Search Results for: Records - Case Number=EB-2011-0271 - 103 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2011-0271 | HaltonHills_PPE_Auditor_Report_20120928 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-09-28 | 2012-09-28 | |
EB-2011-0271 | dec_order_costs_HaltonHills_20120724 | Decision and Order on Cost Awards | Halton Hills Hydro Inc. - Electricity Distributor | 2012-07-24 | 2012-07-24 | |
EB-2011-0271 | Halton_Comments_Cost_Claims_20120717 | Cost Claim Objection | Halton Hills Hydro Inc. - Electricity Distributor | 2012-07-17 | 2012-07-17 | |
EB-2011-0271 | interim_rate_order_HaltonHills_20120704 | Rate Order | Halton Hills Hydro Inc. - Electricity Distributor | 2012-07-04 | 2012-07-04 | |
EB-2011-0271 | EnergyProbe_comments_DRO_revised_20120628 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-28 | 2012-06-28 | |
EB-2011-0271 | HaltonHills_Revised_Cost_Allocation_Model_20120627 | Rate Model | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-27 | 2012-06-27 | |
EB-2011-0271 | HaltonHills_revised_RRWF_20120627 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-27 | 2012-06-27 | |
EB-2011-0271 | HaltonHills_reply_comments_20120627 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-27 | 2012-06-27 | |
EB-2011-0271 | Bdstaff_Comments_HHH_ DRO_20120625 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-25 | 2012-06-25 | 2012-06-25 |
EB-2011-0271 | Energy Probe_Comments DRO_ Halton Hills_20120622 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-22 | 2012-06-22 | |
EB-2011-0271 | Halton_DRO_20120620 | Draft Rate Order | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-20 | 2012-06-20 | |
EB-2011-0271 | dec_order_HaltonHills_20120614 | Decision and Order | Halton Hills Hydro Inc. - Electricity Distributor | 2012-06-14 | 2012-06-14 | |
EB-2011-0271 | HaltonHills_ltr_corr_response to SEC_20120427 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-27 | 2012-04-27 | |
EB-2011-0271 | SEC_Ltr_corr_HaltonHills_reply argument_20120426 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-26 | 2012-04-26 | |
EB-2011-0271 | HaltonHills_reply_ARG_20120425 | Applicant Reply Argument | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-25 | 2012-04-25 | |
EB-2011-0271 | VECC_Sub_Halton Hills_20120413 | Final Argument | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-13 | 2012-04-13 | |
EB-2011-0271 | bdstaff_sub_Halton Hills_20120413 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-13 | 2012-04-13 | |
EB-2011-0271 | SEC_HaltonHills_final argument_20120413 | Final Argument | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-13 | 2012-04-13 | |
EB-2011-0271 | EnergyProbe_final argument_HaltonHills_20120413 | Final Argument | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-13 | 2012-04-13 | |
EB-2011-0271 | HaltonHills_undertaking response_corrected_J1.4 and J1.5_20120303 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-03 | 2012-04-03 | |
EB-2011-0271 | HaltonHills_undertaking response_J1_20120330 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-30 | 2012-03-30 | |
EB-2011-0271 | HaltonHills_ARG_Chief_20120330 | Applicant Argument in Chief | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-30 | 2012-03-30 | |
EB-2011-0271 | PO5_interim Rate Order_HaltonHills_20120326 | Rate Order | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-26 | 2012-03-26 | |
EB-2011-0271 | PO5_interim Rate Order_HaltonHills_20120326 | Procedural Order | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-26 | 2012-03-26 | |
EB-2011-0271 | HaltonHills_undertakings list_20120322 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-04-03 at 2:31 PM | ||
EB-2011-0271 | HaltonHills_exhibit list_20120322 | Exhibits | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-23 at 8:41 AM | ||
EB-2011-0271 | HaltonHills_transcript_volume 1_20120322 | Transcripts | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-22 | 2012-03-22 | |
EB-2011-0271 | EX_K1.1_20120322 | Exhibits | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-21 | 2012-03-21 | |
EB-2011-0271 | HaltonHills_evidence_revised_BLK_20120321 | Settlement Proposal | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-21 | 2012-03-21 | |
EB-2011-0271 | OEB_ltr_HaltonHills_20120320 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-20 | 2012-03-20 | |
EB-2011-0271 | HaltonHills_summary of confidential tree trimming report_20120320 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-20 | 2012-03-20 | |
EB-2011-0271 | EnergyProbe_HaltonHills_DeclarationUndertaking_20120313 | Declaration and Undertakings | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-13 | 2012-03-13 | |
EB-2011-0271 | SEC_HaltonHills_DeclarationUndertaking_20120313 | Declaration and Undertakings | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-13 | 2012-03-13 | |
EB-2011-0271 | HaltonHills_confidential_tree trimming report_20120312 | Settlement Proposal | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-12 | 2012-03-12 | |
EB-2011-0271 | HaltonHills_updated evidence_PP&E Account_20120312 | Settlement Proposal | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-12 | 2012-03-12 | |
EB-2011-0271 | PO4_HaltonHills_20120305 | Procedural Order | Halton Hills Hydro Inc. - Electricity Distributor | 2012-03-05 | 2012-03-05 | |
EB-2011-0271 | HaltonHills_partial settlement proposal_20120229 | Settlement Proposal | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-29 | 2012-02-29 | |
EB-2011-0271 | HaltonHills_ltr_corr_filing extension_20120227 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-27 | 2012-02-27 | |
EB-2011-0271 | Board_ltr_HaltonHills_20120228 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-28 | 2012-02-28 | |
EB-2011-0271 | Board ltr_Settlement Proposal extention Reply_Halton Hills Hydro_20120216 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-16 | 2012-02-16 | |
EB-2011-0271 | HaltonHills_IR_ 2012 Cost Allocation Model_20120206 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-06 | 2012-02-06 | |
EB-2011-0271 | HaltonHills_IR_RRWF_20120206 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-06 | 2012-02-06 | |
EB-2011-0271 | HaltonHills_undertaking response_Weather normalization Model_20120206 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-04 | 2012-02-04 | |
EB-2011-0271 | HaltonHills_undertaking response_Smart Meter Model JT1.9_20120206 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-04 | 2012-02-04 | |
EB-2011-0271 | HaltonHills_untertaking response_JT1.1-JT1.10_20120206 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-04 | 2012-02-04 | |
EB-2011-0271 | HaltonHills_TCQR_EnergyProbe_20120201 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-01 | 2012-02-01 | |
EB-2011-0271 | HaltonHills_TCQR_OEB_20120201 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-01 | 2012-02-01 | |
EB-2011-0271 | HaltonHills_TCQR_SEC_20120201 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-01 | 2012-02-01 | |
EB-2011-0271 | HaltonHills_TCQR_VECC_20120201 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-01 | 2012-02-01 | |
EB-2011-0271 | HaltonHills_undertakings list_TC_20120201 | Undertaking Responses | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-07 at 9:05 AM | ||
EB-2011-0271 | HaltonHills_transcript_TC_vol1_20120201 | Transcripts | Halton Hills Hydro Inc. - Electricity Distributor | 2012-02-02 | 2012-02-02 | |
EB-2011-0271 | SEC_HaltonHills_TCQ_20120130 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-30 at 2:59 PM | ||
EB-2011-0271 | EnergyProbe_TCQ_HaltonHills_20120130 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-30 | 2012-01-30 | 2012-01-30 |
EB-2011-0271 | VECC_TCQ_HaltonHills_20120130 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-30 | 2012-01-30 | |
EB-2011-0271 | Bdstaff_TC_questions_HaltonHills_20120130 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-30 | 2012-01-30 | |
EB-2011-0271 | Bdstaff_HaltonHills_IRR_OEB_SmartMeterModel_20120130 | Submission | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-30 | 2012-01-30 | |
EB-2011-0271 | HaltonHills_PO3_20120130 | Procedural Order | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-30 | 2012-01-30 | |
EB-2011-0271 | HaltonHills_IRR_Energy Probe_20120126 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-26 | 2012-01-26 | |
EB-2011-0271 | HaltonHills_IRR_SEC_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | HaltonHills_IRR_OEB_SmartMeterModel_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | HaltonHills_IRR_OEB_EDDVARcontinuitySchedule_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | HaltonHills_IRR_OEB_RTSRworkform_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | HaltonHills_IRR_OEB_RRWF_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | HaltonHills_IRR_EnergyProbe_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | HaltonHills_IRR_OEB_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | Halton_IRR_VECC_20120124 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2012-01-24 | 2012-01-24 | |
EB-2011-0271 | EnergyProbe_IR2_HaltonHills_20111228 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-12-28 | 2011-12-28 | |
EB-2011-0271 | SEC_IR2_TC_HaltonHills_20111221 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-12-21 | 2011-12-21 | |
EB-2011-0271 | VECC_IR2_TC_Halton Hills_20111221 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-12-21 | 2011-12-21 | |
EB-2011-0271 | Bdstaff_IR_HaltonHills_20111220 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-12-20 | 2011-12-20 | |
EB-2011-0271 | EnergyProbe_2nd_IR_HaltonHills_20111220 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-12-20 | 2011-12-20 | |
EB-2011-0271 | PO2_HaltonHills_20111215 | Procedural Order | Halton Hills Hydro Inc. - Electricity Distributor | 2011-12-15 | 2011-12-15 | |
EB-2011-0271 | Halton_IRR_revised models OEB_20111125 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-28 | 2011-11-28 | |
EB-2011-0271 | Halton_IRR_revised_RRWF model_20111125 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-28 | 2011-11-28 | |
EB-2011-0271 | Halton_IRR_revised_Smart meter model_20111125 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-28 | 2011-11-28 | |
EB-2011-0271 | Halton_IRR_revised CA model_20111125 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-28 | 2011-11-28 | |
EB-2011-0271 | Halton_IRR_outstanding items_20111125 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-28 | 2011-11-28 | |
EB-2011-0271 | Halton_IRR_VECC_20111116 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-16 | 2011-11-16 | |
EB-2011-0271 | Halton_IRR_SEC_20111116 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-16 | 2011-11-16 | |
EB-2011-0271 | Halton_IRR_EnergyProbe_20111116 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-16 | 2011-11-16 | |
EB-2011-0271 | Halton_IRR_OEB_20111116 | Interrogatory Response from Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-11-16 | 2011-11-16 | |
EB-2011-0271 | SEC_IR_HaltonHills_20111026 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-10-26 | 2011-10-26 | |
EB-2011-0271 | VECC_IR_HaltonHills_20111026 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-10-26 | 2011-10-26 | |
EB-2011-0271 | EnergyProbe_IR_HaltonHills_20111024 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-10-25 | 2011-10-25 | |
EB-2011-0271 | BdStaff_covltr_IRs_Halton_20111024 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-10-24 | 2011-10-24 | |
EB-2011-0271 | BdStaff_IRs_Halton_20111024 | Interrogatories to Applicant | Halton Hills Hydro Inc. - Electricity Distributor | 2011-10-24 | 2011-10-24 | |
EB-2011-0271 | PO1_HaltonHills_20111014 | Procedural Order | Halton Hills Hydro Inc. - Electricity Distributor | 2011-10-14 | 2011-10-14 | |
EB-2011-0271 | intervenor list_20111014 | Intervenor List | Halton Hills Hydro Inc. - Electricity Distributor | 2011-10-14 at 10:22 AM | ||
EB-2011-0271 | VECC_intrv_REQ_20110928 | Intervenor Request Letter | Halton Hills Hydro Inc. - Electricity Distributor | 2011-09-28 | 2011-09-28 | |
EB-2011-0271 | SEC_intrv_REQ_20110922 | Intervenor Request Letter | Halton Hills Hydro Inc. - Electricity Distributor | 2011-09-22 | 2011-09-22 | |
EB-2011-0271 | EnergyProbe_intr_REQ_20110915 | Intervenor Request Letter | Halton Hills Hydro Inc. - Electricity Distributor | 2011-09-15 | 2011-09-15 | |
EB-2011-0271 | noah_lod_HaltonHills_20110914 | Letter of Direction | Halton Hills Hydro Inc. - Electricity Distributor | 2011-09-14 | 2011-09-14 | |
EB-2011-0271 | noah_lod_HaltonHills_20110914 | Notice of Application and Notice of Hearing | Halton Hills Hydro Inc. - Electricity Distributor | 2011-09-14 | 2011-09-14 | |
EB-2011-0271 | noah_HaltonHills_20110914 | Notice of Application and Notice of Hearing | Halton Hills Hydro Inc. - Electricity Distributor | 2011-09-14 | 2011-09-14 | |
EB-2011-0271 | Halton_2012_appl_Test_year_income tax_PILs_20110826 | Application and Evidence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-26 | 2011-08-26 | |
EB-2011-0271 | Halton_2012_appl_weather_normalization regression model_20110826 | Application and Evidence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-26 | 2011-08-26 | |
EB-2011-0271 | Halton_2012_appl_RTSR_adjustment_Work Form_20110826 | Application and Evidence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-26 | 2011-08-26 | |
EB-2011-0271 | Halton_2012_appl_Rev_Req_Work Form_20110826 | Application and Evidence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-26 | 2011-08-26 | |
EB-2011-0271 | Halton_2012_appl_EDDVAR_Continuity Schedule_20110826 | Application and Evidence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-26 | 2011-08-26 | |
EB-2011-0271 | Halton_2012_appl_cost allocation model_20110826 | Application and Evidence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-26 | 2011-08-26 | |
EB-2011-0271 | ack_ltr_HaltonHills_20110831 | Acknowledgement Letter | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-31 | 2011-08-31 | |
EB-2011-0271 | HaltonHills_Cos_appl_20110826 | Application and Evidence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-08-26 | 2011-08-26 | |
EB-2011-0271 | Halton_Hills_ltr_2012EDR_20110720 | Correspondence | Halton Hills Hydro Inc. - Electricity Distributor | 2011-07-20 | 2011-07-20 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |