
|
Incomplete Letter Niagara Peninsula_20200901
|
Correspondence
|
2020-09-01
|
|
2020-09-01
|
EB-2020-0040
|
Ack_Ltr_Niagara Peninsula_20200820
|
Acknowledgement Letter
|
2020-08-20
|
|
2020-08-20
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_Test_year_Income_Tax_PILs_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_NPEI_LRAMVA_Workform_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_Weather Normalization Regression Model_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_OEB Appendix 2-Z Commodity Expense_2021 Version_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_NPEI Hydro One data scaled to 2021_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_COVID19-Forgone-Rev-Rate-Rider-model_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_Tariff_Schedule_and_Bill_Impact_Model_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_GA_Analysis_Workform_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_COS_Checklist_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_COS_Checklist_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020-Benchmarking-Spreadsheet-Forecast-Model_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Test_year_Income_Tax_PILs_2018 Actuals only_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_RTSR_Workform_revised for 2021_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Cost_Allocation_Model_v3.7_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Filing_Requirements_Chapter2_Appendices_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_9_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021_1595_Analysis_Workform_1.0_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2021 Tariff Schedule of Rates and Charges_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Test_year_Income_Tax_PILs_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_2020_Rev_Reqt_Work_Form_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Appl_Chapter_5_Appendix_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_8_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_7_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_5_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_3_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_2_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_1_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_6_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
Niagara_Peninsula_Energy_Inc_Exhibit_4_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
NPEI_Cover_Letter_COS_Application_EB_2020_0040_20200818
|
Application and Evidence
|
|
2020-08-18
|
2020-08-18
|
EB-2020-0040
|
OEBltr_NPEI_Deferral of CoS Filing_20200420
|
Correspondence
|
2020-04-20
|
|
2020-04-20
|
EB-2020-0040
|
2021 COS Request for deferral_EB-2020-0040_Niagara_Peninsula_Energy_Inc_04172020
|
Correspondence
|
|
2020-04-17
|
2020-04-17
|