Search Results for: Records - Case Number=EB-2017-0069 - 86 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2017-0069 | dec_order_cost awards_Oshawa_20180227 | Decision and Order on Cost Awards | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-02-27 | 2018-02-27 | |
EB-2017-0069 | Rate Order_Oshawa PUC_20180201 | Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-02-01 | 2018-02-01 | |
EB-2017-0069 | CCC_CostClaim_20180123 | Cost Claim | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-23 | 2018-01-23 | |
EB-2017-0069 | OPUCN_Weather Normalization Regression Model_Draft Rate Order_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_Rev_Reqt_Work_Form_V4_2019_RUN_1_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_Rev_Reqt_Work_Form_V4_2018_RUN_1_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_Rate Design Model - 2015 to 2019_RUN_1_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_CostOfPower Working_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_2018_RTSR_Workform_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_2018_DVA_Continuity_Schedule_CoS_20170724_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_2018_2019_Bill_Impacts_and_TariffSheets_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN__Fixed Asset Continuity Schedules 2018-2019_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | OPUCN_Cvr letter_Updated_Draft Rate Order_20180122 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-22 | 2018-01-22 | |
EB-2017-0069 | VECC_Cost Claim_20170118 | Cost Claim | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-18 | 2018-01-18 | |
EB-2017-0069 | SEC_CostClaim_20180119 | Cost Claim | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-19 | 2018-01-19 | |
EB-2017-0069 | OEBstaff_DRO_SUB_Oshawa_20180115 | Submission | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-15 | 2018-01-15 | |
EB-2017-0069 | OPUCN__Fixed Asset Continuity Schedules 2018-2019_20180111 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-11 | 2018-01-11 | |
EB-2017-0069 | OPUCN__2018-2019 Update - Rate Design Model_20180111 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-11 | 2018-01-11 | |
EB-2017-0069 | OPUCN_Cvr letter_Draft Rate Order_Oshawa_20180111_update_signed | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-11 | 2018-01-11 | |
EB-2017-0069 | OPUCN_Weather Normalization Regression Model_Draft Rate Order_20180109 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN_CostOfPower Working_20180109 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN_2018_RTSR_Workform_20180109 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN_2018_DVA_Continuity_Schedule_CoS_20170724_20180109 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN_2018_2019_Bill_Impacts_20180109 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN__Rev_Reqt_Work_Form_V4_2019_RUN_1_20180109 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN__Rev_Reqt_Work_Form_V4_2018_RUN_1_20180109 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN_Cvr letter_Draft Rate Order_Oshawa_20180108_signed | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | OPUCN_Draft Rate Order_Oshawa_20180105 | Draft Rate Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2018-01-08 | 2018-01-08 | |
EB-2017-0069 | dec_order_Oshawa_20171220 | Decision and Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-12-20 | 2017-12-20 | |
EB-2017-0069 | OPUCN_ReplySUB_20171130 | Submission | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-30 | 2017-11-30 | |
EB-2017-0069 | VECC_Sub_OPUCN_20171123 | Submission | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-23 | 2017-11-23 | |
EB-2017-0069 | CCC_Sub_OPUCN_20171123 | Submission | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-23 | 2017-11-23 | |
EB-2017-0069 | OEBStaff_Sub_OPUCN_20171122 | Submission | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-22 | 2017-11-22 | |
EB-2017-0069 | SEC_Sub_OPUCN_20171122 | Submission | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-22 | 2017-11-22 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_IESO CDM EE CE Tool PortfolioLevel Master 080116-v13_OPUCN_201_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_IESO CDM EE CE Tool PortfolioLevel Master 080116-v13_OPUCN_201_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_Reg Infrastructure Planning Report 2017_GTA East_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_OPUC CDM by year by customer type_V2_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_EB_2017_0169_OPUCN_GA_Analysis_Workform_For 2015_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_EB_2017_0169_OPUCN_2018_DVA_Continuity_Sched_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_CostOfPowerCalc_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_CDM Plan_Oshawa PUC Networks_May 1 2017_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_CDM Plan_Oshawa PUC Networks_Aug15 2017_V1_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_44KV DIAGRAM with proposed Enfield feeders_01_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | OPUCN_Undertakings_Ex_JT1_20171115 | Undertaking Responses | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-15 | 2017-11-15 | |
EB-2017-0069 | PO2_Oshawa _20171103 | Procedural Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-03 | 2017-11-03 | |
EB-2017-0069 | OPUCN_Amended Response to IR SEC-3_20171101 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-11-01 | 2017-11-01 | |
EB-2017-0069 | OPUCN_IR_Response_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_Final_2016_Annual_CDM_Results_20170727 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_2011_2014_Final_Results_HC_OPUCN_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_Q4_2015_CDM_StatusReport_OshawaPUC_NetworksInc_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_Weather Normalization_Trend Model_Mid Term 2017_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_Rate Design Model - 2015 to 2019_RUN_1_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_Chapter2_Appendices - Tab 2-V for 2018 to 2019_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_Chapter2_Appendices - Tab 2-PA for 2017 to 2019_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_2018_RTSR_Workform_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | OPUCN_2018_DVA_Continuity_Schedule_20171027 | Interrogatory Response from Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-27 | 2017-10-27 | |
EB-2017-0069 | SEC_IR_Oshawa_20171013 | Interrogatories to Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-13 | 2017-10-13 | |
EB-2017-0069 | VECC_IR_Oshawa_20171013 | Interrogatories to Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-12 | 2017-10-12 | |
EB-2017-0069 | CCC_IR_Oshawa_20171011 | Interrogatories to Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-11 | 2017-10-11 | |
EB-2017-0069 | OEB Staff_IR_Oshawa_20171005 | Interrogatories to Applicant | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-05 | 2017-10-05 | |
EB-2017-0069 | po1_Oshawa PUC_20171002 | Procedural Order | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-10-02 | 2017-10-02 | |
EB-2017-0069 | OEB_Reply Ltr_Capredoni_Oshawa_20170918 | Correspondence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-09-18 | 2017-09-18 | |
EB-2017-0069 | OPUCN_IntrvObj_20170908 | Intervenor Request Objection | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-09-08 | 2017-09-08 | |
EB-2017-0069 | VECC_INT REQ_20170905 | Intervenor Request Letter | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-09-05 | 2017-09-05 | |
EB-2017-0069 | CCC_INT REQ_20170905.pdf | Intervenor Request Letter | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-09-05 | 2017-09-05 | |
EB-2017-0069 | E Capredoni_INT_REQ_20170829 | Intervenor Request Letter | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-08-29 | 2017-08-29 | |
EB-2017-0069 | R Capredoni_INT_REQ_20170829 | Intervenor Request Letter | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-08-29 | 2017-08-29 | |
EB-2017-0069 | Affidavits of Service_Oshawa PUC_20170828 | Affidavits of Service | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-08-28 | 2017-08-28 | |
EB-2017-0069 | noa_Oshawa PUC_dated_20170825 | Notice | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-08-25 | 2017-08-25 | |
EB-2017-0069 | SEC_INT_REQ_20170824 | Intervenor Request Letter | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-08-24 | 2017-08-24 | |
EB-2017-0069 | noh_Oshawa PUC_20170821 | Notice of Hearing | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-08-21 | 2017-08-21 | |
EB-2017-0069 | lod_noh_Oshawa PUC_20170821 | Letter of Direction | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-08-21 | 2017-08-21 | |
EB-2017-0069 | Capredoni_IntrvREQ_20170708 | Intervenor Request Letter | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-10 | 2017-07-10 | |
EB-2017-0069 | OPUCN_APPL_Rev_Reqt_Work_Form_V4_2019_RUN_1_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_Rev_Reqt_Work_Form_V4_2018_RUN_1_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_2018-2019_Bill_Impacts_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_2018_RTSR_Workform_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_2018_DVA_Continuity_Schedule_Jun2017_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_Ex B_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_Ex A_Att 1_Hydro One CCRA_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_Ex A_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | OPUCN_APPL_CovLtr re Supporting Evidence_20170707 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-07 | 2017-07-07 | |
EB-2017-0069 | AckLtr_Oshawa PUC_20170706 | Acknowledgement Letter | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-06 | 2017-07-06 | |
EB-2017-0069 | OPUCN_APPL_20170704 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-04 | 2017-07-04 | |
EB-2017-0069 | OPUCN_APPL_CovLtr_20170704 | Application and Evidence | Oshawa PUC Networks Inc. - Electricity Distributor | 2017-07-04 | 2017-07-04 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |