EB-2016-0091
|
SEC_London2017_CompanyNameChange_20170504
|
Correspondence
|
|
2017-05-05
|
2017-05-05
|
EB-2016-0091
|
dec_order_cost awards_London Hydro_20170505
|
Decision and Order on Cost Awards
|
2017-05-05
|
|
2017-05-05
|
EB-2016-0091
|
VECC_ltr_London Hydro_Changes in Counsel_20170427
|
Correspondence
|
|
2017-04-27
|
2017-04-27
|
EB-2016-0091
|
London Hydro_Cost Claim Obj_20170506
|
Cost Claim Objection
|
|
2017-04-06
|
2017-04-06
|
EB-2016-0091
|
SEC_Cost Claim_London Hydro_20170406
|
Cost Claim
|
|
2017-04-06
|
2017-04-06
|
EB-2016-0091
|
CCC_CostClaim_LondonHydro_20170331
|
Cost Claim
|
|
2017-03-31
|
2017-03-31
|
EB-2016-0091
|
VECC_Cost Claim_London Hydro_20170330
|
Cost Claim
|
|
|
2017-03-30 at 3:17 PM
|
EB-2016-0091
|
LPMA_Cost Claim_London Hydro_20170324
|
Cost Claim
|
|
2017-03-24
|
2017-03-24
|
EB-2016-0091
|
dec_rate order_London Hydro_20170323
|
Rate Order
|
2017-03-23
|
|
2017-03-23
|
EB-2016-0091
|
dec_rate order_London Hydro_20170323
|
Decision and Order
|
2017-03-23
|
|
2017-03-23
|
EB-2016-0091
|
OEB Staff_SUB_London Hydro_20170227
|
Submission
|
|
2017-02-27
|
2017-02-27
|
EB-2016-0091
|
LPMA_London Hydro_DRO_COMMENTS_20170227
|
Comments
|
|
2017-02-27
|
2017-02-27
|
EB-2016-0091
|
London Hydro_Draft Rate Order_Addendum_20170223
|
Draft Rate Order
|
|
2017-02-23
|
2017-02-23
|
EB-2016-0091
|
London Hydro_Draft Rate Order_Addendum_20170223
|
Draft Rate Order
|
|
2017-02-23
|
2017-02-23
|
EB-2016-0091
|
London Hydro DRO Tariff Sheet Model_20170222
|
Draft Rate Order
|
|
2017-02-21
|
2017-02-21
|
EB-2016-0091
|
London Hydro DRO RRWF_20170222
|
Draft Rate Order
|
|
2017-02-21
|
2017-02-21
|
EB-2016-0091
|
London Hydro_Draft Rate Order_20170222
|
Draft Rate Order
|
|
2017-02-21
|
2017-02-21
|
EB-2016-0091
|
OEB staff_Confirmation OEB Decision & Submission Schedule London Hydro_20170222
|
Correspondence
|
|
2017-02-22
|
2017-02-22
|
EB-2016-0091
|
Transcript_London Hydro_Settlement Proposal_20170216
|
Transcripts
|
|
2017-02-22
|
2017-02-22
|
EB-2016-0091
|
London Hydro_Draft Rate Order_20170222
|
Correspondence
|
|
2017-02-22
|
2017-02-22
|
EB-2016-0091
|
MF Rosehart Letter of comment LONDON-HYDRO-MFR REVISED_20170217
|
Letter of Comment
|
|
2017-02-17
|
2017-02-17
|
EB-2016-0091
|
Community_Meeting_Summary_London Hydro_20170214
|
Correspondence
|
2017-02-14
|
|
2017-02-14
|
EB-2016-0091
|
MRosehart_Presentation_London Hydro_20170215
|
Correspondence
|
|
2017-02-15
|
2017-02-15
|
EB-2016-0091
|
OEB Staff_Sub_Settlement Proposal_London Hydro_20170215
|
Submission
|
|
2017-02-15
|
2017-02-15
|
EB-2016-0091
|
OEB Staff_Sub_MRosehart_LoC_London Hydro_20170214
|
Submission
|
|
2017-02-14
|
2017-02-14
|
EB-2016-0091
|
London Hydro_Settlement Proposal_Tariff Sheet Model_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_Smart Grid Disposal Generator_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_RTSR_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_RRWF_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_LRAMVA Work Form_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_Load Forecast Settlement Version_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_Cost Allocated Model_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_Chapter 2 Appendices_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_ACM Model_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_2017 Test Year Income Tax PiLS Workform_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_2017 DVA Continuity Schedule_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_2017 DVA Class A B_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_2013 Load Profile 2017_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Proposal_20170209
|
Settlement Proposal
|
|
2017-02-09
|
2017-02-09
|
EB-2016-0091
|
OEBltr_Extension to Settlement Proposal filing deadline_20170209
|
Correspondence
|
2017-02-09
|
|
2017-02-09
|
EB-2016-0091
|
London Hydro_Settlement Delay Ltr_20170208
|
Correspondence
|
|
2017-02-08
|
2017-02-08
|
EB-2016-0091
|
M R Rosehart_Ltr of Comment_London Hydro_20170123_Redacted
|
Letter of Comment
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_Supp IRR_LRAMVA Work Form_20170124
|
Interrogatory Response from Applicant
|
|
2017-01-24
|
2017-01-24
|
EB-2016-0091
|
London Hydro_Supp IRR_2017_Filing_Requirements_Chapter2_Appendices_20170124
|
Interrogatory Response from Applicant
|
|
2017-01-24
|
2017-01-24
|
EB-2016-0091
|
London Hydro_Supplemental IRR_20170124
|
Interrogatory Response from Applicant
|
|
2017-01-24
|
2017-01-24
|
EB-2016-0091
|
London Hydro_IRR_WS Forecast Generator_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_Tariff Sheet Model_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_Smart Grid Disposal Generator_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_RTSR_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_RRWF_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_LF Model_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_Cost Allocation Model_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_CA Sheet O1_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_ Bill Impacts Small Customers_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_Bill Impacts Large Customers_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_ACM Model_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_2017 DVA Continuity Schedule_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_2017 DVA Additional lRR Calculation_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
London Hydro_IRR_Update_Report_20170123
|
Interrogatory Response from Applicant
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
VECC_PRE ADR Questions_London Hydro_20170123
|
Correspondence
|
|
2017-01-23
|
2017-01-23
|
EB-2016-0091
|
LPMA_CQ_London Hydro_20170122
|
Correspondence
|
|
2017-01-22
|
2017-01-22
|
EB-2016-0091
|
dec_Issues List_London Hydro_20170120
|
Decision
|
2017-01-20
|
|
2017-01-20
|
EB-2016-0091
|
OEB staff_Proposed Issues List_London Hydro_20170119
|
Correspondence
|
|
2017-01-20
|
2017-01-20
|
EB-2016-0091
|
London Hydro_IRR_3_VECC_23_WS kWh Adjustment
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3-Staff_41 WS Forecast
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3_Staff-41 Load Forecast_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3_LPMA_30 C_Ont GDP_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3_LPMA-27_Avg Customer_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3_LPMA-24 D_Adjust to Rate Class Cons_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_VECC_57 A_CAM Modified_1-8_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_LPMA 52_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_9-Staff-54-B_2011-2014 Final Results Report_HCLondon Hydro Inc_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_9_Staff-54-A_2011-2014 Final Results Report_London Hydro Inc_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-18
|
2017-01-18
|
EB-2016-0091
|
London Hydro_IRR_4_VECC-52-B-2011-2014 Persistence Report_London Hydro Inc._v2_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-18
|
2017-01-18
|
EB-2016-0091
|
London Hydro_IRR_4_VECC_52 A Page from 2011_2014 Final Results Report_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3_VECC_25H_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3_VECC_25F_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_3_VECC_25C_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_2-LPMA-16 appendix_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 9_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 8_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 7_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 6_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 5_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 4_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 3_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 2_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
London Hydro_IRR_Exhibit 1_20170117
|
Interrogatory Response from Applicant
|
|
2017-01-17
|
2017-01-17
|
EB-2016-0091
|
CCC_IR_London Hydro_20161214
|
Interrogatories to Applicant
|
|
2016-12-14
|
2016-12-14
|
EB-2016-0091
|
VECC_IR_London Hydro_20161213
|
Interrogatories to Applicant
|
|
2016-12-13
|
2016-12-13
|
EB-2016-0091
|
SEC_IR_London Hydro_20161214
|
Interrogatories to Applicant
|
|
2016-12-14
|
2016-12-14
|
EB-2016-0091
|
Ack Ltr_Rosehart_letter of comment_London Hydro_20161213
|
Acknowledgement Letter
|
2016-12-13
|
|
2016-12-13
|
EB-2016-0091
|
Ack Ltr_G Rains_letter of comment_London Hydro_20161130
|
Acknowledgement Letter
|
2016-11-30
|
|
2016-11-30
|
EB-2016-0091
|
G Rains_Ltr of Comment_London Hydro_20161127_Redacted
|
Letter of Comment
|
|
2016-11-28
|
2016-11-28
|
EB-2016-0091
|
OEB Staff_IR_London Hydro CoS_20161209
|
Interrogatories to Applicant
|
|
2016-12-09
|
2016-12-09
|
EB-2016-0091
|
LPMA_IR_London Hydro_20161208
|
Interrogatories to Applicant
|
|
2016-12-08
|
2016-12-08
|
EB-2016-0091
|
London Hydro_2017 Tariff_Schedule_Bill_Impact_Model_V1_0_Updated CoC_201612
|
Application and Evidence
|
|
2016-12-05
|
2016-12-05
|
EB-2016-0091
|
London Hydro_WS Forecast Generator 20160826_20161202
|
Application and Evidence
|
|
2016-12-02
|
2016-12-02
|
EB-2016-0091
|
London Hydro_2017_Rev_Reqt_Work_Form_V7 - Updated CoC_20161202
|
Application and Evidence
|
|
2016-12-02
|
2016-12-02
|
EB-2016-0091
|
London Hydro_2017_Cost_Allocation_Model - updated CoC_20161202
|
Application and Evidence
|
|
2016-12-02
|
2016-12-02
|
EB-2016-0091
|
London Hydro_Amd_APPL_20161202
|
Application and Evidence
|
|
2016-12-02
|
2016-12-02
|
EB-2016-0091
|
PO1_London Hydro CoS_20161125
|
Procedural Order
|
2016-11-25
|
|
2016-11-25
|
EB-2016-0091
|
Ack Ltr_G Rains_letter of comment_London Hydro_20161124
|
Acknowledgement Letter
|
2016-11-24
|
|
2016-11-24
|
EB-2016-0091
|
Gary and Gail Rains_ltr of Comment_London Hydro_20161121_Redacted
|
Letter of Comment
|
|
2016-11-21
|
2016-11-21
|
EB-2016-0091
|
C Butler_Meeting Notes_London Hydro_20161116_Redacted
|
Correspondence
|
|
2016-11-16
|
2016-11-16
|
EB-2016-0091
|
C Size_Ltr of Comment_London Hydro_20161116_Redacted
|
Letter of Comment
|
|
2016-11-16
|
2016-11-16
|
EB-2016-0091
|
C Size_Monitor_London Hydro_20161116_Redacted
|
Monitor
|
|
2016-11-16
|
2016-11-16
|
EB-2016-0091
|
Ack Ltr_C_D Size_London Hydro_20161115
|
Acknowledgement Letter
|
2016-11-15
|
|
2016-11-15
|
EB-2016-0091
|
C_D Size_Ltr of Comment_London Hydro_20161115_Redacted
|
Letter of Comment
|
|
2016-11-15
|
2016-11-15
|
EB-2016-0091
|
S Bruce_Ltr of Comment_London Hydro_20161109_Redacted
|
Letter of Comment
|
|
2016-11-09
|
2016-11-09
|
EB-2016-0091
|
Ack Ltr_C Butler_London Hydro_20161031
|
Acknowledgement Letter
|
2016-10-31
|
|
2016-10-31
|
EB-2016-0091
|
C Butler_Ltr of Comment_London Hydro_20161031 _Redacted
|
Letter of Comment
|
|
2016-10-31
|
2016-10-31
|
EB-2016-0091
|
M Gitta_Ltr of Comment_London Hydro_20161031_Redacted
|
Letter of Comment
|
2016-10-31
|
2016-10-31
|
2016-10-31
|
EB-2016-0091
|
CCC_IntrvREQ_London Hydro CoS_20161028
|
Intervenor Request Letter
|
|
2016-10-28
|
2016-10-28
|
EB-2016-0091
|
R Kirkpatrick_Ltr of Comment_London Hydro_20161024_Redacted
|
Letter of Comment
|
|
2016-10-24
|
2016-10-24
|
EB-2016-0091
|
Affidavits of Service_London Hydro_20161019
|
Affidavits of Service
|
|
2016-10-19
|
2016-10-19
|
EB-2016-0091
|
NoA_London HydroQOE-NLO-160F_20161017
|
Notice of Application
|
2016-10-17
|
|
2016-10-17
|
EB-2016-0091
|
NoA_London Hydro_QOE-NLO-160_20161017
|
Notice of Application
|
2016-10-17
|
|
2016-10-17
|
EB-2016-0091
|
lod_London Hydro_2017 CoS_20161017
|
Letter of Direction
|
2016-10-17
|
|
2016-10-17
|
EB-2016-0091
|
VECC_IntrvREQ_London Hydro IRM_20160930
|
Intervenor Request Letter
|
|
2016-09-30
|
2016-09-30
|
EB-2016-0091
|
SEC_Intrv REQ_London Hydro_20160919
|
Intervenor Request Letter
|
|
2016-09-19
|
2016-09-19
|
EB-2016-0091
|
LPMA_IntrvREQ_London Hydro_20160916
|
Cost Eligibility Request
|
|
2016-09-16
|
2016-09-16
|
EB-2016-0091
|
ack_ltr_London Hydro_CoS_20160830
|
Acknowledgement Letter
|
2016-08-30
|
|
2016-08-30
|
EB-2016-0091
|
London Hydro_2017_Filing_Requirements_Chapter2_Appendices_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_2017_Tariff_Schedule_Bill_Impact_Model_V1.0_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Benchmarking Spreadsheet Forecast Model 1.1_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Distribution System Plan_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_DSP Appendices_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 4_OMA_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_COS_Checklist_Final_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_LRAMVA_Work_Form_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_LRAM 2015 Verified Results Report 20160630_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_ED_Disposal_Generator_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_ Cost Allocation Profile 2015_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_2017_Test year Income Tax_PILs_Workform_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_2017_RTSR Workform_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_2017_Rev Reqt Work Form_V7_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_DVA Continuity Schedule_CoS_v2_7_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_2017_DVA Additional RR Calculation_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Cost Allocation Model_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_2017_Capital_Module_ACM_Model_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 9_Def Var_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 8_Rate Design_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 7_Cost Allocation_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 6_Revenue Deficiency_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 5_Capital Structure_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 3_Revenue_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 2_Rate Base_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_Exhibit 1_Administration_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|
EB-2016-0091
|
London Hydro_CoS APPL_cvrltr_20160826
|
Application and Evidence
|
|
2016-08-26
|
2016-08-26
|