Search Results for: Records - Case Number=EB-2019-0002 - 136 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2019-0002 | Dec Order Cost Awards_IESO Fees_20200131 | Decision and Order on Cost Awards | Independent Electricity System Operator - IESO | 2020-01-31 | 2020-01-31 | |
EB-2019-0002 | BOMA_Cost Claim_Error_IESO_EMAIL_20200107 | Cost Claim | Independent Electricity System Operator - IESO | 2020-01-07 | 2020-01-07 | |
EB-2019-0002 | AMPCO_Cost Claim_IESO_20191214 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-16 | 2019-12-16 | |
EB-2019-0002 | AMPCO_Cost Claim_IESO_20191214 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-16 | 2019-12-16 | |
EB-2019-0002 | VECC_Cost Claim_IESO_20191212 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-12 | 2019-12-12 | |
EB-2019-0002 | IESO_Ltr_InterimFees_20191212 | Correspondence | Independent Electricity System Operator - IESO | 2019-12-12 | 2019-12-12 | |
EB-2019-0002 | SEC_CostClaim_IESO_20191210 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-10 | 2019-12-10 | |
EB-2019-0002 | CME_Cost Claim_IESO_20191210 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-10 | 2019-12-10 | |
EB-2019-0002 | APPrO_CostClaim_IESO_20191210 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-10 | 2019-12-10 | |
EB-2019-0002 | OSEA_CostClaim_IESO_20191210 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-10 | 2019-12-10 | |
EB-2019-0002 | BOMA_Cost Claim_IESO_20191210 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-10 | 2019-12-10 | |
EB-2019-0002 | EnergyProbe_Cost Claim_IESO_20191207 | Cost Claim | Independent Electricity System Operator - IESO | 2019-12-07 | 2019-12-07 | |
EB-2019-0002 | Dec_Order_IESO Fees_20191205 | Decision and Order | Independent Electricity System Operator - IESO | 2019-12-05 | 2019-12-05 | |
EB-2019-0002 | IESO_ReplyArg_IESO_20191106 | Argument | Independent Electricity System Operator - IESO | 2019-11-06 | 2019-11-06 | |
EB-2019-0002 | SEC_SUB_IESO_20191025 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | |
EB-2019-0002 | SUP_SUB_IESO_20191025 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | |
EB-2019-0002 | CME_SUB_IESO_20191025 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | |
EB-2019-0002 | VECC_SUB_IESO_20191028 | Submission | Independent Electricity System Operator - IESO | 2019-10-28 | 2019-10-28 | |
EB-2019-0002 | OEB Staff_SUB_IESO_20191025 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | 2019-10-25 |
EB-2019-0002 | AMPCO_SUB_IESO_20191025 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | |
EB-2019-0002 | BOMA_SUB_IESO_20191028 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | |
EB-2019-0002 | APPrO_SUB_IESO_20191025 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | |
EB-2019-0002 | EnergyProbe_SUB_ARG_IESO_20101025 | Submission | Independent Electricity System Operator - IESO | 2019-10-25 | 2019-10-25 | |
EB-2019-0002 | VECC_IRQ2_IESO_20190910 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-09-10 | 2019-09-10 | |
EB-2019-0002 | IESO_AIC_IESO Fees_20191011 | Applicant Argument in Chief | Independent Electricity System Operator - IESO | 2019-10-11 | 2019-10-11 | |
EB-2019-0002 | IESO_AIC_Cvr Ltr_IESO Fees_20191011 | Applicant Argument in Chief | Independent Electricity System Operator - IESO | 2019-10-11 | 2019-10-11 | |
EB-2019-0002 | PO7_IESO_Fees_20190930 | Procedural Order | Independent Electricity System Operator - IESO | 2019-09-30 | 2019-09-30 | |
EB-2019-0002 | IESO_IRR_Updated EVD_A-1-2 Updated Exhibit List_20190925 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-09-25 | 2019-09-25 | |
EB-2019-0002 | IESO_IRR_Updated EVD_20190925 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-09-25 | 2019-09-25 | |
EB-2019-0002 | IESO_IRR_cvrltr_20190925 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-09-25 | 2019-09-25 | |
EB-2019-0002 | OEB Staff_IR_IESO_Updated_EVD_20190911 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-09-11 | 2019-09-11 | |
EB-2019-0002 | AMPCO_IR_IESO_Updated EVD_20190911 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-09-11 | 2019-09-11 | |
EB-2019-0002 | SEC_IR_IESO_Updated EVD_20190911 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-09-11 | 2019-09-11 | |
EB-2019-0002 | CME_IR_IESO_Updated EVD_20190911 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-09-11 | 2019-09-11 | |
EB-2019-0002 | APPrO_IR_IESO_Updated EVD_20190911 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-09-11 | 2019-09-11 | |
EB-2019-0002 | EnergyProbe_IR_IESO_Updated EVD_20190911 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-09-11 | 2019-09-11 | |
EB-2019-0002 | IESO_Updated_IRRs_20190826 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-08-27 at 9:59 AM | ||
EB-2019-0002 | IESO_CvrLtr_UpdatedEvd_20190826 | Exhibits | Independent Electricity System Operator - IESO | 2019-08-26 | 2019-08-26 | |
EB-2019-0002 | IESO_Updated Evidence_20190826 | Exhibits | Independent Electricity System Operator - IESO | 2019-08-26 | 2019-08-26 | |
EB-2019-0002 | PO6_IESO_Fees_20190809 | Procedural Order | Independent Electricity System Operator - IESO | 2019-08-09 | 2019-08-09 | |
EB-2019-0002 | OEB Staff_SUB_IESO Fees_SP_20190807 | Submission | Independent Electricity System Operator - IESO | 2019-08-07 | 2019-08-07 | 2019-08-07 |
EB-2019-0002 | IESO_Cvr Ltr_SettlementP_20190802 | Settlement Proposal | Independent Electricity System Operator - IESO | 2019-08-02 | 2019-08-02 | |
EB-2019-0002 | S-1-1 _Settlement Proposal_IESO_20190208 | Settlement Proposal | Independent Electricity System Operator - IESO | 2019-08-02 | 2019-08-02 | |
EB-2019-0002 | IESO_Ltr_Settlement Proposal ext REQ_20190801 | Correspondence | Independent Electricity System Operator - IESO | 2019-08-01 | 2019-08-01 | |
EB-2019-0002 | IESO_ Ltr_re Settlement_EB-2019-0002_20190723 | Correspondence | Independent Electricity System Operator - IESO | 2019-07-23 | 2019-07-23 | |
EB-2019-0002 | PO5_IESO_Fees_20190627 | Procedural Order | Independent Electricity System Operator - IESO | 2019-06-27 | 2019-06-27 | |
EB-2019-0002 | SEC_Ltr_new email Wayne McNally_20190624_email | Correspondence | Independent Electricity System Operator - IESO | 2019-06-24 | 2019-06-24 | |
EB-2019-0002 | APPrO_LTR_IESO June 14 Evidence_20190624 | Correspondence | Independent Electricity System Operator - IESO | 2019-06-24 | 2019-06-24 | |
EB-2019-0002 | IESO_IRR_revised_SEC11-21_APPrO 7i_AMPCO 7a att 1_20190614 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-06-14 | 2019-06-14 | |
EB-2019-0002 | IESO_CvrLtr_IRR revised_motion_20190614 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-06-14 | 2019-06-14 | |
EB-2019-0002 | PO4_DECISION SEC_Motion IESO Fees_20190531 | Procedural Order | Independent Electricity System Operator - IESO | 2019-05-31 | 2019-05-31 | |
EB-2019-0002 | APPrO_ReplySUB_SEC Motion APPrO IR_20190521 | Submission | Independent Electricity System Operator - IESO | 2019-05-21 | 2019-05-21 | |
EB-2019-0002 | SEC_ReplySUB_Motion_IESO_20190521 | Submission | Independent Electricity System Operator - IESO | 2019-05-21 | 2019-05-21 | 2019-05-21 |
EB-2019-0002 | IESO_IRR_SEC 21_6-1 Updated Ex I Tab 6-1 Sch 10-21_20190517 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-17 | 2019-05-17 | |
EB-2019-0002 | IESO_Ltr_SEC_APPrO_Motion_IRR_20190517 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-17 | 2019-05-17 | |
EB-2019-0002 | PO3_SEC Motion APPrO IR_ IESO Fees _20190513 | Procedural Order | Independent Electricity System Operator - IESO | 2019-05-13 | 2019-05-13 | |
EB-2019-0002 | APPrO_ltr_SEC Motion and APPrO IR 6 6e 7i 11d_20190510 | Correspondence | Independent Electricity System Operator - IESO | 2019-05-10 | 2019-05-10 | |
EB-2019-0002 | PO2_SEC Motion_IESO Fees_20190508 | Procedural Order | Independent Electricity System Operator - IESO | 2019-05-08 | 2019-05-08 | |
EB-2019-0002 | AMPCO_LTR_SEC Motion_IRR_20190507 | Correspondence | Independent Electricity System Operator - IESO | 2019-05-07 | 2019-05-07 | |
EB-2019-0002 | SEC_Motion IRR_IESO 2019 Fees_20190506 | Motion | Independent Electricity System Operator - IESO | 2019-05-06 | 2019-05-06 | |
EB-2019-0002 | IESO_IRR_All Issues_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issues 6-0_6-1_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issues 6-2_6-3_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issues 4-0_4-1_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | 2019-05-01 |
EB-2019-0002 | IESO_IRR_Issues 2-1_2-2_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issues 5-0_5-1_5-2_5-3_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issue 1-3_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issue 1.2_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRRs_Issue 1.1_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issue 1-4_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_Issue 0_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_AMPCO 16 - Attachment 1 - Appendix 2-K Employee Costs_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_A-1-2 Updated April 30, 2019 Exhibit List_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_VECC 10 Attachment 1 Updated C-1-1_Att 1 - 2019 IESO Reg Scorecard_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_PWU 5 - Attachment 1 - Appendix C_Non-Executive Total Remuneration Review_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRRs_Issue 1-0_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-05-01 | 2019-05-01 | |
EB-2019-0002 | IESO_IRR_cvr ltr_2019RRS_20190430 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2019-04-30 | 2019-04-30 | |
EB-2019-0002 | OEB Reply_ESC Late Intv Status_20190418 | Intervenor Request Objection | Independent Electricity System Operator - IESO | 2019-04-18 | 2019-04-18 | |
EB-2019-0002 | IESO_Ltr_ESC IntvrREQ_IESO_2019 RRS_20190416 | Correspondence | Independent Electricity System Operator - IESO | 2019-04-16 | 2019-04-16 | |
EB-2019-0002 | EDA_IR_IESO_20190412 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | EDA_Cvr Ltr_IR_ESO_20190412 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | AMPCO_IR_IESO_20190409 | Interrogatories to Applicant | Ontario Energy Board | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | EnergyStorageCanada_ESC_Late_IntrvREQ_CostREQ_IESO_20190412 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-04-12 | 2019-04-12 | |
EB-2019-0002 | EDA_IR CvrLtr_Corrected date_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-10 | 2019-04-10 | |
EB-2019-0002 | EDA_IR_Corrected date_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-10 | 2019-04-10 | |
EB-2019-0002 | APPrO_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | SEC_IR_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | Society_IR_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | CME_IR_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | OEB Staff_IR 1-27_IESO Fees_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | 2019-04-09 |
EB-2019-0002 | IR 1d_Attachment 1_IESO 2019 Fees Revenue Model_EB-2019-0002_pptx_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | 2019-04-09 |
EB-2019-0002 | HQEM_IR_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | PWU_IR_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | OSEA_IR_IESO_20190409 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-09 | 2019-04-09 | |
EB-2019-0002 | EnergyProbe_IR_IESO_20190408 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-08 | 2019-04-08 | |
EB-2019-0002 | EnergyProbe_IR_CvrLtr_IESO_20190408 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-08 | 2019-04-08 | |
EB-2019-0002 | VECC_IR_IESO_Amended_20190408 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-08 | 2019-04-08 | |
EB-2019-0002 | BOMA_IR_IESO_20180408 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2019-04-08 | 2019-04-08 | |
EB-2019-0002 | Dec_Issues List_IESO Fees_20190328 | Decision | Independent Electricity System Operator - IESO | 2019-03-28 | 2019-03-28 | |
EB-2019-0002 | IESO_UpdatedEVD_Ex A-3-1_B-3-1_20190328 | Application and Evidence | Independent Electricity System Operator - IESO | 2019-03-28 | 2019-03-28 | |
EB-2019-0002 | IESO_CvrLtr_Updated Evidence 2019 RRS_20190328 | Application and Evidence | Independent Electricity System Operator - IESO | 2019-03-28 | 2019-03-28 | |
EB-2019-0002 | IESO_Reply Submission_Issues List_20190326 | Submission | Independent Electricity System Operator - IESO | 2019-03-26 | 2019-03-26 | |
EB-2019-0002 | SEC_SUB_Draft Issues List_IESO_20190320 | Submission | Independent Electricity System Operator - IESO | 2019-03-20 | 2019-03-20 | |
EB-2019-0002 | OEB Staff_SUB_Draft IESO Issues List_20190319 | Submission | Independent Electricity System Operator - IESO | 2019-03-19 | 2019-03-19 | 2019-03-19 |
EB-2019-0002 | APPrO_SUB_Draft issues issues_list_20190319 | Submission | Independent Electricity System Operator - IESO | 2019-03-19 | 2019-03-19 | |
EB-2019-0002 | VECC_SUB_Draft Issues List_IESO_20190318 | Submission | Independent Electricity System Operator - IESO | 2019-03-19 | 2019-03-19 | |
EB-2019-0002 | BOMA_SUB_draft issues list_20190319 | Submission | Independent Electricity System Operator - IESO | 2019-03-19 | 2019-03-19 | |
EB-2019-0002 | Energy Probe_SUB_Draft Issues List_20190319 | Submission | Independent Electricity System Operator - IESO | 2019-03-19 | 2019-03-19 | |
EB-2019-0002 | AMPCO_SUB_Draft Issues List_IESO_20190318 | Submission | Independent Electricity System Operator - IESO | 2019-03-18 | 2019-03-18 | |
EB-2019-0002 | PO1_IESO_Fees_20190312 | Procedural Order | Independent Electricity System Operator - IESO | 2019-03-12 | 2019-03-12 | |
EB-2019-0002 | VECC_IntvrREQ_CostEligREQ_IESO_20190305 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-03-05 | 2019-03-05 | |
EB-2019-0002 | HQEM_IntrvREQ_IESO_20190301 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-03-01 | 2019-03-01 | |
EB-2019-0002 | PWU_IntvrREQ_IESO_20190307 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-03-07 | 2019-03-07 | |
EB-2019-0002 | VECC_IntvrREQ_CostEligREQ_IESO_20190305 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-03-05 | 2019-03-05 | |
EB-2019-0002 | EDA_IntvrREQ_IESO_20190304 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-03-04 | 2019-03-04 | |
EB-2019-0002 | OSEA_IntrvREQ_CostEligREQ_IESO_20190304 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-03-04 | 2019-03-04 | |
EB-2019-0002 | APPrO_IntvrREQ_20190304 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-03-04 | 2019-03-04 | |
EB-2019-0002 | SUP_IntrvrREQ_IESO_20190228 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-02-28 | 2019-02-28 | |
EB-2019-0002 | OPG_IntrvREQ_CostEligReq_IESO_20190228 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-02-28 | 2019-02-28 | |
EB-2019-0002 | EnergyProbe_IntrvREQ_CostEligREQ_IESO_20190228 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-02-28 | 2019-02-28 | |
EB-2019-0002 | IESO_Affidavit_MHeinz_20190225 | Affidavits of Service | Independent Electricity System Operator - IESO | 2019-02-25 | 2019-02-25 | |
EB-2019-0002 | BOMA_IntrvREQ_CostEligREQ_IESO_20190227 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-02-27 | 2019-02-27 | |
EB-2019-0002 | SEC_IntvrREQ_CostEligREQ_IESO_20190226 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-02-26 | 2019-02-26 | |
EB-2019-0002 | CME_IntvrREQ_CostEligREQ_IESO_20190225 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-02-25 | 2019-02-25 | |
EB-2019-0002 | AMPCO_IntrvREQ_CostEligREQ_IESO_20190222 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2019-02-22 | 2019-02-22 | |
EB-2019-0002 | IESO_FR_Dated Notice_20190222 | Notice | Independent Electricity System Operator - IESO | 2019-02-22 | 2019-02-22 | |
EB-2019-0002 | IESO_ENG_DATED NOTICE_20190222 | Notice | Independent Electricity System Operator - IESO | 2019-02-22 | 2019-02-22 | |
EB-2019-0002 | Notice_IESO_FR_20190220 | Notice | Independent Electricity System Operator - IESO | 2019-02-20 | 2019-02-20 | |
EB-2019-0002 | Notice_IESO_ENG_20190220 | Notice | Independent Electricity System Operator - IESO | 2019-02-20 at 4:16 PM | ||
EB-2019-0002 | LOD_Notices_IESO_20190220 | Letter of Direction | Independent Electricity System Operator - IESO | 2019-02-20 | 2019-02-20 | |
EB-2019-0002 | ack_ltr_IESO_2019 Fees_20190130 | Acknowledgement Letter | Independent Electricity System Operator - IESO | 2019-01-30 | 2019-01-30 | |
EB-2019-0002 | IESO_CovLtr_APPL_2019 RRS_20190128 | Application and Evidence | Independent Electricity System Operator - IESO | 2019-01-28 | 2019-01-28 | |
EB-2019-0002 | IESO_APPL_2019 RRS_20190128 | Application and Evidence | Independent Electricity System Operator - IESO | 2019-01-28 | 2019-01-28 | |
EB-2019-0002 | IESO_APPL_C-1-1_Attachment 1 - 2019 IESO Regulatory Scorecard_20190128 | Application and Evidence | Independent Electricity System Operator - IESO | 2019-01-28 | 2019-01-28 | |
EB-2019-0002 | IESO_Ltr_2019RRS_Interim fees_PHF_EB-2018-0143_20181211 | Correspondence | Independent Electricity System Operator - IESO | 2018-12-11 | 2018-12-11 | |
EB-2019-0002 | IESO_Ltr_MRP Schedules_Budget_PHF_EB-2018-0143_20190102 | Correspondence | Independent Electricity System Operator - IESO | 2019-01-02 | 2019-01-02 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |