Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2015-0245 | dec_order_on Cost Awards_20230106_signed | Decision and Order on Cost Awards | Ontario Energy Board | 2023-06-01 | 2023-06-01 | |
EB-2015-0245 | SEC_Cost Claim_20230518 | Cost Claim | Ontario Energy Board | 2023-05-17 | 2023-05-17 | |
EB-2015-0245 | UofT_Cost Claim_20230518 | Cost Claim | Ontario Energy Board | 2023-05-17 | 2023-05-17 | |
EB-2015-0245 | EFG_Cost Claim_20230518 | Cost Claim | Ontario Energy Board | 2023-05-17 | 2023-05-17 | |
EB-2015-0245 | WIRTS_ Cost Claim_20230518 | Cost Claim | Ontario Energy Board | 2023-05-17 | 2023-05-17 | |
EB-2015-0245 | EGI_LTR_CostOBJ_20230428_signed | Cost Claim Objection | Ontario Energy Board | 2023-04-28 | 2023-04-28 | |
EB-2015-0245 | Comcast_Cost claim_Invoice Wirtshafter Associates_20230413 | Cost Claim | Ontario Energy Board | 2023-04-13 | 2023-04-13 | |
EB-2015-0245 | NoH_for Cost Awards_DSM_EAC_20230406_signed | Notice of Hearing for Cost Awards | Ontario Energy Board | 2023-04-06 | 2023-04-06 | |
EB-2015-0245 | OEB Ltr_eTools Report_20230317_signed | Correspondence | Ontario Energy Board | 2023-03-17 | 2023-03-17 | |
EB-2015-0245 | OEB DSM Evaluation_ETools Validation Study_Final Report_20230131 | Report of the OEB | Ontario Energy Board | 2023-03-17 | 2023-03-17 | |
EB-2015-0245 | OEB Natural Gas eTRM_20230103 | correspondence | Ontario Energy Board | 2023-01-03 | 2023-01-03 | |
EB-2015-0245 | EB-2015-0245 Ontario Energy Board_ Correspondence | correspondence | Ontario Energy Board | 2023-01-03 | 2023-01-03 | |
EB-2015-0245 | OEB_Natural Gas TRM_V7.0_20221201 | Correspondence | Ontario Energy Board | 2022-12-01 | 2022-12-01 | |
EB-2015-0245 | OEBLtr_TRM Update_20221201 | Correspondence | Ontario Energy Board | 2022-12-01 | 2022-12-01 | |
EB-2015-0245 | 2021 Natural Gas Demand Side Management Annual Verification Report _01 Nov 2022 | Report of the OEB | Ontario Energy Board | 2022-11-01 | 2022-11-01 | |
EB-2015-0245 | Ltr_2021 DSM Results_20221101 | Correspondence | Ontario Energy Board | 2022-11-01 | 2022-11-01 | |
EB-2015-0245 | dec_order_Cost Awards_revised_DSM EAC_20220328 | Decision and Order on Cost Awards | Ontario Energy Board | 2022-03-28 | 2022-03-28 | |
EB-2015-0245 | OEBltr_costs claims_20220328 | Correspondence | Ontario Energy Board | 2022-03-28 | 2022-03-28 | |
EB-2015-0245 | dec_order_Cost Awards_DSM EAC_20220322 | Decision and Order on Cost Awards | Ontario Energy Board | 2022-03-22 | 2022-03-22 | |
EB-2015-0245 | SEC_Cost Claim_CDM_20220228 | Cost Claim | Ontario Energy Board | 2022-02-28 | 2022-02-28 | |
EB-2015-0245 | EFG_Cost Claim_CDM_20220228 | Cost Claim | Ontario Energy Board | 2022-02-28 | 2022-02-28 | |
EB-2015-0245 | EGI_CostOBJ_20220225_eSigned | Cost Claim Objection | Ontario Energy Board | 2022-02-25 | 2022-02-25 | |
EB-2015-0245 | SEC_Cost Claim_20220218 | Cost Claim | Ontario Energy Board | 2022-02-18 | 2022-02-18 | |
EB-2015-0245 | UofT EB-2015-0245 Cost Claim_1125_20220218 | Cost Claim | Ontario Energy Board | 2022-02-18 | 2022-02-18 | |
EB-2015-0245 | Energy Futures Group_EFG_Cost Claim_DSM EAC_20220217 | Cost Claim | Ontario Energy Board | 2022-02-16 | 2022-02-16 | |
EB-2015-0245 | WIRTS_Cost Claim 0216_20220216 | Cost Claim | Ontario Energy Board | 2022-02-16 | 2022-02-16 | |
EB-2015-0245 | NoH_Cost_Awards_DSM_EAC_20220210 | Notice of Hearing | Ontario Energy Board | 2022-02-10 | 2022-02-10 | |
EB-2015-0245 | OEB_Natural Gas_DSM_Technical Resource Manual_V6.0_20211216 | Correspondence | Ontario Energy Board | 2021-12-16 | 2021-12-16 | |
EB-2015-0245 | OEB_cover letter_Natural Gas_DSM_Technical Resource Manual_20211216 | Correspondence | Ontario Energy Board | 2021-12-16 | 2021-12-16 | |
EB-2015-0245 | 2020 Natural Gas Demand Side Management Annual Verification Report_20211202 | Report of the OEB | Ontario Energy Board | 2021-12-02 | 2021-12-02 | |
EB-2015-0245 | OEB_letter_report_2020 DSM results_ 20211202 | Correspondence | Ontario Energy Board | 2021-12-03 | 2021-12-03 | |
EB-2015-0245 | decision_order_Cost Awards_ DSM EAC_20210726 | Decision and Order on Cost Awards | Ontario Energy Board | 2021-07-26 | 2021-07-26 | |
EB-2015-0245 | Wirtshafter Appendix MB_Cost_Claim_Form_EAC_MJune_M2021_20210603_Revised 20210624 | Cost Claim | Ontario Energy Board | 2021-06-24 | 2021-06-24 | |
EB-2015-0245 | EGI_LTR_CostOBJ_20210621 | Cost Claim | Ontario Energy Board | 2021-06-21 | 2021-06-21 | |
EB-2015-0245 | EnergyFuturesGroup_CostClaim_20210617 | Cost Claim | Ontario Energy Board | 2021-06-17 | 2021-06-17 | |
EB-2015-0245 | SEC_CostClaimAffSigned_EAC_20210615 | Cost Claim | Ontario Energy Board | 2021-06-15 | 2021-06-15 | |
EB-2015-0245 | SEC_Cost Claim _20210614 | Cost Claim | Ontario Energy Board | 2021-06-14 | 2021-06-14 | |
EB-2015-0245 | Kesik_Cost Claim-_20210611 | Cost Claim | Ontario Energy Board | 2021-06-11 | 2021-06-11 | |
EB-2015-0245 | Robert M Wirtshafter_CV_long resume_20210608 | Correspondence | Ontario Energy Board | 2021-06-08 | 2021-06-08 | |
EB-2015-0245 | Wirtshafter 2015-0245 invoice _20210608 | Cost Claim | Ontario Energy Board | 2021-06-08 | 2021-06-08 | |
EB-2015-0245 | notice of hearing_Appendix B_Cost_Claim_Form_EAC June 2021_20210603_Revised | Correspondence | Ontario Energy Board | 2021-06-07 | 2021-06-07 | |
EB-2015-0245 | notice of hearing_cost awards_DSM_EAC_20210603 | Notice of Hearing | Ontario Energy Board | 2021-06-03 | 2021-06-03 | |
EB-2015-0245 | SEC_Contact Info Change_20210507 | Correspondence | Ontario Energy Board | 2021-05-07 | 2021-05-07 | |
EB-2015-0245 | OEB_Corres_DSM EMV Plan Update_20210204 | Correspondence | Ontario Energy Board | 2021-02-04 | 2021-02-04 | |
EB-2015-0245 | OEB_Natural Gas DSM TRM_V5.0_121120_20201203 | Correspondence | Ontario Energy Board | 2020-12-03 | 2020-12-03 | |
EB-2015-0245 | OEB_Corres_TRM Update_20201203 | Correspondence | Ontario Energy Board | 2020-12-03 | 2020-12-03 | |
EB-2015-0245 | 2019 Natural Gas Demand Side Management Annual Verification Report | Correspondence | Ontario Energy Board | 2020-12-03 | 2020-12-03 | |
EB-2015-0245 | OEB_Corres_2019 DSM Results_20201203 | Correspondence | Ontario Energy Board | 2020-12-03 | 2020-12-03 | |
EB-2015-0245 | EGI_2019 Draft DSM Annual Report_Final_20200529 | Correspondence | Ontario Energy Board | 2020-05-29 | 2020-05-29 | |
EB-2015-0245 | OEB Ltr_EGI 2019 Draft DSM Results Extension_20200403 | Correspondence | Ontario Energy Board | 2020-04-03 | 2020-04-03 | |
EB-2015-0245 | EGI_Ltr_2019 Draft DSM Results_ExtREQ_20200330 | Correspondence | Ontario Energy Board | 2020-03-30 | 2020-03-30 | |
EB-2015-0245 | 2018 Natural Gas Demand Side Management Annual Verification Report_20200313 | Correspondence | Ontario Energy Board | 2020-03-12 | 2020-03-12 | |
EB-2015-0245 | 2017 Natural Gas Demand Side Management Annual Verification Report_20200313 | Correspondence | Ontario Energy Board | 2020-03-12 | 2020-03-12 | |
EB-2015-0245 | 2018 Natural Gas DSM Free Ridership Evaluation_20200313 | Correspondence | Ontario Energy Board | 2020-03-12 | 2020-03-12 | |
EB-2015-0245 | 2017-18 Natural Gas DSM Custom Savings Verification_20150313 | Correspondence | Ontario Energy Board | 2020-03-12 | 2020-03-12 | |
EB-2015-0245 | 2017-2018 Natural Gas DSM Custom Evaluation Executive Summary_20200313 | Correspondence | Ontario Energy Board | 2020-03-12 | 2020-03-12 | |
EB-2015-0245 | OEB Ltr_2017 and 2018 DSM Results_20200313 | Correspondence | Ontario Energy Board | 2020-03-12 | 2020-03-12 | |
EB-2015-0245 | OEBltr_DSM Evaluation_TRM Update_20200115 | Correspondence | Ontario Energy Board | 2020-01-15 | 2020-01-15 | |
EB-2015-0245 | OEB_TRM_Version 4.0_20200110 | Correspondence | Ontario Energy Board | 2020-01-15 | 2020-01-15 | |
EB-2015-0245 | Dec Order Cost Awards_DSM EAC_20191217 | Decision and Order on Cost Awards | Ontario Energy Board | 2019-12-17 | 2019-12-17 | |
EB-2015-0245 | Neme_Cost Claim_EB-2015-0245_NOH_Appendix B_Cost_Claim_Form_EAC 20191025_xlsx_20191107 | Cost Claim | Ontario Energy Board | 2019-11-07 | 2019-11-07 | |
EB-2015-0245 | NEME_CostClaim_20181001 thru 20191110 | Cost Claim | Ontario Energy Board | 2019-11-07 | 2019-11-07 | |
EB-2015-0245 | NEME_CostClaim_20181001 thru 20191110_Email | Cost Claim | Ontario Energy Board | 2019-11-07 | 2019-11-07 | |
EB-2015-0245 | Kesik-Cost Claim_NG DSM EAC_20191101 | Cost Claim | Ontario Energy Board | 2019-11-01 | 2019-11-01 | |
EB-2015-0245 | SEC_Cost Claim_NG DSM EAC_20191029 | Cost Claim | Ontario Energy Board | 2019-10-29 | 2019-10-29 | |
EB-2015-0245 | Wirtshafter_Cost Claim_NG DSM EAC_20191028 | Cost Claim | Ontario Energy Board | 2019-10-28 | 2019-10-28 | |
EB-2015-0245 | EB-2015-0245_NOH_Appendix B_Cost_Claim_Form_EAC 2019102_xlsx_20191025 | Notice | Ontario Energy Board | 2019-10-25 | 2019-10-25 | |
EB-2015-0245 | NoH_Cost_Awards_DSM_EAC_20191025 | Notice | Ontario Energy Board | 2019-10-25 | 2019-10-25 | |
EB-2015-0245 | Marion Fraser_Ltr_Resignation OEB Evaluation Advisory Committee_20190227 | Correspondence | Ontario Energy Board | 2019-02-27 | 2019-02-27 | |
EB-2015-0245 | Dec_Order_Cost Awards_NG DSM EAC_20181210 | Decision and Order on Cost Awards | Ontario Energy Board | 2018-12-10 | 2018-12-10 | |
EB-2015-0245 | OEB_TRM_Version_3.0_20181203 | Correspondence | Ontario Energy Board | 2018-12-03 | 2018-12-03 | |
EB-2015-0245 | Ltr_TRM Update_20181203 | Correspondence | Ontario Energy Board | 2018-12-03 | 2018-12-03 | |
EB-2015-0245 | MFEI_Fraser_Cost Claim_2515-1 DSM EAC_Additional Info_20181112 | Cost Claim | Ontario Energy Board | 2018-11-12 | 2018-11-12 | |
EB-2015-0245 | EGDI_CostsObj_DSM EAC_20181109 | Cost Claim | Ontario Energy Board | 2018-11-09 | 2018-11-09 | |
EB-2015-0245 | Wirtshafter_Cost Claim_DSM_EAC_20181025 | Cost Claim | Ontario Energy Board | 2018-10-25 | 2018-10-25 | |
EB-2015-0245 | Neme_NOH_Appendix B_Cost_Claim_Form_Oct 2018-Neme_xls_20181105 | Cost Claim | Ontario Energy Board | 2018-11-05 | 2018-11-05 | |
EB-2015-0245 | Neme_OEB cost award form - EAC 2017-11 to 2018-09 _20181105 | Cost Claim | Ontario Energy Board | 2018-11-05 | 2018-11-05 | |
EB-2015-0245 | Wirtshafter_CostClaim_ NOH_Appendix B_Oct 2018.xls | Cost Claim | Ontario Energy Board | 2018-10-25 | 2018-10-25 | |
EB-2015-0245 | SEC_Cost Claim_DSM EAC_20181105 | Cost Claim | Ontario Energy Board | 2018-11-05 | 2018-11-05 | |
EB-2015-0245 | Kesik_CostClaim_EB-2017-0245_20181103 | Cost Claim | Ontario Energy Board | 2018-11-05 | 2018-11-05 | |
EB-2015-0245 | OEB_2016 Natural Gas Demand Side Management Annual Verification Report_c2_20181030 | Correspondence | Ontario Energy Board | 2018-10-30 | 2018-10-30 | |
EB-2015-0245 | OEB_Ltr_2016 DSM Results_20181030 | Correspondence | Ontario Energy Board | 2018-10-30 | 2018-10-30 | |
EB-2015-0245 | MFEI_CostClaim_EB-2015-0245_cor_20181029 | Cost Claim | Ontario Energy Board | 2018-10-29 | 2018-10-29 | |
EB-2015-0245 | NOH Appendix B_Cost_Claim_Form_Oct 2018_20181024 | Notice | Ontario Energy Board | 2018-10-24 | 2018-10-24 | |
EB-2015-0245 | NoH_Cost_Awards_DSM_EAC_20181024 | Notice | Ontario Energy Board | 2018-10-24 | 2018-10-24 | |
EB-2015-0245 | EGDI_Boiler Baseline Study_20180827 | Submission | Ontario Energy Board | 2018-08-27 | 2018-08-27 | |
EB-2015-0245 | EGDI_Boiler Baseline Study_20180827 | Correspondence | Ontario Energy Board | 2018-08-27 | 2018-08-27 | |
EB-2015-0245 | OEB_Ltr_UG_DSM 2017 draft results_20180322 | Correspondence | Ontario Energy Board | 2018-03-22 | 2018-03-22 | |
EB-2015-0245 | OEB_Ltr_EGD_DSM 2017 draft results_20180322 | Correspondence | Ontario Energy Board | 2018-03-22 | 2018-03-22 | |
EB-2015-0245 | Dec Order Cost Awards_NG DSM EAC_EB-2015-0245_20180305 | Decision and Order on Cost Awards | Ontario Energy Board | 2018-03-05 | 2018-03-05 | |
EB-2015-0245 | 2015 Natural Gas Demand Side Management Annual Verification Report_20171227 | Correspondence | Ontario Energy Board | 2017-12-27 | 2017-12-27 | |
EB-2015-0245 | OEBLtr_2015 DSM Results Correction_EB-2015-0245_20171227 | Correspondence | Ontario Energy Board | 2017-12-27 | 2017-12-27 | |
EB-2015-0245 | OEB TRM v 2-0_20171227 | Correspondence | Ontario Energy Board | 2017-12-27 | 2017-12-27 | |
EB-2015-0245 | OEBLtr_Dec_2017_TRM_Update_20171227 | Correspondence | Ontario Energy Board | 2017-12-27 | 2017-12-27 | |
EB-2015-0245 | EGDI_CostObj_none_20171212 | Cost Claim Objection | Ontario Energy Board | 2017-12-12 | 2017-12-12 | |
EB-2015-0245 | Union_Ltr_Cost Claims_20170512 | Correspondence | Ontario Energy Board | 2017-12-05 | 2017-12-05 | |
EB-2015-0245 | EB-2015-0245 cost award forms_2017-04-01 thru 2017-10-31_Neme-revised 20171130 | Cost Claim | Ontario Energy Board | 2017-11-30 | 2017-11-30 | |
EB-2015-0245 | Fraser_Cost Claim_EB-2015-0245_20171122 | Cost Claim | Ontario Energy Board | 2017-11-22 | 2017-11-22 | |
EB-2015-0245 | Fraser_Cost Claim_EAC_EB-2015-0245_20171122 | Cost Claim | Ontario Energy Board | 2017-11-22 | 2017-11-22 | |
EB-2015-0245 | Fraser_Cost Claim_ Affidavit and Summary of Fees_EB-2015-0245_20171122 | Cost Claim | Ontario Energy Board | 2017-11-22 | 2017-11-22 | |
EB-2015-0245 | SEC_Cost Claim_EAC_EB-2015-0245_20171122 | Cost Claim | Ontario Energy Board | 2017-11-22 | 2017-11-22 | |
EB-2015-0245 | Neme_Cost Claim_2017-04-01 thru 2017-10-31_20171121 | Cost Claim | Ontario Energy Board | 2017-11-21 | 2017-11-21 | |
EB-2015-0245 | Fraser_CostClaim_EB-2015-0245_20171121 | Cost Claim | Ontario Energy Board | 2017-11-21 | 2017-11-21 | |
EB-2015-0245 | Wirtshafter NOH_Appendix B_Cost_Claim_Form_Oct 2017_20171102_20171120 | Cost Claim | Ontario Energy Board | 2017-11-20 | 2017-11-20 | |
EB-2015-0245 | Kesik_Appendix B_Cost Claim_NGDSM Advisory Committee_20171114 | Cost Claim | Ontario Energy Board | 2017-11-14 | 2017-11-14 | |
EB-2015-0245 | Appendix B_NOH_Cost_Claim_Form_Oct 2017_20171107 | Notice of Hearing | Ontario Energy Board | 2017-11-07 | 2017-11-07 | |
EB-2015-0245 | NoH_Cost_Awards_DSM_EAC_20171107 | Notice of Hearing | Ontario Energy Board | 2017-11-07 | 2017-11-07 | |
EB-2015-0245 | Attachment 1_OEB Ltr_ 2015 Natural Gas Demand Side Management Custom Savings Verification and Free-Ridership Evaluation_20171016 | Correspondence | Ontario Energy Board | 2017-10-16 | 2017-10-16 | |
EB-2015-0245 | Attachment 2_2015 Natural Gas Demand Side Management Annual Verification Report_20171016 | Correspondence | Ontario Energy Board | 2017-10-16 | 2017-10-16 | |
EB-2015-0245 | OEB Ltr_2015 DSM Reports_20171016 | Correspondence | Ontario Energy Board | 2017-10-16 | 2017-10-16 | |
EB-2015-0245 | Dec Order_CostAwards_DSM EAC_EB-2015-0245_20170605 | Decision and Order on Cost Awards | Ontario Energy Board | 2017-06-05 | 2017-06-05 | |
EB-2015-0245 | TKesik-EAC-Docket_Cost Claim_20170515 | Cost Claim | Ontario Energy Board | 2017-05-15 | 2017-05-15 | |
EB-2015-0245 | EGDI_CostObj_EB-2015-0245_20170515 | Cost Claim Objection | Ontario Energy Board | 2017-05-15 | 2017-05-15 | |
EB-2015-0245 | Wirtshafter_Cost Claim_DSM_EAC_20170503 | Cost Claim | Ontario Energy Board | 2017-05-03 | 2017-05-03 | |
EB-2015-0245 | EnergyFuturesGroup_Cost Claim_DSM_EAC_20170503 | Cost Claim | Ontario Energy Board | 2017-05-03 | 2017-05-03 | |
EB-2015-0245 | SEC_Cost Claim_DSM_EAC_20170502 | Cost Claim | Ontario Energy Board | 2017-05-02 | 2017-05-02 | |
EB-2015-0245 | MFEI_CostClaim_EB-2015-0245_20170427 | Cost Claim | Ontario Energy Board | 2017-04-27 | 2017-04-27 | |
EB-2015-0245 | Kesik_Cost Claim_DSM_EAC_20170425 | Cost Claim | Ontario Energy Board | 2017-04-25 | 2017-04-25 | |
EB-2015-0245 | MFEI_CostClaim_20170427 | Cost Claim | Ontario Energy Board | 2017-04-27 | 2017-04-27 | |
EB-2015-0245 | Wirtshafter Associates Inc Union Invoice 2017-1 EAC_Cost Claim_20170417 | Cost Claim | Ontario Energy Board | 2017-04-17 | 2017-04-17 | |
EB-2015-0245 | Wirtshafter Associates Inc Enbridge Invoice 2017-1 EAC_20170417 | Cost Claim | Ontario Energy Board | 2017-04-17 | 2017-04-17 | |
EB-2015-0245 | Wirtshafter Copy of NOH_Appendix B_Cost_Claim_Form_April 2017_20170417 | Cost Claim | Ontario Energy Board | 2017-04-13 | 2017-04-13 | |
EB-2015-0245 | NOH_Appendix B_Cost_Claim_Form_April 2017_20170417 | Notice of Hearing | Ontario Energy Board | 2017-04-17 | 2017-04-17 | |
EB-2015-0245 | NoH_Cost_Awards_DSM_EAC_20170417 | Notice of Hearing | Ontario Energy Board | 2017-04-17 | 2017-04-17 | |
EB-2015-0245 | Kesik-EAC Declaration and Undertaking_20170213 | Declaration and Undertakings | Ontario Energy Board | 2017-02-13 | 2017-02-13 | |
EB-2015-0245 | MikeParkes-DSMEACConfidentiality_20170214 | Declaration and Undertakings | Ontario Energy Board | 2017-02-14 | 2017-02-14 | |
EB-2015-0245 | Nemes_EFG-OEB NDA revised_20170214 | Declaration and Undertakings | Ontario Energy Board | 2017-02-14 | 2017-02-14 | |
EB-2015-0245 | Confidentiality_ltr_EAC_20170209 | Correspondence | Ontario Energy Board | 2017-02-09 | 2017-02-09 | |
EB-2015-0245 | Shepherd_SEC_Signed Declaration and Undertaking_20170210 | Declaration and Undertakings | Ontario Energy Board | 2017-02-10 | 2017-02-10 | |
EB-2015-0245 | DecOrder_CostAwards_EGDI_Union_DSM EAC_20160929 | Decision and Order on Cost Awards | Ontario Energy Board | 2016-09-29 | 2016-09-29 | |
EB-2015-0245 | Wirtshafter_Cost Claim_Time Docket EAC Advisory for OEB_20160920 | Cost Claim | Ontario Energy Board | 2016-09-28 | 2016-09-28 | |
EB-2015-0245 | Kesik_Sworn_Affidavit_NOH_Appendix B_Cost_Claim_Form_20160819 | Cost Claim | Ontario Energy Board | 2016-09-19 | 2016-09-19 | |
EB-2015-0245 | Kesik_Cost Claim Form_Time Docket_NOH_Appendix B_20160820.xls | Cost Claim | Ontario Energy Board | 2016-09-20 | 2016-09-20 | |
EB-2015-0245 | Kesik_CostClaim_-CV-Apr1-16_2016 0920 | Cost Claim | Ontario Energy Board | 2016-09-20 | 2016-09-20 | |
EB-2015-0245 | Kesik_Cost Claim_Form_NOH_Appendix B_20160819.xls | Cost Claim | Ontario Energy Board | 2016-09-20 | 2016-09-20 | |
EB-2015-0245 | UNION_Ltr_Cost Claims_Evaluation Advisory Committee_20160913 | Correspondence | Ontario Energy Board | 2016-09-13 | 2016-09-13 | |
EB-2015-0245 | UNION_Ltr_CostObj_NG_DSM_Advisory Committee_20160908 | Cost Claim Objection | Ontario Energy Board | 2016-09-08 | 2016-09-08 | |
EB-2015-0245 | EGDI_CostObj_MFEI_Fraser_NG_DSM_Advisory Committee_20160908 | Cost Claim Objection | Ontario Energy Board | 2016-09-08 | 2016-09-08 | |
EB-2015-0245 | EGDI_CostObj_NG_DSM_Advisory Committee_20160908 | Cost Claim Objection | Ontario Energy Board | 2016-09-08 | 2016-09-08 | |
EB-2015-0245 | MFEI_CostClaim_revised_20160907 | Cost Claim | Ontario Energy Board | 2016-09-08 | 2016-09-08 | |
EB-2015-0245 | SEC_ Cost Claim_OEB_20160902.pdf | Cost Claim | Ontario Energy Board | 2016-09-02 | 2016-09-02 | |
EB-2015-0245 | OEB Ltr_DSM Evaluation Process_Cost Claim_Marion Fraser_20160901 | Correspondence | Ontario Energy Board | 2016-09-01 | 2016-09-01 | |
EB-2015-0245 | EnergyFuturesGroup_Neme_Cost Claim_20160831 | Cost Claim | Ontario Energy Board | 2016-08-31 | 2016-08-31 | |
EB-2015-0245 | Wirtshafter Assoc_Cost claim_20160829 | Cost Claim | Ontario Energy Board | 2016-08-29 | 2016-08-29 | |
EB-2015-0245 | Kesik_CostClaim_20160829 | Cost Claim | Ontario Energy Board | 2016-08-29 | 2016-08-29 | |
EB-2015-0245 | NOH_Appendix B_Cost_Claim_Form_20160819 | Cost Claim | Ontario Energy Board | 2016-08-19 | 2016-08-19 | |
EB-2015-0245 | NoH_Cost_Awards_DSM_EAC_20160819 | Notice of Hearing | Ontario Energy Board | 2016-08-19 | 2016-08-19 | |
EB-2015-0245 | UNION_Ltr_DSM Evaluation Process_Boiler Baseline_20160609 | Correspondence | Ontario Energy Board | 2016-06-09 | 2016-06-09 | |
EB-2015-0245 | OEB Ltr_DSM RRR Updates_20160329 | Notice | Ontario Energy Board | 2016-03-29 | 2016-03-29 | |
EB-2015-0245 | OEB letter_TEC EAC Transition Letter_20160304 | Correspondence | Ontario Energy Board | 2016-03-04 | 2016-03-04 | |
EB-2015-0245 | OEB Ltr_ DSM Evaluation Process_20150821 | Notice | Ontario Energy Board | 2015-08-21 | 2015-08-21 | |