Search Results for: Records - Case Number=EB-2010-0131 - 233 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2010-0131 | Horizon_Public Redacted Version_Feb_25_TC_20111111 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-11-11 | 2011-11-11 | |
EB-2010-0131 | Horizon_Public Redacted Version_April_7_Vol_1_20111111 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-11-11 | 2011-11-11 | |
EB-2010-0131 | Horizon_Public Redacted Version_April_8_Vol_2_20111111 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-11-11 | 2011-11-11 | |
EB-2010-0131 | Dec_Order_OnCost awards_Horizon_20110901 | Decision and Order on Cost Awards | Horizon Utilities Corporation - Electricity Distributor | 2011-09-01 | 2011-09-01 | |
EB-2010-0131 | AMPCO_reply cost claim objection_20110815 | Cost Claim Objection Reply | Horizon Utilities Corporation - Electricity Distributor | 2011-08-15 | 2011-08-15 | |
EB-2010-0131 | Rate_Order_Horizon_20110809 | Rate Order | Horizon Utilities Corporation - Electricity Distributor | 2011-08-09 | 2011-08-09 | |
EB-2010-0131 | Horizon_LTR_Cost Claims_20110808 | Cost Claim Objection | Horizon Utilities Corporation - Electricity Distributor | 2011-08-08 | 2011-08-08 | |
EB-2010-0131 | Horizon_UPDATED DRF_RO_20110805 | Draft Rate Order | Horizon Utilities Corporation - Electricity Distributor | 2011-08-05 | 2011-08-05 | |
EB-2010-0131 | Horizon_UPDATED Deferral and Variance Account Tables_20110805 | Draft Rate Order | Horizon Utilities Corporation - Electricity Distributor | 2011-08-05 | 2011-08-05 | |
EB-2010-0131 | dec_order_DRO_Horizon_20110803 | Decision and Order | Horizon Utilities Corporation - Electricity Distributor | 2011-08-03 | 2011-08-03 | |
EB-2010-0131 | SEC_comments_20110802 | Comments | Horizon Utilities Corporation - Electricity Distributor | 2011-08-02 | 2011-08-02 | |
EB-2010-0131 | Horizon_Deferral and Variance Account Tables_20110728 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-07-28 | 2011-07-28 | |
EB-2010-0131 | Horizon_DRF_RO_AppE Revised_GEA Rider Model_20110728 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-07-28 | 2011-07-28 | |
EB-2010-0131 | Horizon_Revised_Rev_Reqt_Work_Form_20110728 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-07-28 | 2011-07-28 | |
EB-2010-0131 | Horizon_Response to Comments_DRF_RO_20110728 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-07-28 | 2011-07-28 | |
EB-2010-0131 | AMPCO_Comments_HorizonDRO_20110725 | Comments | Horizon Utilities Corporation - Electricity Distributor | 2011-07-25 | 2011-07-25 | |
EB-2010-0131 | HORIZON_LTR_Responses Comments_20110725 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-07-25 | 2011-07-25 | |
EB-2010-0131 | BdStaff_sub_DRO_Horizon_20110725 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-07-25 | 2011-07-25 | |
EB-2010-0131 | VECC_Comments_DRO Horizon_20110721 | Comments | Horizon Utilities Corporation - Electricity Distributor | 2011-07-21 | 2011-07-21 | |
EB-2010-0131 | Energy Probe_Comments_DRO Horizon_20110720 | Comments | Horizon Utilities Corporation - Electricity Distributor | 2011-07-21 | 2011-07-21 | |
EB-2010-0131 | SEC_Comments_DRO Horizon_20110721 | Comments | Horizon Utilities Corporation - Electricity Distributor | 2011-07-21 | 2011-07-21 | |
EB-2010-0131 | Horizon_DRF_RO_20110718 | Draft Rate Order | Horizon Utilities Corporation - Electricity Distributor | 2011-07-18 | 2011-07-18 | |
EB-2010-0131 | Horizon_Rev_Reqt_Work_Form_20110718 | Draft Rate Order | Horizon Utilities Corporation - Electricity Distributor | 2011-07-18 | 2011-07-18 | |
EB-2010-0131 | HORIZON_DRF_RO_Appe_GEA Rider Model_20110718 | Draft Rate Order | Horizon Utilities Corporation - Electricity Distributor | 2011-07-18 | 2011-07-18 | |
EB-2010-0131 | dec_order_Horizon_20110707 | Decision and Order | Horizon Utilities Corporation - Electricity Distributor | 2011-07-07 | 2011-07-07 | |
EB-2010-0131 | Lock Up Letter_Horizon_20110705 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-07-05 | 2011-07-05 | |
EB-2010-0131 | AMPCO_Ltr_Comment_20110617 | Comments | Horizon Utilities Corporation - Electricity Distributor | 2011-06-17 | 2011-06-17 | |
EB-2010-0131 | AMPCO_SUB_HORIZON_PUBLIC_20110615 | Final Argument | Horizon Utilities Corporation - Electricity Distributor | 2011-06-16 | 2011-06-16 | |
EB-2010-0131 | Horizon_Redacted_ReplySUB_20110615 | Applicant Reply Argument | Horizon Utilities Corporation - Electricity Distributor | 2011-06-16 | 2011-06-16 | |
EB-2010-0131 | SEC_Redacted_Final Argument_20110615 | Final Argument | Horizon Utilities Corporation - Electricity Distributor | 2011-06-15 | 2011-06-15 | |
EB-2010-0131 | CCC_redacted_Written Argument_20110613 | Final Argument | Horizon Utilities Corporation - Electricity Distributor | 2011-06-13 | 2011-06-13 | |
EB-2010-0131 | Board_ltr_Horizon_Intervenors_20110610 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-06-10 | 2011-06-10 | |
EB-2010-0131 | Horizon_Letter_Reply Submission_20110510 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-05-10 | 2011-05-10 | |
EB-2010-0131 | Energy Probe_Argument_Horizon_20110506 | Intervenor Argument | Horizon Utilities Corporation - Electricity Distributor | 2011-05-06 | 2011-05-06 | |
EB-2010-0131 | VECC_argument_HORIZON_20110506 | Intervenor Argument | Horizon Utilities Corporation - Electricity Distributor | 2011-05-06 | 2011-05-06 | |
EB-2010-0131 | bdstaff_submission_redacted_Horizon_20110504 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-05-06 | 2011-05-06 | |
EB-2010-0131 | Bdstaff_subm_ltr_Horizon_20110504 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-05-04 | 2011-05-04 | |
EB-2010-0131 | VECC_JAMESWIGHTMAN_declarationundertaking_20110504 | Declaration and Undertakings | Horizon Utilities Corporation - Electricity Distributor | 2011-05-04 | 2011-05-04 | |
EB-2010-0131 | VECC_BILLHARPER_declarationundertaking_20110503 | Declaration and Undertakings | Horizon Utilities Corporation - Electricity Distributor | 2011-05-04 | 2011-05-04 | |
EB-2010-0131 | SEC_DeclarationUndertaking_20110106 | Declaration and Undertakings | Horizon Utilities Corporation - Electricity Distributor | 2011-05-04 at 2:37 PM | ||
EB-2010-0131 | Horizon_Argument-in-Chief_20110425 | Argument | Horizon Utilities Corporation - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2010-0131 | Horizon_COP Calculation_20110415 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-15 | 2011-04-15 | |
EB-2010-0131 | Horizon Rev Reqt Work Form_updated 20110415 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-15 | 2011-04-15 | |
EB-2010-0131 | Horizon Rev Reqt Work Form_updated 20110415 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-15 | 2011-04-15 | |
EB-2010-0131 | Horizon_Ltr_Updated RRWF_20110415 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-15 | 2011-04-15 | |
EB-2010-0131 | Transcript_Vol4_20110414 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-04-14 | 2011-04-14 | |
EB-2010-0131 | Horizon_Table 4-26_PUBLIC REDACTED_New Position Salary-Start Dates Updated_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_Response_J3_7_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_Updated_Load Forecast_UT_Response_J3_3_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_Response_J3_3_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_REDACTED_UT_Response_J2_4_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_Response_J3_2_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_Response_J3_1_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_Response_J3_6_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_Response_J3_5_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_Response_J1_1_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Horizon_UT_response J3_4_CORRECTED_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | HORIZON_EXJ1.9_J2.6_J3.4_Undertaking from Oral Hearing_20110413 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2010-0131 | Transcript_Vol 3_20110411 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-04-12 | 2011-04-12 | |
EB-2010-0131 | Horizon_UT_response_J2_7_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J2_5_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J2_3_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J2_2_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J2_1_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J1_8_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J1_7_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J1_4_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J1_3_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Horizon_UT_response_J1_2_20110411 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Transcript_REDACTED_Vol 2_20110408 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2010-0131 | Transcript_REDACTED_VOL1_20110407 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-04-08 | 2011-04-08 | |
EB-2010-0131 | Energy Probe_Compendium_20110406 | Intervenor Evidence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Horizon_Ltr_Response to Confidentiality Decision_20110406 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Horizon_PUBLIC UNREDACTED IRR_Staff 37 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Horizon_PUBLIC REDACTED IRR_SEC 6a_20110406 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Horizon_E3T2S2 Table 3-24A PUBLIC UNREDACTED Update 20110314 filed 20110406 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Horizon_2011 Load Forecast Model May 17 2010 updated_20110314 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | HORIZON_REVISED IRR_AMPCO 4_VECC 37_VECC 44_20110406 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Rev_Reqt_Work_Form_20110406 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Horizon_2011 Cost Allocation Model_20110406 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-06 | 2011-04-06 | |
EB-2010-0131 | Horizon_Ltr_Witness Panel Composition_20110405 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-05 | 2011-04-05 | |
EB-2010-0131 | AMPCO_Ltr_Comment_witness panels_20110405 | Comments | Horizon Utilities Corporation - Electricity Distributor | 2011-04-05 | 2011-04-05 | |
EB-2010-0131 | Rev_Reqt_Work_Form_20110404 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2010-0131 | Horizon_Ltr_re_responsibilities of witness panels_20110404 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2010-0131 | Rev_Reqt_Work_Form | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2010-0131 | Horizon 2011 Cost Allocation Model | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2010-0131 | HORIZON_IRR_VECC_20110401 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2010-0131 | horizon_IRR_EP_20110401 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2010-0131 | HORIZON_IRR_BOARD STAFF_20110401 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2010-0131 | HORIZON_IRR_AMPCO_20110401 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2010-0131 | Horizon_IRR_Revised Evidence_20110401 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2010-0131 | dec_order_Confidentiality_IRRs_Horizon_20110330 | Decision and Order | Horizon Utilities Corporation - Electricity Distributor | 2011-03-30 | 2011-03-30 | |
EB-2010-0131 | AMPCO_IR_HORIZON_20110325 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-03-25 | 2011-03-25 | |
EB-2010-0131 | Bdstaff_IRs_Horizon_20110325 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-03-25 | 2011-03-25 | |
EB-2010-0131 | VECC_IR_HORIZON_201103225 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-03-25 | 2011-03-25 | |
EB-2010-0131 | Energy Probe_IR_Horizon_ Updated Evidence_20110324 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-03-24 | 2011-03-24 | |
EB-2010-0131 | PO7_Horizon_20110318 | Procedural Order | Horizon Utilities Corporation - Electricity Distributor | 2011-03-18 | 2011-03-18 | |
EB-2010-0131 | Exhibit 3 Tab 2 Schedule 1_20110317 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2011-03-17 | 2011-03-17 | |
EB-2010-0131 | Horizon_ LTR_Updates to Evidence_20110315 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-03-15 | 2011-03-15 | |
EB-2010-0131 | Horizon_Updated Rev_Reqt_Work_Form_20110314 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2011-03-15 | 2011-03-15 | |
EB-2010-0131 | HORIZON_EXJT1.2_JT.13_JT1.6_JT1.8_SUBJECT_RESPONSES TO TC UNDERTAKING_20110303 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-03-03 | 2011-03-03 | |
EB-2010-0131 | Horizon_JT1 5 Rates database 2008 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-03-02 | 2011-03-02 | |
EB-2010-0131 | Horizon_JT1 5 Rate database 2010 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-03-02 | 2011-03-02 | |
EB-2010-0131 | Horizon_JT1 5 Rate database 2009 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-03-02 | 2011-03-02 | |
EB-2010-0131 | Horizon_JT1 5 Ontario LDC Controllable Cost and ROE Database | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-03-02 | 2011-03-02 | |
EB-2010-0131 | HORIZON_EX1.1_EX1.4_EX1.5_EX1.7_Subject to check_RESPONSES TO TC UNDERTAKING_20110211 | Undertaking Responses | Horizon Utilities Corporation - Electricity Distributor | 2011-03-02 | 2011-03-02 | |
EB-2010-0131 | Horizon_LPP_RateRider_20110228 | Rate Model | Horizon Utilities Corporation - Electricity Distributor | 2011-02-28 | 2011-02-28 | |
EB-2010-0131 | Transcript_Horizon_Technical Conference_Redacted_20110225 | Transcripts | Horizon Utilities Corporation - Electricity Distributor | 2011-02-25 | 2011-02-25 | |
EB-2010-0131 | Horizon_TCQ_IRR_CCC 4_20110224 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-25 | 2011-02-25 | |
EB-2010-0131 | Horizon_LTR_confidentiality_responses to SEC TC questions_20110224 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-25 | 2011-02-25 | |
EB-2010-0131 | HORIZON_TCQ_IRR_CCC_20110224 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-24 | 2011-02-24 | |
EB-2010-0131 | HORIZON_TCQ_IRR_EP_20110223 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-23 | 2011-02-23 | |
EB-2010-0131 | HORIZON_TCQ_IRR_VECC_20110223 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-23 | 2011-02-23 | |
EB-2010-0131 | HORIZON_TCQ_IRR_AMPCO_20110223 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-24 | 2011-02-24 | |
EB-2010-0131 | HORIZON_TCQ_IRR_BOARDSTAFF_20110223 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-24 | 2011-02-24 | |
EB-2010-0131 | CCC_TCQs_20110218 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-18 | 2011-02-18 | |
EB-2010-0131 | SEC_TCQ_confidential_ltr_20110215 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-15 | 2011-02-15 | |
EB-2010-0131 | Energy Probe_TCQs_Horizon_20110214 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-14 | 2011-02-14 | |
EB-2010-0131 | AMPCO_TC_Questions_Horizon_20110214 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-15 | 2011-02-15 | |
EB-2010-0131 | Bdstaff_TCQues_Horizon_20110214 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-14 | 2011-02-14 | |
EB-2010-0131 | Bdstaff_cvr ltr_TCQues_Horizon_20110214 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-14 | 2011-02-14 | |
EB-2010-0131 | VECC_TCQ_HORIZON_20110214 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-14 | 2011-02-14 | |
EB-2010-0131 | Horizon_Copy of Rev_Reqt_Work_Form_January_2011_EP33_201101 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-02-11 | 2011-02-11 | |
EB-2010-0131 | PO6_Horizon_20110203 | Procedural Order | Horizon Utilities Corporation - Electricity Distributor | 2011-02-03 | 2011-02-03 | |
EB-2010-0131 | Horizon_PUBLIC UNREDACTED_IRR_Staff 28_20110128 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-31 | 2011-01-31 | |
EB-2010-0131 | Horizon_PUBLIC UNREDACTED_IRR_Staff 27_20110128 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-31 | 2011-01-31 | |
EB-2010-0131 | Horizon_Ltr_confidentiality_IRRs_20110128 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-31 | 2011-01-31 | |
EB-2010-0131 | SEC_ltr_confidentiality_20110129 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-31 | 2011-01-31 | |
EB-2010-0131 | Horizon_IRR_SEC 20 Appendix 1_20110127 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2010-0131 | Horizon_IRR_CCC 27_20110127 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2010-0131 | Horizon_IRR_CCC 17 corrected cover page_20110127 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2010-0131 | Horizon_IRR_CCC 15 cover page_20110127 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2010-0131 | Horizon_IRR_CCC 14 cover page_20110127 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2010-0131 | Horizon_REDACTED_IRR_EP_20110127 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2010-0131 | Horizon_Ltr_Corrections to IRRs_20110127 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2010-0131 | Board_ltr_IR Confidentiality_Horizon_20110126 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-26 | 2011-01-26 | |
EB-2010-0131 | SEC_URGENT RE: Emailing: HORIZON_IRR_EP_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | URGENT RE: Emailing: HORIZON_IRR_EP_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | Horizon_SEC Interrogatory Responses - one missing attachment due to file size | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | SEC 18c - Network Infrastructure Hardware Inventory | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | SEC 18c - Server Hardware Inventory | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_SEC_20101124 17-18 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_SEC_20101124 15-16 pdf | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_SEC_20101124 13 to 15 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_SEC_20110124 Q19-34 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_SEC_20101124 1 to 12 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_CCC_20110124v1 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_CCC_email_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_CCC_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_AMPCO_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_VECC_email_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_VECC_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | Board_55 Continuity Schedule Exhibit 9-1-2 Appendix A Revised Jan17 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | Horizon_Ltr_IRR_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_IRR_BOARDSTAFF_20110124 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | Board_ltr_IR Confidentiality_Horizon_20110126 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-26 | 2011-01-26 | |
EB-2010-0131 | HORIZON_REQ_confidentiality_additional info_IRR_EP_20110124 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | SEC_HORIZON_IRR_EP_20110124 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | HORIZON_REQ_confidentiality_IRR_EP_20110124 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-25 | 2011-01-25 | |
EB-2010-0131 | AMPCO_IR_HORIZON_20110110 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-11 | 2011-01-11 | |
EB-2010-0131 | SEC_IRs_Horizon_20110111 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-11 | 2011-01-11 | |
EB-2010-0131 | Energy Probe_IRs_Pt2_Horizon_20110111 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-11 | 2011-01-11 | |
EB-2010-0131 | Energy Probe_IRs_Pt1_Horizon_20110111 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-11 | 2011-01-11 | |
EB-2010-0131 | CCC_IRs_Horizon_20110110 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-10 | 2011-01-10 | |
EB-2010-0131 | VECC_IR_HORIZON_20110110 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-10 | 2011-01-10 | |
EB-2010-0131 | Dec_PO5_Confidentiality_Horizon_20110110 | Procedural Order | Horizon Utilities Corporation - Electricity Distributor | 2011-01-10 | 2011-01-10 | |
EB-2010-0131 | Dec_PO5_Confidentiality_Horizon_20110110 | Decision | Horizon Utilities Corporation - Electricity Distributor | 2011-01-10 | 2011-01-10 | |
EB-2010-0131 | HORIZON_LTR_Confidentiality_SEC_20110107 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-07 | 2011-01-07 | |
EB-2010-0131 | SEC_Submission_Horizon_20110107 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2011-01-07 | 2011-01-07 | |
EB-2010-0131 | Bdstaff_IRs_Horizon_20110107 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-07 | 2011-01-07 | |
EB-2010-0131 | Bdstaff_cvrltr_IR_Horizon_20110107 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2011-01-07 | 2011-01-07 | |
EB-2010-0131 | Horizon_confidentiality_email_20110105 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-05 | 2011-01-05 | |
EB-2010-0131 | Energy Probe_Ltr_Confidentiality_Horizon_20110105 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-05 | 2011-01-05 | |
EB-2010-0131 | Horizon_Ltr_Confidentiality and LEAP_20110104 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-05 | 2011-01-05 | |
EB-2010-0131 | Energy Probe_Ltr_confidentiality Req_Horizon_20100104 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2011-01-04 | 2011-01-04 | |
EB-2010-0131 | AMPCO_Late_IntrvREQ_20101217 | Intervenor Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-12-17 | 2010-12-17 | |
EB-2010-0131 | Dec_Prelim_Issue_po4_Horizon_20101215 | Procedural Order | Horizon Utilities Corporation - Electricity Distributor | 2010-12-15 | 2010-12-15 | |
EB-2010-0131 | Dec_Prelim_Issue_Horizon_20101215 | Decision | Horizon Utilities Corporation - Electricity Distributor | 2010-12-15 | 2010-12-15 | |
EB-2010-0131 | Horizon_Reply_Sub_Prelim_Issue_Rev 20101203 | Applicant Final Argument | Horizon Utilities Corporation - Electricity Distributor | 2010-12-06 | 2010-12-06 | |
EB-2010-0131 | SEC_correspondence_20101130 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2010-11-30 | 2010-11-30 | |
EB-2010-0131 | Horizon_Reply_Sub_Prelim_Issue_20101129 | Applicant Final Argument | Horizon Utilities Corporation - Electricity Distributor | 2010-11-29 | 2010-11-29 | |
EB-2010-0131 | CCC_Sub_Horizon_20101124 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2010-11-24 | 2010-11-24 | |
EB-2010-0131 | Energy Probe_Sub_Horizon_20101123 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2010-11-24 | 2010-11-24 | |
EB-2010-0131 | Energy Probe_cvrltr_Sub_Horizon_20101123 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2010-11-24 | 2010-11-24 | |
EB-2010-0131 | VECC_Sub_Horizon_20101123 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2010-11-23 | 2010-11-23 | |
EB-2010-0131 | Bdstaff_sub_Horizon_Preliminary_Issue_20101123 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2010-11-23 | 2010-11-23 | 2010-11-23 |
EB-2010-0131 | Bdstaff_sub_Horizon_prelim_Issue_cvr_ltr_20101123 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2010-11-23 | 2010-11-23 | 2010-11-23 |
EB-2010-0131 | SEC_Sub_Horizon_preliminary Issue_20101123 | Submission | Horizon Utilities Corporation - Electricity Distributor | 2010-11-23 | 2010-11-23 | |
EB-2010-0131 | Horizon_PUBLIC IR_EP 1a_Preliminary Issue_20101108 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-18 | 2010-11-18 | |
EB-2010-0131 | Horizon_PUBLIC IR_Staff 4b_Preliminary Issue_20101108 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-18 | 2010-11-18 | |
EB-2010-0131 | HORIZON_LTR_20101117 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-18 | 2010-11-18 | |
EB-2010-0131 | PO3_Horizon_20101115 | Procedural Order | Horizon Utilities Corporation - Electricity Distributor | 2010-11-15 | 2010-11-15 | |
EB-2010-0131 | CCC_Confidentiality Undertaking_ltr_20101115 | Declaration and Undertakings | Horizon Utilities Corporation - Electricity Distributor | 2010-11-15 | 2010-11-15 | |
EB-2010-0131 | Energy Probe_Confidentiality Forms re Horizon & Ltr OEB_20101108 | Declaration and Undertakings | Horizon Utilities Corporation - Electricity Distributor | 2010-11-09 | 2010-11-09 | |
EB-2010-0131 | Horizon_REDACTED_IRR_Staff 4b_Preliminary Issue_20101108 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-09 | 2010-11-09 | |
EB-2010-0131 | HORIZON_IRR_VECC_Preliminary Issue_20101108 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-09 | 2010-11-09 | |
EB-2010-0131 | Horizon_IRR_Staff_Preliminary Issue_20101108 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-09 | 2010-11-09 | |
EB-2010-0131 | Horizon_IRR_ENERGYPROBE_Preliminary Issue_20101108 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-09 | 2010-11-09 | |
EB-2010-0131 | Horizon_Letter_IRR_preliminary issue_20101108 | Interrogatory Response from Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-11-09 | 2010-11-09 | |
EB-2010-0131 | PO2_Horizon_20101104 | Procedural Order | Horizon Utilities Corporation - Electricity Distributor | 2010-11-04 | 2010-11-04 | |
EB-2010-0131 | Energy Probe_Ltr_IR_corr_Horizon_20101103 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2010-11-03 | 2010-11-03 | |
EB-2010-0131 | CCC_Ltr_IR_corr_Horizon_20101103 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2010-11-03 | 2010-11-03 | |
EB-2010-0131 | SEC_Ltr_IR_Corr_Horizon_20101103 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2010-11-03 | 2010-11-03 | |
EB-2010-0131 | Horizon_Ltr_IR_20101103 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2010-11-03 | 2010-11-03 | |
EB-2010-0131 | Energy Probe_IRs_Preliminary Issue_Horizon_20101028 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-10-28 | 2010-10-28 | |
EB-2010-0131 | VECC_IRS_HORIZON_20101028 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-10-28 | 2010-10-28 | |
EB-2010-0131 | Brdstaff_IR_PreliminaryIssue_Horizon_20101028 | Interrogatories to Applicant | Horizon Utilities Corporation - Electricity Distributor | 2010-10-28 | 2010-10-28 | |
EB-2010-0131 | Horizon_Letter_revised pages_20101022 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-10-22 | 2010-10-22 | |
EB-2010-0131 | Mary Holadyk_ltr comments_Horizon_redacted_20101022 | Letter of Comment | Horizon Utilities Corporation - Electricity Distributor | 2010-10-22 | 2010-10-22 | |
EB-2010-0131 | PO1_Horizon_20101021 | Procedural Order | Horizon Utilities Corporation - Electricity Distributor | 2010-10-21 | 2010-10-21 | |
EB-2010-0131 | CCC_Intervention_REQ_20101015 | Intervenor Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-10-15 | 2010-10-15 | |
EB-2010-0131 | MikeSullivan_Observer_REQ_redacted_20101007 | Intervenor Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-10-07 | 2010-10-07 | |
EB-2010-0131 | VECC_INTERVENTION_REQ_20100929 | Intervenor Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-09-29 | 2010-09-29 | |
EB-2010-0131 | GMacDonald_Observer_REQ_redacted_20100927 | Observer Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-09-27 | 2010-09-27 | |
EB-2010-0131 | DBryce_Observer_REQ_redacted_20100927 | Observer Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-09-27 | 2010-09-27 | |
EB-2010-0131 | RMorrow_ltr Comment_redacted_20100927 | Letter of Comment | Horizon Utilities Corporation - Electricity Distributor | 2010-09-27 | 2010-09-27 | |
EB-2010-0131 | NJTrudgian_ltr comment_redacted_20100927 | Letter of Comment | Horizon Utilities Corporation - Electricity Distributor | 2010-09-27 | 2010-09-27 | |
EB-2010-0131 | SEC_interv_req_20100923 | Intervenor Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-09-23 | 2010-09-23 | |
EB-2010-0131 | EnergyProbe_ Intervention_REQ_20100922 | Intervenor Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-09-22 | 2010-09-22 | |
EB-2010-0131 | noa_Horizon_20100920_FR | Notice of Application and Notice of Hearing | Horizon Utilities Corporation - Electricity Distributor | 2010-09-20 | 2010-09-20 | |
EB-2010-0131 | noa_Horizon_20100920 | Notice of Application and Notice of Hearing | Horizon Utilities Corporation - Electricity Distributor | 2010-09-20 | 2010-09-20 | |
EB-2010-0131 | noa_lod_Horizon_20100920 | Letter of Direction | Horizon Utilities Corporation - Electricity Distributor | 2010-09-20 | 2010-09-20 | |
EB-2010-0131 | PowerStream_Ltr_Intervenor_REQ_20100913 | Intervenor Request Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-09-14 | 2010-09-14 | |
EB-2010-0131 | Horizon_Appendix 7-1 - Horizon 2011 Cost Allocation Model_20100909 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-09-09 | 2010-09-09 | |
EB-2010-0131 | Ack_Letter_Horizon_2011_EDR_20100901 | Acknowledgement Letter | Horizon Utilities Corporation - Electricity Distributor | 2010-09-01 | 2010-09-01 | |
EB-2010-0131 | Horizon_Rev_Reqt_Work_Form_20100817 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-08-20 at 11:25 AM | ||
EB-2010-0131 | Horizon_Fixed Asset Continuity Schedule v4(07_09_10) (2)_20100827 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-08-27 at 2:41 PM | ||
EB-2010-0131 | Horizon_Appendix 9-1_Continuity Schedule Exhibit 9-1-2 Appendix 9-1_20100827 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-08-27 at 4:53 PM | ||
EB-2010-0131 | Horizon_Appendix 3-2 Copy of Horizon 2011 Load Forecast Model May 17, 2010 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-08-25 at 2:48 PM | ||
EB-2010-0131 | Horizon_Appendix 2M Depreciation and Amortization_2010 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-08-27 at 4:53 PM | ||
EB-2010-0131 | Horizon_Appendix 2B Capital Projects Table_20100812 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-08-27 at 2:34 PM | ||
EB-2010-0131 | Horizon_APPL_2011 Rates_20100826 | Application and Evidence | Horizon Utilities Corporation - Electricity Distributor | 2010-08-27 | 2010-08-27 | |
EB-2010-0131 | BrdLtr_Horizon_EDR Setting Plan_20100625 | Correspondence | Horizon Utilities Corporation - Electricity Distributor | 2010-06-25 | 2010-06-25 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |