Search Results for: Records - Case Number=EB-2017-0150 - 150 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2017-0150 | Dec_Order_on Cost Awards_20180205 | Decision and Order on Cost Awards | Independent Electricity System Operator - IESO | 2018-02-05 | 2018-02-05 | |
EB-2017-0150 | BOMA_Reply_Obj_CostClaim_20180124 | Correspondence | Independent Electricity System Operator - IESO | 2018-01-24 | 2018-01-24 | |
EB-2017-0150 | IESO_Ltr_re Cost Claims_20180119 | Correspondence | Independent Electricity System Operator - IESO | 2018-01-19 | 2018-01-19 | |
EB-2017-0150 | AMPCO_IESO_CostClaim_20180110 | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-10 | 2018-01-10 | |
EB-2017-0150 | ED_CostClaim_20180108 | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-08 | 2018-01-08 | |
EB-2017-0150 | CME Cost Claim_20180109 | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-08 | 2018-01-08 | |
EB-2017-0150 | OSEA_CostClaim_20180108 | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-08 | 2018-01-08 | |
EB-2017-0150 | APPrO_CostClaim_IESO fees 2017_20180108 | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-08 | 2018-01-08 | |
EB-2017-0150 | VECC Cost claim EB-2017-0150 IESO.pdf | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-08 | 2018-01-08 | |
EB-2017-0150 | BOMA_Cost_Claim_20180105 | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-08 | 2018-01-08 | |
EB-2017-0150 | SEC_IESO_CostClaim_20180103.pdf | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-03 | 2018-01-03 | |
EB-2017-0150 | EP cost claim 2017-0150 IESO 2017 fees_20180103 | Cost Claim | Independent Electricity System Operator - IESO | 2018-01-03 | 2018-01-03 | |
EB-2017-0150 | Decision and Order | Decision and Order | Independent Electricity System Operator - IESO | 2017-12-14 | 2017-12-14 | |
EB-2017-0150 | IESO_ LtrInterimFees_ 20171207 | Correspondence | Independent Electricity System Operator - IESO | 2017-12-07 | 2017-12-07 | |
EB-2017-0150 | IESO_ReplyArg_20171117 | Applicant Reply Argument | Independent Electricity System Operator - IESO | 2017-11-20 | 2017-11-20 | |
EB-2017-0150 | VECC Final Submission_IESO_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | OSEA_LTR_SUB_REVEXP_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-11-13 | 2017-11-13 | |
EB-2017-0150 | CME_Argument_20171110 | Argument | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | OSEA_Sub_Letter_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | OEB Staff Submission_IESO Settlement_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | BOMA_SUB_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-10-11 | 2017-10-11 | |
EB-2017-0150 | SEC_IESO_Submissions_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-10-11 | 2017-10-11 | |
EB-2017-0150 | PWU_SUB_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-10-11 | 2017-10-11 | |
EB-2017-0150 | ED_Submissions_171110.pdf | Submission | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | AMPCO_SUB_IESO_20171110 | Submission | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | Energy Probe_cvr letter_Final Argument_20171110 | Argument | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | Energy Probe_final argument_20171110 | Argument | Independent Electricity System Operator - IESO | 2017-11-10 | 2017-11-10 | |
EB-2017-0150 | IESO_Ltr_Argument-in-Chief_20171103 | Applicant Argument in Chief | Independent Electricity System Operator - IESO | 2017-11-03 | 2017-11-03 | |
EB-2017-0150 | IESO_Dec_PO5_20171031 | Decision | Independent Electricity System Operator - IESO | 2017-10-31 | 2017-10-31 | |
EB-2017-0150 | Ontario Energy Board | Procedural Order | Independent Electricity System Operator - IESO | 2017-10-31 | 2017-10-31 | |
EB-2017-0150 | ED_replyLtr_to IESO_20171024 | Correspondence | Independent Electricity System Operator - IESO | 2017-10-24 | 2017-10-24 | |
EB-2017-0150 | IESO_RespEDMotion_20171024 | Correspondence | Independent Electricity System Operator - IESO | 2017-10-23 | 2017-10-23 | |
EB-2017-0150 | IESO_Ltr_IRR_20171020.pdf | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-10-20 | 2017-10-20 | |
EB-2017-0150 | PO4_IESO Fees Case_20171018 | Procedural Order | Independent Electricity System Operator - IESO | 2017-10-18 | 2017-10-18 | |
EB-2017-0150 | ED_CvrLtrMotion_171016.pdf | Motion | Independent Electricity System Operator - IESO | 2017-10-16 | 2017-10-16 | |
EB-2017-0150 | ED_Motion_IESO_20171016.pdf | Motion | Independent Electricity System Operator - IESO | 2017-10-16 | 2017-10-16 | |
EB-2017-0150 | PO3_IESO Fees Case_20171013 | Procedural Order | Independent Electricity System Operator - IESO | 2017-10-13 | 2017-10-13 | |
EB-2017-0150 | OEB Staff Submission_IESO Settlement_EB-2017-0150_2017.pdf | Submission | Independent Electricity System Operator - IESO | 2017-10-06 | 2017-10-06 | |
EB-2017-0150 | BOMA_Correspondence_20171010 | Correspondence | Independent Electricity System Operator - IESO | 2017-10-10 | 2017-10-10 | |
EB-2017-0150 | IESO_Ltr_Submission_20171006 | Submission | Independent Electricity System Operator - IESO | 2017-10-06 | 2017-10-06 | |
EB-2017-0150 | CME_SUB_Form of Hearing_IESO_20171006 | Submission | Independent Electricity System Operator - IESO | 2017-10-06 | 2017-10-06 | |
EB-2017-0150 | SEP_SUB_Oral Hearing_IESO_20171005 | Submission | Independent Electricity System Operator - IESO | 2017-10-05 | 2017-10-05 | |
EB-2017-0150 | ED_SUB_Oral Hearing_IESO_20171005 | Submission | Independent Electricity System Operator - IESO | 2017-10-05 | 2017-10-05 | |
EB-2017-0150 | Settlement Proposal_S-1-1_20171003 | Settlement Proposal | Independent Electricity System Operator - IESO | 2017-10-03 | 2017-10-03 | |
EB-2017-0150 | IESO_ CvrLtr_Settlement_20171003 | Correspondence | Independent Electricity System Operator - IESO | 2017-10-03 | 2017-10-03 | |
EB-2017-0150 | IESO_PWU_IRR_Exhibit I_Tab 1.6_Schedule 6.02_Updated_20171003 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-10-03 | 2017-10-03 | |
EB-2017-0150 | IESO_Ltr_20170929 | Correspondence | Independent Electricity System Operator - IESO | 2017-09-29 | 2017-09-29 | |
EB-2017-0150 | IESO_Ltr_EB-2017-0150_20170929 | Correspondence | Independent Electricity System Operator - IESO | 2017-09-29 | 2017-09-29 | |
EB-2017-0150 | IESO_IRR_ISSUE 5.3_REVISED_20170913 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-13 | 2017-09-13 | |
EB-2017-0150 | IESO_IRR_ISSUE_3.0 REVISED_20170913 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-13 | 2017-09-13 | |
EB-2017-0150 | IESO_IRR_ISSUE_ 1.3_revised_20170913 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-13 | 2017-09-13 | |
EB-2017-0150 | IESO_IRR_Letter to OEB_20170913 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-13 | 2017-09-13 | |
EB-2017-0150 | IESO_IRR_ISSUE_1.6_REVISED_20170913 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-13 | 2017-09-13 | |
EB-2017-0150 | IESO_IRR_Exhibit ListRevised_20170913 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-13 | 2017-09-13 | |
EB-2017-0150 | IESO_IRR_ISSUE_5.1_20170908 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-08 | 2017-09-08 | |
EB-2017-0150 | IESO_LTR_IRR_20170908 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-08 | 2017-09-08 | |
EB-2017-0150 | IESO_IRR_EXHIBITLIST_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_LTR_IRR_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_6.1_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_5.4_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_5.3_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_5.2_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_5.1_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_5.0_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_4.4_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_4.3_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_4.2_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_4.1_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_4.0_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_3.1_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_3.0_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_2.2_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_2.1_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_2.0_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_1.6_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_1.5_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_1.4_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_1.3_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_1.2_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE_1.0_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE 6.0_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE 1.1_PART3_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE 1.1_PART2_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE 1.1_PART1b_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | IESO_IRR_ISSUE 1.1_PART1a_20170907 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2017-09-07 | 2017-09-07 | |
EB-2017-0150 | OEB Staff Expert Evidence_20170825 | Correspondence | Independent Electricity System Operator - IESO | 2017-08-25 | 2017-08-25 | |
EB-2017-0150 | AMPCO_IR_IESO_20170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-18 | 2017-08-18 | |
EB-2017-0150 | OEB Staff IRs IESO Issues List_EB-2017-0150_20170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | Society_ IRs_IESO_20170818 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | CME _IRS_IESO_20170818 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | Society_ IRs_IESO_20170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | OSEA_IR_IESO_20170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | SEC_IESO_IR_20170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | EP_IRs_ IESO 2017 Fees_20170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | VECC_IR_IESO_0150_20170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | ED_IRs_170817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-17 | 2017-08-17 | |
EB-2017-0150 | BOMA_IRs_20170816 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-16 | 2017-08-16 | |
EB-2017-0150 | PWU_IR_IESO_20170814.pdf | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2017-08-14 | 2017-08-14 | |
EB-2017-0150 | APPrO_LTR_Decision_on_Issues_List_20170811 | Submission | Independent Electricity System Operator - IESO | 2017-08-11 | 2017-08-11 | |
EB-2017-0150 | dec_Final Issues List_IESO Fees_20170804 | Decision | Independent Electricity System Operator - IESO | 2017-08-04 | 2017-08-04 | |
EB-2017-0150 | APPrO_Completion of record_20170801 | Correspondence | Independent Electricity System Operator - IESO | 2017-08-01 | 2017-08-01 | |
EB-2017-0150 | VECC_SUB_IESO_IssueList_Sub2_20170728 | Submission | Independent Electricity System Operator - IESO | 2017-07-28 | 2017-07-28 | |
EB-2017-0150 | BrdStaff_ Further Sub_on Draft IESO Issues List_20170727 | Submission | Independent Electricity System Operator - IESO | 2017-07-27 | 2017-07-27 | |
EB-2017-0150 | APPrO_Additional_Submissions_on_IssuesList_20170727 | Submission | Independent Electricity System Operator - IESO | 2017-07-27 | 2017-07-27 | |
EB-2017-0150 | SEC_Sub_IESO_IssuesListPO2_20170727 | Submission | Independent Electricity System Operator - IESO | 2017-07-27 | 2017-07-27 | |
EB-2017-0150 | EP_Sub_Benefits-Case-Assessment-Market-Renewal-Project_20170727 | Submission | Independent Electricity System Operator - IESO | 2017-07-27 | 2017-07-27 | |
EB-2017-0150 | EP_ Sub_IESO 2017 Fees_Issues List Part 2_20170727 | Submission | Independent Electricity System Operator - IESO | 2017-07-27 | 2017-07-27 | |
EB-2017-0150 | AMPCO_Sub_20170727 | Submission | Independent Electricity System Operator - IESO | 2017-07-27 at 10:02 AM | ||
EB-2017-0150 | BOMA_SUB_20170727 | Submission | Independent Electricity System Operator - IESO | 2017-07-27 | 2017-07-27 | |
EB-2017-0150 | APPrO_Ltr replying to IESO July 18 letter_20170719 | Correspondence | Independent Electricity System Operator - IESO | 2017-07-19 | 2017-07-19 | |
EB-2017-0150 | IESO_Ltr_EB-2017-0150_20170718 | Correspondence | Independent Electricity System Operator - IESO | 2017-07-18 | 2017-07-18 | |
EB-2017-0150 | PO2_IESO_20170717 | Procedural Order | Independent Electricity System Operator - IESO | 2017-07-17 | 2017-07-17 | |
EB-2017-0150 | IESO_Submission_20170710 | Submission | Independent Electricity System Operator - IESO | 2017-07-11 | 2017-07-11 | |
EB-2017-0150 | VECC_IESO0150_IssueList_20170630 | Submission | Independent Electricity System Operator - IESO | 2017-07-04 | 2017-07-04 | |
EB-2017-0150 | C-1-1_Attachment 2_IESO scorecard_20170630 | Exhibits | Independent Electricity System Operator - IESO | 2017-06-30 | 2017-06-30 | |
EB-2017-0150 | A-1-2 Updated_Exhibit List_20170630 | Exhibits | Independent Electricity System Operator - IESO | 2017-06-30 | 2017-06-30 | |
EB-2017-0150 | C-1-1 Updated_ IESO Regulatory Scorecard_20170630 | Exhibits | Independent Electricity System Operator - IESO | 2017-06-30 | 2017-06-30 | |
EB-2017-0150 | C-1-1 Attachment 1_ Elenchus Report - IESO Scorecard_20170630 | Exhibits | Independent Electricity System Operator - IESO | 2017-06-30 | 2017-06-30 | |
EB-2017-0150 | B-4-1_Other Variance Accounts OPEB_20170630 | Exhibits | Independent Electricity System Operator - IESO | 2017-06-30 | 2017-06-30 | |
EB-2017-0150 | OEB Staff_SUB_Draft IESO Issues List_20170630 | Submission | Independent Electricity System Operator - IESO | 2017-06-30 | 2017-06-30 | |
EB-2017-0150 | APPrO_SUB_Issues_List_20170630 | Submission | Independent Electricity System Operator - IESO | 2017-06-30 | 2017-06-30 | |
EB-2017-0150 | EnergyProbe_SUB_Issue List_IESO 2017 Revenue Application_20170629 | Submission | Independent Electricity System Operator - IESO | 2017-06-29 | 2017-06-29 | |
EB-2017-0150 | EnergyProbe_SUB_Issue List_cvrltr_IESO 2017 Revenue Application_20170629 | Submission | Independent Electricity System Operator - IESO | 2017-06-29 | 2017-06-29 | |
EB-2017-0150 | PO1_IESO Revenue Requirement_20170623 | Procedural Order | Independent Electricity System Operator - IESO | 2017-06-23 | 2017-06-23 | |
EB-2017-0150 | IESO_Correspondence__20170623 | Correspondence | Independent Electricity System Operator - IESO | 2017-06-23 | 2017-06-23 | |
EB-2017-0150 | APPrO_Intervention_Request_IESOfees2017_20170616 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-16 | 2017-06-16 | |
EB-2017-0150 | ED_IntReq_20170612 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-13 | 2017-06-13 | |
EB-2017-0150 | CME_IntvnRQST_20170613 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-13 | 2017-06-13 | |
EB-2017-0150 | BOMA_Correspondence_20170612 | Correspondence | Independent Electricity System Operator - IESO | 2017-06-12 | 2017-06-12 | |
EB-2017-0150 | AMPCO_IntervReq_IESO_20170612 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-12 | 2017-06-12 | |
EB-2017-0150 | HQEM_IntervReq_IESO_20170609 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-09 | 2017-06-09 | |
EB-2017-0150 | VECC_IntvRQST_IESO_20170609 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-09 | 2017-06-09 | |
EB-2017-0150 | SEP_IntvrReq_IESO_20170609 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-09 | 2017-06-09 | |
EB-2017-0150 | OPG_IntrvREQ_IESO_20170606 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-06 | 2017-06-06 | |
EB-2017-0150 | OSEA_IntrvREQ_IESO_20170606 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-06 | 2017-06-06 | |
EB-2017-0150 | PWU_Participation Letter_IESO Exp and Rev Req_20170606 | Participation Request Letter | Independent Electricity System Operator - IESO | 2017-06-06 | 2017-06-06 | |
EB-2017-0150 | Affidavit_cvrltr_IESO_20170602 | Affidavits of Service | Independent Electricity System Operator - IESO | 2017-06-02 | 2017-06-02 | |
EB-2017-0150 | Affidavit_IESO_20170602 | Affidavits of Service | Independent Electricity System Operator - IESO | 2017-06-02 | 2017-06-02 | |
EB-2017-0150 | SEC_IntvnRQST_20170601 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-06-01 | 2017-06-01 | |
EB-2017-0150 | EP_cvrltr_intvnRQST_20170530 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-05-30 | 2017-05-30 | |
EB-2017-0150 | EP_IntvnRQST_IESO 2017 Revenue_20170530 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-05-30 | 2017-05-30 | |
EB-2017-0150 | Notice_IESO_Dated_EN_20170523 | Notice | Independent Electricity System Operator - IESO | 2017-05-23 | 2017-05-23 | |
EB-2017-0150 | Notice_IESO_Dated_FR_20170523 | Notice | Independent Electricity System Operator - IESO | 2017-05-23 | 2017-05-23 | |
EB-2017-0150 | BOMA_IntREQ_CostEligREQ_20170529 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2017-05-29 | 2017-05-29 | |
EB-2017-0150 | Notice_IESO_FR_20170523 | Notice | Independent Electricity System Operator - IESO | 2017-05-23 | 2017-05-23 | |
EB-2017-0150 | Notice_IESO_EN_20170523 | Notice | Independent Electricity System Operator - IESO | 2017-05-23 | 2017-05-23 | |
EB-2017-0150 | LoD_Notice_IESO_EB-2017-0150_20170523 | Letter of Direction | Independent Electricity System Operator - IESO | 2017-05-23 | 2017-05-23 | |
EB-2017-0150 | ack_ltr_IESO 2017 Fees_20170426 | Acknowledgement Letter | 2017-04-26 | 2017-04-26 | ||
EB-2017-0150 | IESO_APP_Revenue Requirement_20170424 | Application and Evidence | Independent Electricity System Operator - IESO | 2017-04-24 | 2017-04-24 | |
EB-2017-0150 | IESO_CvrLtr_APP_Revenue Requirement_20170424 | Application and Evidence | Independent Electricity System Operator - IESO | 2017-04-24 | 2017-04-24 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |