Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2021-0011 document icon dec_order_cost awards_CNPI COS_20220207 Decision and Order on Cost Awards Canadian Niagara Power Inc. - Electricity Distributor 2022-02-07 2022-02-07
EB-2021-0011 document icon decision_rate order_rev_CNPI_cos_20220203 Decision and Order Canadian Niagara Power Inc. - Electricity Distributor 2022-02-03 2022-02-03
EB-2021-0011 document icon CNPI_COS Cost_claim_non_objection_20220117 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2022-01-17 2022-01-17
EB-2021-0011 document icon CCC.CostClaim.CNPI_20220110 Cost Claim Canadian Niagara Power Inc. - Electricity Distributor 2022-01-10 2022-01-10
EB-2021-0011 document icon SEC_CostClaim_CNPI_20220110 Cost Claim Canadian Niagara Power Inc. - Electricity Distributor 2022-01-10 2022-01-10
EB-2021-0011 document icon VECC_CostClaim_20220106 Cost Claim Canadian Niagara Power Inc. - Electricity Distributor 2022-01-06 2022-01-06
EB-2021-0011 document icon dec_rate order_CNPI_20211216 Rate Order Canadian Niagara Power Inc. - Electricity Distributor 2021-12-16 2021-12-16
EB-2021-0011 document icon dec_rate order_CNPI_20211216 Decision and Order Canadian Niagara Power Inc. - Electricity Distributor 2021-12-16 2021-12-16
EB-2021-0011 document icon OEB_Ltr_Cancl_Presentation_CNPI_20211203 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-12-03 2021-12-03
EB-2021-0011 document icon CNPI_settlement_staff_submission_20211130 Submission Canadian Niagara Power Inc. - Electricity Distributor 2021-11-30 2021-11-30
EB-2021-0011 document icon po2_CNPI_20211124 Procedural Order Canadian Niagara Power Inc. - Electricity Distributor 2021-11-24 2021-11-24
EB-2021-0011 document icon CNPI_Settlement_Filing_Requirements_Chapter2_Appendices_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_CNPI_2022_DVA_Continuity_Schedule_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Benchmarking-Spreadsheet-Forecast-Model_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2022_Test_year_Income_Tax_PILs_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2022_Tariff_Schedule_and_Bill_Impact_Model_20211122_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2022_RTSR_Workform_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2022_Rev_Reqt_Workform_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Appendix G - 1588 and 1589 DVA Version Comparisons_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Appendix D - CNPI_2022 TESI Load Forecast_VECC-48_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Appendix D - CNPI_2022 TESI Load Forecast_VECC-47_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Appendix D - CNPI_2022 TESI Load Forecast_7-Staff-106_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Appendix D - CNPI_2022 TESI Load Forecast_7-Staff-105_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_COS Settlement_Proposal_Cover_Letter_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Filing_Requirements_Chapter_5_Appendix_20221122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_CNPI 2022 Tariff (Generated from OEB Model)_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_CNP Rate Design Model_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_CNP 2022 TESI Load Forecast_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2022_GA_Analysis_Workform_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2022_Cost_Allocation_Model_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2022 CoS_1595_Analysis_Workform_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2021_LRAMVA_Workform_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_2-C Depreciation Schedule_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon CNPI_Settlement_Proposal_20211122 Settlement Proposal Canadian Niagara Power Inc. - Electricity Distributor 2021-11-22 2021-11-22
EB-2021-0011 document icon OEB_Ltr_CNPI_Ext Req2_20211118 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-11-18 2021-11-18
EB-2021-0011 document icon CNPI_COS Settlement_Extension_Request_20211117 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-11-17 2021-11-17
EB-2021-0011 document icon OEB_Ltr_CNPI_Ext Req_20211109 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-11-09 2021-11-09
EB-2021-0011 document icon CNPI_COS Settlement_Extension_Request_20211108 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-11-08 2021-11-08
EB-2021-0011 document icon CNPI_COS Settlement_Update_Letter_20211015 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-10-15 2021-10-15
EB-2021-0011 document icon IMT_LTR_settlement conference _20211006 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-10-06 2021-10-06
EB-2021-0011 document icon 4-STAFF-68 Attachment A Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-29 2021-09-29
EB-2021-0011 document icon CNPI_IRR_CNPI Rate Design Model_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_CNPI 2022 Tariff_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2022_Tariff_Schedule_and_Bill_Impact_Model_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_CNPI_2022_DVA_Continuity_Schedule_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_CNP 2022 TESI Load Forecast_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2021_Benchmarking Spreadsheet Forecast Model_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2021_Rev_Reqt_Workform_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2022_RTSR_Workform_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2021_Test_year_Income_Tax_PILs_20200520-rev_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_9 SEC 36 Attachment_A CCA_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_8 STAFF 82 Attachment_A CNPI 2022_RTSR_Workform_1.0_20210624-rev (2) 9-10-2021_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_7 Staff 79 Attachment_A Cost Allocation Standby Scenario_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_4 SEC 34 Attachment_A_B_CCA Continuity_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_3 VECC 21_2010-2019 Regression Model_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_3 VECC 20 Attachment B_CNP 2011-2014 Persistent savings_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_3_VECC 20 Attachment A_2006_2010 Final OPA CDM Results.CNPI_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2-VECC 8_Attachment A_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2021_Filing_Requirements_Chapter2_Appendices_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2021_Filing_Requirements_Chapter_5_Appendix_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_2021_Cost_Allocation_Model_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_9 STAFF 87 Attach A_2022_GA_Analysis_Workform_1.0_20210722 (002) 91 3-2021_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_7 Staff 78 Attachment A_Demand Allocator Scaling_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_4 VECC 29 Appendix A_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_4 STAFF 71 Attachment A UCC Tables_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_4 Staff 43 Attachment A_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon CNPI_IRR_3 VECC 22_Alternative CDM_Customer Analysis_20210924 Interrogatory Response from Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-24 2021-09-24
EB-2021-0011 document icon Donna Stewart_Letter of Comment_20210918_Redacted Letter of Comment Canadian Niagara Power Inc. - Electricity Distributor 2021-09-20 2021-09-20
EB-2021-0011 document icon CCC_IRs_CNPI_20210908 Interrogatories to Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-08 2021-09-08
EB-2021-0011 document icon VECC_IR_CNPI0011_20210907 Interrogatories to Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-07 2021-09-07
EB-2021-0011 document icon SEC_IR_CNPI_20210907 Interrogatories to Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-07 2021-09-07
EB-2021-0011 document icon IMT_IR_Canadian Niagara Power_20210907 Interrogatories to Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-07 2021-09-07
EB-2021-0011 document icon HONI_IR_CNPI_20210907 Interrogatories to Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-07 2021-09-07
EB-2021-0011 document icon OEBStaff_IR_Canadian Niagara Power_20210903 Interrogatories to Applicant Canadian Niagara Power Inc. - Electricity Distributor 2021-09-03 2021-09-03
EB-2021-0011 document icon Decision_issues list_confidentiality_20210827 Decision Canadian Niagara Power Inc. - Electricity Distributor 2021-08-27 2021-08-27
EB-2021-0011 document icon Proposed Issues List_CNP_20210818 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-18 2021-08-18
EB-2021-0011 document icon po1_CNPI_20210813 Procedural Order Canadian Niagara Power Inc. - Electricity Distributor 2021-08-13 2021-08-13
EB-2021-0011 document icon Larry Harper_Letter of Comment_20210812_Redacted Letter of Comment Canadian Niagara Power Inc. - Electricity Distributor 2021-08-12 2021-08-12
EB-2021-0011 document icon Susan Speck_Letter of Comment_20210811_Redacted Letter of Comment Canadian Niagara Power Inc. - Electricity Distributor 2021-08-11 2021-08-11 2021-08-11
EB-2021-0011 document icon CNPI_Exhibit 2_Rate Base_Revised_20210810 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-10 2021-08-10
EB-2021-0011 document icon CNPI_DSP_Revised_20210810 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-10 2021-08-10
EB-2021-0011 document icon CNPI_Exhibit 4_ Operating Expenses_Revised_20210810 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-10 2021-08-10
EB-2021-0011 document icon CCC.IntrvREQ_CNPI_20210809 Intervenor Request Letter Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon CNPI 2022_DVA Continuity Schedule_20210809.xlsb Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon CNPI_ 2022_TESI_Load_Forecast_20210809 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon CNPI_2022_Filing Requirements Chapter2 Appendices_20210809 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon CNPI_2022_2 C Depreciation Schedule_20210809 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon CNPI_Attach1_Corrected pg 93 of DSP_20210809 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon CNPI_COS error correction_20210809 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon CNPI_Attach 2_Corrected page 61_Exhibit 4_20210809 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon HONI_Intervenor Request_CNPI_20210809 Intervenor Request Letter Canadian Niagara Power Inc. - Electricity Distributor 2021-08-09 2021-08-09
EB-2021-0011 document icon IMT Corp_IntrvREQ_20210806 Intervenor Request Letter Canadian Niagara Power Inc. - Electricity Distributor 2021-08-06 2021-08-06
EB-2021-0011 document icon SEC_IntrvREQ_CNPI_20210803 Intervenor Request Letter Canadian Niagara Power Inc. - Electricity Distributor 2021-08-04 2021-08-04
EB-2021-0011 document icon CNPI_Request on Redacted Materials_20210729.pdf Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-07-29 2021-07-29
EB-2021-0011 document icon Shawn Hutcheson_Letter of Comment_20210727_Redacted Letter of Comment Canadian Niagara Power Inc. - Electricity Distributor 2021-07-27 2021-07-27
EB-2021-0011 document icon Heather Gallacher_Letter of Comment_20210727_Redacted Letter of Comment Canadian Niagara Power Inc. - Electricity Distributor 2021-07-27 2021-07-27
EB-2021-0011 document icon Brad Hurst_Letter of Comment_20210727_Redacted Letter of Comment Canadian Niagara Power Inc. - Electricity Distributor 2021-07-27 2021-07-27
EB-2021-0011 document icon Gary Dekker_Letter of Comment_20210727_Redacted Letter of Comment Canadian Niagara Power Inc. - Electricity Distributor 2021-07-27 2021-07-27
EB-2021-0011 document icon CNPI_Affidavit_20210727 Affidavits of Service Canadian Niagara Power Inc. - Electricity Distributor 2021-07-27 2021-07-27
EB-2021-0011 document icon VECC_IntrvREQ_CNPI0011_20210723 Intervenor Request Letter Canadian Niagara Power Inc. - Electricity Distributor 2021-07-23 2021-07-23
EB-2021-0011 document icon Notice_fr_CNPI_20210719 Notice Canadian Niagara Power Inc. - Electricity Distributor 2021-07-19 2021-07-19
EB-2021-0011 document icon Notice_CNPI_20210719 Notice Canadian Niagara Power Inc. - Electricity Distributor 2021-07-19 2021-07-19
EB-2021-0011 document icon LoD_CNPI_20210719 Letter of Direction Canadian Niagara Power Inc. - Electricity Distributor 2021-07-19 2021-07-19
EB-2021-0011 document icon OEB_CompleteLtr_CNPI_20210716 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-07-16 2021-07-16
EB-2021-0011 document icon CNPI_COS Additional Information_20210715 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-07-15 2021-07-15
EB-2021-0011 document icon CNPI_COS Additional Information_20210714 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-07-14 2021-07-14
EB-2021-0011 document icon OEBLetter_Incomplete_CNPI_20210714 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-07-14 2021-07-14
EB-2021-0011 document icon ackltr_CNPI_CoS_20210702 Acknowledgement Letter Canadian Niagara Power Inc. - Electricity Distributor 2021-07-02 2021-07-02
EB-2021-0011 document icon CNPI 2021_COS_Checklist_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_TESI Load Forecast Model_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Tariff Schedule and Bill Impact Model_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_RTSR Workform_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Revenue Requirement Workform_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_LRAMVA Work Form_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Filing Requirements Chapter2 Appendices_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Filing Requirements Chapter 5 Appendix_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_DVA Continuity Schedule_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Benchmarking Spreadsheet Forecast Model_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_2-C Depreciation Schedule_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Test Year Income Tax PILs_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Rate Design Model_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Proposed 2022 Tariff_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_GA Analysis Workform_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_Cost Allocation Model_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022_1595 Analysis Workform_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022 LRAMVA Support_2021 IRM_IRR_2021_LRAMVA_Workform_20201015 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022 LRAMVA Support_2017 Final Verified Annual LDC CDM Program Results_CNPI_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 9_Deferral and Variance Accounts_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 7_Cost Allocation_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 6_Revenue Requirement_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 3_Operating Revenue_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022 Rate Application_Customer Summary_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Cover Letter_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022 LRAMVA Support_Participation_Cost Report_Canadian Niagara Power_2019_04_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022 LRAMVA Support_2021_IRM_IRR_Staff-10_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI 2022 LRAMVA Support_2021 IRM_IRR_Staff-12a_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI DSP_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 8_Rate Design_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 5_Cost of Capital_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 4_ Operating Expenses_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 2_Rate Base_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon CNPI Exhibit 1_Administrative Documents_20210630 Application and Evidence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-30 2021-06-30
EB-2021-0011 document icon OEB_Ltr_Delay_CNPI_20210601 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-06-01 2021-06-01
EB-2021-0011 document icon CNPI COS_Filing Date_20210527 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-05-27 2021-05-27
EB-2021-0011 document icon OEB_Ltr_Delay_CNPI_20210430 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-04-30 2021-04-30
EB-2021-0011 document icon CNPI COS_Filing Date_20210427 Correspondence Canadian Niagara Power Inc. - Electricity Distributor 2021-04-27 2021-04-27
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received