Search Results for: Records - Case Number=EB-2012-0168 - 108 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2012-0168 | Tillsonburg_Tariff_CorrectedforDVAs_20130730 | Rate Order | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-07-30 | 2013-07-30 | |
EB-2012-0168 | Brdltr_Tariff Correction_Tillsonburg Hydro_20130730 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-07-30 | 2013-07-30 | |
EB-2012-0168 | 2013_EDDVAR_Continuity_Schedule_CoS_v2_20120706 Sept 25 Revised July 22 2013 | Rate Model | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-07-30 | 2013-07-30 | |
EB-2012-0168 | Tillsonburg Hydro Inc_Settlement Agreement_Error_20130717 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-07-17 | 2013-07-17 | |
EB-2012-0168 | Tillsonburg_rev_Tariff of Rates and Charges_20130523 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-05-23 | 2013-05-23 | |
EB-2012-0168 | Brdltr_Tariff Correction_Tillsonburg Hydro_20130523 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-05-23 | 2013-05-23 | |
EB-2012-0168 | dec_order_Cost Awards_Tillsonburg Hydro_20130522 | Decision and Order on Cost Awards | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-05-22 | 2013-05-22 | |
EB-2012-0168 | VECC_Cost Claim_Tillsonburg_20130423 | Cost Claim | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-04-23 | 2013-04-23 | |
EB-2012-0168 | Energy Probe_Cost Claim_Tillsonburg Hydro_20130418 | Cost Claim | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-04-19 | 2013-04-19 | |
EB-2012-0168 | OEB Reply_VECC cost claim extension request_20130416 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-04-16 | 2013-04-16 | |
EB-2012-0168 | OEB Reply_VECC cost claim extension request_20130416 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-04-16 | 2013-04-16 | |
EB-2012-0168 | VECC_Cost Claim_extension request_20130415 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-04-15 | 2013-04-15 | |
EB-2012-0168 | dec_order_Tillsonburg CoS_20130411 | Decision and Order | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-04-11 | 2013-04-11 | |
EB-2012-0168 | TillsonburgHydroInc_SettlementP_20130325 | Settlement Proposal | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-03-25 | 2013-03-25 | |
EB-2012-0168 | Tillsonburg_late in Filing_Settlement AGR_20130315 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-03-15 | 2013-03-15 | |
EB-2012-0168 | Tillsonburg_IRR_Supplemental_20130228 | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-28 | 2013-02-28 | |
EB-2012-0168 | Tillsonburg_IRR_Supplemental 2013_Rev Reqt Work Form_20130228 | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-28 | 2013-02-28 | |
EB-2012-0168 | Tillsonburg_IRR_Supplemental 2013_SM Model V3_20130228 | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-28 | 2013-02-28 | |
EB-2012-0168 | Tillsonburg_IRR_Supplemental CDM_Adjusted_20130228 | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-28 | 2013-02-28 | |
EB-2012-0168 | Tillsonburg_IRR_Supplemental_CDMWF_20130228 | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-28 | 2013-02-28 | |
EB-2012-0168 | Tillsonburg_IRR_Supplemental_VECC 45 CA Model_20130228 | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-28 | 2013-02-28 | |
EB-2012-0168 | BrdStaff_IR2_Tillsonburg_20130220 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-20 | 2013-02-20 | |
EB-2012-0168 | BrdStaff_IR2_LoadForecastCDMWF_Tillsonburg_20130220 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-20 | 2013-02-20 | |
EB-2012-0168 | VECC_Supplemental IR_Tillsonburg Hydro_20130220 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-20 | 2013-02-20 | |
EB-2012-0168 | Energy Probe_2nd Round IR_cvrltr_Tillsonburg Hydro_20130215 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-16 | 2013-02-16 | |
EB-2012-0168 | PO4_Tillsonburg_20130215 | Procedural Order | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-15 | 2013-02-15 | |
EB-2012-0168 | VECC_TCQ_Tillsonburg Hydro_20130215 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-15 | 2013-02-15 | |
EB-2012-0168 | Tillsonburg_Req to Postpone TC_20130214 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-14 | 2013-02-14 | |
EB-2012-0168 | Energy Probe_TCQ_Tillsonburg Hydro_20130213 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-14 | 2013-02-14 | |
EB-2012-0168 | Energy Probe_TCQ_cvrltr_Tillsonburg Hydro_20130213 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-14 | 2013-02-14 | |
EB-2012-0168 | dec_order_PO3_Tillsonburg_20130207 | Procedural Order | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-07 | 2013-02-07 | |
EB-2012-0168 | dec_order_PO3_Tillsonburg_20130207 | Decision and Order | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-02-07 | 2013-02-07 | |
EB-2012-0168 | Energy Probe_Comments_Confidentiality Request_Tillsonburg Hydro_20130131 | Submission | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-31 | 2013-01-31 | |
EB-2012-0168 | VECC_Confidentiality Submission_Tillsonburg_20130130 | Submission | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-30 | 2013-01-30 | |
EB-2012-0168 | CA Model_20130125 .xls | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-25 | 2013-01-25 | |
EB-2012-0168 | 2013_Rev_Reqt_Work_Form_V3_20120628 PILS Corrected_20130125.xls | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-25 | 2013-01-25 | |
EB-2012-0168 | 2011 Final Annual Report Data_Tillsonburg Hydro Inc_20130125..xls | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-25 | 2013-01-25 | |
EB-2012-0168 | 2009 CA Model_20130125.xls | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-25 | 2013-01-25 | |
EB-2012-0168 | 2006-2010 Final OPA CDM Results.Tillsonburg Hydro Inc_20130125..xls | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-25 | 2013-01-25 | |
EB-2012-0168 | THI IR Responses EB-2012-0168 20130125.pdf | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-25 | 2013-01-25 | |
EB-2012-0168 | D MacIntosh_Declaration and Undertaking_Tillsonburg_20130124 | Declaration and Undertakings | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-24 | 2013-01-24 | |
EB-2012-0168 | RAiken_Confidentiality Declaration_Tillsonburg_20130124 | Declaration and Undertakings | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-24 | 2013-01-24 | |
EB-2012-0168 | Energy Probe_ltr_Declarations_Tillsonburg Hydro_20130124 | Declaration and Undertakings | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-24 | 2013-01-24 | |
EB-2012-0168 | PO2_Tillsonburg Hydro_20130123 | Procedural Order | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-23 | 2013-01-23 | |
EB-2012-0168 | Tillsonburg_Guidance_VECC_EP_IRR_20130123 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-23 | 2013-01-23 | |
EB-2012-0168 | Tillsonburg Hydro_Guidance_VECC IR No 22C_20130121 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-21 | 2013-01-21 | |
EB-2012-0168 | Tillsonburg Hydro_IRR_Brdstaff_Delay in Filing_20130117 | Interrogatory Response from Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-17 | 2013-01-17 | |
EB-2012-0168 | VECC_IR_Tillsonburg_20130104 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-04 | 2013-01-04 | |
EB-2012-0168 | BrdStaff_IR_TillsonburgCoS_20130104 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-04 | 2013-01-04 | |
EB-2012-0168 | Energy Probe_IR_Tillsonburg Hydro_20130102 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-03 | 2013-01-03 | |
EB-2012-0168 | Energy Probe_IR_cvrltr_Tillsonburg Hydro_20130102 | Interrogatories to Applicant | Tillsonburg Hydro Inc. - Electricity Distributor | 2013-01-03 | 2013-01-03 | |
EB-2012-0168 | PO1_Tillsonburg_20121210 | Procedural Order | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-12-10 | 2012-12-10 | |
EB-2012-0168 | VECC_Intervenor REQ_Tillsonburg_20121123 | Intervenor Request Letter | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-11-23 | 2012-11-23 | |
EB-2012-0168 | Energy Probe_Intervenor REQ_Tillsonburg Hydro_20121122 | Intervenor Request Letter | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-11-22 | 2012-11-22 | |
EB-2012-0168 | noah_Tillsonburg_20121116 | Notice of Application and Notice of Hearing | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-11-16 | 2012-11-16 | |
EB-2012-0168 | lod_noah_Tillsonburg_20121116 | Letter of Direction | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-11-16 | 2012-11-16 | |
EB-2012-0168 | Tillsonburg_2013 Chapter 2 Appendices_20121107 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-11-07 | 2012-11-07 | |
EB-2012-0168 | Tillsonburg_Rate Model_20121107 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-11-07 | 2012-11-07 | |
EB-2012-0168 | Rate Model_Tillsonburg_20121107 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-11-07 | 2012-11-07 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 8-9_Part 1 of 1_Corrected_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 5-7_Part 1 of 1_Corrected_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 7 of 7_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 6 of 7_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 5 of 7_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 4 of 7_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 3 of 7_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 2 of 7_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 1 of 7_Corrected_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 3_Part 1 of 1_Corrected_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 4 of 4_Corrected_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 3 of 4_Corrected_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 2 of 4_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 1 of 4_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 1_Part 1 of 1_Addendum_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | Tillsonburg Hydro_cvrltr_APPL_20121023 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-23 | 2012-10-23 | |
EB-2012-0168 | ack_ltr_incomplete_Tillsonburg_20121012 | Acknowledgement Letter | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-12 | 2012-10-12 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex8-9_Corrected_20121005 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-05 | 2012-10-05 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex5-7_Corrected_20121005 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-05 | 2012-10-05 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 3_Corrected_20121005 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-05 | 2012-10-05 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 4_Corrected_20121005 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-05 | 2012-10-05 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 3_Corrected_20121005 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-05 | 2012-10-05 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 1_Part 1_Addendum_20121005 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-05 | 2012-10-05 | |
EB-2012-0168 | ack_ltr_Tillsonburg Hydro_20121003 | Acknowledgement Letter | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-03 | 2012-10-03 | 2012-10-03 |
EB-2012-0168 | Tillsonburg_2013 Chapter 2 Appendices_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg_2013 Smart Meter Model_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg_2013 RTSR MODEL_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg_2013 Rev Reqt Work Form PILS Corrected_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg_2013 Rev Reqt Work Form Board format_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_2013 IncomeTax PILs Workform IFRS_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_2013 IncomeTax PILs Workform GAAP_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg_2013 EDDVAR Continuity Schedule CoS_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_2013_Cost_Allocation_Model_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex8-9_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex5-7_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_part 7_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 4_Part 6_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex 4_part 5_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex 4_Part 4_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex 4_part 3_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex 4_Part 2_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_Ex 4_Part 1_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 3_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 4_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 3_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 2_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 2_Part 1_20121010 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-10 | 2012-10-10 | |
EB-2012-0168 | Tillsonburg Hydro_APPL_EX 1_Part 1_20120928 | Application and Evidence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-10-01 | 2012-10-01 | |
EB-2012-0168 | Tillsonburg_Ltr_2013 COS Filing Delay_20120830 | Correspondence | Tillsonburg Hydro Inc. - Electricity Distributor | 2012-08-30 | 2012-08-30 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |