EB-2018-0329
|
Dec Order on Cost Awards_LTC Northshore_20211015
|
Decision and Order on Cost Awards
|
2021-10-15
|
|
2021-10-15
|
EB-2018-0329
|
LLFN_Cost Claim_OEB Aug 2021_Greer_20211008
|
Cost Claim
|
|
2021-10-08
|
2021-10-08
|
EB-2018-0329
|
Town of Marathon_Status Update_202210910
|
Correspondence
|
|
2021-09-13
|
2021-09-13
|
EB-2018-0329
|
LLFN_CostClaim_cvrltr_ToM_20210910
|
Cost Claim
|
|
2021-09-10
|
2021-09-10
|
EB-2018-0329
|
LLFN_Cost_Claim_ToM_20210910
|
Cost Claim
|
|
2021-09-10
|
2021-09-10
|
EB-2018-0329
|
OEB Ltr_Cost Claim Extn_Long Lake 58_Lakeshore North Shore_20210908
|
Correspondence
|
2021-09-08
|
|
2021-09-08
|
EB-2018-0329
|
Long Lake_Cost Claim_delay_20210908_Email
|
Correspondence
|
|
2021-09-08
|
2021-09-08
|
EB-2018-0329
|
SEC_Marathon_CostClaim_20210907
|
Cost Claim
|
|
2021-09-07
|
2021-09-07
|
EB-2018-0329
|
VECC Cost Claim EB 2018-0329 Marathon_20210907
|
Cost Claim
|
|
2021-09-07
|
2021-09-07
|
EB-2018-0329
|
Anwaatin_Cost Claim_20210907
|
Cost Claim
|
|
2021-09-07
|
2021-09-07
|
EB-2018-0329
|
Jackfish Metis Assoc_Email re PO5_Lakeshore Natural Gas_20210823
|
Correspondence
|
|
2021-08-23
|
2021-08-23
|
EB-2018-0329
|
PO5_Cost Awards Process_Lakeshore Nat Gas_North Shore Prjct_20210819
|
Procedural Order
|
2021-08-19
|
|
2021-08-19
|
EB-2018-0329
|
SEC_CostClaimProcess_NorthShore_20210805
|
Correspondence
|
|
2021-08-05
|
2021-08-05
|
EB-2018-0329
|
SEC_Contact Info Change_20210505
|
Correspondence
|
|
2021-05-07
|
2021-05-07
|
EB-2018-0329
|
Resilient_Ltr_DRC Name Change_Anwaatin_20210112
|
Correspondence
|
|
2021-01-12
|
2021-01-12
|
EB-2018-0329
|
OEB Ltr_Wahkohtowin_Indigenous Consultation_20200228
|
Correspondence
|
2020-02-28
|
|
2020-02-28
|
EB-2018-0329
|
dec_order_Phase 1_TOM_North Shore Project_20200227
|
Decision and Order
|
2020-02-27
|
|
2020-02-27
|
EB-2018-0329
|
David Flood_Wahkohtowin Dev_Letter of Comment_Town of Marathon_20200226
|
Letter of Comment
|
|
2020-02-26
|
2020-02-26
|
EB-2018-0329
|
Attach_3 _TOM_Revised_Working Area Access Agt_20200124
|
Submission
|
|
2020-01-24
|
2020-01-24
|
EB-2018-0329
|
Attach_2 TOM_Indigenous Consultation Summary Report 20200124
|
Submission
|
|
2020-01-24
|
2020-01-24
|
EB-2018-0329
|
Attach_1 TOM_Revised_Certificate Maps_2020012f
|
Submission
|
|
2020-01-24
|
2020-01-24
|
EB-2018-0329
|
TOM_CovLtr_ADD_DOCUMENTS_TO_REPLY ARG_20200124
|
Submission
|
|
2020-01-24
|
2020-01-24
|
EB-2018-0329
|
TOM_ReplyARG SUB_20200123
|
Submission
|
|
2020-01-23
|
2020-01-23
|
EB-2018-0329
|
OEB Ltr_Marathon_Req Ext_North Shore Project_20200120
|
Correspondence
|
2020-01-20
|
|
2020-01-20
|
EB-2018-0329
|
TOM__Ltr_Request for Extension20200120
|
Correspondence
|
|
2020-01-20
|
2020-01-20
|
EB-2018-0329
|
VECC_ SUB_TOM_2020107
|
Submission
|
|
2020-01-07
|
2020-01-07
|
EB-2018-0329
|
OEB Staff_SUB_TOM_North Shore Project_20200106
|
Submission
|
2020-01-06
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
RRIBBNA_SUB_TOM_20200106
|
Submission
|
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
LLFN_SUB_TOM_20200106
|
Submission
|
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
Anwaatin_SUB_TOM_20200106
|
Submission
|
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
NLNG_SUB2_TOM_20200106
|
Submission
|
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
NLNG_CvrLtr_SUB_TOM_20200106
|
Submission
|
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
SEC_SUB_TOM_20200106
|
Submission
|
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
Certarus_SUB_TOM_20100106
|
Submission
|
|
2020-01-06
|
2020-01-06
|
EB-2018-0329
|
TOM_Argument_in_Chief_20191211
|
Argument
|
|
2019-12-11
|
2019-12-11
|
EB-2018-0329
|
TOM_CovLtr_Arg_in_Chief_20191211
|
Argument
|
|
2019-12-11
|
2019-12-11
|
EB-2018-0329
|
OEB Ltr_Marathon_Ext AIC_20191210
|
Correspondence
|
2019-12-10
|
|
2019-12-10
|
EB-2018-0329
|
TOM_Ltr_Request for Extension_20191209
|
Correspondence
|
|
2019-12-09
|
2019-12-09
|
EB-2018-0329
|
TOM_IRR_CovLtr_REVISED IRR 41 TO OEBSTAFF_20191203
|
Interrogatory Response from Applicant
|
2019-12-03
|
2019-12-03
|
2019-12-03
|
EB-2018-0329
|
TOM_REVISED_IRR_41_TO_OEB STAFF_20191203
|
Interrogatories to Applicant
|
2019-12-03
|
2019-12-03
|
2019-12-03
|
EB-2018-0329
|
Dec_Confidentiality_PO4_ToM North Shore_20191202
|
Procedural Order
|
2019-12-02
|
|
2019-12-02
|
EB-2018-0329
|
Dec_Confidentiality_PO4_ToM North Shore_20191202
|
Decision
|
2019-12-02
|
|
2019-12-02
|
EB-2018-0329
|
TOM_REDACTED_IRR to Anwaatin Inc. 20191126
|
Interrogatory Response from Applicant
|
|
2019-11-26
|
2019-11-26
|
EB-2018-0329
|
TOM_REDACTED_IRR to Certarus 20191126
|
Interrogatory Response from Applicant
|
|
2019-11-26
|
2019-11-26
|
EB-2018-0329
|
TOM_REDACTED_IRR TO OEB STAFF 20191126
|
Interrogatory Response from Applicant
|
|
2019-11-26
|
2019-11-26
|
EB-2018-0329
|
TOM_Attach_A to SEC-7 - Levelization Chart_xlsm_20191126
|
Interrogatory Response from Applicant
|
|
2019-11-26
|
2019-11-26
|
EB-2018-0329
|
TOM_IRR to VECC_20191126
|
Interrogatory Response from Applicant
|
|
2019-11-26
|
2019-11-26
|
EB-2018-0329
|
TOM_CovLtr to IRR Responses_20191126
|
Interrogatory Response from Applicant
|
|
2019-11-26
|
2019-11-26
|
EB-2018-0329
|
TOM_IRR TO SEC 20191126
|
Interrogatory Response from Applicant
|
|
2019-11-26
|
2019-11-26
|
EB-2018-0329
|
OEB Ltr_LongLake no58 First Nation_IntrvREQ Reply_20191125
|
Intervenor Request Objection
|
2019-11-25
|
|
2019-11-25
|
EB-2018-0329
|
Town of Marathon_Ltr_Reply_IntvrREQ_Long Lake 58_First Nation_20191121
|
Intervenor Request Objection
|
|
2019-11-21
|
2019-11-21
|
EB-2018-0329
|
OEB Ltr_Batchewana_IntrvREQ Reply_20191115
|
Intervenor Request Objection
|
2019-11-15
|
|
2019-11-15
|
EB-2018-0329
|
OEB Ltr_Marathon_Withdrawal of Appendix A_20191120
|
Correspondence
|
2019-11-20
|
|
2019-11-20
|
EB-2018-0329
|
Long Lake 58 First Nation_LL58FN_IntrvREQ_CostREQ_late_20191119
|
Intervenor Request Letter
|
|
2019-11-19
|
2019-11-19
|
EB-2018-0329
|
Town of Marathon_Ltr_Request to Withdraw AppendixA_20191118
|
Correspondence
|
|
2019-11-18
|
2019-11-18
|
EB-2018-0329
|
Batchewana First Nation_BFN_Ltr_Reply_IntvrREQ_CostREQ_ToM_20191115
|
Intervenor Request Objection
|
|
2019-11-15
|
2019-11-15
|
EB-2018-0329
|
Town of Marathon_Reply_IntrvREQ_Batchewana First Nation_20191114
|
Intervenor Request Objection
|
|
2019-11-14
|
2019-11-14
|
EB-2018-0329
|
Batchewana First Nation_IntrvREQ_CostREQ_ToM_20191114
|
Intervenor Request Letter
|
|
2019-11-13
|
2019-11-13
|
EB-2018-0329
|
Anwaatin_IR_Municipalities_ToM_NorthShore_20191112
|
Interrogatories to Applicant
|
|
2019-11-12
|
2019-11-12
|
EB-2018-0329
|
SEC_IR_ToM_NorthShore_20191112
|
Interrogatories to Applicant
|
|
2019-11-12
|
2019-11-12
|
EB-2018-0329
|
Certarus Ltd_IR_Town of Marathon_20191112
|
Interrogatories to Applicant
|
|
2019-11-12
|
2019-11-12
|
EB-2018-0329
|
VECC_IRQ_Marathon0329_20191111
|
Interrogatories to Intervenor
|
|
2019-11-11
|
2019-11-11
|
EB-2018-0329
|
PO3_Dec_Confidentiality_ToM_North Shore_20191111
|
Decision
|
2019-11-11
|
|
2019-11-11
|
EB-2018-0329
|
PO3_Dec_Confidentiality_ToM_North Shore_20191111
|
Procedural Order
|
2019-11-11
|
|
2019-11-11
|
EB-2018-0329
|
OEBStaff_IRs_Marathon_North Shore LNG_20191108
|
Interrogatories to Applicant
|
|
2019-11-08
|
2019-11-08
|
EB-2018-0329
|
Town of Marathon_Affidavits_of_Service_20191028
|
Affidavits of Service
|
|
2019-10-28
|
2019-10-28
|
EB-2018-0329
|
Town of Marathon_SUB_Confidentiality_20191106
|
Submission
|
|
2019-11-06
|
2019-11-06
|
EB-2018-0329
|
PO2_Town of Marathon_North Shore_20191030
|
Procedural Order
|
2019-10-30
|
|
2019-10-30
|
EB-2018-0329
|
Anwaatin_IntrvREQ_Traditional Territories_20191025_Email
|
Intervenor Request Letter
|
|
2019-10-25
|
2019-10-25
|
EB-2018-0329
|
SEC_NorthShoreProject_IntrvREQ OBJ Reply20191025
|
Intervenor Request Objection
|
|
2019-10-25
|
2019-10-25
|
EB-2018-0329
|
OEB Ltr_TOM_Anwaatin Intrv Resp Extn_20191025
|
Correspondence
|
2019-10-25
|
|
2019-10-25
|
EB-2018-0329
|
Town of Marathon_Service on Additional Parties 20191025
|
Correspondence
|
|
2019-10-25
|
2019-10-25
|
EB-2018-0329
|
Town of Marathon_IntrvREQ OBJ_Anwaatin_Request for Extension_20191024
|
Correspondence
|
|
2019-10-24
|
2019-10-24
|
EB-2018-0329
|
Anwaatin_IntvrREQ_CostREQ_UPDATED Add_Info_ToM_NS_20191024
|
Intervenor Request Letter
|
|
2019-10-24
|
2019-10-24
|
EB-2018-0329
|
Town of Marathon_IntrvREQ OBJ_to_SEC_20191022
|
Intervenor Request Objection
|
|
2019-10-22
|
2019-10-22
|
EB-2018-0329
|
OEB Ltr_Anwaatin_Intervention Info_20191021
|
Intervenor Request Objection
|
2019-10-21
|
|
2019-10-21
|
EB-2018-0329
|
OEB Ltr to TOM Response to SEC IntvrREQ OBJ_Reply_20191021
|
Intervenor Request Objection
|
2019-10-21
|
|
2019-10-21
|
EB-2018-0329
|
Town of Marathon_Reply_IntrvREQ OBJ_SEC and VECC_20191018
|
Intervenor Request Objection
|
|
2019-10-18
|
2019-10-18
|
EB-2018-0329
|
Anwaatin_IntrvREQ_CostREQ_Late_Town of Marathon_NS_20191017
|
Intervenor Request Letter
|
|
2019-10-17
|
2019-10-17
|
EB-2018-0329
|
VECC_Reply IntrvREQ OBJ_Town of Marathon_20191011
|
Intervenor Request Objection
|
|
2019-10-11
|
2019-10-11
|
EB-2018-0329
|
Red Rock Indian Band_RRIB_Ltr_Counsel_20191011
|
Intervenor Request Letter
|
|
2019-10-11
|
2019-10-11
|
EB-2018-0329
|
Bingwi Neyaashi Anishinaabek First Nation_BNA_IntrvREQ_Late_Town of Marathon_2019101
|
Intervenor Request Letter
|
|
2019-10-11
|
2019-10-11
|
EB-2018-0329
|
Certarus Ltd._Reply IntrvREQ OBJ_ToM_20191011
|
Intervenor Request Objection
|
|
2019-10-11
|
2019-10-11
|
EB-2018-0329
|
Nipigon_Comments_Town of Marathon_20191011
|
Comments
|
|
2019-10-11
|
2019-10-11
|
EB-2018-0329
|
OEB Staff_SUB_Confidentiality_North Shore_20191010
|
Submission
|
2019-10-10
|
2019-10-10
|
2019-10-10
|
EB-2018-0329
|
SEC_IntrvREQ_CostREQ_Town of Marathon_North Shore_20191010
|
Intervenor Request Letter
|
|
2019-10-10
|
2019-10-10
|
EB-2018-0329
|
PO1_Town of Marathon_North Shore_20191007
|
Procedural Order
|
2019-10-07
|
|
2019-10-07
|
EB-2018-0329
|
VECC_OBJ_IntvrREQ_Reply_Nipigon LNG_ToM_20191007
|
Intervenor Request Objection
|
|
|
2019-10-07 at 8:58 AM
|
EB-2018-0329
|
Town of Marathon OBJ IntvrREQ_Certarus Ltd_VECC_20191003
|
Intervenor Request Objection
|
|
2019-10-03
|
2019-10-03
|
EB-2018-0329
|
Nipigon_OBJ_VECC_IntrREQ_20191003
|
Intervenor Request Objection
|
|
2019-10-03
|
2019-10-03
|
EB-2018-0329
|
Nipigon_OBJ_Centarus_IntrREQ_20191003
|
Intervenor Request Objection
|
|
2019-10-03
|
2019-10-03
|
EB-2018-0329
|
Town of Marathon_Ltr_REQ Confidentiality_20190802
|
Correspondence
|
|
2019-08-02
|
2019-08-02
|
EB-2018-0329
|
Jackfish Metis Community_IntrvREQ_CostREQ_North Shore_20191002
|
Intervenor Request Letter
|
|
2019-10-02
|
2019-10-02
|
EB-2018-0329
|
VECC_IntrvREQ_Town of Marathon_20191001
|
Intervenor Request Letter
|
|
2019-10-01
|
2019-10-01
|
EB-2018-0329
|
Red Rock Indian Band_RRIB_IntrvREQ_20190927
|
Intervenor Request Letter
|
|
2019-09-30
|
2019-09-30
|
EB-2018-0329
|
ENBRIDGE_IntrvREQ_20190727
|
Intervenor Request Letter
|
|
2019-09-27
|
2019-09-27
|
EB-2018-0329
|
Nipigon_IntrvREQ_Town of Marathon LTC_20190927
|
Intervenor Request Letter
|
|
2019-09-27
|
2019-09-27
|
EB-2018-0329
|
Certarus Ltd_IntrvREQ_20190926
|
Intervenor Request Letter
|
|
2019-09-26
|
2019-09-26
|
EB-2018-0329
|
RSMIN_request_extension_comments _20190917
|
Correspondence
|
|
2019-09-17
|
2019-09-17
|
EB-2018-0329
|
Notice_Wawa_Manitouwadge_FR_20190912
|
Notice
|
2019-09-12
|
|
2019-09-12
|
EB-2018-0329
|
Notice_Wawa_Manitouwadge_20190912
|
Notice
|
2019-09-12
|
|
2019-09-12
|
EB-2018-0329
|
Notice_Terrace Bay Schreiber_FR_20190912
|
Notice
|
2019-09-12
|
|
2019-09-12
|
EB-2018-0329
|
Notice_Terrace Bay Schreiber_20190912
|
Notice
|
2019-09-12
|
|
2019-09-12
|
EB-2018-0329
|
Notice_Marathon_FR_20190912
|
Notice
|
2019-09-12
|
|
2019-09-12
|
EB-2018-0329
|
Notice_Marathon_20190912
|
Notice
|
2019-09-12
|
|
2019-09-12
|
EB-2018-0329
|
LoD_North Shore_LTC_20190912
|
Letter of Direction
|
2019-09-12
|
|
2019-09-12
|
EB-2018-0329
|
complete_ltr_North Shore LTC_20190816
|
Correspondence
|
2019-08-16
|
|
2019-08-16
|
EB-2018-0329
|
Town of Marathon_APPL_LTC_Updated_v2_20190815
|
Application and Evidence
|
|
2019-08-15
|
2019-08-15
|
EB-2018-0329
|
EX_A-10-1e_Wawa_ER_20190807
|
Application and Evidence
|
|
2019-08-07
|
2019-08-07
|
EB-2018-0329
|
EX_A-10-1d_Terrace_Bay_ER_20190807
|
Application and Evidence
|
|
2019-08-07
|
2019-08-07
|
EB-2018-0329
|
EX_A-10-1c_Schreiber_ER_20190807
|
Application and Evidence
|
|
2019-08-07
|
2019-08-07
|
EB-2018-0329
|
EX_A-10-1b_Marathon_ER_20190807
|
Application and Evidence
|
|
2019-08-07
|
2019-08-07
|
EB-2018-0329
|
Ex A-10-1a_Manitouwadge_ER_20190807
|
Application and Evidence
|
|
2019-08-07
|
2019-08-07
|
EB-2018-0329
|
ack_ltr_Marathon_North Shore_20190807
|
Acknowledgement Letter
|
2019-08-07
|
|
2019-08-07
|
EB-2018-0329
|
OEB_ltr_North Shore_20190313
|
Correspondence
|
2019-03-13
|
|
2019-03-13
|
EB-2018-0329
|
ENBRIDGE_GAS_Ltr_North Shore LNG_20190204
|
Correspondence
|
|
2019-02-04
|
2019-02-04
|
EB-2018-0329
|
OEB_Ltr_Town of Marathon_TOM_20190123
|
Correspondence
|
|
2019-01-23
|
2019-01-23
|
EB-2018-0329
|
OEB_Ltr_Interested Parties_North Shore_20181220
|
Correspondence
|
2018-12-20
|
|
2018-12-20
|
EB-2018-0329
|
ENBRIDGE_GAS_Ltr_serving north shore communities_20190116
|
Correspondence
|
|
2019-01-16
|
2019-01-16
|
EB-2018-0329
|
ack_ltr_North Shore_20181219
|
Acknowledgement Letter
|
2018-12-19
|
|
2018-12-19
|
EB-2018-0329
|
NOI_Town of Marathon_APPL_OEB_20181204
|
Application and Evidence
|
|
2018-12-04
|
2018-12-04
|
EB-2018-0329
|
Town of Marathon_APPL_OEB Notice of Intent_20181204
|
Application and Evidence
|
|
|
2018-12-05 at 11:45 AM
|