Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2017-0039 document icon dec_order_on Cost Awards_ Essex Powerlines_20181010.pdf Decision and Order on Cost Awards Essex Powerlines Corporation - Electricity Distributor 2018-10-10 2018-10-10
EB-2017-0039 document icon VECC_CostClaim_20180924 Cost Claim Essex Powerlines Corporation - Electricity Distributor 2018-09-21 at 4:29 PM
EB-2017-0039 document icon SEC_EPLC_CostClaim_Rev_20180921 Cost Claim Essex Powerlines Corporation - Electricity Distributor 2018-09-21 2018-09-21
EB-2017-0039 document icon Final_Rate_Order_Essex_20180920.pdf Rate Order Essex Powerlines Corporation - Electricity Distributor 2018-09-20 2018-09-20
EB-2017-0039 document icon SEC_EPLC_CostClaim_20180918.pdf Cost Claim Essex Powerlines Corporation - Electricity Distributor 2018-09-18 2018-09-18
EB-2017-0039 document icon Proposed_Tariff_Sheet_091018.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-09-10 2018-09-10
EB-2017-0039 document icon Revised_Rider_Calculations_20180910.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-09-10 2018-09-10
EB-2017-0039 document icon RE: Essex Powerlines Corp. - Reply Submission - EB-2017-0039 - CORRESPONDENCE Correspondence Essex Powerlines Corporation - Electricity Distributor 2018-09-07 2018-09-07
EB-2017-0039 document icon Revised_Rider_Calculations_20180907.xlsx Final Argument Essex Powerlines Corporation - Electricity Distributor 2018-09-07 2018-09-07
EB-2017-0039 document icon Proposed_Tariff_Sheet_20180907.xlsx Final Argument Essex Powerlines Corporation - Electricity Distributor 2018-09-07 2018-09-07
EB-2017-0039 document icon EPLC_DVAContinuity_R6_20180907.xlsb Final Argument Essex Powerlines Corporation - Electricity Distributor 2018-09-07 at 10:58 AM
EB-2017-0039 document icon EPLC Reply Submission 20180907.pdf Final Argument Essex Powerlines Corporation - Electricity Distributor 2018-09-07 2018-09-07
EB-2017-0039 document icon SEC_EPLC_EffectiveDate_20180904.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-09-04 2018-09-04
EB-2017-0039 document icon OEBstaff_DRO SUB_Essex Powerlines_20180904.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-09-04 2018-09-04 2018-09-04
EB-2017-0039 document icon VECC Submission_Implementation_Essex0039_20180904.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-09-04 2018-09-04
EB-2017-0039 document icon Bill Impacts _R7_20180829.xlsx Submission Essex Powerlines Corporation - Electricity Distributor 2018-08-29 2018-08-29
EB-2017-0039 document icon EPLC_DVAContinuity_R5_20180829.xlsb Submission Essex Powerlines Corporation - Electricity Distributor 2018-08-29 2018-08-29
EB-2017-0039 document icon Foregone_Revenue_Rider_Calculation_20180829.xlsx Submission Essex Powerlines Corporation - Electricity Distributor 2018-08-29 2018-08-29
EB-2017-0039 document icon Proposed_Tariff_Sheet_20190829.xlsx Submission Essex Powerlines Corporation - Electricity Distributor 2018-08-29 2018-08-29
EB-2017-0039 document icon EPLC_Submissions on Implementation_20180829.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-08-29 2018-08-29
EB-2017-0039 document icon dec_order_Essex Power_ 20180823 Decision and Order Essex Powerlines Corporation - Electricity Distributor 2018-08-23 2018-08-23
EB-2017-0039 document icon EPLC_ReplySubmission_20180723.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-07-23 2018-07-23
EB-2017-0039 document icon SEC_EPLC_Sub_BoA_20180711.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-07-11 2018-07-11
EB-2017-0039 document icon SEC_EPLC_Sub_20180711_PUBLIC.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-07-11 2018-07-11
EB-2017-0039 document icon VECC_SubmissionDVA_Essex0039_20180712.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-07-12 2018-07-12
EB-2017-0039 document icon po5_Essex Powerlines_20180706 Procedural Order Essex Powerlines Corporation - Electricity Distributor 2018-07-06 2018-07-06
EB-2017-0039 document icon SEC_EPLC_ExtensionReqLtr_20180705.pdf Correspondence Essex Powerlines Corporation - Electricity Distributor 2018-07-05 2018-07-05
EB-2017-0039 document icon OEBstaff_SUB2_Essex Powerlines_Rev 0_20180704.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-07-04 2018-07-04 2018-07-04
EB-2017-0039 document icon EPLC_Argument_in_Chief_20180622.doc Applicant Argument in Chief Essex Powerlines Corporation - Electricity Distributor 2018-06-22 2018-06-22
EB-2017-0039 document icon PO4_Essex Powerlines_20180612.pdf Procedural Order Essex Powerlines Corporation - Electricity Distributor 2018-06-12 2018-06-12
EB-2017-0039 document icon Attachment 1-B - DVA Continuity Schedule Before_After.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-06-07 2018-06-07
EB-2017-0039 document icon Attachment 1-D - IR Responses.PDF Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-06-07 2018-06-07
EB-2017-0039 document icon Attachment 1-C - Change Management Action Plan.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-06-07 2018-06-07
EB-2017-0039 document icon Attachment 1-A - Board Excel Table tab IR2-Staff-1.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-06-07 2018-06-07
EB-2017-0039 document icon EPLC_IRR_060718.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-06-07 2018-06-07
EB-2017-0039 document icon VECC IRQ2_ DVAEssex0039_20180524 Interrogatories to Applicant Essex Powerlines Corporation - Electricity Distributor 2018-05-24 2018-05-24
EB-2017-0039 document icon SEC_EPLC_SupIR_20180524 Interrogatories to Applicant Essex Powerlines Corporation - Electricity Distributor 2018-05-24 2018-05-24
EB-2017-0039 document icon OEB_IRS_toEssex Powerlines_20180524 Interrogatories to Applicant Essex Powerlines Corporation - Electricity Distributor 2018-05-24 2018-05-24
EB-2017-0039 document icon OEB_IRS_toEssex Powerlines_20180524 Interrogatories to Applicant Essex Powerlines Corporation - Electricity Distributor 2018-05-24 2018-05-24
EB-2017-0039 document icon PO3_Essex Powerlines_20180523 Procedural Order Essex Powerlines Corporation - Electricity Distributor 2018-05-23 2018-05-23
EB-2017-0039 document icon SEC_EPL_DU_MR_20180523 Declaration and Undertakings Essex Powerlines Corporation - Electricity Distributor 2018-05-23 2018-05-23
EB-2017-0039 document icon Essex Powerlines_WrittenSummaryofChronology_20180517.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-05-17 2018-05-17
EB-2017-0039 document icon po2_EssexPowerlines_20180503 Procedural Order Essex Powerlines Corporation - Electricity Distributor 2018-05-03 2018-05-03
EB-2017-0039 document icon Interim Rate Order_Essex Powerlines_20180426.pdf Interim rate order Essex Powerlines Corporation - Electricity Distributor 2018-04-26 2018-04-26
EB-2017-0039 document icon OEBstaff_SUB_Essex Powerlines_20180420.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-04-20 2018-04-20 2018-04-20
EB-2017-0039 document icon EPLC_Corres_Interim Rates Request_20180418 .pdf Correspondence Essex Powerlines Corporation - Electricity Distributor 2018-04-18 2018-04-18
EB-2017-0039 document icon EPLC_Attachment D_AmendedAppendixF_20180416.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-04-16 2018-04-16
EB-2017-0039 document icon EPLC_Attachment C_Letter dated 20171114_20180416.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-04-16 2018-04-16
EB-2017-0039 document icon EPLC_Attachment B_Letter dated 20170321_20180416.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-04-16 2018-04-16
EB-2017-0039 document icon EPLC_Attachment A_Letter dated 20160422_20180416.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-04-16 2018-04-16
EB-2017-0039 document icon EPLC_Letter_Request for Confidential Treatment of Information_20180416.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-04-16 2018-04-16
EB-2017-0039 document icon EPLC_Settlement_Agreement_amended appendix F_20180416.pdf Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-16 2018-04-16
EB-2017-0039 document icon Load Forecast 2018_EPL_Revised_Settlement_Revised v2_20180413.xlsx Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon EPLC_RTSR_20180413.xlsm Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon EPLC_RRWF_20180115 _R620180413_.xlsm Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon EPLC_LRAMVA_20180413.xlsx Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon EPLC_DVAContinuity_R4_20180413.xlsb Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon EPLC_Chp2Appendice_20180413.xlsm Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon Cost of Power Summary _20180413_.xlsx Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon Bill Impacts _R6_20180413_.xlsx Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon 2018_Test_year_Income_Tax_PILs_Workform_V1 _R5_20180413_.xlsm Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon 2018_Cost_Allocation_Model _R5 20180413_.xlsm Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon Essex_Follow_Up_IRs _20180413.pdf Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon EPLC_Settlement_Agreement_20180413.pdf Settlement Proposal Essex Powerlines Corporation - Electricity Distributor 2018-04-13 2018-04-13
EB-2017-0039 document icon Essex Powerlines_Corres_COS Settlement Extension Request_20180329 Correspondence Essex Powerlines Corporation - Electricity Distributor 2018-03-29 2018-03-29
EB-2017-0039 document icon OEB_Corres_Essex Powerlines Settlement Proposal Extension _20180402 Correspondence Essex Powerlines Corporation - Electricity Distributor 2018-04-02 2018-04-02
EB-2017-0039 document icon decision_on issues list_Essex Powerlines_20180312 Decision Essex Powerlines Corporation - Electricity Distributor 2018-03-12 2018-03-12
EB-2017-0039 document icon Issues List_Essex Powerlines_ Cost of Service Rev 0_20180309.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-03-09 2018-03-09 2018-03-09
EB-2017-0039 document icon Attachment 1-R3 - 2016_Verified_CDM_Report.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-R2 - 2015_Verified_CDM_Report.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-O3 - 2016_EPLC_Persistence_Final.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-O2 - 2015_EPLC_Persistence_Final.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Bill Impacts_R2_030218.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-X - EPLC_DVAContinuity_R2_030218.xlsb Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-W - 2018_Cost_Allocation_Model_R2_030218.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-R - 2011-2014_Final_Results_Report_EPLC.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-Q - EPLC_LRAMVA_20170828.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-P - EPLC_CDMPlan_Oct_2017.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-O - 2011-14 Persistence Report_Essex Powerlines.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-L - Cost_of_Power_Summary.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-K - 2018_Test_year_Income_Tax_PILs_Workform_V1_R2_030218.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-J - EPLC_Chp2Appendice_20180302.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-C - EPLC_RRWF_20180115_R2 030218.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon EPLC_IR_Responses_030218.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-O - 2011-14 Persistence Report_Essex Powerlines.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-L - Cost_of_Power_Summary.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-K - 2018_Test_year_Income_Tax_PILs_Workform_V1_R2_030218.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-J - EPLC_Chp2Appendice_20180302.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-C - EPLC_RRWF_20180115_R2 030218.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon EPLC_IR_Responses_030218.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-R - 2011-2014 Final Results Report_EPLC.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-Q - EPLC_LRAMVA_20170828.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-P - EPLC CDM-Plan Oct 2017.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-O - 2011-14 Persistence Report_Essex Powerlines.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-L - Cost of Power Summary.xlsx Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon Attachment 1-J - EPLC_Chp2Appendice_20180302.xlsm Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon EPLC_IR_Responses_20180302.pdf Interrogatory Response from Applicant Essex Powerlines Corporation - Electricity Distributor 2018-03-02 2018-03-02
EB-2017-0039 document icon OEB Staff_Essex Powerlines Community_Meeting_Summary Rev 0_20180226.pdf Submission Essex Powerlines Corporation - Electricity Distributor 2018-02-26 2018-02-26
EB-2017-0039 document icon EB-2017-0039 Essex Powerlines Community_Meeting_Summary Rev 0_20180208.docx Correspondence Essex Powerlines Corporation - Electricity Distributor 2018-02-08 2018-02-08
EB-2017-0039 document icon SEC_EPL_IR_20180209.pdf Interrogatories to Applicant Essex Powerlines Corporation - Electricity Distributor 2018-02-09 2018-02-09
EB-2017-0039 document icon Board Staff_IR_Essex Powerlines Cost of Service Rev 0_20180208.pdf Interrogatories to Applicant Essex Powerlines Corporation - Electricity Distributor 2018-02-08 2018-02-08
EB-2017-0039 document icon Burford C_ Letter of Comment__20180129 Letter of Comment Essex Powerlines Corporation - Electricity Distributor 2018-01-29 2018-01-29
EB-2017-0039 document icon LaRose G_FW Letter of Comment_Redacted_20180122 Letter of Comment Essex Powerlines Corporation - Electricity Distributor 2018-01-22 2018-01-22
EB-2017-0039 document icon po1_ Essex Powerlines_20180126 Procedural Order Essex Powerlines Corporation - Electricity Distributor 2018-01-26 2018-01-26
EB-2017-0039 document icon EPLC_RRWF_20180115_Rev1.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-01-15 2018-01-15
EB-2017-0039 document icon EPLC_PILS_20180115_Rev1.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-01-15 2018-01-15
EB-2017-0039 document icon EPLC_DVAContinuity_20180115_Rev1.xlsb Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-01-15 2018-01-15
EB-2017-0039 document icon EPLC_Cost_Allocation_20180115_Rev1.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-01-15 2018-01-15
EB-2017-0039 document icon EPLC_Bill_Impacts_20180115_Rev1.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-01-15 2018-01-15
EB-2017-0039 document icon EPLC_Supplemental_Cover_20180115.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2018-01-15 2018-01-15
EB-2017-0039 document icon HONI_INT_REQ_20180104.pdf Intervenor Request Letter Essex Powerlines Corporation - Electricity Distributor 2018-01-04 2018-01-04
EB-2017-0039 document icon VECC_INT_REQ_ Essex Powerlines_20180103 Intervenor Request Letter Essex Powerlines Corporation - Electricity Distributor 2018-01-03 2018-01-03
EB-2017-0039 document icon SEC_INT_REQ_Essex Powerlines_20120102 Intervenor Request Letter Essex Powerlines Corporation - Electricity Distributor 2018-01-02 2018-01-02
EB-2017-0039 document icon Essex Powerlines_Cos_Affidavit_20171221 Affidavits of Service Essex Powerlines Corporation - Electricity Distributor 2017-12-21 2017-12-21
EB-2017-0039 document icon noa_Essex Power_FR_20171206.pdf Notice of Application Essex Powerlines Corporation - Electricity Distributor 2017-12-06 2017-12-06
EB-2017-0039 document icon noa_Essex Power_20171206.pdf Notice of Application Essex Powerlines Corporation - Electricity Distributor 2017-12-06 2017-12-06
EB-2017-0039 document icon lod_noa_Essex Power_20171206.pdf Letter of Direction Essex Powerlines Corporation - Electricity Distributor 2017-12-06 2017-12-06
EB-2017-0039 document icon EPLC_Bill_Impacts_20171114.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-11-14 2017-11-14
EB-2017-0039 document icon EPLC_Load_Forecast_20171114.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-11-14 2017-11-14
EB-2017-0039 document icon EPLC_Load_Forecast_20171114.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-11-14 2017-11-14
EB-2017-0039 document icon EPLC_DVAContinuity_20170828.xlsb Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_PILs_20170828.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_LRAMVA_20170828.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_RTSR_20170828.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_RRWF_20170828.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_CostAllocation_20170828.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Chp2Appendice_20170828.xlsm Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Checklist_20170828.xlsx Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_CoverLetter_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit9_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit8_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit7_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit6_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit5_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit4_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit3_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit2_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
EB-2017-0039 document icon EPLC_Application-Exhibit1_20170828.pdf Application and Evidence Essex Powerlines Corporation - Electricity Distributor 2017-08-28 2017-08-28
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received