Search Results for: Records - Case Number=EB-2017-0182 - 417 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2017-0182 | AcknLetter NextBridge Report_EWT_20230201 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2023-02-01 | 2023-02-01 | |
EB-2017-0182 | NextBridge_EWT 4th Quarterly Progress Report_20230120 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2023-01-20 | 2023-01-20 | |
EB-2017-0182 | OEB ltr_NextBridge Report EWT_20221108 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-11-08 | 2022-11-08 | |
EB-2017-0182 | NextBridge_EWT Qrtly Progress Report_20221021 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-10-21 | 2022-10-21 | |
EB-2017-0182 | Ack_Letter NextBridge Report_EWT_20220726 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-07-26 | 2022-07-26 | |
EB-2017-0182 | NextBridge_EWT Quarterly Progress Report_20220722 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-07-22 | 2022-07-22 | |
EB-2017-0182 | NextBridge_Reporting Letter_EWT_20220606 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-06-06 | 2022-06-06 | |
EB-2017-0182 | NextBridge_EWT_Report_20220421 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-04-21 | 2022-04-21 | |
EB-2017-0182 | AcknLetter NextBridge Report EWT_20220308 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-03-08 | 2022-03-08 | |
EB-2017-0182 | NextBridge_EWT_Report_20220124 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2022-01-24 | 2022-01-24 | |
EB-2017-0182 | AcknLetter_NextBridge Report EWT_20211108 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-11-08 | 2021-11-08 | |
EB-2017-0182 | NextBridge_EWT_Report_20211022 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-10-22 | 2021-10-22 | |
EB-2017-0182 | ack_ltr_NextBridge IO Update_20210827 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-08-27 | 2021-08-27 | |
EB-2017-0182 | NextBridge_LTR_OEB Fire_FNL_20210819 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-08-19 | 2021-08-19 | |
EB-2017-0182 | NextBridge_LTR_Fire FNL_20210812 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-08-12 | 2021-08-12 | |
EB-2017-0182 | AcknLetter NextBridge Report EWT_20210804 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-08-04 | 2021-08-04 | |
EB-2017-0182 | NextBridge_LTR_Fire IO_20210723 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-07-23 | 2021-07-23 | |
EB-2017-0182 | NextBridge_EWT_Report_20210722 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-07-22 | 2021-07-22 | |
EB-2017-0182 | ack_ltr_NextBridge Report EWT_20210427 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-04-27 | 2021-04-27 | |
EB-2017-0182 | NextBridge_EWT_Report_20210422 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-04-22 | 2021-04-22 | |
EB-2017-0182 | Ack_ltr_NextBridge Report EWT_20210125 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-01-25 | 2021-01-25 | |
EB-2017-0182 | NextBridge_EWT_Report_20210122 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2021-01-22 | 2021-01-22 | |
EB-2017-0182 | OEBltr_NextBridge Report EWT_20201023 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-10-23 | 2020-10-23 | |
EB-2017-0182 | NextBridge_EWT_Report_20201022 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-10-22 | 2020-10-22 | |
EB-2017-0182 | ack_ltr_NextBridge Report EWT_20200924 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-09-24 | 2020-09-24 | |
EB-2017-0182 | Attachment_2_NextBridge_ LTR_to_IESO_22072020 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-09-03 | 2020-09-03 | |
EB-2017-0182 | Attachment_1_NextBridge_EWT_Report_20200722 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-09-03 | 2020-09-03 | |
EB-2017-0182 | NextBridge_LTR_Notice_of_Date_Change_03092020 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-09-03 | 2020-09-03 | |
EB-2017-0182 | Attachment_3_IESO_Response_to_NextBridge_LTR_ 28082020 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-09-03 | 2020-09-03 | |
EB-2017-0182 | ack_ltr_NextBridge Report EWT_20200723 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-07-23 | 2020-07-23 | |
EB-2017-0182 | NextBridge_ IESO Request COD_20200722 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-07-22 | 2020-07-22 | |
EB-2017-0182 | NextBridge_EWT_Report_20200722 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-07-22 | 2020-07-22 | |
EB-2017-0182 | OEB ltr_NextBridge_EWT April Report_20200617 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-06-17 | 2020-06-17 | |
EB-2017-0182 | AcknLetter_NextBridge_Report EWT_20200423 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-04-23 | 2020-04-23 | |
EB-2017-0182 | NextBridge _COVID_19_Deferral_Account_Order_Request_20200422 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-04-22 | 2020-04-22 | |
EB-2017-0182 | NextBridge_EWT_Report_20200422 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-04-22 | 2020-04-22 | |
EB-2017-0182 | NextBridge_LTR_Covid-19_23032020 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-03-23 | 2020-03-23 | |
EB-2017-0182 | AcknLetter_NextBridge Report EWT_20200227 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-02-27 | 2020-02-27 | |
EB-2017-0182 | NextBridge Response_to_OEB_Request_ Q4_ 2019_Construction_Progress_ Report_20200226 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-02-26 | 2020-02-26 | |
EB-2017-0182 | OEB ltr_NextBridge_Response to January Report_20200212 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-02-12 | 2020-02-12 | |
EB-2017-0182 | ack_ltr_NextBridge Report EWT_20200123 | Acknowledgement Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-01-23 | 2020-01-23 | |
EB-2017-0182 | NextBridge_EWT_Report_20200122 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2020-01-22 | 2020-01-22 | |
EB-2017-0182 | ackltr_NextBridge_20191111 | Acknowledgement Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-11-11 | 2019-11-11 | |
EB-2017-0182 | NextBridge_EWT_Report_20191108 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-11-08 | 2019-11-08 | |
EB-2017-0182 | OEB letter_NextBridge_Extension Request_20191017 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-10-17 | 2019-10-17 | |
EB-2017-0182 | NextBridge Quarterly Report Extension Request_20191017 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-10-17 | 2019-10-17 | |
EB-2017-0182 | OEB ltr_NextBridge_Response to First Report_20191010 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-10-10 | 2019-10-10 | |
EB-2017-0182 | AcknLetter NextBridge Report EWT_20190909 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-09-09 | 2019-09-09 | |
EB-2017-0182 | Quarterly Report 1_EWT NextBridge_20190830 | Post Hearing Filings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-08-30 | 2019-08-30 | |
EB-2017-0182 | IESO_Letter_NB Reporting Req_20190730 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-07-30 | 2019-07-30 | |
EB-2017-0182 | Reporting Requirements_OEB NextBridge EWT_20190729 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-07-29 | 2019-07-29 | |
EB-2017-0182 | CvrLtr_Reporting requirement_NextBridge_2090729 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-07-29 | 2019-07-29 | |
EB-2017-0182 | dec_order_costs_NextBridge_HONI_20190530 | Decision and Order on Cost Awards | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-05-30 | 2019-05-30 | |
EB-2017-0182 | LL#58FN_costclaim_20190408 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-04-08 | 2019-04-08 | |
EB-2017-0182 | MFN_costs claim_20190405 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-04-05 | 2019-04-05 | |
EB-2017-0182 | MNO Revised Statement of Cost Claim_20190328 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-29 | 2019-03-29 | |
EB-2017-0182 | BZA_Cost_Claim_Revisedpage2and4_20190328 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-28 | 2019-03-28 | |
EB-2017-0182 | BZA Cost Claim letter_20190327 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-27 | 2019-03-27 | |
EB-2017-0182 | John Kim Bell_Curriculum vitae_20190327 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-27 | 2019-03-27 | |
EB-2017-0182 | licence_dec_order_et_amd_upper_canada_ministerial_directive_20190211 | Licence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-11 | 2019-02-11 | |
EB-2017-0182 | NextBridge_Response to Cost Claims_Michipicoten_20190320 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-20 | 2019-03-20 | |
EB-2017-0182 | BLP_ResivedCostClaim_Porter Airlines letter_20190320 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-20 | 2019-03-20 | |
EB-2017-0182 | BLP_RevisedCostClaim_20190320 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-20 | 2019-03-20 | |
EB-2017-0182 | Anwaatin_RevCostClaim_20190225 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-19 | 2019-03-19 | |
EB-2017-0182 | HONI_CostsObj_Comments_20190318 | Cost Claim Objection | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-18 | 2019-03-18 | |
EB-2017-0182 | NextBridge_Cost Claim Objections_20190318 | Cost Claim Objection | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-18 | 2019-03-18 | |
EB-2017-0182 | LL58FN_CostClaim_20190308 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-08 | 2019-03-08 | |
EB-2017-0182 | BFN_EWT_CostClaim_20190308 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-08 | 2019-03-08 | |
EB-2017-0182 | PO 9_HONI_UCT Combined Hearing_20190301 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-03-01 | 2019-03-01 | |
EB-2017-0182 | CCC_EWT_CostClaim_20190228 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-28 | 2019-02-28 | |
EB-2017-0182 | Anwaatin_CostClaim_20190225 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-25 | 2019-02-25 | |
EB-2017-0182 | SEC_HONI_LSL_CostClaim_20190225 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-25 | 2019-02-25 | |
EB-2017-0182 | BZA_CostClaim_20190225 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-25 | 2019-02-25 | |
EB-2017-0182 | VECC_CostClaim_20190225 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-25 | 2019-02-25 | |
EB-2017-0182 | MNO_CostClaim_20190225 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-25 | 2019-02-25 | |
EB-2017-0182 | MFN_CostClaim_20190225 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-25 | 2019-02-25 | |
EB-2017-0182 | BLP_CostClaim_20190222 | Cost Claim | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-22 | 2019-02-22 | |
EB-2017-0182 | dec_order_EWT-LSL_20190211 | Decision and Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-02-11 | 2019-02-11 | |
EB-2017-0182 | HONI_Ltr_East West Tie Line_20190131 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-01-31 | 2019-01-31 | |
EB-2017-0182 | NextBridge_Ltr_Minister Rickford_East West Tie Line_20190121 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-01-30 | 2019-01-30 | |
EB-2017-0182 | Minister of Energy_ltr_OEB_East West Tie_20190130 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-01-30 | 2019-01-30 | |
EB-2017-0182 | Order-in-Council_20190130 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-01-30 | 2019-01-30 | |
EB-2017-0182 | Ltr_OEB_HONI_EWT_20190124 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-01-24 | 2019-01-24 | |
EB-2017-0182 | FFCC ltr to Minister of Energy_20180926 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | Sioux Lookout Chamber of Comm ltr to Minister of Energy_20180925 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-25 | 2018-09-25 | |
EB-2017-0182 | City of Thunde Bay ltr to Minster of Energy_20180921 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-21 | 2018-09-21 | |
EB-2017-0182 | NOMA ltr to Minister of Energy_20180917 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-17 | 2018-09-17 | |
EB-2017-0182 | Common Voice Northwest ltr to Minister of Energy_20180923 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-23 | 2018-09-23 | |
EB-2017-0182 | TBCEDC ltr to Minister of Energy_20180917 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-17 | 2018-09-17 | |
EB-2017-0182 | TB Chamber of Comm ltr to Minister of Energy_20180919 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | HONI_LSL_SUB_20190115.pdf | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2019-01-15 | 2019-01-15 | |
EB-2017-0182 | Dec_Order_EWT-LSL_20181220 | Decision and Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-12-20 | 2018-12-20 | |
EB-2017-0182 | OEB_ltr_DecisionAdvance Review_EWT-LSL_20181218 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-12-18 | 2018-12-18 | |
EB-2017-0182 | OEB_ltr_All Parties_EWT_LSL_20181130 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-30 | 2018-11-30 | |
EB-2017-0182 | HONI_ToR Sept 5 2018 _20181128 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-28 | 2018-11-28 | |
EB-2017-0182 | HONI_Lake Superior Link AD ENG20181128 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-28 | 2018-11-28 | |
EB-2017-0182 | HONI_Lake Superior Link AD FR_20181128 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-28 | 2018-11-28 | |
EB-2017-0182 | HONI_Lake Superior Link Flyer final_201811228 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-28 | 2018-11-28 | |
EB-2017-0182 | HONI_Ltr_response MFN_20181127 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-27 | 2018-11-27 | |
EB-2017-0182 | HONI_LtrComment_20181127 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-27 | 2018-11-27 | |
EB-2017-0182 | PRFN_Letter to HONI_OEB_Declaration Order Seeking Exemption_OEA Act_20181126 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-26 | 2018-11-26 | |
EB-2017-0182 | MFN_Ltr_ReplyARG_HONI_EB-2017-0182 -0194 -0364_Nov 12, 2018_20181116 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-16 | 2018-11-16 | |
EB-2017-0182 | HONI_LTR_20181119 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-19 | 2018-11-19 | |
EB-2017-0182 | MFN_ltr_response HONI reply submission_20181113 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-13 | 2018-11-13 | |
EB-2017-0182 | NextBridge_ReplyARG_20181110_Corrected | Applicant Reply Argument | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-12 | 2018-11-12 | |
EB-2017-0182 | NextBridge_ReplyARG_20181109 | Applicant Reply Argument | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-09 | 2018-11-09 | |
EB-2017-0182 | HONI_Reply submission_0181109 | Applicant Reply Argument | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-09 | 2018-11-09 | |
EB-2017-0182 | Ack Ltr_letter of comment_M Gravelle MPP_20181107 | Acknowledgement Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-07 | 2018-11-07 | |
EB-2017-0182 | Thunder Bay_MPP_correspondence_20181025_Redacted | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-25 | 2018-10-25 | |
EB-2017-0182 | Thunder Bay_MPP_correspondence_20181016 | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-16 | 2018-10-16 | |
EB-2017-0182 | MECP_Response ltr to OEB_20181106 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-06 | 2018-11-06 | |
EB-2017-0182 | OEBltr_HONI_NB_East West Tie_20181106 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-06 | 2018-11-06 | |
EB-2017-0182 | HONI_Ltr_EWT_LSL_20181106 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-06 | 2018-11-06 | |
EB-2017-0182 | OEBResponse_Township of Terrace Bay_HONI_Nextbridge Combined_20181102 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-02 | 2018-11-02 | |
EB-2017-0182 | Township of Terrace Bay_letter of comment_20181101 | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-01 | 2018-11-01 | |
EB-2017-0182 | OEB Staff_sub_NextBridge_Hydro One_20181031_Revised(3) | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-01 | 2018-11-01 | |
EB-2017-0182 | VECC Submission_EWT Combined Proceeding_20181101 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-01 | 2018-11-01 | |
EB-2017-0182 | OEB Letter to MECP_EWT_LSL_20181101 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-11-01 | 2018-11-01 | |
EB-2017-0182 | OEB Staff_sub_NextBridge_Hydro One_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | MECP_LTR_EWT_LSL_20181101 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | CCC_FinalArgument_EWT_HON_NB_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | BFN_ Final Submission_Combined Hearing_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | BFN_CvrLtr_Submission_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | PWU_SUB_transmission line_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | SEC_NB_HON_EWT_LSL_FinalArgument_20181031_Redacted | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | MNO_SUB_EWT_LSL_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | BLP_BookofAuthorities_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | BLP_FinalSUB_2018103 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | IESO_Submission_EWT_LSL_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | IESO_CvrLtr_Submisson_EWT_LSL_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | NextBridge_ReplyARG_20181031 | Applicant Reply Argument | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | Anwaatin_SUB_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | HONI_Response to NextBridge_20181031 | Applicant Reply Argument | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | BZA_FinalSUB2_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | LLFN_SUB_EWT_LSL_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | MFN_Argument_EWT_LSL_20181031 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-31 | 2018-10-31 | |
EB-2017-0182 | HONI_ltr_EWT_LSL_20181030 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-30 | 2018-10-30 | |
EB-2017-0182 | HONI_LTR_EWT_LSL_20181029 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-29 | 2018-10-29 | |
EB-2017-0182 | Thunder Bay_MPP_correspondence_20181025_Redacted | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-25 | 2018-10-25 | |
EB-2017-0182 | HONI_ARGChief_20181022 | Applicant Argument in Chief | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-22 | 2018-10-22 | |
EB-2017-0182 | NextBridge_ARGChief_20181022 | Applicant Argument in Chief | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-22 | 2018-10-22 | |
EB-2017-0182 | Thunder Bay_MPP_correspondence_20181016 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-16 | 2018-10-16 | |
EB-2017-0182 | OEB correspondence _EWT_LSL_20181015 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-16 | 2018-10-16 | |
EB-2017-0182 | NextBridge_UndertakingResponse_J6 1_20181015 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-15 | 2018-10-15 | |
EB-2017-0182 | HONI_UndertakingResponse_JT4 1__20181015 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-15 | 2018-10-15 | |
EB-2017-0182 | Nextbridge Chart_Exhi K7 1_20181012 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-12 | 2018-10-12 | |
EB-2017-0182 | NextBridge_Number 8 Operations Maintenance_Exhi K6 2_20181011 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-11 | 2018-10-11 | |
EB-2017-0182 | Environmental assessmentact act_RSO1990_Exhi K7 2_20181012 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-12 | 2018-10-12 | |
EB-2017-0182 | Transcripts_Volume 7_EWT_LSL_combined hearing_20181012 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-12 | 2018-10-12 | |
EB-2017-0182 | HONI_UndertakingResponse_JT4 1_20181012 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-12 | 2018-10-12 | |
EB-2017-0182 | Addendum to the 2017 Updated Assessment_Exhi K4 4_20181011 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-11 | 2018-10-11 | |
EB-2017-0182 | EWT LP response to OEB Staff IR_Exhi K4 3_20181011 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-11 | 2018-10-11 | |
EB-2017-0182 | OEB Staff Summary of the Evidence on Costs_EWT_LSL_Exhi K4 2_20181009 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-09 | 2018-10-09 | |
EB-2017-0182 | NextBridge_Undertaking J5 1_breakdown timing__20181012 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-12 | 2018-10-12 | |
EB-2017-0182 | Transcripts_Volume 6_EWT_LSL_Combined hearing_20181011 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-11 | 2018-10-11 | |
EB-2017-0182 | HONI_Compendium for Cross-Examination_Exhi K6 1_20181011 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-11 | 2018-10-11 | |
EB-2017-0182 | VECC Compendium_NextBridge_Exhi K6 4_20181011 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-11 | 2018-10-11 | |
EB-2017-0182 | Transcripts_Volume 5_EWT_LSL_combined hearing_20181010 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-10 | 2018-10-10 | |
EB-2017-0182 | BZA_Appendix 2 1X_Indigenous consultation and record log table_Exhi K5 3_20181010 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-10 | 2018-10-10 | |
EB-2017-0182 | PWU_Compendium_EWT_LSL_combined hearing_Exhi K6 3_20181010 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-10 | 2018-10-10 | |
EB-2017-0182 | NextBridge_Project Spend cost table to Date_20181008 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-10 | 2018-10-10 | |
EB-2017-0182 | SEC_EWTLSL_NextBridgePanel_NB_Exhi K5 1__20181010 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-10 | 2018-10-10 | |
EB-2017-0182 | BZA_Compendium of Docs for Next Bridge Cross Exam_Exhi K5 2_20181010 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-10 | 2018-10-10 | |
EB-2017-0182 | Transcripts_Volume 4_revised_EWT_LSL_Combined hearing_20181009 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-09 | 2018-10-09 | |
EB-2017-0182 | HONI_list of documents for cross examination_20181009 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-09 | 2018-10-09 | |
EB-2017-0182 | HONI_ltr_NextBridge_docs for cross examination_20181009 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-09 | 2018-10-09 | |
EB-2017-0182 | VECC Panel 1 Hydro One LSL Compendium_Exhi K4 1_20181009 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-09 | 2018-10-09 | |
EB-2017-0182 | BZA_Compendium_Cross-examination_Material_IESO_Exhi K4 5__20181009 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-09 | 2018-10-09 | |
EB-2017-0182 | NextBridge_September 28 2018_ ltr from Ministry of Environment_20181005 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-05 | 2018-10-05 | |
EB-2017-0182 | NextBridge_August 3 2018_ltr _Min of Tourism_20181005 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-05 | 2018-10-05 | |
EB-2017-0182 | HONI_UndertakingResponses_JT2 1_JT3 1_20181005 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-05 | 2018-10-05 | |
EB-2017-0182 | Transcripts_Volume 3_EWT_LSL_Combined Oral Hearing_20181004 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-04 | 2018-10-04 | |
EB-2017-0182 | OEBltr_Response_Minister of Energy_EWT Combined_20181003 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-04 | 2018-10-04 | |
EB-2017-0182 | Letter_Minister of Energy_EWT Combined_20181002 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | Dwijen Bharad_Letter of Comment_20181002_Redacted | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | MNO_Ltr_HONI_EWT_LSL_20181004 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-04 | 2018-10-04 | |
EB-2017-0182 | Anwaatin_Hydro One Panel Compendium_Addendum_Exhi K3 3_20181003 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-03 | 2018-10-03 | |
EB-2017-0182 | Transcripts_Volume 2_EWT_LSL_Combined Oral Hearing_20181003 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-03 | 2018-10-03 | |
EB-2017-0182 | SEC_EWTLSL_HydroOnePanel_Compendium_Rev_Exhi K2 2_20181003 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-03 | 2018-10-03 | |
EB-2017-0182 | HONI_ltr_EWT_LSL_20181003 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-03 | 2018-10-03 | |
EB-2017-0182 | Anwaatin_Hydro One Panel Compendium_Exhi 3 2_20181003 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-03 | 2018-10-03 | |
EB-2017-0182 | SEC_EWTLSL_HydroOnePanel_Compendium_Exhi_K2 2__20181002 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | Transcripts_Volume 1_EWT_LSL_Combined Oral Hearing_20181002 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | BZA_Compendium_Cross-examination_Exhi_K3 1_20181002 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | BLP_Compendium_Cross-examination_Exhi_K2 3__20181002 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | HONI_Kartiga Thavaraj_dec_undertaking_20181002 | Declaration and Undertakings | 2018-10-02 | 2018-10-02 | ||
EB-2017-0182 | SNC-Lavalin_Janet Oh dec-undertaking_20181002 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | IESO_UpdatedIRR_NB6_20181002 | Interrogatory Response from Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | MNO_Provisional_Compendium_Cross-Examination_Exhi_K2.1_20181002 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | OEBResponse_President_Sioux Lookout CC_HONI_Nextbridge Combined_20181002 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | OEBResponse_Quad Council_HONI_Nextbridge Combined_20181002 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge Compendium_Cross-Examination of Hydro_Volume 1_Exhi_K1 1_20181002 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge Compendium_Cross-Examination of Hydro_Volume 2_Exhi_K1 2_20181002 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge_B-15-1 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge_Exhibit JT2.19 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge_HONI_IR response to Board Staff 17 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge_HONI_IR response to NB 24 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge_HONI_IR response to NB 44 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge_PO2_UpperCanada_HONI_20180301 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | Hearing Schedule Combined Oct 2-3-4-9-11-12-2018 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | HONI_LSL_UpdatedIRRS_20181001 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | NextBridge_Declaration_Undertaking_D.Stevens_20181002 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-02 | 2018-10-02 | |
EB-2017-0182 | RSMIN_comments_20181001 | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | NextBridge_OEB_Minimum Technical Requirement for OEWTL_20181001 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | NextBridge_SNC Lavlin_class action_2012_20181002 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | NextBridge_Interim Condensed _FS_Q2 report_Exhi K1 3__20181001 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | NextBridge_Galloping tutorial_2007.ppt | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | NextBridge_Cover Letter_Cross Examination Materials_20181001 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | John McGrath_Letter of Comment_20181001_Redacted | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | Quad Council_letter of comment_20181001 | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | IESO_Ltr_CVs_EWT_LSL_20181001 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | NextBridge_LTR_Confidential Interrogatories Cover Letter_20181001 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | PO8_HONI_UCT Combined_20181001 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-10-01 | 2018-10-01 | |
EB-2017-0182 | LLFN_Declaraion and undertaking_20180928 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-28 | 2018-09-28 | |
EB-2017-0182 | NextBridge_ReplyARG_20180928 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-28 | 2018-09-28 | |
EB-2017-0182 | BLP_LTR_EWT-LSL_20180928 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-28 | 2018-09-28 | |
EB-2017-0182 | SEC_HONI_Nextbridge_Corr_20180928 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-28 | 2018-09-28 | |
EB-2017-0182 | NextBridge_Letter_Access_Confidential_Materials _20180928 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-28 | 2018-09-28 | |
EB-2017-0182 | HONI_Declaration and Undertaking_Robert Warren_20180928 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-28 | 2018-09-28 | |
EB-2017-0182 | HONI_EWT_LSL_Ltr Re ConfidentialDocuments_20180928 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-28 | 2018-09-28 | |
EB-2017-0182 | HONI_Ltr to OEB_EWT_LSL_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | Anwaatin_DecUndertaking_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | NextBridge_Declaration and Undertakings_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | BZA_DEC_Undertaking_MM_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | BZA_DEC_Undertaking_EE_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | BZA_CvrLtr_DecUnd_EWT_LSL_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | NextBridge_Confidentiality_OBJ_20180927 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEB_ltr_NextBridge_reply submissions_deadline extension_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEBResponse_TBCC_HONI_Nextbridge Combined_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEBResponse_Sioux Lookout CC_HONI_Nextbridge Combined_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEBResponse_NOMA_HONI_Nextbridge Combined_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEBResponse_FFCC_HONI_Nextbridge Combined_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEBResponse_Common Voice NW_HONI_Nextbridge Combined_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEBResponse_City of TB_HONI_Nextbridge Combined_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | OEBResponse_CEDC_HONI_Nextbridge Combined_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | BLP_LTR_Conf_Undertaking_EWT-LSL_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | PWU_DEC_Undertaking_RS_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | PWU_DEC_Undertaking_BK_20180926 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | PWU_DEC_Undertaking_AB_20180926 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | PWU_CvrLtr_DecUnd_EWT_LSL_20180927 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | MNO_ltr_EWT_LSL_20180927 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-27 | 2018-09-27 | |
EB-2017-0182 | CCC_MRB_Confidentiality_declaration_undertaking_20180926 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | SEC_UCT_EWT_LSL_DecUnd_MR_201800926 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | NextBridge_LTR_ Development Costs Reply Extension_20180926 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | PO7_HONI_UCT Combined_20180926 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | dec_order_cost awards_HONI_Lake Superior Motion_20180926 | Decision and Order on Cost Awards | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | NextBridge_Exhibit_A-3-1_updated_20180926 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | NextBridge_LTR_EWT-LSL_20180926 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-26 | 2018-09-26 | |
EB-2017-0182 | HONI_CombinedHearing_CVs_20180925 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-25 | 2018-09-25 | |
EB-2017-0182 | NextBridge_Additional IRR_Combined_20180924 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | I-05-22-01.xlsm | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | HONI_LSL_IRRS_TAB3-TAB11_20180924 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | HONI_LSL_IRRS_TAB2_20180924 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | HONI_LSL_IRRS_TAB1_PART3_20180924 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | HONI_LSL_IRRS_TAB1_PART2_20180924 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | HONI_LSL_IRRS_TAB1_PART1_20180924 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | IESO_IRRs_EWT_LSL_20180924 | Interrogatory Response from Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | IESO_CvrLtr_IRRs_EWT_LSL_20180924 | Interrogatory Response from Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | Anwaatin_LTR_IntrvREQ Revision_20180924 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-24 | 2018-09-24 | |
EB-2017-0182 | PO6_HONI_UCT Combined_20180921 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-21 | 2018-09-21 | |
EB-2017-0182 | Anwaatin_IntrvREQ_20180920 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-20 | 2018-09-20 | |
EB-2017-0182 | OEB Staff_sub_NextBridge Development Costs_20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | VECC_ SUB_NextBridge_ Development_Costs_20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | CCC_SUB_NextBridge_Development_Costs20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | MNO_SUB_NextBridge_Development_Costs_20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | HONI_SUB_NextBridge_Development_Costs_20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | SEC_Nextbridge_DevCosts_Sub_20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | BZA_SUB_Nextbridge_Development_Costs_20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | PO5_HONI_UCT Combined_20180919 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | Intervention List_East West Tie_20180919 | Intervenor List | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | BLP_SUB_Nextbridge_Development_Costs_20180919 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-19 | 2018-09-19 | |
EB-2017-0182 | LL#58FN_EVD_20180914 | Intervenor Evidence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-14 | 2018-09-14 | |
EB-2017-0182 | Memo_GRT_TOR_HONI_20180912 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | ack_receipt_TOR_HONI_review by GRT_20180912 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | LL#58FN_IR_HONI_20180912 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | LL#58FN_IR_NextBridge_20180912 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | OEB_Staff_IR_IESO_EWT_LSL_20180912 | Interrogatories to Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | ELLCA_IR_HONI_20180912 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | SEC_HONI_Nextbridge_IESO_IRs_20180912 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | BZA_IR_IESO_20180912 | Interrogatories to Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | HONI_LSL_Affidavit_of_Service_20180912 | Affidavits of Service | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | CCC_IR_IESO_20180912 | Interrogatories to Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | PWU_IR_IESO_20180912 | Interrogatory Response from Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-12 | 2018-09-12 | |
EB-2017-0182 | NextBridge_ARGChief_Development_Costs_20180911 | Argument | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-10 | 2018-09-10 | |
EB-2017-0182 | MFN_Intrv_REQ_20180907 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-07 | 2018-09-07 | |
EB-2017-0182 | PO4_HONI_UCT_Combined_20180907 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-07 | 2018-09-07 | |
EB-2017-0182 | East Loon Lake Campers Assoc_Intrv_Req_20180904 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-04 | 2018-09-04 | |
EB-2017-0182 | HONI_ToR_LSL_20180905 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-09-05 | 2018-09-05 | |
EB-2017-0182 | PO3_HONI_UCT_Combined_20180831 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-31 | 2018-08-31 | |
EB-2017-0182 | OEB staff_IR_NextBridge_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | OEB staff_IR_HONI_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | CCC_IR_to HONI_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | VECC_IR_to NextBridge_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | VECC IR_ to HONI_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | HONI_IR_to NextBridge_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | BZA_IR_HONI_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | BZA_IR_Nextbridge_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | IESO_IR_Hydro One_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | IESO_IR_NextBridge_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | BLP_IR_HONI_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | MNO_IR_to_Nextbridge_HONI_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | SEC_HONI_Nextbridge_IRs_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | PWU_IR_HONI_20180830 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-30 | 2018-08-30 | |
EB-2017-0182 | Long Lake 58FN_IntrvREQ_20180829 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-29 | 2018-08-29 | |
EB-2017-0182 | NextBridge_Interrogatories_to_IESO_20180829 | Interrogatories to Intervenor | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-29 | 2018-08-29 | |
EB-2017-0182 | NextBridge_Interrogatories_to_HONI_20180828 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-28 | 2018-08-28 | |
EB-2017-0182 | BZA_ltr_OEB_re_PO1_20180827 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-27 | 2018-08-27 | |
EB-2017-0182 | PO2_HONI_UCT_Combined_20180827 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-27 | 2018-08-27 | |
EB-2017-0182 | NextBridge_IRR_Development Costs_20180824 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-24 | 2018-08-24 | |
EB-2017-0182 | HONI_Letter to OEB re ltc application_20180823 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-23 | 2018-08-23 | |
EB-2017-0182 | intvr_req_BLP_20180822 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-23 at 11:20 AM | ||
EB-2017-0182 | SEC_NextbridgeHydroOne_Ltr_PO1_20180816 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-16 | 2018-08-16 | |
EB-2017-0182 | Board Staff_IRs_EWT_20180814 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-14 | 2018-08-14 | |
EB-2017-0182 | SEC_Nextbridge_UT_IRs_20180814 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-14 | 2018-08-14 | |
EB-2017-0182 | HONI IRS_EWT_20180814 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-14 | 2018-08-14 | |
EB-2017-0182 | CCC_Suppemntal IR_EWT_20180814 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-14 | 2018-08-14 | |
EB-2017-0182 | PO 1_HONI_UCT Combined_20180813 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-13 | 2018-08-13 | |
EB-2017-0182 | NextBridge_Cost ClaimOBJ_20180802 | Cost Claim Objection | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-08-02 | 2018-08-02 | |
EB-2017-0182 | OEB Letter_extention of time_20180731 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-31 | 2018-07-31 | |
EB-2017-0182 | R Warren_response PO 6 _20180730 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-30 | 2018-07-30 | |
EB-2017-0182 | PO 6 UpperCanada_HONI_20180727 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-27 | 2018-07-27 | |
EB-2017-0182 | Addendum to the 2017 Updated Assessment for the EWT Need_20180726 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-26 | 2018-07-26 | |
EB-2017-0182 | IESO_CvrLtr__IESO Impact Analysis_20180726 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-26 | 2018-07-26 | |
EB-2017-0182 | NextBridge_EWT_Report_20180723 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-23 | 2018-07-23 | |
EB-2017-0182 | NextBridge_Undertaking Responses_20180723 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-23 | 2018-07-23 | |
EB-2017-0182 | Hydro One_letter to OEB_development costs_20180720 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-20 | 2018-07-20 | |
EB-2017-0182 | NextBridge Letter to OEB_Undertaking Response_20180713 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-13 | 2018-07-13 | |
EB-2017-0182 | NextBridge_Ex_JT1.1_Page 2_Corrected_20180712 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-12 | 2018-07-12 | |
EB-2017-0182 | Exhibit KD1.2 SEC_Nextbridge_DevCosts_Compendium | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-05 | 2018-07-05 | |
EB-2017-0182 | Transcripts_Oral Hearing_EWT_20180705 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-05 | 2018-07-05 | |
EB-2017-0182 | Exhibit KD1.3 VECC Compendium NextBridge DevCosts_20180705 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-05 | 2018-07-05 | |
EB-2017-0182 | Exhibit KD1.1 OEB Staff Compendium_EWT_20180705 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-05 | 2018-07-05 | |
EB-2017-0182 | Updated Undertaking response NextBridge JT 1 8_20180704 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-04 | 2018-07-04 | |
EB-2017-0182 | NextBridge_CVs_Updated_20180704 | Exhibits | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-07-04 | 2018-07-04 | |
EB-2017-0182 | HONI ltr Min of Environment_EWT_20180629 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-06-29 | 2018-06-29 | |
EB-2017-0182 | PO 5 UpperCanada_HONI_EWT_20180626 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-06-26 | 2018-06-26 | |
EB-2017-0182 | NextBridge_Undertaking Responses_20180620 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-06-20 | 2018-06-20 | |
EB-2017-0182 | NextBridge_Undertaking Responses_20180601 | Undertaking Responses | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-06-01 | 2018-06-01 | |
EB-2017-0182 | NextBridge_Cover Letter_transcript corrections_20180601 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-06-01 | 2018-06-01 | |
EB-2017-0182 | PO 4_UpperCanada_HONI_20180518 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-18 | 2018-05-18 | |
EB-2017-0182 | BZA_IntrvREQ_20180509 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-09 | 2018-05-09 | |
EB-2017-0182 | Township of White River_comments_NextBridgeConstruct_20170507 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-07 | 2018-05-07 | |
EB-2017-0182 | Transcript_East West Tie_Technical Conference_Redacted_20180507 | Transcripts | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-07 | 2018-05-07 | |
EB-2017-0182 | MNO_Declaration and Undertaking for J Wilson_20180503 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | MNO_Declaration and Undertaking for M Strachan_20180503 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | MNO_Declaration and Undertaking for J Madden_20180503 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | NextBridge_CVs_Updated Exhibit List_20180503 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | NextBridge Detailed Schedule in Response to Procedural Order No. 3_20180503 | Application and Evidence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | I.B.NextBridge.STAFF.7_Attachment 2_Unredacted_Updated_20180503 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | I.B.NextBridge.STAFF.7_Attachment 3_Redacted_Updated_20180503 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | NextBridge Cover Letter_response to Procedural Order No. 3_20180503 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | OEB ltr_EWT_resHONI_20180503 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-03 | 2018-05-03 | |
EB-2017-0182 | NextBridge_Letter_Responding to Hydro One Letter_East West Tie_20180501 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-01 | 2018-05-01 | |
EB-2017-0182 | HONI_ltr_Requesting Change of Date for Tech Conf_20180501 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-05-01 | 2018-05-01 | |
EB-2017-0182 | PO 3_UpperCanada_HONI_ConfidDecision_20180427 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-04-27 | 2018-04-27 | |
EB-2017-0182 | CCC.letter.MRB.Counsel.20180417 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-04-17 | 2018-04-17 | |
EB-2017-0182 | VECC_IntervReq_NXTBridge_20180412 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-04-12 | 2018-04-12 | |
EB-2017-0182 | NextBridge Cover Letter_updated IR responses_20180321_Redacted | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-21 | 2018-03-21 | |
EB-2017-0182 | I.B.NextBridge.STAFF.7_Attachment 3_REDACTED_Updated_20180314 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-21 | 2018-03-21 | |
EB-2017-0182 | I.B.NextBridge.STAFF.7_Attachment 2_REDACTED_Updated_2010314 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-21 | 2018-03-21 | |
EB-2017-0182 | I.B.NextBridge.CCC.8_Attachment_REDACTED_Updated_20180314 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-21 | 2018-03-21 | |
EB-2017-0182 | SEC Request for Access to Confidential Information_20180315 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-15 | 2018-03-15 | |
EB-2017-0182 | NextBridge_Updated Evidence_Response to PO 2_20180314 | Application and Evidence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-14 | 2018-03-14 | |
EB-2017-0182 | JGirvan.Declaration.EWTProceeding_20180312 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-12 | 2018-03-12 | |
EB-2017-0182 | SEC_UCT_EWT_DecUnd_MR_20180307 | Declaration and Undertakings | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-07 | 2018-03-07 | |
EB-2017-0182 | Amended environmental assessment report_20180206 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-02-06 | 2018-02-06 | |
EB-2017-0182 | Cover letter_amended environmental assessment report_20180302 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-02 | 2018-03-02 | |
EB-2017-0182 | PO2_UpperCanada_HONI_20180301 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-03-01 | 2018-03-01 | |
EB-2017-0182 | NextBridge_Letter_East West Tie Project_20180227 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-02-28 | 2018-02-28 | |
EB-2017-0182 | Nextbridge cvrltr_Confidential segment_20180131 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-01-31 | 2018-01-31 | |
EB-2017-0182 | NextBridge_Supplemental Affidavit _2_20180202 | Affidavits of Service | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-02-02 | 2018-02-02 | |
EB-2017-0182 | NextBridge_Supplemental Affidavit _1_20180202 | Affidavits of Service | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-02-02 | 2018-02-02 | |
EB-2017-0182 | NextBridge_Cover Letter_Supplemental Affidavit_20180202 | Affidavits of Service | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-02-02 | 2018-02-02 | |
EB-2017-0182 | NextBridge_Letter on Confidentiality_20180125 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-01-25 | 2018-01-25 | |
EB-2017-0182 | NextBridge_IRR_EWT_20180125 | Interrogatory Response from Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-01-25 | 2018-01-25 | |
EB-2017-0182 | HONI correspondence_EWT_20171221 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2018-01-02 | 2018-01-02 | |
EB-2017-0182 | HONI_EWT IR1_Att1_20171221 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-22 | 2017-12-22 | |
EB-2017-0182 | CCC_IR_Nextbridge EWT_20171222 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-22 | 2017-12-22 | |
EB-2017-0182 | OEB Staff_IR_UCT EWT_20171221 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-21 | 2017-12-21 | |
EB-2017-0182 | HONI_EWT_IR_20171221 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-21 | 2017-12-21 | |
EB-2017-0182 | SEC_UCT_EWTLTC_IRs_20171221 | Interrogatories to Applicant | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-21 | 2017-12-21 | |
EB-2017-0182 | NextBridge_Reply Letter_20171208 | Comments | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-08 | 2017-12-08 | |
EB-2017-0182 | HONI_ResponseLTR_20171205 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-05 | 2017-12-05 | |
EB-2017-0182 | HydroOne_Response to NEXTBRIDGE_20171205 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-05 | 2017-12-05 | |
EB-2017-0182 | Letter from the Minister of Energy_20171201 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-01 | 2017-12-01 | |
EB-2017-0182 | Updated-Assessment-East-West-Tie-Expansion_20171201 | Submission | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-12-01 | 2017-12-01 | |
EB-2017-0182 | PO1_EB-2017-0182_EB-2017-0194_20171129 | Procedural Order | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-29 | 2017-11-29 | |
EB-2017-0182 | Corp Municipality Wawa_ltr_HONI_UpperCanada_20171115 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-15 | 2017-11-15 | |
EB-2017-0182 | NextBridge_IntvREQ_HONI_UpperCanada_20171113 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-13 | 2017-11-13 | |
EB-2017-0182 | HONI_ltr_OEB_IntrvREQLtr_20171106 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-06 | 2017-11-06 | |
EB-2017-0182 | MNO_IntrvREQ_HONI_UpperCanada_20171107 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-07 | 2017-11-07 | |
EB-2017-0182 | CCC_IntvREQ_HONI_UpperCanada_20171106 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-06 | 2017-11-06 | |
EB-2017-0182 | MNO_IntrvREQ_HONI_UpperCanada_20171107 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-07 | 2017-11-07 | |
EB-2017-0182 | HONI_IntrvREQ_Ltr_UCT_20171106 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-06 | 2017-11-06 | |
EB-2017-0182 | Attachment_Honi_Ltr_OEB_EWT_dated 20170922_20171102 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-02 | 2017-09-22 | 2017-11-02 |
EB-2017-0182 | OEB Ltr_Honi_Upper Canada Transmission Inc_EWT_20171102 | Correspondence | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-11-02 | 2017-11-02 | |
EB-2017-0182 | NextBridge_Affidavit_20171031 | Affidavits of Service | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-10-31 | 2017-10-31 | |
EB-2017-0182 | Ministy of Tourism Culture and Sport_Ltr COMMENT_HONI_UpperCanada_20171030 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-10-30 | 2017-10-30 | |
EB-2017-0182 | DorionTownship_ltr COMMENT_HONI_UpperCanada_20171030 | Letter of Comment | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-10-30 | 2017-10-30 | |
EB-2017-0182 | NextBridge_IntvREQ_HONI_UpperCanada_20171030 | Intervenor Request Letter | Upper Canada Transmission 2, Inc. - Electricity Transmitter | 2017-10-30 | 2017-10-30 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |