Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2011-0242 document icon OEB_ltr_Reply to Request to Withdraw_20120917 Correspondence Ontario Energy Board 2012-09-17 2012-09-17
EB-2011-0242 document icon dec_order_costs_EGDI_Union_20120910 Decision and Order on Cost Awards Ontario Energy Board 2012-09-10 2012-09-10
EB-2011-0242 document icon EGDI_ltr_reply RNG decision_20120907 Correspondence Ontario Energy Board 2012-09-07 2012-09-07
EB-2011-0242 document icon Union_CostClaimObjection_Reply_20120809 Cost Claim Objection Reply Ontario Energy Board 2012-08-09 2012-08-09
EB-2011-0242 document icon EGDI_CostClaimOBJ_Reply_20120809 Cost Claim Objection Ontario Energy Board 2012-08-09 2012-08-09
EB-2011-0242 document icon PollutionProbe_ARG_20120522 Argument Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon EnergyProbe_ARG_20120522 Argument Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon VECC_ltr_correction_interim DO_20120712 Correspondence Ontario Energy Board 2012-07-13 2012-07-13
EB-2011-0242 document icon dec_order_interim_EGDI_Union_20120712 Interim Decision and Order Ontario Energy Board 2012-07-12 2012-07-12
EB-2011-0242 document icon transcripts_EGDI_Union_vol_7_20120524 Transcripts Ontario Energy Board 2012-05-24 2012-05-24
EB-2011-0242 document icon EX_K5.4_20120522 Exhibits Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon EX_K5.5_20120522 Exhibits Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon EX_K5.3_20120522 Exhibits Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon EX_K5.1_20120522 Exhibits Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon transcripts_EGDI_Union_vol_6_20120522 Transcripts Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon EX_K5.6_20120522 Exhibits Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon EX_K5.2_20120522 Exhibits Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0242 document icon BioGasA_ARG_20120518 Argument Ontario Energy Board 2012-05-18 2012-05-18
EB-2011-0242 document icon EGDI_SUB_Exhibit A_Tab 3_Sched 1-5_updates_20120516 Application and Evidence Ontario Energy Board 2012-05-16 2012-05-16
EB-2011-0242 document icon FRPO_ARG_20150515 Argument Ontario Energy Board 2012-05-15 2012-05-15
EB-2011-0242 document icon FRPO_cvr_ltr_ARG_20120515 Argument Ontario Energy Board 2012-05-15 2012-05-15
EB-2011-0242 document icon DirectEnergy_ARG_20120515 Argument Ontario Energy Board 2012-05-15 2012-05-15
EB-2011-0242 document icon LPMA_ARG_20120515 Argument Ontario Energy Board 2012-05-15 2012-05-15
EB-2011-0242 document icon GEC_ARG_20120515 Argument Ontario Energy Board 2012-05-15 2012-05-15
EB-2011-0242 document icon AgEnergy_ARG_EGDI_Union_20120514 Argument Ontario Energy Board 2012-05-14 2012-05-14
EB-2011-0242 document icon ShellEnergy_ARG_EGDI_Union_20120513 Argument Ontario Energy Board 2012-05-14 2012-05-14
EB-2011-0242 document icon Union_undertaking responses_J3.1_J4.1_J4.11_updated_J2.6_20120511 Undertaking Responses Ontario Energy Board 2012-05-11 2012-05-11
EB-2011-0242 document icon EGDI_undertaking responses_J3.1_J4.11_updated_J2.6_20120511 Undertaking Responses Ontario Energy Board 2012-05-11 2012-05-11
EB-2011-0242 document icon EGDI_Union_undertakings list_20120511 Undertaking Responses Ontario Energy Board 2012-05-14 at 1:05 PM
EB-2011-0242 document icon EGDI_Union_undertaking response_J2.4-J2.6,J3.2,J4.2,J4.3,J4.8,J4.10_20120510 Undertaking Responses Ontario Energy Board 2012-05-10 2012-05-10
EB-2011-0242 document icon Union_undrtkg resp_J4.4-J4.7,J4.9_Union and EGDI_J2.4-J2.6,J3.2,J4.2_20120510 Undertaking Responses Ontario Energy Board 2012-05-10 2012-05-10
EB-2011-0242 document icon PO7_ EGDI_Union_20120508 Procedural Order Ontario Energy Board 2012-05-08 2012-05-08
EB-2011-0242 document icon EX_K4.1_20120504 Exhibits Ontario Energy Board 2012-05-04 2012-05-04
EB-2011-0242 document icon transcripts_EGDI_Union_vol_5_20120504 Transcripts Ontario Energy Board 2012-05-04 2012-05-04
EB-2011-0242 document icon EGDI_Union_Undertaking_Responses_J2.1-J2.2_20120504 Undertaking Responses Ontario Energy Board 2012-05-04 2012-05-04
EB-2011-0242 document icon Union_appl_Update Evidence Exh C Append 1 Sched 1-2_page301-302_ 20120503 Application and Evidence Ontario Energy Board 2012-05-03 2012-05-03
EB-2011-0242 document icon transcripts_EGDI_Union_vol_4_20120503 Transcripts Ontario Energy Board 2012-05-03 2012-05-03
EB-2011-0242 document icon EX_K3.3_20120503 Exhibits Ontario Energy Board 2012-05-03 2012-05-03
EB-2011-0242 document icon EX_K3.4_20120503 Exhibits Ontario Energy Board 2012-05-03 2012-05-03
EB-2011-0242 document icon EGDI_Union_Undertaking_Response_J2.3_20120503 Undertaking Responses Ontario Energy Board 2012-05-03 2012-05-03
EB-2011-0242 document icon EGDI_Union_Undertaking_Responses_J1.1-J1.4_20120502 Undertaking Responses Ontario Energy Board 2012-05-02 2012-05-02
EB-2011-0242 document icon EX_K2.1_20120501 Exhibits Ontario Energy Board 2012-05-01 2012-05-01
EB-2011-0242 document icon EX_K2.2_20120501 Exhibits Ontario Energy Board 2012-05-01 2012-05-01
EB-2011-0242 document icon transcripts_vol3_EGDI_Union_20120501 Transcripts Ontario Energy Board 2012-05-02 2012-05-02
EB-2011-0242 document icon EX_K1.1_20120430 Exhibits Ontario Energy Board 2012-04-30 2012-04-30
EB-2011-0242 document icon Union_EGDI_exhibits list_20120522 Exhibits Ontario Energy Board 2012-05-23 at 10:32 AM
EB-2011-0242 document icon Enbridge_Union_undertakings list_20120510 Undertaking Responses Ontario Energy Board 2012-05-10 at 12:45 PM
EB-2011-0242 document icon transcripts_vol2_Union_EGDI_20120430 Transcripts Ontario Energy Board 2012-05-01 2012-05-01
EB-2011-0242 document icon UNION_CVs_RNG_HEARING_20120425 Correspondence Ontario Energy Board 2012-04-25 2012-04-25
EB-2011-0242 document icon IpsosReid_CV_S Guiry_20120425 Correspondence Ontario Energy Board 2012-04-25 2012-04-25
EB-2011-0242 document icon EX_K3.2_20120503 Exhibits Ontario Energy Board 2012-05-03 2012-05-03
EB-2011-0242 document icon EGDI_CVs_RNG_HEARING_20120425 Correspondence Ontario Energy Board 2012-04-25 2012-04-25
EB-2011-0242 document icon EX_K3.1_20120503 Exhibits Ontario Energy Board 2012-05-03 2012-05-03
EB-2011-0242 document icon EX_K1.2_20120430 Exhibits Ontario Energy Board 2012-04-27 2012-04-27
EB-2011-0242 document icon EX_K2.2_20120501 Exhibits Ontario Energy Board 2012-04-27 2012-04-27
EB-2011-0242 document icon EX_K1.3_20120430 Exhibits Ontario Energy Board 2012-04-27 2012-04-27
EB-2011-0242 document icon PollutionProbe_motion withdrawal_20120412 Correspondence Ontario Energy Board 2012-04-12 2012-04-12
EB-2011-0242 document icon Bdltr_PollutionProbe_Motion Withdrawal_20120413 Correspondence Ontario Energy Board 2012-04-13 2012-04-13
EB-2011-0242 document icon Bdltr_Bullfrog_req_withdraw_evid_20120411 Correspondence Ontario Energy Board 2012-04-11 2012-04-11
EB-2011-0242 document icon PollutionProbe_SUB_motion response_20120410 Submission Ontario Energy Board 2012-04-10 2012-04-10
EB-2011-0242 document icon EGDI_SUB_motion response_20120405 Submission Ontario Energy Board 2012-04-09 2012-04-09
EB-2011-0242 document icon Bullfrog_evidence_withdrawal_20120404 Correspondence Ontario Energy Board 2012-04-04 2012-04-04
EB-2011-0242 document icon PO6_ EGDI_Union_20120329 Procedural Order Ontario Energy Board 2012-03-29 2012-03-29
EB-2011-0242 document icon PollutionProbe_Motion_full IR response_20120326 Motion Ontario Energy Board 2012-03-26 2012-03-26
EB-2011-0242 document icon PO5_EGDI_Union_20120326 Procedural Order Ontario Energy Board 2012-03-26 2012-03-26
EB-2011-0242 document icon UNION_Ltr_Bullfrog IRs_20120322 Correspondence Ontario Energy Board 2012-03-22 2012-03-22
EB-2011-0242 document icon EGDI_Union_IR_Bullfrog_20120322 Interrogatories to Intervenor Ontario Energy Board 2012-03-22 2012-03-22
EB-2011-0242 document icon CME_IR_Bullfrog_20120321 Interrogatories to Intervenor Ontario Energy Board 2012-03-21 2012-03-21
EB-2011-0242 document icon CCC_IR_Bullfrog_20120321 Interrogatories to Intervenor Ontario Energy Board 2012-03-21 2012-03-21
EB-2011-0242 document icon VECC_IR_Bullfrog_20120321 Interrogatories to Intervenor Ontario Energy Board 2012-03-21 2012-03-21
EB-2011-0242 document icon EnergyProbe_IR_Bullfrog Power_20120321 Interrogatories to Intervenor Ontario Energy Board 2012-03-21 2012-03-21
EB-2011-0242 document icon EGDI_IRR_revised_20120309 Interrogatory Response from Applicant Ontario Energy Board 2012-03-09 2012-03-09
EB-2011-0242 document icon Bullfrog_intervenor evidence_20120307 Intervenor Evidence Ontario Energy Board 2012-03-07 2012-03-07
EB-2011-0242 document icon Union_updated evidence_Appendix 3_Ipsos Reid Report_20120305 Application and Evidence Ontario Energy Board 2012-03-05 2012-03-05
EB-2011-0242 document icon EGDI_SUB_updated evidence_Exhibit B_Tab 1_Appendix 3_20120305 Submission Ontario Energy Board 2012-03-05 2012-03-05
EB-2011-0242 document icon PO4_EGDI_Union_20120302 Procedural Order Ontario Energy Board 2012-03-02 2012-03-02
EB-2011-0242 document icon Bullfrog_ltr_corr_filing extension req_20120301 Correspondence Ontario Energy Board 2012-03-01 2012-03-01
EB-2011-0242 document icon EGDI_IRR_complete_20120229 Interrogatory Response from Applicant Ontario Energy Board 2012-02-29 2012-02-29
EB-2011-0242 document icon EGDI_Union_IRR_20120224 Interrogatory Response from Applicant Ontario Energy Board 2012-02-24 2012-02-24
EB-2011-0242 document icon Union_ltr_corr_IRR extension REQ_20120217 Correspondence Ontario Energy Board 2012-02-17 2012-02-17
EB-2011-0242 document icon EGDI_ltr_corr_IRR extension REQ_20120217 Correspondence Ontario Energy Board 2012-02-17 2012-02-17
EB-2011-0242 document icon FRPO_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon BOMA_IR_Union_EGDI_20120207pdf Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon APAO_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon Bullfrog_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon JustEnergy_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon CME_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon SEC_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon CCC_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon Poll Probe_IR_Union_EGDI_20120206 Interrogatories to Applicant Ontario Energy Board 2012-02-06 2012-02-06
EB-2011-0242 document icon VECC_IR_Union_EGDI_20120206 Interrogatories to Applicant Ontario Energy Board 2012-02-06 2012-02-06
EB-2011-0242 document icon ShellEnergy_IR_Union_EGDI_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon Bdstaff_IR_EGDI_Union_20120207 Interrogatories to Applicant Ontario Energy Board 2012-02-07 2012-02-07
EB-2011-0242 document icon LPMA_IR_EGDI_20120206 Interrogatories to Applicant Ontario Energy Board 2012-02-05 2012-02-05
EB-2011-0242 document icon GEC_IR_EGDI_Union_20120206 Interrogatories to Applicant Ontario Energy Board 2012-02-06 2012-02-06
EB-2011-0242 document icon DirectEnergy_IR_EGDI_Union_20120203 Interrogatories to Applicant Ontario Energy Board 2012-02-03 2012-02-03
EB-2011-0242 document icon PO3_dec_issues_EGDI_Union_20120124 Decision Ontario Energy Board 2012-01-24 2012-01-24
EB-2011-0242 document icon PO3_dec_issues_EGDI_Union_20120124 Procedural Order Ontario Energy Board 2012-01-24 2012-01-24
EB-2011-0242 document icon EX_KP1.1_20120112 Exhibits Ontario Energy Board 2012-01-12 2012-01-12
EB-2011-0242 document icon Enbridge_Union_exhibit list_20120112 Exhibits Ontario Energy Board 2012-01-12 at 2:23 PM
EB-2011-0242 document icon Enbridge_Union_transcript_vol1_20120112 Transcripts Ontario Energy Board 2012-01-12 2012-01-12
EB-2011-0242 document icon EX_KP1.2_20121012 Exhibits Ontario Energy Board 2012-01-10 2012-01-10
EB-2011-0242 document icon EX_KP1.3_20120112 Exhibits Ontario Energy Board 2012-01-10 2012-01-10
EB-2011-0242 document icon EX_KP1.4_20120112 Exhibits Ontario Energy Board 2012-01-10 2012-01-10
EB-2011-0242 document icon EX_KP1.5_20120112 Exhibits Ontario Energy Board 2012-01-10 2012-01-10
EB-2011-0242 document icon EX_KP1.7_20120112 Exhibits Ontario Energy Board 2012-01-10 2012-01-10
EB-2011-0242 document icon Union_ltr_response to issues list_20111222 Correspondence Ontario Energy Board 2011-12-22 2011-12-22
EB-2011-0242 document icon Union_ltr_issues list_20111214 Correspondence Ontario Energy Board 2011-12-14 2011-12-14
EB-2011-0242 document icon EX_KP1.6_20120112 Exhibits Ontario Energy Board 2012-01-10 2012-01-10
EB-2011-0242 document icon PO2_Union_EGDI_20111219 Procedural Order Ontario Energy Board 2011-12-19 2011-12-19
EB-2011-0242 document icon intervention list_20111219 Intervenor List Ontario Energy Board 2011-12-19 2011-12-19
EB-2011-0242 document icon CME_comments on draft issues_20111214 Comments Ontario Energy Board 2011-12-14 2011-12-14
EB-2011-0242 document icon TransCanada_corr_20111215 Correspondence Ontario Energy Board 2011-12-15 2011-12-15
EB-2011-0242 document icon JustEnergy_comments on draft issues_20111214 Comments Ontario Energy Board 2011-12-15 2011-12-15
EB-2011-0242 document icon Bullfrog_comments on draft issues_20111214 Comments Ontario Energy Board 2011-12-14 2011-12-14
EB-2011-0242 document icon FRPO_comments on draft issues_20111214 Comments Ontario Energy Board 2011-12-14 2011-12-14
EB-2011-0242 document icon BOMA_comments on draft issues_20111214 Comments Ontario Energy Board 2011-12-14 2011-12-14
EB-2011-0242 document icon CCC_comments on draft issues_20111213 Comments Ontario Energy Board 2011-12-13 2011-12-13
EB-2011-0242 document icon RE: Procedural Conference dial in instructions for EB-2011-0242 Enbridge Gas Distribution Inc. and EB-2011-0283 Union Gas EMAIL Correspondence Ontario Energy Board 2011-12-15 2011-12-15
EB-2011-0242 document icon Procedural Conference for EB-2011-0242 Enbridge Gas Distribution Inc. and EB-2011-0283 Union Gas EMAIL Correspondence Ontario Energy Board 2011-12-15 2011-12-15
EB-2011-0242 document icon EnergyProbe_comments on draft issues_20111214 Comments Ontario Energy Board 2011-12-14 2011-12-14
EB-2011-0242 document icon EGDI_comments on draft issues_20111214 Comments Ontario Energy Board 2011-12-14 2011-12-14
EB-2011-0242 document icon Bdstaff_ltr_Guelph_intervenor confirmation_20111213 Intervenor Request Objection Ontario Energy Board 2011-12-13 2011-12-13
EB-2011-0242 document icon GEC_comments on draft issues_20111213 Comments Ontario Energy Board 2011-12-13 2011-12-13
EB-2011-0242 document icon SEC_comments on draft issues_20111213 Comments Ontario Energy Board 2011-12-13 2011-12-13
EB-2011-0242 document icon DirectEnergy_comments on draft issues_20111213 Comments Ontario Energy Board 2011-12-13 2011-12-13
EB-2011-0242 document icon Shell_comments on draft issues_20111212 Comments Ontario Energy Board 2011-12-12 2011-12-12
EB-2011-0242 document icon VECC_ltr_comment_20111208 Comments Ontario Energy Board 2011-12-08 2011-12-08
EB-2011-0242 document icon PlanET_comment_ltr_20111207 Comments Ontario Energy Board 2011-12-08 2011-12-08
EB-2011-0242 document icon GuelphHydro_intrv_REQ_20111206 Intervenor Request Letter Ontario Energy Board 2011-12-07 2011-12-07
EB-2011-0242 document icon AMO_comment_ltr_additional_20111205 Ontario Energy Board 2011-12-05 2011-12-05
EB-2011-0242 document icon intervention list_20111205 Intervenor List Ontario Energy Board 2011-12-05 at 11:10 AM
EB-2011-0242 document icon PO1_Union_EGDI_20111205 Procedural Order Ontario Energy Board 2011-12-05 2011-12-05
EB-2011-0242 document icon Xebec_comment_ltr_20111202 Comments Ontario Energy Board 2011-12-02 2011-12-02
EB-2011-0242 document icon Bdstaff_ltr_PlanET_cfrmd obsrv REQ_20111125 Monitor Ontario Energy Board 2011-11-25 2011-11-25
EB-2011-0242 document icon Bdstaff_ltr_GEC_cfrmd intrv REQ_20111125 Intervenor Request Objection Ontario Energy Board 2011-11-25 2011-11-25
EB-2011-0242 document icon Bdstaff_ltr_Flotech_cfrmd obsvr REQ_20111125 Monitor Ontario Energy Board 2011-11-25 2011-11-25
EB-2011-0242 document icon Bdstaff_ltr_CCI_ cfrmd obsvr REQ_20111125 Monitor Ontario Energy Board 2011-11-25 2011-11-25
EB-2011-0242 document icon Bdstaff_ltr_BOMA cfrmd intrv REQ_20111125 Intervenor Request Objection Ontario Energy Board 2011-11-25 2011-11-25
EB-2011-0242 document icon Bdstaff_ltr_AgEnergy_ cfrmd intrv REQ_20111125 Intervenor Request Objection Ontario Energy Board 2011-11-25 2011-11-25
EB-2011-0242 document icon your observer request EB 2011-0242/0283 EMAIL Monitor Ontario Energy Board 2011-11-25 2011-11-25
EB-2011-0242 document icon GEC_intrv_REQ_20111124 Intervenor Request Letter Ontario Energy Board 2011-11-24 2011-11-24
EB-2011-0242 document icon OSEA_comment_ltr_20111121 Comments Ontario Energy Board 2011-11-21 2011-11-21
EB-2011-0242 document icon Comsatec_comment ltr_20111107 Comments Ontario Energy Board 2011-11-15 2011-11-15
EB-2011-0242 document icon CityofToronto_obsvr_REQ_20111109 Observer Request Letter Ontario Energy Board 2011-11-14 2011-11-14
EB-2011-0242 document icon BOMA_intrv_REQ_20111116 Intervenor Request Letter Ontario Energy Board 2011-11-16 2011-11-16
EB-2011-0242 document icon CCIBioEnergy_obsvr_REQ_20111115 Observer Request Letter Ontario Energy Board 2011-11-15 2011-11-15
EB-2011-0242 document icon PlanET_obsvr_REQ_20111114 Observer Request Letter Ontario Energy Board 2011-11-14 2011-11-14
EB-2011-0242 document icon TheFlotechGroup_obsvr_REQ_20111114 Observer Request Letter Ontario Energy Board 2011-11-14 2011-11-14
EB-2011-0242 document icon AgEnergy_intrv_REQ_20111114 Intervenor Request Letter Ontario Energy Board 2011-11-14 2011-11-14
EB-2011-0242 document icon bstaff_ltr_Enbridge_intrv_obsrv_approved_20111111 Correspondence Ontario Energy Board 2011-11-11 2011-11-11
EB-2011-0242 document icon SLindsay_obsrv_REQ_20111109 Observer Request Letter Ontario Energy Board 2011-11-09 2011-11-09
EB-2011-0242 document icon JCheng_obsvr_REQ_20111110 Observer Request Letter Ontario Energy Board 2011-11-10 2011-11-10
EB-2011-0242 document icon GGlibbery_obsvr_REQ_REDACTED_20111109 Observer Request Letter Ontario Energy Board 2011-11-09 2011-11-09
EB-2011-0242 document icon DBeattie_obsvr REQ_REDACTED_20111108 Observer Request Letter Ontario Energy Board 2011-11-08 2011-11-08
EB-2011-0242 document icon SDVida_comment letter_REDACTED_20111108 Comments Ontario Energy Board 2011-11-08 2011-11-08
EB-2011-0242 document icon BRaney_comment ltr_REDACTED_20111106 Comments Ontario Energy Board 2011-11-07 2011-11-07
EB-2011-0242 document icon PFallis_obsrv_REQ_REDACTED_20111103 Observer Request Letter Ontario Energy Board 2011-11-03 2011-11-03
EB-2011-0242 document icon SummitEnergy_intrv_REQ_20111031 Intervenor Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon TransCanada_intrv_REQ_20111031 Intervenor Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon AMO_obsvr_REQ_20111101 Observer Request Letter Ontario Energy Board 2011-11-01 2011-11-01
EB-2011-0242 document icon EnergyProbe_intrv_REQ_20111031 Intervenor Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon PWU_obsvr_REQ_20111031 Observer Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon DKauling_obsrv_REQ_REDACTED_20111031 Observer Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon WorleyParsons_obsvr_REQ_20111031 Observer Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon APAO_intrv_REQ_20111031 Intervenor Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon JBalakrishnan_obsrv_REQ_REDACTED_20111031 Observer Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon JTilton_comment_ltr_REDACTED_20111029 Comments Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon BullfrogPower_intrv_REQ_20111028 Intervenor Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon JRoberts_comment_ltr_REDACTED_20111029 Comments Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon ConestogaRovers_obsvr_REQ_20111031 Observer Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon FRPO_intrv_REQ_20111031 Intervenor Request Letter Ontario Energy Board 2011-10-31 2011-10-31
EB-2011-0242 document icon CME_intrv_REQ_20111027 Intervenor Request Letter Ontario Energy Board 2011-10-28 2011-10-28
EB-2011-0242 document icon ShellEnergy_intrv_REQ_20111028 Intervenor Request Letter Ontario Energy Board 2011-10-28 2011-10-28
EB-2011-0242 document icon CityofKitchener_intrv_REQ_20111027 Intervenor Request Letter Ontario Energy Board 2011-10-28 2011-10-28
EB-2011-0242 document icon JustEnergy_intrv_REQ_20111026 Intervenor Request Letter Ontario Energy Board 2011-10-26 2011-10-26
EB-2011-0242 document icon DEnergy_intrv_REQ_20111021 Intervenor Request Letter Ontario Energy Board 2011-10-21 2011-10-21
EB-2011-0242 document icon noah_lod_EGDI_20111021 Letter of Direction Ontario Energy Board 2011-10-21 2011-10-21
EB-2011-0242 document icon noah_lod_EGDI_20111021 Notice of Application and Notice of Hearing Ontario Energy Board 2011-10-21 2011-10-21
EB-2011-0242 document icon noah_EGDI_Union_French_20111021 Notice of Application and Notice of Hearing Ontario Energy Board 2011-10-21 2011-10-21
EB-2011-0242 document icon noah_EGDI_Union_20111021 Notice of Application and Notice of Hearing Ontario Energy Board 2011-10-21 2011-10-21
EB-2011-0242 document icon TRCA_intrv_REQ_20111018 Intervenor Request Letter Ontario Energy Board 2011-10-19 2011-10-19
EB-2011-0242 document icon CityofOttawa_ltr_comment_20111005 Comments Ontario Energy Board 2011-10-12 2011-10-12
EB-2011-0242 document icon CME_intrv_REQ_20111013 Intervenor Request Letter Ontario Energy Board 2011-10-13 2011-10-13
EB-2011-0242 document icon VECC_intrv_REQ_20111011 Intervenor Request Letter Ontario Energy Board 2011-10-12 2011-10-12
EB-2011-0242 document icon Poll Probe_intrv_REQ_20111003 Intervenor Request Letter Ontario Energy Board 2011-10-03 2011-10-03
EB-2011-0242 document icon SEC_intrv_REQ_20111006 Intervenor Request Letter Ontario Energy Board 2011-10-06 2011-10-06
EB-2011-0242 document icon CCC_intrv_REQ_20111005 Intervenor Request Letter Ontario Energy Board 2011-10-06 2011-10-06
EB-2011-0242 document icon ack_ltr_EGDI_20111005 Acknowledgement Letter Ontario Energy Board 2011-10-05 at 3:01 PM
EB-2011-0242 document icon EGDI_APPL_RNG_20110930 Application and Evidence Ontario Energy Board 2011-09-30 2011-09-30
EB-2011-0242 document icon AMO_ltr_enbridge_biomethane_20110826 Comments Ontario Energy Board 2011-08-26 2011-08-26