Search Results for: Records - Case Number=EB-2018-0219 - 149 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2018-0219 | Confidentiality_certificate_destruction_VECC_20220105 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2022-01-05 | 2022-01-05 | |
EB-2018-0219 | SEC_JCS_Confidentiality_CertDestruction_PUC_20211109 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-11-09 | 2021-11-09 | |
EB-2018-0219 | dec_order_cost awards_PUC Smart Grid_20210525 | Decision and Order on Cost Awards | PUC Distribution Inc. - Electricity Distributor | 2021-05-25 | 2021-05-25 | |
EB-2018-0219 | CCC.CostClaim.PUC.SSG.ICM.corrected_20210518 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2021-05-18 | 2021-05-18 | |
EB-2018-0219 | VECC_Cost Claim_PUC_20210510 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2021-05-10 | 2021-05-10 | |
EB-2018-0219 | SEC_Contact Info Change_20210505 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-05-07 | 2021-05-07 | |
EB-2018-0219 | CCC_Cost Claim_PUC_20210506 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2021-05-06 | 2021-05-06 | |
EB-2018-0219 | SEC_CostClaim_PUC_20210505 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2021-05-05 | 2021-05-05 | |
EB-2018-0219 | ED_CostClaim_PUC_20210504 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2021-05-04 | 2021-05-04 | |
EB-2018-0219 | dec_order_PUC Smart Grid_20210429 | Decision and Order | PUC Distribution Inc. - Electricity Distributor | 2021-04-29 | 2021-04-29 | |
EB-2018-0219 | PUC_SUB_Clarification_20210414 | Submission | PUC Distribution Inc. - Electricity Distributor | 2021-04-14 | 2021-04-14 | |
EB-2018-0219 | OEBLtr_PUC_Evidence Update_Clarification_20200407 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-04-07 | 2021-04-07 | |
EB-2018-0219 | PUC_EVD Update_20210401 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2021-04-01 | 2021-04-01 | |
EB-2018-0219 | VECC_SUB_PUC_20210323 | Submission | PUC Distribution Inc. - Electricity Distributor | 2021-03-23 | 2021-03-23 | |
EB-2018-0219 | SEC_Final Argument_PUC_20210322 | Submission | PUC Distribution Inc. - Electricity Distributor | 2021-03-22 | 2021-03-22 | |
EB-2018-0219 | OEBStaff_SUB_ICM_PUC Distribution_20210322 | Submission | PUC Distribution Inc. - Electricity Distributor | 2021-03-22 | 2021-03-22 | |
EB-2018-0219 | CCC.Submission.PUC.SSG_20210322 | Submission | PUC Distribution Inc. - Electricity Distributor | 2021-03-22 | 2021-03-22 | |
EB-2018-0219 | ED_CoverLetterforArg-20210322 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-03-22 | 2021-03-22 | |
EB-2018-0219 | ED_Arg_PUC_20210322 | Submission | PUC Distribution Inc. - Electricity Distributor | 2021-03-22 | 2021-03-22 | |
EB-2018-0219 | ED_IntReq_PUC_201117 | Intervenor Request Letter | PUC Distribution Inc. - Electricity Distributor | 2020-11-17 | 2020-11-17 | |
EB-2018-0219 | PUC_ARGChief_20210312 | Applicant Argument in Chief | PUC Distribution Inc. - Electricity Distributor | 2021-03-12 | 2021-03-12 | |
EB-2018-0219 | Transcripts_REVISED_PUC TC Feb 17 2021_20210301 | Transcripts | PUC Distribution Inc. - Electricity Distributor | 2021-03-01 | 2021-03-01 | |
EB-2018-0219 | PUC_Undertakings_TC_20210226 | Undertaking Responses | PUC Distribution Inc. - Electricity Distributor | 2021-02-26 | 2021-02-26 | |
EB-2018-0219 | PUC Distribution_LTR_2021 ICM Smart Grid_TC Revision_20210222 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-22 | 2021-02-22 | |
EB-2018-0219 | Transcripts_final_PUC TC_20210217 | Transcripts | PUC Distribution Inc. - Electricity Distributor | 2021-02-18 | 2021-02-18 | |
EB-2018-0219 | PUC_CVs_witness panel_TC_20210216 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-16 | 2021-02-16 | |
EB-2018-0219 | OEBstaff_PUC Distribution_TC Topics_20210209 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-09 | 2021-02-09 | |
EB-2018-0219 | PUC Distribution_ED_TC_participation_20210209 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-09 | 2021-02-09 | |
EB-2018-0219 | SEC_TC questions_PUC Distribution_20210204 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-04 | 2021-02-04 | |
EB-2018-0219 | PO7_Decision_Confidentiality_PUC Smart Grid_20210203 | Decision | PUC Distribution Inc. - Electricity Distributor | 2021-02-03 | 2021-02-03 | |
EB-2018-0219 | PO7_Decision_Confidentiality_PUC Smart Grid_20210203 | Procedural Order | PUC Distribution Inc. - Electricity Distributor | 2021-02-03 | 2021-02-03 | |
EB-2018-0219 | PUC_LTR_2021 ICM Smart Grid_20210201 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-01 | 2021-02-01 | |
EB-2018-0219 | VECC_LTR_PUC Smart Grid_Next Steps_20210201 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-01 | 2021-02-01 | |
EB-2018-0219 | SEC_Corres_PUC_20210201 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-02-01 | 2021-02-01 | |
EB-2018-0219 | VECC_IR_PUC_20201218 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2020-12-21 | 2020-12-21 | |
EB-2018-0219 | SEC Interrogatories_PUC_20201220 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2020-12-21 | 2020-12-21 | |
EB-2018-0219 | CCC.IRs.PUCDistributionInc_20201218 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2020-12-21 | 2020-12-21 | |
EB-2018-0219 | PUC_IRR Attachment 10 SEC_13_Bill Impacts_20210125 | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2021-01-26 | 2021-01-26 | |
EB-2018-0219 | PUC_IRR Attachment 7_OEB Staff 37_Bill Impacts_CCA 8% _Half Year Rev Req_20210125 | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2021-01-26 | 2021-01-26 | |
EB-2018-0219 | PUC_IRR_20210125 | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2021-01-26 | 2021-01-26 | |
EB-2018-0219 | OEBLtr__PUC_Ext Request_Interrogatories_20210111 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-01-11 | 2021-01-11 | |
EB-2018-0219 | PUC Distribution Inc._LTR_Extension_IRR_ICM Smart Grid_20200108 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2021-01-08 | 2021-01-08 | |
EB-2018-0219 | ED_IRs_PUC_20201218 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2020-12-18 | 2020-12-18 | |
EB-2018-0219 | OEBstaff_PUC ICM Model_20201218 | Rate Model | PUC Distribution Inc. - Electricity Distributor | 2020-12-18 | 2020-12-18 | |
EB-2018-0219 | OEBstaffIRs_PUC_Smart Grid_20201218 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2020-12-18 | 2020-12-18 | |
EB-2018-0219 | Decision_Confidentiality_PUC Smart Grid_20201215 | Decision | PUC Distribution Inc. - Electricity Distributor | 2020-12-15 | 2020-12-15 | |
EB-2018-0219 | PUC_Appendix AA3 7_EPC Appendix H Key Personnel_20201215 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-12-14 | 2020-12-14 | |
EB-2018-0219 | PUC_Appendix AA3 6_EPC Pricing Summary_Redacted_20201215 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-12-14 | 2020-12-14 | |
EB-2018-0219 | PUC_Appendix AA3 7_EPC Contract_Redacted_20201215 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-12-14 | 2020-12-14 | |
EB-2018-0219 | PUC_Appendix AA3 7_ EPC Appendix B Compensation Redacted_20201215 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-12-14 | 2020-12-14 | |
EB-2018-0219 | PUC_ReplySUB_Confidentiality_20201211 | Submission | PUC Distribution Inc. - Electricity Distributor | 2020-12-11 | 2020-12-11 | |
EB-2018-0219 | OEBLtr_Confidentiality_EGI ltc_20201210 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-12-10 | 2020-12-10 | |
EB-2018-0219 | PUC_LTR_Reply_20201209 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-12-09 | 2020-12-09 | |
EB-2018-0219 | SEC_submission_PUC distribution_Confidentiality_20201207 | Submission | PUC Distribution Inc. - Electricity Distributor | 2020-12-07 | 2020-12-07 | |
EB-2018-0219 | OEBStaff_SUB_ICM_PUC Distribution_Confidentiality_12072020 | Submission | PUC Distribution Inc. - Electricity Distributor | 2020-12-07 | 2020-12-07 | |
EB-2018-0219 | PUC_Appendix AA3_Redacted_20201126 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-11-26 | 2020-11-26 | |
EB-2018-0219 | PUC_Ltr_Revised Confidentiality Request_20201126(2) | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-11-26 | 2020-11-26 | |
EB-2018-0219 | OEBltr_ED_intvnrREQ_PUC Distribution_Smart Grid_20201118 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-11-18 | 2020-11-18 | |
EB-2018-0219 | OEBltr_Complete_PUC Distribution_Smart Grid_20201112_signed | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-11-12 | 2020-11-12 | |
EB-2018-0219 | OEBltr_Complete_PUC Distribution_Smart Grid_20201112 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-11-12 | 2020-11-12 | |
EB-2018-0219 | AMPCO_SGrice_Declaration_Undertaking_PUC_20201120 | Declaration and Undertakings | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | Jay Shepherd_Declaration_Undertaking_PUC_20201119 | Declaration and Undertakings | PUC Distribution Inc. - Electricity Distributor | 2020-11-19 | 2020-11-19 | |
EB-2018-0219 | PUC_App_AA16_PUC 2021_ACM_ICM_Model_20200928_ Half Year Rev Req_20201029 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PUC_App_AA14 Copy_VVM Energy Savings Est for ICM 20200120_20201029 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PUC_App_ AA11 2016 Proj_Distribution Capital Eng_20201029 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PUC_App_AA5_App_1 JTC1_1 CAPEX Deferral Value Cal_Revised from Early UDM est_20201029 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PUC_App_AA15_Cost of Power Forecast_20201029 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PUC_App_AA12-3_SSG Revised Scope_Proj_Estimate Sum_20201029 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PUC_App AA5_App_ 7 JTC2_13 0201 12 2016 Proj_Distribution Capital Eng_20201029 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PUC_Amended APPL_ICM_20201028 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2020-10-29 | 2020-10-29 | |
EB-2018-0219 | PO6_PUC Smart Grid_20201116 | Procedural Order | PUC Distribution Inc. - Electricity Distributor | 2020-11-16 | 2020-11-16 | |
EB-2018-0219 | Letter_Extension for Refiling Application_20200203 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-02-03 | 2020-02-03 | |
EB-2018-0219 | PUC SSM_Request to Delay Filing_20200131 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2020-01-31 | 2020-01-31 | |
EB-2018-0219 | PUC Distribution_Affidavit_20191120 | Affidavits of Service | PUC Distribution Inc. - Electricity Distributor | 2019-11-21 | 2019-11-21 | |
EB-2018-0219 | PUC SSM_Request to Delay of Filing_20191011 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-10-11 | 2019-10-11 | |
EB-2018-0219 | PUC_APPL_IRM_ICM_20190131_Part 1 resubmission | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-09-27 | 2019-09-27 | |
EB-2018-0219 | 2017 Final Verified Annual CDM Program Results_PUC Distribution_20190131 resubmission | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-09-25 | 2019-09-25 | |
EB-2018-0219 | dec_order_costs_PUC_20190731 | Decision and Order on Cost Awards | PUC Distribution Inc. - Electricity Distributor | 2019-07-31 | 2019-07-31 | |
EB-2018-0219 | CCC.CostClaim.PUC_ICM_20190724 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2019-07-25 | 2019-07-25 | |
EB-2018-0219 | VECC_Cost Claim_PUC_20190724 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2019-07-24 | 2019-07-24 | |
EB-2018-0219 | SEC_Cost Claim_PUC_20190723 | Cost Claim | PUC Distribution Inc. - Electricity Distributor | 2019-07-23 | 2019-07-23 | |
EB-2018-0219 | PO5_PUC_rates_20190716 | Procedural Order | PUC Distribution Inc. - Electricity Distributor | 2019-07-16 | 2019-07-16 | |
EB-2018-0219 | Final Rate Order_PUC_20190709 | Rate Order | PUC Distribution Inc. - Electricity Distributor | 2019-07-09 | 2019-07-09 | |
EB-2018-0219 | PUC Distribution_DRO Comment Response_20190705 | Draft Rate Order | PUC Distribution Inc. - Electricity Distributor | 2019-07-05 | 2019-07-05 | |
EB-2018-0219 | PUC Tariff_OEBstaff_DRO Comments | Comments | PUC Distribution Inc. - Electricity Distributor | 2019-07-02 | 2019-07-02 | |
EB-2018-0219 | OEBStaff_Comments_DRO_20190702 | Comments | PUC Distribution Inc. - Electricity Distributor | 2019-07-02 | 2019-07-02 | |
EB-2018-0219 | PUC Distribution_Amendment to Application_20190628 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-06-28 | 2019-06-28 | |
EB-2018-0219 | PUC Distribution_IRR Appendix 13_Draft Project Agreement_20190628 | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-06-28 | 2019-06-28 | |
EB-2018-0219 | Dec_Confidentiality_PUC_20190627 | Decision | PUC Distribution Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0219 | PUC Distribution_2019RateGen_20190626.xlsb | Draft Rate Order | PUC Distribution Inc. - Electricity Distributor | 2019-06-26 | 2019-06-26 | |
EB-2018-0219 | PUC Distribution_DRO_20190626 | Draft Rate Order | PUC Distribution Inc. - Electricity Distributor | 2019-06-26 | 2019-06-26 | |
EB-2018-0219 | Transcripts final_PUC_Technical Conference_20190620 | Transcripts | PUC Distribution Inc. - Electricity Distributor | 2019-06-20 | 2019-06-20 | |
EB-2018-0219 | dec_PUC Distribution_IRM_20190620 | Decision and Order | PUC Distribution Inc. - Electricity Distributor | 2019-06-20 | 2019-06-20 | |
EB-2018-0219 | Exhibit KTC1 1_PUC Distribution_IRR Correction_20190619 | Exhibits | PUC Distribution Inc. - Electricity Distributor | 2019-06-20 | 2019-06-20 | |
EB-2018-0219 | PUC Distribution_IRR Correction_20190619 | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-06-19 | 2019-06-19 | |
EB-2018-0219 | Transcripts_PUC_Technical Conference_20190619 | Transcripts | PUC Distribution Inc. - Electricity Distributor | 2019-06-19 | 2019-06-19 | |
EB-2018-0219 | PUC_CVs_20190618 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-06-18 | 2019-06-18 | |
EB-2018-0219 | PUC_IRR Appendix 13_Draft Project Agreement_20190617_Redacted | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-17 | 2019-06-17 | |
EB-2018-0219 | PUC_IRR Appendix 12_ Schedule to Draft Project Agreement_20190617 | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-17 | 2019-06-17 | |
EB-2018-0219 | PUC_IRR Appendix 11_LOI Amendment_20190617_Redacted | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-17 | 2019-06-17 | |
EB-2018-0219 | PUC_IRR Appendix 9_Letter of Intent_20190617 | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-17 | 2019-06-17 | |
EB-2018-0219 | PUC_Reply SUB_Confidentiality_20190617 | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-17 | 2019-06-17 | |
EB-2018-0219 | VECC_Declaration Undertaking_SG_PUC_20190614 | Declaration and Undertakings | PUC Distribution Inc. - Electricity Distributor | 2019-06-17 | 2019-06-17 | |
EB-2018-0219 | JGirvan_Declaration Confidentiality_PUC.ICM_20190618 | Declaration and Undertakings | PUC Distribution Inc. - Electricity Distributor | 2019-06-18 | 2019-06-18 | |
EB-2018-0219 | SEC_topic areas for TC_20190613 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-06-13 | 2019-06-13 | |
EB-2018-0219 | VECC_LTR_Topic Areas_20190612 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-06-13 | 2019-06-13 | |
EB-2018-0219 | OEBStaff_TC Topics_PUC_20190613 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-06-13 | 2019-06-13 | |
EB-2018-0219 | OEBStaff_SUB_IRM_PUC Distribution_Confidentiality_20190612 | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-12 | 2019-06-12 | |
EB-2018-0219 | SEC_submission_20190611 | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-11 | 2019-06-11 | |
EB-2018-0219 | PUC Distribution_ReplySUB_20190607 | Submission | PUC Distribution Inc. - Electricity Distributor | 2019-06-07 | 2019-06-07 | |
EB-2018-0219 | Jay Declaration and Undertaking_20190606 | Declaration and Undertakings | PUC Distribution Inc. - Electricity Distributor | 2019-06-06 | 2019-06-06 | |
EB-2018-0219 | PO4_PUC_rates_20190604 | Procedural Order | PUC Distribution Inc. - Electricity Distributor | 2019-06-04 | 2019-06-04 | |
EB-2018-0219 | OEBStaff_SUB_IRM_PUC Distribution_20190531 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-31 | 2019-05-31 | |
EB-2018-0219 | Appendix 4 - SEC-25 CVR0-9 ICM1-877M rev 20190115 OEB Final.xlsx | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-31 | 2019-05-31 | |
EB-2018-0219 | Appendix 2 - Staff-69 - PUC_2019_Capital_Module_ACM_Model_20190531.xlsm | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-31 | 2019-05-31 | |
EB-2018-0219 | PUC_ICM_IRR_20190531 | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-31 | 2019-05-31 | |
EB-2018-0219 | PO3_PUC_rates_20190522 | Procedural Order | PUC Distribution Inc. - Electricity Distributor | 2019-05-22 | 2019-05-22 | |
EB-2018-0219 | SEC correspondence_PUC_Tax Calculation_20190521 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-05-21 | 2019-05-21 | |
EB-2018-0219 | PUC Distribution_Final 2015 Annual Verified Results Report.xlsx | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-17 | 2019-05-17 | |
EB-2018-0219 | PUC Distribution_2014 Persistence June 15-2016.xlsx | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-17 | 2019-05-17 | |
EB-2018-0219 | PUC Distribution_Staff-19g_Count of Streetlights_20190517.xlsx | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-17 | 2019-05-17 | |
EB-2018-0219 | PUC Distribution_LRAMVA_Work_Form_3.0_20190517.xlsx | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-17 | 2019-05-17 | |
EB-2018-0219 | PUC Distribution_2019-IRM-Rate-Generator-Model_Updated.xlsb | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-17 | 2019-05-17 | |
EB-2018-0219 | PUC Distribution_2019_IRM_IRR Response_20190517 | Interrogatory Response from Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-17 | 2019-05-17 | |
EB-2018-0219 | OEB Letter_Granting_Extension_IRR_20190515 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-05-15 | 2019-05-15 | |
EB-2018-0219 | PUC_LTR_Time_Extension_20190513 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-05-13 | 2019-05-13 | |
EB-2018-0219 | CCC.Interrogatories.PUC.Dx.ICM.2019 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-07 | 2019-05-07 | |
EB-2018-0219 | VECC_IR_PUC_20190505 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-06 | 2019-05-06 | |
EB-2018-0219 | PUC Distribution_2019-IRM-Rate-Generator-Model_Updated | Rate Model | PUC Distribution Inc. - Electricity Distributor | 2019-05-03 | 2019-05-03 | |
EB-2018-0219 | OEB staff Interrogatories_20190503 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-03 | 2019-05-03 | |
EB-2018-0219 | SEC Interrogatories_20190503 | Interrogatories to Applicant | PUC Distribution Inc. - Electricity Distributor | 2019-05-03 | 2019-05-03 | |
EB-2018-0219 | PO2_PUC_rates_20190503 | Procedural Order | PUC Distribution Inc. - Electricity Distributor | 2019-05-03 | 2019-05-03 | |
EB-2018-0219 | Interim Rate Order_20190410 | Interim rate order | PUC Distribution Inc. - Electricity Distributor | 2019-04-10 | 2019-04-10 | |
EB-2018-0219 | PO1_PUC_rates_20190404 | Procedural Order | PUC Distribution Inc. - Electricity Distributor | 2019-04-04 | 2019-04-04 | |
EB-2018-0219 | PUC Distribution_LRAMVA_Work_Form_3.0_20190131 v2 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-04-01 | 2019-04-01 | |
EB-2018-0219 | CCC_IntrvREQ_PUC_20190319 | Intervenor Request Letter | PUC Distribution Inc. - Electricity Distributor | 2019-03-19 | 2019-03-19 | |
EB-2018-0219 | VECC_IntrvREQ_PUC_20190315 | Intervenor Request Letter | PUC Distribution Inc. - Electricity Distributor | 2019-03-18 | 2019-03-18 | |
EB-2018-0219 | PUC Distribution_Affidavit_20190313 | Affidavits of Service | PUC Distribution Inc. - Electricity Distributor | 2019-03-13 | 2019-03-13 | |
EB-2018-0219 | SEC Notice of Intervention_20190313 | Intervenor Request Letter | PUC Distribution Inc. - Electricity Distributor | 2019-03-13 | 2019-03-13 | |
EB-2018-0219 | notice_bilingual_PUC_2019 rates_20190307 | Notice of Hearing | PUC Distribution Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0219 | LoD_PUC_2019 rates_20190307 | Letter of Direction | PUC Distribution Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0219 | Completeness Letter_PUC_20190206 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-02-06 | 2019-02-06 | |
EB-2018-0219 | ack_ltr_PUC_20190201 | Correspondence | PUC Distribution Inc. - Electricity Distributor | 2019-02-01 | 2019-02-01 | |
EB-2018-0219 | PUC_APPL_IRM_ICM_Part 2_20190131 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-01-31 | 2019-01-31 | |
EB-2018-0219 | PUC Distribution_LRAMVA_Work_Form_3.0_20190131 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-01-31 | 2019-01-31 | |
EB-2018-0219 | PUC Distribution_GA_Analysis_Workform_20190131 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-01-31 | 2019-01-31 | |
EB-2018-0219 | PUC Distribution_2019-IRM-Rate-Generator-Model_20190131 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-01-31 | 2019-01-31 | |
EB-2018-0219 | PUC Distribution_1595 Workform Beta 4.0_20190131 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-01-31 | 2019-01-31 | |
EB-2018-0219 | PUC Distribution_2019_Capital_Module_ACM_Model_20190131 | Application and Evidence | PUC Distribution Inc. - Electricity Distributor | 2019-01-31 | 2019-01-31 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |