EB-2017-0182
|
AcknLetter NextBridge Report_EWT_20230201
|
Correspondence
|
2023-02-01
|
|
2023-02-01
|
EB-2017-0182
|
NextBridge_EWT 4th Quarterly Progress Report_20230120
|
Post Hearing Filings
|
|
2023-01-20
|
2023-01-20
|
EB-2017-0182
|
OEB ltr_NextBridge Report EWT_20221108
|
Correspondence
|
2022-11-08
|
|
2022-11-08
|
EB-2017-0182
|
NextBridge_EWT Qrtly Progress Report_20221021
|
Post Hearing Filings
|
|
2022-10-21
|
2022-10-21
|
EB-2017-0182
|
Ack_Letter NextBridge Report_EWT_20220726
|
Correspondence
|
2022-07-26
|
|
2022-07-26
|
EB-2017-0182
|
NextBridge_EWT Quarterly Progress Report_20220722
|
Post Hearing Filings
|
|
2022-07-22
|
2022-07-22
|
EB-2017-0182
|
NextBridge_Reporting Letter_EWT_20220606
|
Correspondence
|
2022-06-06
|
|
2022-06-06
|
EB-2017-0182
|
NextBridge_EWT_Report_20220421
|
Post Hearing Filings
|
|
2022-04-21
|
2022-04-21
|
EB-2017-0182
|
AcknLetter NextBridge Report EWT_20220308
|
Correspondence
|
2022-03-08
|
|
2022-03-08
|
EB-2017-0182
|
NextBridge_EWT_Report_20220124
|
Post Hearing Filings
|
|
2022-01-24
|
2022-01-24
|
EB-2017-0182
|
AcknLetter_NextBridge Report EWT_20211108
|
Correspondence
|
2021-11-08
|
|
2021-11-08
|
EB-2017-0182
|
NextBridge_EWT_Report_20211022
|
Post Hearing Filings
|
|
2021-10-22
|
2021-10-22
|
EB-2017-0182
|
ack_ltr_NextBridge IO Update_20210827
|
Correspondence
|
2021-08-27
|
|
2021-08-27
|
EB-2017-0182
|
NextBridge_LTR_OEB Fire_FNL_20210819
|
Post Hearing Filings
|
|
2021-08-19
|
2021-08-19
|
EB-2017-0182
|
NextBridge_LTR_Fire FNL_20210812
|
Post Hearing Filings
|
|
2021-08-12
|
2021-08-12
|
EB-2017-0182
|
AcknLetter NextBridge Report EWT_20210804
|
Correspondence
|
2021-08-04
|
|
2021-08-04
|
EB-2017-0182
|
NextBridge_LTR_Fire IO_20210723
|
Post Hearing Filings
|
|
2021-07-23
|
2021-07-23
|
EB-2017-0182
|
NextBridge_EWT_Report_20210722
|
Post Hearing Filings
|
|
2021-07-22
|
2021-07-22
|
EB-2017-0182
|
ack_ltr_NextBridge Report EWT_20210427
|
Correspondence
|
2021-04-27
|
|
2021-04-27
|
EB-2017-0182
|
NextBridge_EWT_Report_20210422
|
Post Hearing Filings
|
|
2021-04-22
|
2021-04-22
|
EB-2017-0182
|
Ack_ltr_NextBridge Report EWT_20210125
|
Correspondence
|
2021-01-25
|
|
2021-01-25
|
EB-2017-0182
|
NextBridge_EWT_Report_20210122
|
Post Hearing Filings
|
|
2021-01-22
|
2021-01-22
|
EB-2017-0182
|
OEBltr_NextBridge Report EWT_20201023
|
Correspondence
|
2020-10-23
|
|
2020-10-23
|
EB-2017-0182
|
NextBridge_EWT_Report_20201022
|
Post Hearing Filings
|
|
2020-10-22
|
2020-10-22
|
EB-2017-0182
|
ack_ltr_NextBridge Report EWT_20200924
|
Correspondence
|
2020-09-24
|
|
2020-09-24
|
EB-2017-0182
|
Attachment_2_NextBridge_ LTR_to_IESO_22072020
|
Submission
|
|
2020-09-03
|
2020-09-03
|
EB-2017-0182
|
Attachment_1_NextBridge_EWT_Report_20200722
|
Post Hearing Filings
|
|
2020-09-03
|
2020-09-03
|
EB-2017-0182
|
NextBridge_LTR_Notice_of_Date_Change_03092020
|
Submission
|
|
2020-09-03
|
2020-09-03
|
EB-2017-0182
|
Attachment_3_IESO_Response_to_NextBridge_LTR_ 28082020
|
Submission
|
|
2020-09-03
|
2020-09-03
|
EB-2017-0182
|
ack_ltr_NextBridge Report EWT_20200723
|
Correspondence
|
2020-07-23
|
|
2020-07-23
|
EB-2017-0182
|
NextBridge_ IESO Request COD_20200722
|
Correspondence
|
|
2020-07-22
|
2020-07-22
|
EB-2017-0182
|
NextBridge_EWT_Report_20200722
|
Post Hearing Filings
|
|
2020-07-22
|
2020-07-22
|
EB-2017-0182
|
OEB ltr_NextBridge_EWT April Report_20200617
|
Correspondence
|
2020-06-17
|
|
2020-06-17
|
EB-2017-0182
|
AcknLetter_NextBridge_Report EWT_20200423
|
Correspondence
|
2020-04-23
|
|
2020-04-23
|
EB-2017-0182
|
NextBridge _COVID_19_Deferral_Account_Order_Request_20200422
|
Submission
|
|
2020-04-22
|
2020-04-22
|
EB-2017-0182
|
NextBridge_EWT_Report_20200422
|
Post Hearing Filings
|
|
2020-04-22
|
2020-04-22
|
EB-2017-0182
|
NextBridge_LTR_Covid-19_23032020
|
Correspondence
|
|
2020-03-23
|
2020-03-23
|
EB-2017-0182
|
AcknLetter_NextBridge Report EWT_20200227
|
Correspondence
|
2020-02-27
|
|
2020-02-27
|
EB-2017-0182
|
NextBridge Response_to_OEB_Request_ Q4_ 2019_Construction_Progress_ Report_20200226
|
Post Hearing Filings
|
|
2020-02-26
|
2020-02-26
|
EB-2017-0182
|
OEB ltr_NextBridge_Response to January Report_20200212
|
Correspondence
|
2020-02-12
|
|
2020-02-12
|
EB-2017-0182
|
ack_ltr_NextBridge Report EWT_20200123
|
Acknowledgement Letter
|
2020-01-23
|
|
2020-01-23
|
EB-2017-0182
|
NextBridge_EWT_Report_20200122
|
Post Hearing Filings
|
|
2020-01-22
|
2020-01-22
|
EB-2017-0182
|
ackltr_NextBridge_20191111
|
Acknowledgement Letter
|
2019-11-11
|
|
2019-11-11
|
EB-2017-0182
|
NextBridge_EWT_Report_20191108
|
Post Hearing Filings
|
|
2019-11-08
|
2019-11-08
|
EB-2017-0182
|
OEB letter_NextBridge_Extension Request_20191017
|
Correspondence
|
2019-10-17
|
|
2019-10-17
|
EB-2017-0182
|
NextBridge Quarterly Report Extension Request_20191017
|
Correspondence
|
|
2019-10-17
|
2019-10-17
|
EB-2017-0182
|
OEB ltr_NextBridge_Response to First Report_20191010
|
Post Hearing Filings
|
2019-10-10
|
|
2019-10-10
|
EB-2017-0182
|
AcknLetter NextBridge Report EWT_20190909
|
Correspondence
|
2019-09-09
|
|
2019-09-09
|
EB-2017-0182
|
Quarterly Report 1_EWT NextBridge_20190830
|
Post Hearing Filings
|
|
2019-08-30
|
2019-08-30
|
EB-2017-0182
|
IESO_Letter_NB Reporting Req_20190730
|
Correspondence
|
|
2019-07-30
|
2019-07-30
|
EB-2017-0182
|
Reporting Requirements_OEB NextBridge EWT_20190729
|
Correspondence
|
2019-07-29
|
|
2019-07-29
|
EB-2017-0182
|
CvrLtr_Reporting requirement_NextBridge_2090729
|
Correspondence
|
2019-07-29
|
|
2019-07-29
|
EB-2017-0182
|
dec_order_costs_NextBridge_HONI_20190530
|
Decision and Order on Cost Awards
|
2019-05-30
|
|
2019-05-30
|
EB-2017-0182
|
LL#58FN_costclaim_20190408
|
Cost Claim
|
|
2019-04-08
|
2019-04-08
|
EB-2017-0182
|
MFN_costs claim_20190405
|
Cost Claim
|
|
2019-04-05
|
2019-04-05
|
EB-2017-0182
|
MNO Revised Statement of Cost Claim_20190328
|
Cost Claim
|
|
2019-03-29
|
2019-03-29
|
EB-2017-0182
|
BZA_Cost_Claim_Revisedpage2and4_20190328
|
Cost Claim
|
|
2019-03-28
|
2019-03-28
|
EB-2017-0182
|
BZA Cost Claim letter_20190327
|
Cost Claim
|
|
2019-03-27
|
2019-03-27
|
EB-2017-0182
|
John Kim Bell_Curriculum vitae_20190327
|
Correspondence
|
|
2019-03-27
|
2019-03-27
|
EB-2017-0182
|
licence_dec_order_et_amd_upper_canada_ministerial_directive_20190211
|
Licence
|
2019-02-11
|
|
2019-02-11
|
EB-2017-0182
|
NextBridge_Response to Cost Claims_Michipicoten_20190320
|
Correspondence
|
|
2019-03-20
|
2019-03-20
|
EB-2017-0182
|
BLP_ResivedCostClaim_Porter Airlines letter_20190320
|
Cost Claim
|
|
2019-03-20
|
2019-03-20
|
EB-2017-0182
|
BLP_RevisedCostClaim_20190320
|
Cost Claim
|
|
2019-03-20
|
2019-03-20
|
EB-2017-0182
|
Anwaatin_RevCostClaim_20190225
|
Cost Claim
|
|
2019-03-19
|
2019-03-19
|
EB-2017-0182
|
HONI_CostsObj_Comments_20190318
|
Cost Claim Objection
|
|
2019-03-18
|
2019-03-18
|
EB-2017-0182
|
NextBridge_Cost Claim Objections_20190318
|
Cost Claim Objection
|
|
2019-03-18
|
2019-03-18
|
EB-2017-0182
|
LL58FN_CostClaim_20190308
|
Cost Claim
|
|
2019-03-08
|
2019-03-08
|
EB-2017-0182
|
BFN_EWT_CostClaim_20190308
|
Cost Claim
|
|
2019-03-08
|
2019-03-08
|
EB-2017-0182
|
PO 9_HONI_UCT Combined Hearing_20190301
|
Procedural Order
|
2019-03-01
|
|
2019-03-01
|
EB-2017-0182
|
CCC_EWT_CostClaim_20190228
|
Cost Claim
|
|
2019-02-28
|
2019-02-28
|
EB-2017-0182
|
Anwaatin_CostClaim_20190225
|
Cost Claim
|
|
2019-02-25
|
2019-02-25
|
EB-2017-0182
|
SEC_HONI_LSL_CostClaim_20190225
|
Cost Claim
|
|
2019-02-25
|
2019-02-25
|
EB-2017-0182
|
BZA_CostClaim_20190225
|
Cost Claim
|
|
2019-02-25
|
2019-02-25
|
EB-2017-0182
|
VECC_CostClaim_20190225
|
Cost Claim
|
|
2019-02-25
|
2019-02-25
|
EB-2017-0182
|
MNO_CostClaim_20190225
|
Cost Claim
|
|
2019-02-25
|
2019-02-25
|
EB-2017-0182
|
MFN_CostClaim_20190225
|
Cost Claim
|
|
2019-02-25
|
2019-02-25
|
EB-2017-0182
|
BLP_CostClaim_20190222
|
Cost Claim
|
|
2019-02-22
|
2019-02-22
|
EB-2017-0182
|
dec_order_EWT-LSL_20190211
|
Decision and Order
|
2019-02-11
|
|
2019-02-11
|
EB-2017-0182
|
HONI_Ltr_East West Tie Line_20190131
|
Correspondence
|
|
2019-01-31
|
2019-01-31
|
EB-2017-0182
|
NextBridge_Ltr_Minister Rickford_East West Tie Line_20190121
|
Correspondence
|
|
2019-01-30
|
2019-01-30
|
EB-2017-0182
|
Minister of Energy_ltr_OEB_East West Tie_20190130
|
Correspondence
|
|
2019-01-30
|
2019-01-30
|
EB-2017-0182
|
Order-in-Council_20190130
|
Correspondence
|
|
2019-01-30
|
2019-01-30
|
EB-2017-0182
|
Ltr_OEB_HONI_EWT_20190124
|
Correspondence
|
2019-01-24
|
|
2019-01-24
|
EB-2017-0182
|
FFCC ltr to Minister of Energy_20180926
|
Letter of Comment
|
|
2018-09-26
|
2018-09-26
|
EB-2017-0182
|
Sioux Lookout Chamber of Comm ltr to Minister of Energy_20180925
|
Letter of Comment
|
|
2018-09-25
|
2018-09-25
|
EB-2017-0182
|
City of Thunde Bay ltr to Minster of Energy_20180921
|
Letter of Comment
|
|
2018-09-21
|
2018-09-21
|
EB-2017-0182
|
NOMA ltr to Minister of Energy_20180917
|
Letter of Comment
|
|
2018-09-17
|
2018-09-17
|
EB-2017-0182
|
Common Voice Northwest ltr to Minister of Energy_20180923
|
Letter of Comment
|
|
2018-09-23
|
2018-09-23
|
EB-2017-0182
|
TBCEDC ltr to Minister of Energy_20180917
|
Letter of Comment
|
|
2018-09-17
|
2018-09-17
|
EB-2017-0182
|
TB Chamber of Comm ltr to Minister of Energy_20180919
|
Letter of Comment
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
HONI_LSL_SUB_20190115.pdf
|
Submission
|
|
2019-01-15
|
2019-01-15
|
EB-2017-0182
|
Dec_Order_EWT-LSL_20181220
|
Decision and Order
|
2018-12-20
|
|
2018-12-20
|
EB-2017-0182
|
OEB_ltr_DecisionAdvance Review_EWT-LSL_20181218
|
Correspondence
|
2018-12-18
|
|
2018-12-18
|
EB-2017-0182
|
OEB_ltr_All Parties_EWT_LSL_20181130
|
Correspondence
|
|
2018-11-30
|
2018-11-30
|
EB-2017-0182
|
HONI_ToR Sept 5 2018 _20181128
|
Correspondence
|
|
2018-11-28
|
2018-11-28
|
EB-2017-0182
|
HONI_Lake Superior Link AD ENG20181128
|
Correspondence
|
|
2018-11-28
|
2018-11-28
|
EB-2017-0182
|
HONI_Lake Superior Link AD FR_20181128
|
Correspondence
|
|
2018-11-28
|
2018-11-28
|
EB-2017-0182
|
HONI_Lake Superior Link Flyer final_201811228
|
Correspondence
|
|
2018-11-28
|
2018-11-28
|
EB-2017-0182
|
HONI_Ltr_response MFN_20181127
|
Correspondence
|
|
2018-11-27
|
2018-11-27
|
EB-2017-0182
|
HONI_LtrComment_20181127
|
Correspondence
|
|
2018-11-27
|
2018-11-27
|
EB-2017-0182
|
PRFN_Letter to HONI_OEB_Declaration Order Seeking Exemption_OEA Act_20181126
|
Correspondence
|
|
2018-11-26
|
2018-11-26
|
EB-2017-0182
|
MFN_Ltr_ReplyARG_HONI_EB-2017-0182 -0194 -0364_Nov 12, 2018_20181116
|
Correspondence
|
|
2018-11-16
|
2018-11-16
|
EB-2017-0182
|
HONI_LTR_20181119
|
Correspondence
|
|
2018-11-19
|
2018-11-19
|
EB-2017-0182
|
MFN_ltr_response HONI reply submission_20181113
|
Correspondence
|
|
2018-11-13
|
2018-11-13
|
EB-2017-0182
|
NextBridge_ReplyARG_20181110_Corrected
|
Applicant Reply Argument
|
|
2018-11-12
|
2018-11-12
|
EB-2017-0182
|
NextBridge_ReplyARG_20181109
|
Applicant Reply Argument
|
|
2018-11-09
|
2018-11-09
|
EB-2017-0182
|
HONI_Reply submission_0181109
|
Applicant Reply Argument
|
|
2018-11-09
|
2018-11-09
|
EB-2017-0182
|
Ack Ltr_letter of comment_M Gravelle MPP_20181107
|
Acknowledgement Letter
|
2018-11-07
|
|
2018-11-07
|
EB-2017-0182
|
Thunder Bay_MPP_correspondence_20181025_Redacted
|
Comments
|
|
2018-10-25
|
2018-10-25
|
EB-2017-0182
|
Thunder Bay_MPP_correspondence_20181016
|
Comments
|
|
2018-10-16
|
2018-10-16
|
EB-2017-0182
|
MECP_Response ltr to OEB_20181106
|
Correspondence
|
|
2018-11-06
|
2018-11-06
|
EB-2017-0182
|
OEBltr_HONI_NB_East West Tie_20181106
|
Correspondence
|
2018-11-06
|
|
2018-11-06
|
EB-2017-0182
|
HONI_Ltr_EWT_LSL_20181106
|
Correspondence
|
|
2018-11-06
|
2018-11-06
|
EB-2017-0182
|
OEBResponse_Township of Terrace Bay_HONI_Nextbridge Combined_20181102
|
Correspondence
|
2018-11-02
|
|
2018-11-02
|
EB-2017-0182
|
Township of Terrace Bay_letter of comment_20181101
|
Comments
|
|
2018-11-01
|
2018-11-01
|
EB-2017-0182
|
OEB Staff_sub_NextBridge_Hydro One_20181031_Revised(3)
|
Submission
|
|
2018-11-01
|
2018-11-01
|
EB-2017-0182
|
VECC Submission_EWT Combined Proceeding_20181101
|
Submission
|
|
2018-11-01
|
2018-11-01
|
EB-2017-0182
|
OEB Letter to MECP_EWT_LSL_20181101
|
Correspondence
|
2018-11-01
|
|
2018-11-01
|
EB-2017-0182
|
OEB Staff_sub_NextBridge_Hydro One_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
MECP_LTR_EWT_LSL_20181101
|
Correspondence
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
CCC_FinalArgument_EWT_HON_NB_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
BFN_ Final Submission_Combined Hearing_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
BFN_CvrLtr_Submission_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
PWU_SUB_transmission line_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
SEC_NB_HON_EWT_LSL_FinalArgument_20181031_Redacted
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
MNO_SUB_EWT_LSL_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
BLP_BookofAuthorities_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
BLP_FinalSUB_2018103
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
IESO_Submission_EWT_LSL_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
IESO_CvrLtr_Submisson_EWT_LSL_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
NextBridge_ReplyARG_20181031
|
Applicant Reply Argument
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
Anwaatin_SUB_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
HONI_Response to NextBridge_20181031
|
Applicant Reply Argument
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
BZA_FinalSUB2_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
LLFN_SUB_EWT_LSL_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
MFN_Argument_EWT_LSL_20181031
|
Submission
|
|
2018-10-31
|
2018-10-31
|
EB-2017-0182
|
HONI_ltr_EWT_LSL_20181030
|
Correspondence
|
|
2018-10-30
|
2018-10-30
|
EB-2017-0182
|
HONI_LTR_EWT_LSL_20181029
|
Correspondence
|
|
2018-10-29
|
2018-10-29
|
EB-2017-0182
|
Thunder Bay_MPP_correspondence_20181025_Redacted
|
Comments
|
|
2018-10-25
|
2018-10-25
|
EB-2017-0182
|
HONI_ARGChief_20181022
|
Applicant Argument in Chief
|
|
2018-10-22
|
2018-10-22
|
EB-2017-0182
|
NextBridge_ARGChief_20181022
|
Applicant Argument in Chief
|
|
2018-10-22
|
2018-10-22
|
EB-2017-0182
|
Thunder Bay_MPP_correspondence_20181016
|
Correspondence
|
|
2018-10-16
|
2018-10-16
|
EB-2017-0182
|
OEB correspondence _EWT_LSL_20181015
|
Correspondence
|
|
2018-10-16
|
2018-10-16
|
EB-2017-0182
|
NextBridge_UndertakingResponse_J6 1_20181015
|
Undertaking Responses
|
|
2018-10-15
|
2018-10-15
|
EB-2017-0182
|
HONI_UndertakingResponse_JT4 1__20181015
|
Undertaking Responses
|
|
2018-10-15
|
2018-10-15
|
EB-2017-0182
|
Nextbridge Chart_Exhi K7 1_20181012
|
Exhibits
|
|
2018-10-12
|
2018-10-12
|
EB-2017-0182
|
NextBridge_Number 8 Operations Maintenance_Exhi K6 2_20181011
|
Exhibits
|
|
2018-10-11
|
2018-10-11
|
EB-2017-0182
|
Environmental assessmentact act_RSO1990_Exhi K7 2_20181012
|
Exhibits
|
|
2018-10-12
|
2018-10-12
|
EB-2017-0182
|
Transcripts_Volume 7_EWT_LSL_combined hearing_20181012
|
Transcripts
|
|
2018-10-12
|
2018-10-12
|
EB-2017-0182
|
HONI_UndertakingResponse_JT4 1_20181012
|
Undertaking Responses
|
|
2018-10-12
|
2018-10-12
|
EB-2017-0182
|
Addendum to the 2017 Updated Assessment_Exhi K4 4_20181011
|
Exhibits
|
|
2018-10-11
|
2018-10-11
|
EB-2017-0182
|
EWT LP response to OEB Staff IR_Exhi K4 3_20181011
|
Exhibits
|
|
2018-10-11
|
2018-10-11
|
EB-2017-0182
|
OEB Staff Summary of the Evidence on Costs_EWT_LSL_Exhi K4 2_20181009
|
Exhibits
|
|
2018-10-09
|
2018-10-09
|
EB-2017-0182
|
NextBridge_Undertaking J5 1_breakdown timing__20181012
|
Undertaking Responses
|
|
2018-10-12
|
2018-10-12
|
EB-2017-0182
|
