Advanced Regulatory Document Search (RDS)

 

Search Results for: Records - Case Number=EB-2021-0118 - 159 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2021-0118 document icon Examples of Proposals for Incentives for Third-Party NWAs OEB Webinar Presentation_20231123_20231212 Correspondence Ontario Energy Board 2023-12-12 2023-12-12
EB-2021-0118 document icon OEBLtr_DER Integration Investments_CustomIR_20231010 Correspondence Ontario Energy Board 2023-10-10 2023-10-10
EB-2021-0118 document icon OEB Cvr Ltr_ Filing Guidance_Incentives for Third-Party DERs as NWAs_20230328_eSigned Guidelines Ontario Energy Board 2023-03-28 2023-03-28
EB-2021-0118 document icon Filing Guidance_Incentives for Third-Party DERs as NWAs_20230328 Guidelines Ontario Energy Board 2023-03-28 2023-03-28
EB-2021-0118 document icon Dec_Order_on Cost Awards_FEI_20230228_eSigned Decision and Order on Cost Awards Ontario Energy Board 2023-02-28 2023-02-28
EB-2021-0118 document icon FEI Report_20230130_AODA Correspondence Ontario Energy Board 2023-01-30 2023-01-30
EB-2021-0118 document icon OEB Cvr Ltr_FEI Report_20230130_eSigned Correspondence Ontario Energy Board 2023-01-30 2023-01-30
EB-2021-0118 document icon CCC_Cost Claiim_FEI Phase 3_20230116_FA_20230131 Cost Claim Ontario Energy Board 2023-01-31 2023-01-31
EB-2021-0118 document icon SEC_Cost Claim_FEI Phase 3_20230116_FA_20230123 Cost Claim Ontario Energy Board 2023-01-31 2023-01-31
EB-2021-0118 document icon EVS Cost Claim_FEI_Phase 3_20230116_FA_20230131 Cost Claim Ontario Energy Board 2023-01-31 2023-01-31
EB-2021-0118 document icon PWU_SUB_Completing a DER BCA Framework_20230110 Comments Ontario Energy Board 2023-01-10 2023-01-10
EB-2021-0118 document icon CME_Cost Claim_FEI_Phase 3_20230103_FA_20230131 Cost Claim Ontario Energy Board 2023-01-31 2023-01-31
EB-2021-0118 document icon E_PRO_Cost Claim_FEI_Phase 3_20221215_FA_20230131 Cost Claim Ontario Energy Board 2023-01-31 2023-01-31
EB-2021-0118 document icon NoH_Cost Awards_FEI_Joint Engagement Session_20221214_eSigned Notice of Hearing Ontario Energy Board 2022-12-14 2022-12-14
EB-2021-0118 document icon dec_order_on Cost Awards_20221102_signed Decision and Order on Cost Awards Ontario Energy Board 2022-11-02 2022-11-02
EB-2021-0118 document icon Pollution Probe_Cost Claim Ltr_FEI Correction_20221025 Cost Claim Ontario Energy Board 2022-10-25 2022-10-25
EB-2021-0118 document icon SEC_Cost Claim_FEIWG_Docket Detail February to end plus Report_20220926 Cost Claim Ontario Energy Board 2022-09-26 2022-09-26
EB-2021-0118 document icon ED_Cost Claim_FEIWG Report_Phase2_Sept26_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon SEC_Cost Claim_FEIWG Report_Phase2_Sept26_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon EVS_Cost Claim_FEIWG Report_Phase2_Sept26_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon ANWAA_Cost Claim_FEIWG Report_Phase2_Sept26_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon CCC_Cost Claim_FEIWG Report_Phase2_Sept26_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon E_Probe_Cost Claim_FEIWG Report_Phase2_Sept23_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon OCC_Cost Claim_FEIWG Report_Phase2_Sept22_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon BOMA_Cost Claim_FEIWG Report_Phase 2_Sept22_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon CME_Cost Claim_FEIWG Report_Phase2_Sept22_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon AMPCO__Cost Claim_FEIWG Report_Phase2_Sept22_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon P_Probe_Cost Claim_FEIWG Report_Phase2_Sept21_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon IGUA_Cost Claim_FEIWG Report_Phase2_Sept22_FA_20221007 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon LPMA_Cost Claim_FEIWG Report_Phase2_Sept20_FA_20220920 Cost Claim Ontario Energy Board 2022-10-07 2022-10-07
EB-2021-0118 document icon NoH_Cost Awards_FEIWG_P2_20220912_Esigned Notice of Hearing Ontario Energy Board 2022-09-12 2022-09-12
EB-2021-0118 document icon CCC_Comments_FEIWG Report_20220906 Comments Ontario Energy Board 2022-09-06 2022-09-06
EB-2021-0118 document icon BOMA_Comments_FEIWG Report_20220906 Comments Ontario Energy Board 2022-09-04 2022-09-04
EB-2021-0118 document icon Elexicon_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon Hydro Ottawa_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon THESL_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon EDA_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon EVS_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon Anwaatin_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon TAF_Comments_FEI WG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon EnergyProbe_Comments_FEI WG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon ED_Comments_FEI WG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon BOMA_Comments_FEI WG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon PeakPower_Comments_FEI WG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon AMPCO_IGUA_Comments_FEI WG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon PollutionProbe_Comments_FEI WG_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon Alectra_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon OEA_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon Essex Powerlines_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon HONI_Comments_FEIWG Report_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon LPMA_Comments_FEIWG_20220902 Comments Ontario Energy Board 2022-09-02 2022-09-02
EB-2021-0118 document icon SEC_Comments_FEIWG_20220901 Comments Ontario Energy Board 2022-09-01 2022-09-01
EB-2021-0118 document icon PWU_Comments_FEI WG Reports_20220831 Comments Ontario Energy Board 2022-08-31 2022-08-31
EB-2021-0118 document icon CME_Comments_FEIWG Report_20220830 Comments Ontario Energy Board 2022-08-30 2022-08-30
EB-2021-0118 document icon CME_cvrltr_Comments_FEIWG_20220830 Comments Ontario Energy Board 2022-08-30 2022-08-30
EB-2021-0118 document icon OCC_Comments_FEIWG Report Updated_20220831 Comments Ontario Energy Board 2022-08-30 2022-08-30
EB-2021-0118 document icon ESA_Comments_FEIWG_20220825 Comments Ontario Energy Board 2022-08-26 2022-08-26
EB-2021-0118 document icon ESA_Comments_FEIWG_202208 Comments Ontario Energy Board 2022-08-25 2022-08-25
EB-2021-0118 document icon Demand Power Group_Comments_FEIWG_20220817 Comments Ontario Energy Board 2022-08-17 2022-08-17
EB-2021-0118 document icon CHEC_Comments_FEIWG_20220816 Comments Ontario Energy Board 2022-08-16 2022-08-16
EB-2021-0118 document icon OEB Ltr_FEIWG_Extension for Comments_20220726_Esigned Correspondence Ontario Energy Board 2022-07-26 2022-07-26
EB-2021-0118 document icon Appendix D_FEIWG_Terms-of-Reference_20220630 Correspondence Ontario Energy Board 2022-07-06 2022-07-06
EB-2021-0118 document icon OEB Letter_Inviting Comments on FEIWG Report_20220706_Esigned Correspondence Ontario Energy Board 2022-07-06 2022-07-06
EB-2021-0118 document icon Appendix C_DERI Subgroup Report_20220630 Correspondence Ontario Energy Board 2022-07-06 2022-07-06
EB-2021-0118 document icon Appendix B_UI Subgroup Report_20220630 Correspondence Ontario Energy Board 2022-07-06 2022-07-06
EB-2021-0118 document icon Appendix A_BCA Subgroup Report_20220630 Correspondence Ontario Energy Board 2022-07-06 2022-07-06
EB-2021-0118 document icon FEIWG Report to the OEB_20220630 Correspondence Ontario Energy Board 2022-07-06 2022-07-06
EB-2021-0118 document icon Dec Order Cost Awards_FEIWG_20220324 Decision and Order on Cost Awards Ontario Energy Board 2022-03-24 2022-03-24
EB-2021-0118 document icon SEC_SummRevised_CostClaim_FEIWG_20220314 Cost Claim Ontario Energy Board 2022-03-14 2022-03-14
EB-2021-0118 document icon OEB Ltr_OEB_IESO_Joint Engagement_2022April13_20220308_signed Notice Ontario Energy Board 2022-03-08 2022-03-08
EB-2021-0118 document icon SEC_Cost Claim_FEIWG_Phase 1_late_20220307 Cost Claim Ontario Energy Board 2022-03-07 2022-03-07
EB-2021-0118 document icon SEC_Cost Claim_ExtensionLetterRequest_FEI WG_20220304 Cost Claim Ontario Energy Board 2022-03-04 2022-03-04
EB-2021-0118 document icon ED_Cost Claim_FEI Phase 1_275-20220302 Cost Claim Ontario Energy Board 2022-03-02 2022-03-02
EB-2021-0118 document icon IGUA_Cost Claim_FEI Phase 1_242-20220302 Cost Claim Ontario Energy Board 2022-03-02 2022-03-02
EB-2021-0118 document icon AMPCO_Cost Claim_FEI Phase 1_234-20220302 Cost Claim Ontario Energy Board 2022-03-02 2022-03-02
EB-2021-0118 document icon CCC_Cost Claim_FEI Phase 1_264-20220302 Cost Claim Ontario Energy Board 2022-03-02 2022-03-02
EB-2021-0118 document icon EVS_Cost Claim_FEI Phase 1_259-20220302 Cost Claim Ontario Energy Board 2022-03-02 2022-03-02
EB-2021-0118 document icon ANWAA_Cost Claim_FEI Phase 1_258-20220302 Cost Claim Ontario Energy Board 2022-03-02 2022-03-02
EB-2021-0118 document icon OCC_Cost Claim_FEI Phase 1_273-20220301 Cost Claim Ontario Energy Board 2022-03-01 2022-03-01
EB-2021-0118 document icon CME_Cost Claim_FEI Phase 1_262-20220301 Cost Claim Ontario Energy Board 2022-03-01 2022-03-01
EB-2021-0118 document icon P_PRO_Cost Claim_FEI Phase 1_236-20220226 Cost Claim Ontario Energy Board 2022-02-28 2022-02-28
EB-2021-0118 document icon NoH_Cost Awards_FEI_20220217 Notice of Hearing Ontario Energy Board 2022-02-17 2022-02-17
EB-2021-0118 document icon OEB Letter_FEIWG_Eligible Activities_20220119 Correspondence Ontario Energy Board 2022-01-19 2022-01-19
EB-2021-0118 document icon OEB_Ltr_Cost Awards_FEI_OEB_IESO_Joint Engagement_20211014 Correspondence Ontario Energy Board 2021-10-14 2021-10-14
EB-2021-0118 document icon OEB Ltr_Request for Extension for Written Comments_Response_20210913 Correspondence Ontario Energy Board 2021-09-13 2021-09-13
EB-2021-0118 document icon PollutionProbe_Ltr_alt_John DeVenz)FEI WG_20210813 Participation Request Letter Ontario Energy Board 2021-08-13 2021-08-13
EB-2021-0118 document icon Dec_Order_Cost Awards_UR_RDER_20210618 Decision and Order on Cost Awards Ontario Energy Board 2021-06-18 2021-06-18
EB-2021-0118 document icon EnelX_THESL_FEI WG Lead Nomination_20210525 Correspondence Ontario Energy Board 2021-05-25 2021-05-25
EB-2021-0118 document icon SEC_Ltr_Nomination_FEIWG_20210521 Correspondence Ontario Energy Board 2021-05-21 2021-05-21
EB-2021-0118 document icon PollutionProbe_FEI WG Nomination Correction May 13 OEB Reply_20210521 Participation Request Letter Ontario Energy Board 2021-05-21 2021-05-13 2021-05-21
EB-2021-0118 document icon EVS_Ltr_FEI WG_20210514 Correspondence Ontario Energy Board 2021-05-17 2021-05-17
EB-2021-0118 document icon CanREA_Ltr_ATT_FEI WG Nomination_Comments_202104014_20210514 Correspondence Ontario Energy Board 2021-05-14 2021-05-14
EB-2021-0118 document icon CanREA_Ltr_APPEAL_FEI WG Membership_20210514 Correspondence Ontario Energy Board 2021-05-14 2021-05-14
EB-2021-0118 document icon HONI_OEB_FEIWG_Nomination rep change_20210513 Participation Request Letter Ontario Energy Board 2021-05-14 2021-05-14
EB-2021-0118 document icon Sussex Strategy Group_ObserverREQ Reply_20210513 Monitor Ontario Energy Board 2021-05-13 2021-05-13 2021-05-13
EB-2021-0118 document icon Dec Cost Elig_FEI_20210510 Cost Eligibility Decision Ontario Energy Board 2021-05-10 2021-05-10
EB-2021-0118 document icon FEIWG_Terms_of_Reference_updated_20210526 Correspondence Ontario Energy Board 2021-05-26 2021-05-26
EB-2021-0118 document icon OEB Ltr_FEI Working Group and Workstreams_updated_20210526 Correspondence Ontario Energy Board 2021-05-26 2021-05-26
EB-2021-0118 document icon SEC_Contact Info Change_WM_20210505 Correspondence Ontario Energy Board 2021-05-07 2021-05-07
EB-2021-0118 document icon EGI_ParticipREQ_FEI WG Nomination_20210428 Participation Request Letter Ontario Energy Board 2021-04-28 2021-04-28
EB-2021-0118 document icon OEB Ltr_Attachment_Cost Claim form EB-2018-0287_0288_20210422_Email Correspondence Ontario Energy Board 2021-04-22 2021-04-22
EB-2021-0118 document icon OEB Ltr_UR RDER_Costs Awards_20210422 Correspondence Ontario Energy Board 2021-04-22 2021-04-22
EB-2021-0118 document icon Association of Municipalities of Ontario_AMO_FEI_WG Nomin_ParticipREQ_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon Versorium_FEI_WG Nomination_ParticipREQ_Comments_20210415 Participation Request Letter Ontario Energy Board 2021-04-16 2021-04-16
EB-2021-0118 document icon Alectra_FEI WG_Nomination letter_20210414 Participation Request Letter Ontario Energy Board 2021-04-15 2021-04-15
EB-2021-0118 document icon WSP Canada_FEI WG Nomination_20210414 Participation Request Letter Ontario Energy Board 2021-04-15 2021-04-15
EB-2021-0118 document icon Environmental Defence_ED_FEI WG Nomination_20210414 Participation Request Letter Ontario Energy Board 2021-04-15 2021-04-15
EB-2021-0118 document icon CanREA_FEI WG Nomination_Comments_202104014 Participation Request Letter Ontario Energy Board 2021-04-15 2021-04-15
EB-2021-0118 document icon CanREA_FEI WG Comments_Nomin_202104014 Comments Ontario Energy Board 2021-04-15 2021-04-15
EB-2021-0118 document icon Alectra_Ltr_FEI_Comments_20210414 Comments Ontario Energy Board 2021-04-15 2021-04-15
EB-2021-0118 document icon Anwaatin_Ltr_FEI WG Nomination_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon Oakville_FEI_WG_Nomination_ParticipREQ_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon AEMA_FEI Comments_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon CLD_Alectra_Elexicon_HydroOttawa_THESL_HONI_Comments_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon FRPO_FEI_WG Nomination_ParticipREQ_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon Electric Vehicle Society__EVS_Ltr_FEI WG_Nomination_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon PeakPower_Ltr_Nomination_FEI WG_ParticipREQ_20210413 Participation Request Letter Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon EDA_FEI_WG Comments_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon EDA_Ltr_FEI_WG Nomination_ParticipREQ_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon HydroOttawa_Ltr_Nomination_FEI_WG_Nomination_ParticipREQ_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon THESL_Ltr_FEI_WG Nomination_ParticipREQ_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon IESO_Ltr_FEI_WG Nominations_ParticipREQ_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon PWU_FEI_WG Comments_SPE 1 of 2_ParticipREQ_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon PWU_FEI_WG Comments_SPE 2 of 2_ParticipREQ_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon PWU_FEI_WG Nomination_SPE 2 of 2_ParticipREQ_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon PWU_FEI_WG Nomination_SPE 1 of 2_ParticipREQ_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon CME_FEI_WG Comments_SPE 2 of 2_ParticipREQ_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon CME_FEI_WG Comments_SPE 1 of 2_ParticipREQ_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon CME_FEI_WG Nomination_SPE_2 of 2_ParticipREQ_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon CME_FEI_WG Nomination_SPE_1 of 2_ParticipREQ_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon OCC_FEI_WG Comments_SPE 1 of 2_ParticipREQ_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon OCC_FEI_WG Comments_SPE 2 of 2_ParticipREQ_20210414 Comments Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon OCC_FEI_WG Nomination_SPE 2 of 2_ParticipREQ_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon OCC_FEI_WG Nomination_SPE 1 of 2_ParticipREQ_Comments_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon ChargePoint_FEI_WG Nomination_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon OPG_Ltr_FEI_WG Nomination_ParticipREQ_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon Powerconsumer_FEI_WG Nomination_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon HONI_Ltr_FEI_WG Nomination_20210414 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon Energy Storage Canada_ESC_Ltr_FEI WG Nomination_Comments_20210314 Participation Request Letter Ontario Energy Board 2021-04-14 2021-04-14
EB-2021-0118 document icon ENWIN_Ltr_Nomination_FEI WG_ParticipREQ_20210413 Participation Request Letter Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon AMPCO_IGUA_FEI_Comments_WG Nomin_ParticipantREQ_20210413 Comments Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon Consumers Council of Canada_CCC_Ltr_FEI_WG Nomin_ParticipREQ_20210413 Participation Request Letter Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon City of Ottawa_FEI Nomination_ParticipREQ_Comments_20210413 Participation Request Letter Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon EssexPL_Ltr_FEI_WG Nomination_ParticipREQ_20210413 Participation Request Letter Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon Elexicon_FEI WG Nomination_ParticipREQ_2021012 Participation Request Letter Ontario Energy Board 2021-04-12 2021-04-12
EB-2021-0118 document icon AMPCO_IGUA_FEI WG_ParticipantREQ_20210413 Participation Request Letter Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon Entegrus_FEI_WG Nomination_ParticipREQ_20210413 Participation Request Letter Ontario Energy Board 2021-04-13 2021-04-13
EB-2021-0118 document icon Heliene_FEI WG Nomination_ParticipREQ_20210412 Participation Request Letter Ontario Energy Board 2021-04-12 2021-04-12
EB-2021-0118 document icon PollutionProbe_Ltr_Comment_FEI WG Nom_ParticipREQ_20210412 Comments Ontario Energy Board 2021-04-12 at 12:50 PM
EB-2021-0118 document icon PollutionProbe_Ltr_FEI_WG Nomination_ParticpREQ_Comment_20210412 Participation Request Letter Ontario Energy Board 2021-04-12 2021-04-12
EB-2021-0118 document icon Google Nest_FEI_WG_Nomination_ParticipREQ_20210412 Participation Request Letter Ontario Energy Board 2021-04-12 2021-04-12
EB-2021-0118 document icon Enel_Ltr_FEI_WG Nomination_ParticipREQ_20210409 Participation Request Letter Ontario Energy Board 2021-04-09 2021-04-09
EB-2021-0118 document icon EnergyProbe_Ltr_FEI WG Nomination_ParticipREQ_20210408 Participation Request Letter Ontario Energy Board 2021-04-08 2021-04-08
EB-2021-0118 document icon Demand Power Group Inc_Ltr_Nomination_ParticipREQ_20210405 Participation Request Letter Ontario Energy Board 2021-04-05 2021-04-05
EB-2021-0118 document icon London Hydro_ParticipREQ_FEI WG_NominREQ_20210405 Participation Request Letter Ontario Energy Board 2021-04-01 2021-04-01
EB-2021-0118 document icon London Hydro_Ltr_Nomination_FEI_WG_20210405 Participation Request Letter Ontario Energy Board 2021-04-01 2021-04-01
EB-2021-0118 document icon SEC_Ltr_Nomination_FEI WG_ParticipREQ_20210331 Participation Request Letter Ontario Energy Board 2021-03-31 2021-03-31
EB-2021-0118 document icon EPCOR_Ltr_Nomination_FEI WG_ParticipREQ_20210330 Participation Request Letter Ontario Energy Board 2021-03-30 2021-03-30
EB-2021-0118 document icon OEB Ltr_FEI Near-Term Priorities_20210323 Notice Ontario Energy Board 2021-03-23 2021-03-23
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received