EB-2013-0234
|
SEC_Certificate_Destruction_THESL s29_20140717
|
Correspondence
|
|
2014-07-17
|
2014-07-17
|
EB-2013-0234
|
dec_order_cost_awards_THESL s29_20140707
|
Decision and Order on Cost Awards
|
2014-07-07
|
|
2014-07-07
|
EB-2013-0234
|
amd_licence_ed_thesl_20140605
|
Licence
|
2014-06-05
|
|
2014-06-05
|
EB-2013-0234
|
dec_accounting_order_THESL s29_20140605
|
Decision
|
2014-06-05
|
|
2014-06-05
|
EB-2013-0234
|
dec_order_THESL s29_20140605
|
Decision and Order
|
2014-06-05
|
|
2014-06-05
|
EB-2013-0234
|
VECC_Cost Claim_THESL s29_20140603
|
Cost Claim
|
|
2014-06-03
|
2014-06-03
|
EB-2013-0234
|
Energy Probe_Cost Claim_THESL s29_20140530
|
Cost Claim
|
|
2014-05-30
|
2014-05-30
|
EB-2013-0234
|
CCC_Cost Claim_THESL s29_20140602
|
Cost Claim
|
|
2014-06-02
|
2014-06-02
|
EB-2013-0234
|
SEC_Cost Claim_THESL s29_20140528
|
Cost Claim
|
|
2014-05-28
|
2014-05-28
|
EB-2013-0234
|
K1_1_THESL_Compendium of Materials_20140516
|
Exhibit List
|
|
2014-05-16
|
2014-05-16
|
EB-2013-0234
|
THESL s29_Draft Accounting Order_20140523
|
Correspondence
|
|
2014-05-23
|
2014-05-23
|
EB-2013-0234
|
Transcript_Vol 1_Oral Hearing_20140516
|
Transcripts
|
|
2014-05-16
|
2014-05-16
|
EB-2013-0234
|
BdStaff_Sub_Settlement Proposal_THESL s29_20140515
|
Submission
|
|
2014-05-15
|
2014-05-15
|
EB-2013-0234
|
BdStaff_Sub_Settlement Proposal_THESL s29_covltr_20140515
|
Submission
|
|
2014-05-15
|
2014-05-15
|
EB-2013-0234
|
THESL s29_Settlement Proposal_20140515
|
Settlement Proposal
|
|
2014-05-15
|
2014-05-15
|
EB-2013-0234
|
THESL s29_Settlement Proposal_covltr_20140515
|
Settlement Proposal
|
|
2014-05-15
|
2014-05-15
|
EB-2013-0234
|
Bdltr_THESL s29_Oral Hearing_20140514
|
Correspondence
|
2014-05-14
|
|
2014-05-14
|
EB-2013-0234
|
Haussmann_Consulting_Joint Written Statement _Competition Issues_THESL s29_20140502
|
Correspondence
|
|
2014-05-12
|
2014-05-12
|
EB-2013-0234
|
Haussmann_Consulting_Joint Written Statement _Competition Issues_THESL s29_covltr_20140502
|
Correspondence
|
|
2014-05-12
|
2014-05-12
|
EB-2013-0234
|
THESL s29_Unredacted IRR_CCC_3_5_EP_18_20140512
|
Interrogatory Response from Applicant
|
|
2014-05-12
|
2014-05-12
|
EB-2013-0234
|
THESL s29_Unredacted IRR_CCC_3_5_EP_18_covltr_20140512
|
Interrogatory Response from Applicant
|
|
|
2014-05-12 at 3:04 PM
|
EB-2013-0234
|
Bdltr_THESL_s29_IRRs_20140508
|
Correspondence
|
2014-05-08
|
|
2014-05-08
|
EB-2013-0234
|
THESL s29_updated IRR_CCC-16_covltr_20140508
|
Interrogatory Response from Applicant
|
|
2014-05-08
|
2014-05-08
|
EB-2013-0234
|
THESL s29_updated IRR_CCC-16_20140508
|
Interrogatory Response from Applicant
|
|
2014-05-08
|
2014-05-08
|
EB-2013-0234
|
THESL_s29 Motion_IRR_redacted_covltr_20140506
|
Interrogatory Response from Applicant
|
|
2014-05-06
|
2014-05-06
|
EB-2013-0234
|
THESL_s29 Motion_IRR_redacted_20140506
|
Interrogatory Response from Applicant
|
|
2014-05-06
|
2014-05-06
|
EB-2013-0234
|
Haussmann Consulting_Joint Experts Report on Tech Issues_20140502
|
Correspondence
|
|
2014-05-02
|
2014-05-02
|
EB-2013-0234
|
Haussmann Consulting_Joint Written Statement _Competition Issues_THESL s29_Redacted_20140502
|
Correspondence
|
|
2014-05-02
|
2014-05-02
|
EB-2013-0234
|
Haussmann Consulting_Expert Statements_THESL s29_covltr_20140502
|
Correspondence
|
|
|
2014-05-02 at 8:59 AM
|
EB-2013-0234
|
Bdltr_oral hearing_THESL_s29_20140501
|
Correspondence
|
2014-05-01
|
|
2014-05-01
|
EB-2013-0234
|
ackltr_Observer_Cogeco_THESL s29_20140421
|
Acknowledgement Letter
|
2014-04-21
|
|
2014-04-21
|
EB-2013-0234
|
THESL s29_Undertaking Resp_Tech Conf_20140417
|
Undertaking Responses
|
|
2014-04-17
|
2014-04-17
|
EB-2013-0234
|
JFarmer_Nordicity_Declaration_Undertaking_20140415
|
Declaration and Undertakings
|
|
2014-04-15
|
2014-04-15
|
EB-2013-0234
|
po7_THESL s29_20140416
|
Procedural Order
|
2014-04-16
|
|
2014-04-16
|
EB-2013-0234
|
Cogeco_ObservReq_20140415
|
Observer Request Letter
|
|
2014-04-15
|
2014-04-15
|
EB-2013-0234
|
BdLtr_Experts Conference_THESL s29_20140416
|
Correspondence
|
2014-04-16
|
|
2014-04-16
|
EB-2013-0234
|
Attachment B_U S Supreme Court Decision 2002-National Cable v Gulf Power_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment B_U S Code - Title 47_20140404
|
Interrogatory Response from Applicant
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment B_FCC 2011 Pole Attachment Order_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment B_FCC 1998 Implementation Order_20140404
|
Interrogatory Response from Applicant
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Appendix B_Table of Contents_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment A_Nova Scotia Utility_Review Board (2002)_ In the matter of the public utilities act_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment A_Nova Scotia Public Utilities Act 1989_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment A_Newfoundland Power Inc (2001)- Direct Evid_Exh of Nfld Power Inc_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment A_New Brunswick Energy_Utilities Board Act_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment A_Canadian Cable Television Association (2003)_AppendixC Evid of Donald A Ford_20140404
|
Interrogatory Response from Applicant
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment A_Bull_Housser_Tupper LLP_behalf of Shaw Cablesystems Ltd (2009) - Appl_BC Utilities Commission_20140404
|
Interrogatories to Applicant
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Attachment A_Alberta Energy_Utilities Board - Decision 2000-86_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Nordicity_IRR_THESL_20140404
|
Interrogatory Response from Applicant
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Nordicity_IRR_Energy Probe_20140404
|
Interrogatory Response from Applicant
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Bdstaff_Nordicity_IRR_cvrltr_20140404
|
Interrogatory Response from Applicant
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Analysis Group_IRR_VECC_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Analysis Group_IRR_THESL_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Analysis Group_IRR_Energy Probe_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
Bdstaff_Analysis_Group_IRR_cvrltr_20140404
|
Interrogatory Response from Intervenor
|
|
2014-04-04
|
2014-04-04
|
EB-2013-0234
|
po6_THESL s29_20140410
|
Procedural Order
|
2014-04-10
|
|
2014-04-10
|
EB-2013-0234
|
Transcript_Technical Conf_THESL s29_REDACTED_20140409
|
Transcripts
|
|
2014-04-09
|
2014-04-09
|
EB-2013-0234
|
THESL s29_Ltr_dec review_tech_conf_20140408
|
Correspondence
|
|
2014-04-08
|
2014-04-08
|
EB-2013-0234
|
dec_confidentiality_THESL s29_20140408
|
Decision
|
2014-04-08
|
|
2014-04-08
|
EB-2013-0234
|
Energy Probe_TechConf_Questions_20140407
|
Correspondence
|
|
2014-04-08
|
2014-04-08
|
EB-2013-0234
|
Rde Avillez_Nordicity_Declaration_Undertaking_20140401
|
Declaration and Undertakings
|
|
2014-04-01
|
2014-04-01
|
EB-2013-0234
|
SMeyer_Nordicity_Declaration_Undertaking_20140401
|
Declaration and Undertakings
|
|
2014-04-01
|
2014-04-01
|
EB-2013-0234
|
DChodorowicz_Nordicity_Declaration_Undertaking_20140402
|
Declaration and Undertakings
|
|
2014-04-02
|
2014-04-02
|
EB-2013-0234
|
THESL_s29_ReplySub_Confidentiality_covltr_20140328
|
Submission
|
|
2014-04-28
|
2014-04-28
|
EB-2013-0234
|
THESL s29_ReplySub_ Confidentiality_20140328
|
Submission
|
|
2014-03-28
|
2014-03-28
|
EB-2013-0234
|
CCC_Declaration_Undertaking_20140321
|
Declaration and Undertakings
|
|
2014-03-21
|
2014-03-21
|
EB-2013-0234
|
CCC_Sub_confidentialIRS_20140321
|
Submission
|
|
2014-03-21
|
2014-03-21
|
EB-2013-0234
|
EDA_Declaration_Undertakings_20140321
|
Declaration and Undertakings
|
|
2014-03-21
|
2014-03-21
|
EB-2013-0234
|
EnergyProbe_IR_BoardStaff_20140321
|
Interrogatories to Intervenor
|
|
2014-03-24
|
2014-03-24
|
EB-2013-0234
|
EnergyProbe_IR_VECC20140321
|
Interrogatories to Intervenor
|
|
2014-03-24
|
2014-03-24
|
EB-2013-0234
|
THESL_IR_Wireless_20140321
|
Interrogatories to Intervenor
|
|
2014-03-21
|
2014-03-21
|
EB-2013-0234
|
VECC_IR_BdStaff Witness_20140320
|
Interrogatories to Intervenor
|
|
2014-03-20
|
2014-03-20
|
EB-2013-0234
|
BdStaff_IR_Evd_VECC_THESL s29_20140320
|
Interrogatories to Intervenor
|
|
2014-03-20
|
2014-03-20
|
EB-2013-0234
|
Bdstaff_IR_Evd_VECC_THESL s29_cvr_ltr_20140320
|
Interrogatories to Intervenor
|
|
2014-03-20
|
2014-03-20
|
EB-2013-0234
|
Bdltr_CST_IntervReq_20140318
|
Intervenor Request Letter - Reply
|
2014-03-18
|
|
2014-03-18
|
EB-2013-0234
|
SEC_Sub_Confidentality_THESL s29_Cor_20140317
|
Submission
|
|
2014-03-21
|
2014-03-21
|
EB-2013-0234
|
BdStaff_Sub_Confidentiality_THESL s29_20140317
|
Submission
|
|
2014-03-17
|
2014-03-17
|
EB-2013-0234
|
BdStaff_Sub_Confidentiality_THESL s29_covltr_20140317
|
Submission
|
|
2014-03-17
|
2014-03-17
|
EB-2013-0234
|
VECC_Evd_20140314
|
Intervenor Evidence
|
|
2014-03-14
|
2014-03-14
|
EB-2013-0234
|
Evidence attachment_Appendix - Pole Attachment Regulation_20140314
|
Intervenor Evidence
|
|
2014-03-14
|
2014-03-14
|
EB-2013-0234
|
Evidence attachment_Expert Report of Dr. van Audenrode_20140314
|
Intervenor Evidence
|
|
2014-03-14
|
2014-03-14
|
EB-2013-0234
|
BdStaff_evidence_Technical Report_20140314
|
Intervenor Evidence
|
|
2014-03-14
|
2014-03-14
|
EB-2013-0234
|
Bdstaff_evidence_covltr_20140314
|
Intervenor Evidence
|
|
2014-03-14
|
2014-03-14
|
EB-2013-0234
|
THESL_s29_IRR_VECC09_updated_20140312
|
Interrogatory Response from Applicant
|
|
2014-03-12
|
2014-03-12
|
EB-2013-0234
|
MRubenstein_SEC_Declaration_Undertaking_THESL s29_20140307
|
Declaration and Undertakings
|
|
2014-03-07
|
2014-03-07
|
EB-2013-0234
|
po5_THESL s29_20140307
|
Procedural Order
|
2014-03-07
|
|
2014-03-07
|
EB-2013-0234
|
CST_IntervReq_THESL s29_20140306
|
Intervenor Request Letter
|
|
2014-03-06
|
2014-03-06
|
EB-2013-0234
|
THESL s29_IRR_Iss09_05_EP_20_AppA_20140228
|
Interrogatory Response from Applicant
|
|
2014-02-28
|
2014-02-28
|
EB-2013-0234
|
THESL s29_IRR_20140228
|
Interrogatory Response from Applicant
|
|
2014-02-28
|
2014-02-28
|
EB-2013-0234
|
Bdltr_CST_Intervention_Req_20140226
|
Intervenor Request Letter - Reply
|
2014-02-26
|
|
2014-02-26
|
EB-2013-0234
|
CST_IntervReq_THESL_20140220
|
Intervenor Request Letter
|
|
2014-02-20
|
2014-02-20
|
EB-2013-0234
|
Energy Probe_IR_THESL s29_20140214
|
Interrogatories to Applicant
|
|
2014-02-14
|
2014-02-14
|
EB-2013-0234
|
Energy Probe_IR_THESL s29_covltr_20140214
|
Interrogatories to Applicant
|
|
2014-02-14
|
2014-02-14
|
EB-2013-0234
|
SEC_IR_THESL_s29_20140214
|
Interrogatories to Applicant
|
|
2014-02-14
|
2014-02-14
|
EB-2013-0234
|
BdStaff_IR_THESL_20140214
|
Interrogatories to Applicant
|
|
2014-02-14
|
2014-02-14
|
EB-2013-0234
|
Bdstaff_IR_THESL_cvr_ltr_20140214
|
Interrogatories to Applicant
|
|
2014-02-14
|
2014-02-14
|
EB-2013-0234
|
VECC_IR_THESL_20140213
|
Interrogatories to Applicant
|
|
2014-02-13
|
2014-02-13
|
EB-2013-0234
|
CCC_IR_THESL_20140207
|
Interrogatories to Applicant
|
|
2014-02-07
|
2014-02-07
|
EB-2013-0234
|
CCC_IR_THESL_covltr_20140207
|
Interrogatories to Applicant
|
|
2014-02-07
|
2014-02-07
|
EB-2013-0234
|
dec_issues list_po4_THESL s29_20140128
|
Procedural Order
|
2014-01-28
|
|
2014-01-28
|
EB-2013-0234
|
dec_issues list_po4_THESL s29_20140128
|
Decision
|
2014-01-28
|
|
2014-01-28
|
EB-2013-0234
|
Transcript_THESL_Issues Day_20140123
|
Transcripts
|
|
2014-01-23
|
2014-01-23
|
EB-2013-0234
|
THESL_List of Issues_20140120
|
Correspondence
|
|
2014-01-20
|
2014-01-20
|
EB-2013-0234
|
THESL_List of Issues_covltr_20140120
|
Correspondence
|
|
2014-01-20
|
2014-01-20
|
EB-2013-0234
|
GHariton_CV_VECC_20140106
|
Correspondence
|
|
2014-01-06
|
2014-01-06
|
EB-2013-0234
|
PO3_THESL_s29_20131219
|
Procedural Order
|
2013-12-19
|
|
2013-12-19
|
EB-2013-0234
|
Intervenor list_THESL_updated_20131010
|
Intervention List
|
|
|
2013-10-10 at 11:43 AM
|
EB-2013-0234
|
po2_THESL_s29_20131025
|
Procedural Order
|
2013-10-25
|
|
2013-10-25
|
EB-2013-0234
|
Shaw_Ltr_Comment_THESL_s29_20131010
|
Letter of Comment
|
|
2013-10-10
|
2013-10-10
|
EB-2013-0234
|
THESL_Ltr_expert witnesses_20131025
|
Correspondence
|
|
2013-10-25
|
2013-10-25
|
EB-2013-0234
|
EDA_THESL_s29_Proposed Issues List_20131018
|
Correspondence
|
|
2013-10-18
|
2013-10-18
|
EB-2013-0234
|
THESL_s29_proposed issues list_20131018
|
Correspondence
|
|
2013-10-18
|
2013-10-18
|
EB-2013-0234
|
BdStaff Proposed Issues List_THESL_20131018
|
Correspondence
|
|
2013-10-18
|
2013-10-18
|
EB-2013-0234
|
Bdstaff_Proposed Issues List_THESL_cvr_ltr_20131018
|
Correspondence
|
|
2013-10-18
|
2013-10-18
|
EB-2013-0234
|
SEC_CCC_VECC_Energy Probe_Draft Issues List_THESL_s29_20131018
|
Correspondence
|
|
2013-10-18
|
2013-10-18
|
EB-2013-0234
|
Energy Probe_additional_contact_THESL_s29_20131004
|
Correspondence
|
|
2013-10-07
|
2013-10-07
|
EB-2013-0234
|
TerreStar_Solutions_Ltr_Comment_20131010
|
Letter of Comment
|
|
2013-10-10
|
2013-10-10
|
EB-2013-0234
|
ExteNet_Systems_DAScom_Ltr_Comment_20131010
|
Letter of Comment
|
|
2013-10-10
|
2013-10-10
|
EB-2013-0234
|
ack_Ltr_Observer_Rogers_THESL_s29_20131008
|
Acknowledgement Letter
|
2013-10-08
|
|
2013-10-08
|
EB-2013-0234
|
dec_intervenor_cost eligibility_po1_THESL_20131004
|
Decision
|
2013-10-04
|
|
2013-10-04
|
EB-2013-0234
|
VECC_ReplyLtr_THESL_intervention requests_20130930
|
Correspondence
|
|
2013-09-30
|
2013-09-30
|
EB-2013-0234
|
THESL_Ltr_intervention_requests_20130927
|
Correspondence
|
|
2013-09-27
|
2013-09-27
|
EB-2013-0234
|
Rogers_ObserverReq_THESL_s29_20130925
|
Observer Request Letter
|
|
2013-09-25
|
2013-09-25
|
EB-2013-0234
|
ack_ltr_Observer_ExteNet_DAScom_20130925
|
Acknowledgement Letter
|
2013-09-25
|
|
2013-09-25
|
EB-2013-0234
|
Rogers_Ltr_IntervReq_withdrawn_20130925
|
Correspondence
|
|
2013-09-25
|
2013-09-25
|
EB-2013-0234
|
ack_ltr_Observer_Shaw_20130924
|
Acknowledgement Letter
|
2013-09-24
|
|
2013-09-24
|
EB-2013-0234
|
Shaw_ObserverReq_THESL_s29_20130923
|
Observer Request Letter
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
ack_ltr_Observer_TerreStar_Solutions_20130923
|
Observer Request Letter - Reply
|
2013-09-23
|
|
2013-09-23
|
EB-2013-0234
|
Hydro Ottawa_IntervReq_THESL_s29_20130920
|
Intervenor Request Letter
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
EDA_IntervReq_THESL_s29_20130920
|
Intervenor Request Letter
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
THESL_Ltr_IntervReq_VECC_Energy Probe_20130920
|
Correspondence
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
CCC_IntervReq_THESL_s29_20130920
|
Intervenor Request Letter
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
ExteNet Systems_ObserverReq_THESL_s29_20130920
|
Observer Request Letter
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
Terrestar Solutions_ObserverReq_THESL_s29_20130920
|
Observer Request Letter
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
Rogers_IntervReq_THESL_s29_20130920
|
Intervenor Request Letter
|
|
2013-09-20
|
2013-09-20
|
EB-2013-0234
|
VECC_Addendum_IntervReq_THESL_s29_20130919
|
Intervenor Request Letter
|
|
2013-09-19
|
2013-09-19
|
EB-2013-0234
|
ack_ltr_Observer_Hydro One_THESL_s29_20130919
|
Observer Request Letter - Reply
|
2013-09-19
|
|
2013-09-19
|
EB-2013-0234
|
ack_Ltr_Observer_Hydro One Brampton_THESL_s29_20130919
|
Observer Request Letter - Reply
|
2013-09-19
|
|
2013-09-19
|
EB-2013-0234
|
HONI_ObserverReq_THESL_S29_20130918
|
Observer Request Letter
|
|
2013-09-18
|
2013-09-18
|
EB-2013-0234
|
Hydro One Brampton_ObserverReq_THESL_s29_Email_20130918
|
Observer Request Letter
|
|
2013-09-18
|
2013-09-18
|
EB-2013-0234
|
ack_ltr_Observer_Telus_THESL_s29_20130918
|
Observer Request Letter - Reply
|
2013-09-18
|
|
2013-09-18
|
EB-2013-0234
|
Telus_ObserverReq_THESL_s29_Email_20130917
|
Observer Request Letter
|
|
2013-09-17
|
2013-09-17
|
EB-2013-0234
|
Energy Probe_IntervReq_THESL_s29_20130916
|
Intervenor Request Letter
|
|
2013-09-16
|
2013-09-16
|
EB-2013-0234
|
THESL_Notice_published_FR_20130913
|
Notice
|
|
|
2013-09-17 at 11:07 AM
|
EB-2013-0234
|
THESL_Notice_published_20130913
|
Notice
|
|
|
2013-09-17 at 11:39 AM
|
EB-2013-0234
|
SEC_THESL_s29_IntervObjReply_20130916
|
Correspondence
|
|
2013-09-16
|
2013-09-16
|
EB-2013-0234
|
THESL_s29_Affidavit_20130913
|
Affidavits of Service
|
|
2013-09-13
|
2013-09-13
|
EB-2013-0234
|
VECC_IntervReq_THESL_s29_20130912
|
Intervenor Request Letter
|
|
2013-09-12
|
2013-09-12
|
EB-2013-0234
|
THESL_Ltr_IntervReq_Objection_SEC_20130911
|
Intervenor Request Objection
|
|
2013-09-11
|
2013-09-11
|
EB-2013-0234
|
SEC_IntervReq_THESL_s29_20130905
|
Intervenor Request Letter
|
|
2013-09-05
|
2013-09-05
|
EB-2013-0234
|
notice_THESL_s29_unpublished_FR_20130829
|
Notice
|
2013-09-04
|
|
2013-09-04
|
EB-2013-0234
|
notice_THESL_s29_unpublished_20130829
|
Notice
|
2013-09-04
|
|
2013-09-04
|
EB-2013-0234
|
lod_THESL_s29_20130904
|
Letter of Direction
|
2013-09-04
|
|
2013-09-04
|
EB-2013-0234
|
THESL_ReplyLtr_Suppl_Evid_20130814
|
Correspondence
|
|
|
2013-08-14 at 1:34 PM
|
EB-2013-0234
|
BdLtr_supplemental_evid_THESL_20130725
|
Correspondence
|
2013-07-25
|
|
2013-07-25
|
EB-2013-0234
|
THESL_ReplyLtr_s29_20130719
|
Correspondence
|
|
2013-07-19
|
2013-07-19
|
EB-2013-0234
|
BdLtr_THESL_Infor_Req_20130712
|
Correspondence
|
2013-07-12
|
|
2013-07-12
|
EB-2013-0234
|
ack_ltr_THESL_s 29_20130625
|
Acknowledgement Letter
|
2013-06-25
|
|
2013-06-25
|
EB-2013-0234
|
THESL_APPL_20130614
|
Application and Evidence
|
|
2013-06-14
|
2013-06-14
|