Transcripts_Volume 6_EWT_LSL_Combined hearing_20181011
|
Transcripts
|
|
2018-10-11
|
2018-10-11
|
EB-2017-0182
|
HONI_Compendium for Cross-Examination_Exhi K6 1_20181011
|
Exhibits
|
|
2018-10-11
|
2018-10-11
|
EB-2017-0182
|
VECC Compendium_NextBridge_Exhi K6 4_20181011
|
Exhibits
|
|
2018-10-11
|
2018-10-11
|
EB-2017-0182
|
Transcripts_Volume 5_EWT_LSL_combined hearing_20181010
|
Transcripts
|
|
2018-10-10
|
2018-10-10
|
EB-2017-0182
|
BZA_Appendix 2 1X_Indigenous consultation and record log table_Exhi K5 3_20181010
|
Exhibits
|
|
2018-10-10
|
2018-10-10
|
EB-2017-0182
|
PWU_Compendium_EWT_LSL_combined hearing_Exhi K6 3_20181010
|
Exhibits
|
|
2018-10-10
|
2018-10-10
|
EB-2017-0182
|
NextBridge_Project Spend cost table to Date_20181008
|
Exhibits
|
|
2018-10-10
|
2018-10-10
|
EB-2017-0182
|
SEC_EWTLSL_NextBridgePanel_NB_Exhi K5 1__20181010
|
Exhibits
|
|
2018-10-10
|
2018-10-10
|
EB-2017-0182
|
BZA_Compendium of Docs for Next Bridge Cross Exam_Exhi K5 2_20181010
|
Exhibits
|
|
2018-10-10
|
2018-10-10
|
EB-2017-0182
|
Transcripts_Volume 4_revised_EWT_LSL_Combined hearing_20181009
|
Transcripts
|
|
2018-10-09
|
2018-10-09
|
EB-2017-0182
|
HONI_list of documents for cross examination_20181009
|
Exhibits
|
|
2018-10-09
|
2018-10-09
|
EB-2017-0182
|
HONI_ltr_NextBridge_docs for cross examination_20181009
|
Correspondence
|
|
2018-10-09
|
2018-10-09
|
EB-2017-0182
|
VECC Panel 1 Hydro One LSL Compendium_Exhi K4 1_20181009
|
Exhibits
|
|
2018-10-09
|
2018-10-09
|
EB-2017-0182
|
BZA_Compendium_Cross-examination_Material_IESO_Exhi K4 5__20181009
|
Exhibits
|
|
2018-10-09
|
2018-10-09
|
EB-2017-0182
|
NextBridge_September 28 2018_ ltr from Ministry of Environment_20181005
|
Exhibits
|
|
2018-10-05
|
2018-10-05
|
EB-2017-0182
|
NextBridge_August 3 2018_ltr _Min of Tourism_20181005
|
Exhibits
|
|
2018-10-05
|
2018-10-05
|
EB-2017-0182
|
HONI_UndertakingResponses_JT2 1_JT3 1_20181005
|
Undertaking Responses
|
|
2018-10-05
|
2018-10-05
|
EB-2017-0182
|
Transcripts_Volume 3_EWT_LSL_Combined Oral Hearing_20181004
|
Transcripts
|
|
2018-10-04
|
2018-10-04
|
EB-2017-0182
|
OEBltr_Response_Minister of Energy_EWT Combined_20181003
|
Correspondence
|
2018-10-04
|
|
2018-10-04
|
EB-2017-0182
|
Letter_Minister of Energy_EWT Combined_20181002
|
Correspondence
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
Dwijen Bharad_Letter of Comment_20181002_Redacted
|
Comments
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
MNO_Ltr_HONI_EWT_LSL_20181004
|
Exhibits
|
|
2018-10-04
|
2018-10-04
|
EB-2017-0182
|
Anwaatin_Hydro One Panel Compendium_Addendum_Exhi K3 3_20181003
|
Exhibits
|
|
2018-10-03
|
2018-10-03
|
EB-2017-0182
|
Transcripts_Volume 2_EWT_LSL_Combined Oral Hearing_20181003
|
Transcripts
|
|
2018-10-03
|
2018-10-03
|
EB-2017-0182
|
SEC_EWTLSL_HydroOnePanel_Compendium_Rev_Exhi K2 2_20181003
|
Exhibits
|
|
2018-10-03
|
2018-10-03
|
EB-2017-0182
|
HONI_ltr_EWT_LSL_20181003
|
Correspondence
|
|
2018-10-03
|
2018-10-03
|
EB-2017-0182
|
Anwaatin_Hydro One Panel Compendium_Exhi 3 2_20181003
|
Exhibits
|
|
2018-10-03
|
2018-10-03
|
EB-2017-0182
|
SEC_EWTLSL_HydroOnePanel_Compendium_Exhi_K2 2__20181002
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
Transcripts_Volume 1_EWT_LSL_Combined Oral Hearing_20181002
|
Transcripts
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
BZA_Compendium_Cross-examination_Exhi_K3 1_20181002
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
BLP_Compendium_Cross-examination_Exhi_K2 3__20181002
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
HONI_Kartiga Thavaraj_dec_undertaking_20181002
|
Declaration and Undertakings
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
SNC-Lavalin_Janet Oh dec-undertaking_20181002
|
Declaration and Undertakings
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
IESO_UpdatedIRR_NB6_20181002
|
Interrogatory Response from Intervenor
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
MNO_Provisional_Compendium_Cross-Examination_Exhi_K2.1_20181002
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
OEBResponse_President_Sioux Lookout CC_HONI_Nextbridge Combined_20181002
|
Correspondence
|
2018-10-02
|
|
2018-10-02
|
EB-2017-0182
|
OEBResponse_Quad Council_HONI_Nextbridge Combined_20181002
|
Correspondence
|
2018-10-02
|
|
2018-10-02
|
EB-2017-0182
|
NextBridge Compendium_Cross-Examination of Hydro_Volume 1_Exhi_K1 1_20181002
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge Compendium_Cross-Examination of Hydro_Volume 2_Exhi_K1 2_20181002
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge_B-15-1
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge_Exhibit JT2.19
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge_HONI_IR response to Board Staff 17
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge_HONI_IR response to NB 24
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge_HONI_IR response to NB 44
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge_PO2_UpperCanada_HONI_20180301
|
Exhibits
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
Hearing Schedule Combined Oct 2-3-4-9-11-12-2018
|
Correspondence
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
HONI_LSL_UpdatedIRRS_20181001
|
Interrogatory Response from Applicant
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
NextBridge_Declaration_Undertaking_D.Stevens_20181002
|
Declaration and Undertakings
|
|
2018-10-02
|
2018-10-02
|
EB-2017-0182
|
RSMIN_comments_20181001
|
Comments
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
NextBridge_OEB_Minimum Technical Requirement for OEWTL_20181001
|
Exhibits
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
NextBridge_SNC Lavlin_class action_2012_20181002
|
Exhibits
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
NextBridge_Interim Condensed _FS_Q2 report_Exhi K1 3__20181001
|
Exhibits
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
NextBridge_Galloping tutorial_2007.ppt
|
Exhibits
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
NextBridge_Cover Letter_Cross Examination Materials_20181001
|
Exhibits
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
John McGrath_Letter of Comment_20181001_Redacted
|
Comments
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
Quad Council_letter of comment_20181001
|
Comments
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
IESO_Ltr_CVs_EWT_LSL_20181001
|
Correspondence
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
NextBridge_LTR_Confidential Interrogatories Cover Letter_20181001
|
Correspondence
|
|
2018-10-01
|
2018-10-01
|
EB-2017-0182
|
PO8_HONI_UCT Combined_20181001
|
Procedural Order
|
2018-10-01
|
|
2018-10-01
|
EB-2017-0182
|
LLFN_Declaraion and undertaking_20180928
|
Declaration and Undertakings
|
|
2018-09-28
|
2018-09-28
|
EB-2017-0182
|
NextBridge_ReplyARG_20180928
|
Submission
|
|
2018-09-28
|
2018-09-28
|
EB-2017-0182
|
BLP_LTR_EWT-LSL_20180928
|
Correspondence
|
|
2018-09-28
|
2018-09-28
|
EB-2017-0182
|
SEC_HONI_Nextbridge_Corr_20180928
|
Correspondence
|
|
2018-09-28
|
2018-09-28
|
EB-2017-0182
|
NextBridge_Letter_Access_Confidential_Materials _20180928
|
Correspondence
|
|
2018-09-28
|
2018-09-28
|
EB-2017-0182
|
HONI_Declaration and Undertaking_Robert Warren_20180928
|
Declaration and Undertakings
|
|
2018-09-28
|
2018-09-28
|
EB-2017-0182
|
HONI_EWT_LSL_Ltr Re ConfidentialDocuments_20180928
|
Correspondence
|
|
2018-09-28
|
2018-09-28
|
EB-2017-0182
|
HONI_Ltr to OEB_EWT_LSL_20180927
|
Correspondence
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
Anwaatin_DecUndertaking_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
NextBridge_Declaration and Undertakings_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
BZA_DEC_Undertaking_MM_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
BZA_DEC_Undertaking_EE_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
BZA_CvrLtr_DecUnd_EWT_LSL_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
NextBridge_Confidentiality_OBJ_20180927
|
Submission
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
OEB_ltr_NextBridge_reply submissions_deadline extension_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
OEBResponse_TBCC_HONI_Nextbridge Combined_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
OEBResponse_Sioux Lookout CC_HONI_Nextbridge Combined_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
OEBResponse_NOMA_HONI_Nextbridge Combined_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
OEBResponse_FFCC_HONI_Nextbridge Combined_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
OEBResponse_Common Voice NW_HONI_Nextbridge Combined_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
OEBResponse_City of TB_HONI_Nextbridge Combined_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
OEBResponse_CEDC_HONI_Nextbridge Combined_20180927
|
Correspondence
|
2018-09-27
|
|
2018-09-27
|
EB-2017-0182
|
BLP_LTR_Conf_Undertaking_EWT-LSL_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
PWU_DEC_Undertaking_RS_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
PWU_DEC_Undertaking_BK_20180926
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
PWU_DEC_Undertaking_AB_20180926
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
PWU_CvrLtr_DecUnd_EWT_LSL_20180927
|
Declaration and Undertakings
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
MNO_ltr_EWT_LSL_20180927
|
Correspondence
|
|
2018-09-27
|
2018-09-27
|
EB-2017-0182
|
CCC_MRB_Confidentiality_declaration_undertaking_20180926
|
Declaration and Undertakings
|
|
2018-09-26
|
2018-09-26
|
EB-2017-0182
|
SEC_UCT_EWT_LSL_DecUnd_MR_201800926
|
Declaration and Undertakings
|
|
2018-09-26
|
2018-09-26
|
EB-2017-0182
|
NextBridge_LTR_ Development Costs Reply Extension_20180926
|
Correspondence
|
|
2018-09-26
|
2018-09-26
|
EB-2017-0182
|
PO7_HONI_UCT Combined_20180926
|
Procedural Order
|
2018-09-26
|
|
2018-09-26
|
EB-2017-0182
|
dec_order_cost awards_HONI_Lake Superior Motion_20180926
|
Decision and Order on Cost Awards
|
2018-09-26
|
|
2018-09-26
|
EB-2017-0182
|
NextBridge_Exhibit_A-3-1_updated_20180926
|
Exhibits
|
|
2018-09-26
|
2018-09-26
|
EB-2017-0182
|
NextBridge_LTR_EWT-LSL_20180926
|
Correspondence
|
|
2018-09-26
|
2018-09-26
|
EB-2017-0182
|
HONI_CombinedHearing_CVs_20180925
|
Correspondence
|
|
2018-09-25
|
2018-09-25
|
EB-2017-0182
|
NextBridge_Additional IRR_Combined_20180924
|
Interrogatory Response from Applicant
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
I-05-22-01.xlsm
|
Interrogatory Response from Applicant
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
HONI_LSL_IRRS_TAB3-TAB11_20180924
|
Interrogatory Response from Applicant
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
HONI_LSL_IRRS_TAB2_20180924
|
Interrogatory Response from Applicant
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
HONI_LSL_IRRS_TAB1_PART3_20180924
|
Interrogatory Response from Applicant
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
HONI_LSL_IRRS_TAB1_PART2_20180924
|
Interrogatory Response from Applicant
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
HONI_LSL_IRRS_TAB1_PART1_20180924
|
Interrogatory Response from Applicant
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
IESO_IRRs_EWT_LSL_20180924
|
Interrogatory Response from Intervenor
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
IESO_CvrLtr_IRRs_EWT_LSL_20180924
|
Interrogatory Response from Intervenor
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
Anwaatin_LTR_IntrvREQ Revision_20180924
|
Intervenor Request Letter
|
|
2018-09-24
|
2018-09-24
|
EB-2017-0182
|
PO6_HONI_UCT Combined_20180921
|
Procedural Order
|
2018-09-21
|
|
2018-09-21
|
EB-2017-0182
|
Anwaatin_IntrvREQ_20180920
|
Intervenor Request Letter
|
|
2018-09-20
|
2018-09-20
|
EB-2017-0182
|
OEB Staff_sub_NextBridge Development Costs_20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
VECC_ SUB_NextBridge_ Development_Costs_20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
CCC_SUB_NextBridge_Development_Costs20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
MNO_SUB_NextBridge_Development_Costs_20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
HONI_SUB_NextBridge_Development_Costs_20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
SEC_Nextbridge_DevCosts_Sub_20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
BZA_SUB_Nextbridge_Development_Costs_20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
PO5_HONI_UCT Combined_20180919
|
Procedural Order
|
2018-09-19
|
|
2018-09-19
|
EB-2017-0182
|
Intervention List_East West Tie_20180919
|
Intervenor List
|
2018-09-19
|
|
2018-09-19
|
EB-2017-0182
|
BLP_SUB_Nextbridge_Development_Costs_20180919
|
Submission
|
|
2018-09-19
|
2018-09-19
|
EB-2017-0182
|
LL#58FN_EVD_20180914
|
Intervenor Evidence
|
|
2018-09-14
|
2018-09-14
|
EB-2017-0182
|
Memo_GRT_TOR_HONI_20180912
|
Correspondence
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
ack_receipt_TOR_HONI_review by GRT_20180912
|
Correspondence
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
LL#58FN_IR_HONI_20180912
|
Interrogatories to Applicant
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
LL#58FN_IR_NextBridge_20180912
|
Interrogatories to Applicant
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
OEB_Staff_IR_IESO_EWT_LSL_20180912
|
Interrogatories to Intervenor
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
ELLCA_IR_HONI_20180912
|
Interrogatories to Applicant
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
SEC_HONI_Nextbridge_IESO_IRs_20180912
|
Interrogatories to Applicant
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
BZA_IR_IESO_20180912
|
Interrogatories to Intervenor
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
HONI_LSL_Affidavit_of_Service_20180912
|
Affidavits of Service
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
CCC_IR_IESO_20180912
|
Interrogatories to Intervenor
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
PWU_IR_IESO_20180912
|
Interrogatory Response from Intervenor
|
|
2018-09-12
|
2018-09-12
|
EB-2017-0182
|
NextBridge_ARGChief_Development_Costs_20180911
|
Argument
|
|
2018-09-10
|
2018-09-10
|
EB-2017-0182
|
MFN_Intrv_REQ_20180907
|
Intervenor Request Letter
|
|
2018-09-07
|
2018-09-07
|
EB-2017-0182
|
PO4_HONI_UCT_Combined_20180907
|
Procedural Order
|
2018-09-07
|
|
2018-09-07
|
EB-2017-0182
|
East Loon Lake Campers Assoc_Intrv_Req_20180904
|
Intervenor Request Letter
|
|
2018-09-04
|
2018-09-04
|
EB-2017-0182
|
HONI_ToR_LSL_20180905
|
Correspondence
|
|
2018-09-05
|
2018-09-05
|
EB-2017-0182
|
PO3_HONI_UCT_Combined_20180831
|
Procedural Order
|
2018-08-31
|
|
2018-08-31
|
EB-2017-0182
|
OEB staff_IR_NextBridge_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
OEB staff_IR_HONI_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
CCC_IR_to HONI_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
VECC_IR_to NextBridge_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
VECC IR_ to HONI_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
HONI_IR_to NextBridge_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
BZA_IR_HONI_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
BZA_IR_Nextbridge_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
IESO_IR_Hydro One_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
IESO_IR_NextBridge_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
BLP_IR_HONI_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
MNO_IR_to_Nextbridge_HONI_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
SEC_HONI_Nextbridge_IRs_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
PWU_IR_HONI_20180830
|
Interrogatories to Applicant
|
|
2018-08-30
|
2018-08-30
|
EB-2017-0182
|
Long Lake 58FN_IntrvREQ_20180829
|
Intervenor Request Letter
|
|
2018-08-29
|
2018-08-29
|
EB-2017-0182
|
NextBridge_Interrogatories_to_IESO_20180829
|
Interrogatories to Intervenor
|
|
2018-08-29
|
2018-08-29
|
EB-2017-0182
|
NextBridge_Interrogatories_to_HONI_20180828
|
Interrogatories to Applicant
|
|
2018-08-28
|
2018-08-28
|
EB-2017-0182
|
BZA_ltr_OEB_re_PO1_20180827
|
Correspondence
|
|
2018-08-27
|
2018-08-27
|
EB-2017-0182
|
PO2_HONI_UCT_Combined_20180827
|
Procedural Order
|
2018-08-27
|
|
2018-08-27
|
EB-2017-0182
|
NextBridge_IRR_Development Costs_20180824
|
Interrogatory Response from Applicant
|
|
2018-08-24
|
2018-08-24
|
EB-2017-0182
|
HONI_Letter to OEB re ltc application_20180823
|
Correspondence
|
|
2018-08-23
|
2018-08-23
|
EB-2017-0182
|
intvr_req_BLP_20180822
|
Intervenor Request Letter
|
|
|
2018-08-23 at 11:20 AM
|
EB-2017-0182
|
SEC_NextbridgeHydroOne_Ltr_PO1_20180816
|
Correspondence
|
|
2018-08-16
|
2018-08-16
|
EB-2017-0182
|
Board Staff_IRs_EWT_20180814
|
Interrogatories to Applicant
|
|
2018-08-14
|
2018-08-14
|
EB-2017-0182
|
SEC_Nextbridge_UT_IRs_20180814
|
Interrogatories to Applicant
|
|
2018-08-14
|
2018-08-14
|
EB-2017-0182
|
HONI IRS_EWT_20180814
|
Interrogatories to Applicant
|
|
2018-08-14
|
2018-08-14
|
EB-2017-0182
|
CCC_Suppemntal IR_EWT_20180814
|
Interrogatories to Applicant
|
|
2018-08-14
|
2018-08-14
|
EB-2017-0182
|
PO 1_HONI_UCT Combined_20180813
|
Procedural Order
|
2018-08-13
|
|
2018-08-13
|
EB-2017-0182
|
NextBridge_Cost ClaimOBJ_20180802
|
Cost Claim Objection
|
|
2018-08-02
|
2018-08-02
|
EB-2017-0182
|
OEB Letter_extention of time_20180731
|
Correspondence
|
2018-07-31
|
|
2018-07-31
|
EB-2017-0182
|
R Warren_response PO 6 _20180730
|
Correspondence
|
|
2018-07-30
|
2018-07-30
|
EB-2017-0182
|
PO 6 UpperCanada_HONI_20180727
|
Procedural Order
|
2018-07-27
|
|
2018-07-27
|
EB-2017-0182
|
Addendum to the 2017 Updated Assessment for the EWT Need_20180726
|
Correspondence
|
|
2018-07-26
|
2018-07-26
|
EB-2017-0182
|
IESO_CvrLtr__IESO Impact Analysis_20180726
|
Correspondence
|
|
2018-07-26
|
2018-07-26
|
EB-2017-0182
|
NextBridge_EWT_Report_20180723
|
Submission
|
|
2018-07-23
|
2018-07-23
|
EB-2017-0182
|
NextBridge_Undertaking Responses_20180723
|
Undertaking Responses
|
|
2018-07-23
|
2018-07-23
|
EB-2017-0182
|
Hydro One_letter to OEB_development costs_20180720
|
Correspondence
|
|
2018-07-20
|
2018-07-20
|
EB-2017-0182
|
NextBridge Letter to OEB_Undertaking Response_20180713
|
Correspondence
|
|
2018-07-13
|
2018-07-13
|
EB-2017-0182
|
NextBridge_Ex_JT1.1_Page 2_Corrected_20180712
|
Undertaking Responses
|
|
2018-07-12
|
2018-07-12
|
EB-2017-0182
|
Exhibit KD1.2 SEC_Nextbridge_DevCosts_Compendium
|
Exhibits
|
|
2018-07-05
|
2018-07-05
|
EB-2017-0182
|
Transcripts_Oral Hearing_EWT_20180705
|
Transcripts
|
|
2018-07-05
|
2018-07-05
|
EB-2017-0182
|
Exhibit KD1.3 VECC Compendium NextBridge DevCosts_20180705
|
Exhibits
|
|
2018-07-05
|
2018-07-05
|
EB-2017-0182
|
Exhibit KD1.1 OEB Staff Compendium_EWT_20180705
|
Exhibits
|
|
2018-07-05
|
2018-07-05
|
EB-2017-0182
|
Updated Undertaking response NextBridge JT 1 8_20180704
|
Undertaking Responses
|
|
2018-07-04
|
2018-07-04
|
EB-2017-0182
|
NextBridge_CVs_Updated_20180704
|
Exhibits
|
|
2018-07-04
|
2018-07-04
|
EB-2017-0182
|
HONI ltr Min of Environment_EWT_20180629
|
Correspondence
|
|
2018-06-29
|
2018-06-29
|
EB-2017-0182
|
PO 5 UpperCanada_HONI_EWT_20180626
|
Procedural Order
|
2018-06-26
|
|
2018-06-26
|
EB-2017-0182
|
NextBridge_Undertaking Responses_20180620
|
Undertaking Responses
|
|
2018-06-20
|
2018-06-20
|
EB-2017-0182
|
NextBridge_Undertaking Responses_20180601
|
Undertaking Responses
|
|
2018-06-01
|
2018-06-01
|
EB-2017-0182
|
NextBridge_Cover Letter_transcript corrections_20180601
|
Correspondence
|
|
2018-06-01
|
2018-06-01
|
EB-2017-0182
|
PO 4_UpperCanada_HONI_20180518
|
Procedural Order
|
2018-05-18
|
|
2018-05-18
|
EB-2017-0182
|
BZA_IntrvREQ_20180509
|
Intervenor Request Letter
|
|
2018-05-09
|
2018-05-09
|
EB-2017-0182
|
Township of White River_comments_NextBridgeConstruct_20170507
|
Correspondence
|
|
2018-05-07
|
2018-05-07
|
EB-2017-0182
|
Transcript_East West Tie_Technical Conference_Redacted_20180507
|
Transcripts
|
|
2018-05-07
|
2018-05-07
|
EB-2017-0182
|
MNO_Declaration and Undertaking for J Wilson_20180503
|
Declaration and Undertakings
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
MNO_Declaration and Undertaking for M Strachan_20180503
|
Declaration and Undertakings
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
MNO_Declaration and Undertaking for J Madden_20180503
|
Declaration and Undertakings
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
NextBridge_CVs_Updated Exhibit List_20180503
|
Submission
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
NextBridge Detailed Schedule in Response to Procedural Order No. 3_20180503
|
Application and Evidence
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
I.B.NextBridge.STAFF.7_Attachment 2_Unredacted_Updated_20180503
|
Submission
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
I.B.NextBridge.STAFF.7_Attachment 3_Redacted_Updated_20180503
|
Submission
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
NextBridge Cover Letter_response to Procedural Order No. 3_20180503.
|
Submission
|
|
2018-05-03
|
2018-05-03
|
EB-2017-0182
|
OEB ltr_EWT_resHONI_20180503
|
Correspondence
|
2018-05-03
|
|
2018-05-03
|
EB-2017-0182
|
NextBridge_Letter_Responding to Hydro One Letter_East West Tie_20180501
|
Correspondence
|
|
2018-05-01
|
2018-05-01
|
EB-2017-0182
|
HONI_ltr_Requesting Change of Date for Tech Conf_20180501
|
Correspondence
|
|
2018-05-01
|
2018-05-01
|
EB-2017-0182
|
PO 3_UpperCanada_HONI_ConfidDecision_20180427
|
Procedural Order
|
2018-04-27
|
|
2018-04-27
|
EB-2017-0182
|
CCC.letter.MRB.Counsel.20180417
|
Correspondence
|
|
2018-04-17
|
2018-04-17
|
EB-2017-0182
|
VECC_IntervReq_NXTBridge_20180412
|
Intervenor Request Letter
|
|
2018-04-12
|
2018-04-12
|
EB-2017-0182
|
NextBridge Cover Letter_updated IR responses_20180321_Redacted
|
Interrogatory Response from Applicant
|
|
2018-03-21
|
2018-03-21
|
EB-2017-0182
|
I.B.NextBridge.STAFF.7_Attachment 3_REDACTED_Updated_20180314
|
Interrogatory Response from Applicant
|
|
2018-03-21
|
2018-03-21
|
EB-2017-0182
|
I.B.NextBridge.STAFF.7_Attachment 2_REDACTED_Updated_2010314
|
Interrogatory Response from Applicant
|
|
2018-03-21
|
2018-03-21
|
EB-2017-0182
|
I.B.NextBridge.CCC.8_Attachment_REDACTED_Updated_20180314
|
Interrogatory Response from Applicant
|
|
2018-03-21
|
2018-03-21
|
EB-2017-0182
|
SEC Request for Access to Confidential Information_20180315
|
Correspondence
|
|
2018-03-15
|
2018-03-15
|
EB-2017-0182
|
NextBridge_Updated Evidence_Response to PO 2_20180314
|
Application and Evidence
|
|
2018-03-14
|
2018-03-14
|
EB-2017-0182
|
JGirvan.Declaration.EWTProceeding_20180312
|
Declaration and Undertakings
|
|
2018-03-12
|
2018-03-12
|
EB-2017-0182
|
SEC_UCT_EWT_DecUnd_MR_20180307
|
Declaration and Undertakings
|
|
2018-03-07
|
2018-03-07
|
EB-2017-0182
|
Amended environmental assessment report_20180206
|
Correspondence
|
|
2018-02-06
|
2018-02-06
|
EB-2017-0182
|
Cover letter_amended environmental assessment report_20180302
|
Correspondence
|
|
2018-03-02
|
2018-03-02
|
EB-2017-0182
|
PO2_UpperCanada_HONI_20180301
|
Procedural Order
|
2018-03-01
|
|
2018-03-01
|
EB-2017-0182
|
NextBridge_Letter_East West Tie Project_20180227
|
Correspondence
|
|
2018-02-28
|
2018-02-28
|
EB-2017-0182
|
Nextbridge cvrltr_Confidential segment_20180131
|
Correspondence
|
|
2018-01-31
|
2018-01-31
|
EB-2017-0182
|
NextBridge_Supplemental Affidavit _2_20180202
|
Affidavits of Service
|
|
2018-02-02
|
2018-02-02
|
EB-2017-0182
|
NextBridge_Supplemental Affidavit _1_20180202
|
Affidavits of Service
|
|
2018-02-02
|
2018-02-02
|
EB-2017-0182
|
NextBridge_Cover Letter_Supplemental Affidavit_20180202
|
Affidavits of Service
|
|
2018-02-02
|
2018-02-02
|
EB-2017-0182
|
NextBridge_Letter on Confidentiality_20180125
|
Correspondence
|
|
2018-01-25
|
2018-01-25
|
EB-2017-0182
|
NextBridge_IRR_EWT_20180125
|
Interrogatory Response from Applicant
|
|
2018-01-25
|
2018-01-25
|
EB-2017-0182
|
HONI correspondence_EWT_20171221
|
Correspondence
|
|
2018-01-02
|
2018-01-02
|
EB-2017-0182
|
HONI_EWT IR1_Att1_20171221
|
Interrogatories to Applicant
|
|
2017-12-22
|
2017-12-22
|
EB-2017-0182
|
CCC_IR_Nextbridge EWT_20171222
|
Interrogatories to Applicant
|
|
2017-12-22
|
2017-12-22
|
EB-2017-0182
|
OEB Staff_IR_UCT EWT_20171221
|
Interrogatories to Applicant
|
|
2017-12-21
|
2017-12-21
|
EB-2017-0182
|
HONI_EWT_IR_20171221
|
Interrogatories to Applicant
|
|
2017-12-21
|
2017-12-21
|
EB-2017-0182
|
SEC_UCT_EWTLTC_IRs_20171221
|
Interrogatories to Applicant
|
|
2017-12-21
|
2017-12-21
|
EB-2017-0182
|
NextBridge_Reply Letter_20171208
|
Comments
|
|
2017-12-08
|
2017-12-08
|
EB-2017-0182
|
HONI_ResponseLTR_20171205
|
Correspondence
|
|
2017-12-05
|
2017-12-05
|
EB-2017-0182
|
HydroOne_Response to NEXTBRIDGE_20171205
|
Correspondence
|
|
2017-12-05
|
2017-12-05
|
EB-2017-0182
|
Letter from the Minister of Energy_20171201
|
Submission
|
|
2017-12-01
|
2017-12-01
|
EB-2017-0182
|
Updated-Assessment-East-West-Tie-Expansion_20171201
|
Submission
|
|
2017-12-01
|
2017-12-01
|
EB-2017-0182
|
PO1_EB-2017-0182_EB-2017-0194_20171129
|
Procedural Order
|
2017-11-29
|
|
2017-11-29
|
EB-2017-0182
|
Corp Municipality Wawa_ltr_HONI_UpperCanada_20171115
|
Correspondence
|
|
2017-11-15
|
2017-11-15
|
EB-2017-0182
|
NextBridge_IntvREQ_HONI_UpperCanada_20171113
|
Intervenor Request Letter
|
|
2017-11-13
|
2017-11-13
|
EB-2017-0182
|
HONI_ltr_OEB_IntrvREQLtr_20171106
|
Correspondence
|
|
2017-11-06
|
2017-11-06
|
EB-2017-0182
|
MNO_IntrvREQ_HONI_UpperCanada_20171107
|
Intervenor Request Letter
|
|
2017-11-07
|
2017-11-07
|
EB-2017-0182
|
CCC_IntvREQ_HONI_UpperCanada_20171106
|
Intervenor Request Letter
|
|
2017-11-06
|
2017-11-06
|
EB-2017-0182
|
MNO_IntrvREQ_HONI_UpperCanada_20171107
|
Intervenor Request Letter
|
|
2017-11-07
|
2017-11-07
|
EB-2017-0182
|
HONI_IntrvREQ_Ltr_UCT_20171106
|
Intervenor Request Letter
|
|
2017-11-06
|
2017-11-06
|
EB-2017-0182
|
Attachment_Honi_Ltr_OEB_EWT_dated 20170922_20171102
|
Correspondence
|
2017-11-02
|
2017-09-22
|
2017-11-02
|
EB-2017-0182
|
OEB Ltr_Honi_Upper Canada Transmission Inc_EWT_20171102
|
Correspondence
|
2017-11-02
|
|
2017-11-02
|
EB-2017-0182
|
NextBridge_Affidavit_20171031
|
Affidavits of Service
|
|
2017-10-31
|
2017-10-31
|
EB-2017-0182
|
Ministy of Tourism Culture and Sport_Ltr COMMENT_HONI_UpperCanada_20171030
|
Letter of Comment
|
|
2017-10-30
|
2017-10-30
|
EB-2017-0182
|
DorionTownship_ltr COMMENT_HONI_UpperCanada_20171030
|
Letter of Comment
|
|
2017-10-30
|
2017-10-30
|
EB-2017-0182
|
NextBridge_IntvREQ_HONI_UpperCanada_20171030
|
Intervenor Request Letter
|
|
2017-10-30
|
2017-10-30
|