Search Results for: Records - Case Number:EB-2017-0364 - 374 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2017-0364 document icon NextBridge_LTR_OEB Fire_FNL_20210819 Post Hearing Filings Hydro One Networks Inc. - Electricity Transmitter 2021-08-19 2021-08-19
EB-2017-0364 document icon NextBridge_LTR_Fire FNL_20210812 Post Hearing Filings Hydro One Networks Inc. - Electricity Transmitter 2021-08-12 2021-08-12
EB-2017-0364 document icon dec_order_costs_NextBridge_HONI_20190530 Decision and Order on Cost Awards Hydro One Networks Inc. - Electricity Transmitter 2019-05-30 2019-05-30
EB-2017-0364 document icon LL#58FN_costclaim_20190408 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-04-08 2019-04-08
EB-2017-0364 document icon MFN_costs claim_20190405 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-04-05 2019-04-05
EB-2017-0364 document icon MNO Revised Statement of Cost Claim_20190328(3) Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-29 2019-03-29
EB-2017-0364 document icon BZA_Cost_Claim_Revisedpage2and4_20190328 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-28 2019-03-28
EB-2017-0364 document icon BZA Cost Claim letter_20190327 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-27 2019-03-27
EB-2017-0364 document icon John Kim Bell_Curriculum vitae_20190327 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2019-03-27 2019-03-27
EB-2017-0364 document icon NextBridge_Response to Cost Claims_Michipicoten_20190320 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2019-03-20 2019-03-20
EB-2017-0364 document icon BLP_ResivedCostClaim_Porter Airlines letter_20190320 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-20 2019-03-20
EB-2017-0364 document icon BLP_RevisedCostClaim_20190320 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-20 2019-03-20
EB-2017-0364 document icon Anwaatin_RevCostClaim_20190225 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-19 2019-03-19
EB-2017-0364 document icon HONI_CostsObj_Comments_20190318 Cost Claim Objection Hydro One Networks Inc. - Electricity Transmitter 2019-03-18 2019-03-18
EB-2017-0364 document icon NextBridge_Cost Claim Objections_20190318 Cost Claim Objection Hydro One Networks Inc. - Electricity Transmitter 2019-03-18 2019-03-18
EB-2017-0364 document icon LL58FN_CostClaim_20190308 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-08 2019-03-08
EB-2017-0364 document icon BFN_EWT_CostClaim_20190308 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-03-08 2019-03-08
EB-2017-0364 document icon PO 9_HONI_UCT Combined Hearing_20190301 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2019-03-01 2019-03-01
EB-2017-0364 document icon CCC_EWT_CostClaim_20190228 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-28 2019-02-28
EB-2017-0364 document icon Anwaatin_CostClaim_20190225 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-25 2019-02-25
EB-2017-0364 document icon SEC_HONI_LSL_CostClaim_20190225 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-25 2019-02-25
EB-2017-0364 document icon BZA_CostClaim_20190225 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-25 2019-02-25
EB-2017-0364 document icon VECC_CostClaim_20190225 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-25 2019-02-25
EB-2017-0364 document icon MNO_CostClaim_20190225 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-25 2019-02-25
EB-2017-0364 document icon MFN_CostClaim_20190225 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-25 2019-02-25
EB-2017-0364 document icon BLP_CostClaim_20190222 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2019-02-22 2019-02-22
EB-2017-0364 document icon dec_order_EWT-LSL_20190211 Decision and Order Hydro One Networks Inc. - Electricity Transmitter 2019-02-11 2019-02-11
EB-2017-0364 document icon HONI_Ltr_East West Tie Line_20190131 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2019-01-31 2019-01-31
EB-2017-0364 document icon NextBridge_Ltr_Minister Rickford_East West Tie Line_20190121 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2019-01-30 2019-01-30
EB-2017-0364 document icon Minister of Energy_Ltr_OEB_East West Tie Line_20190130 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2019-01-30 2019-01-30
EB-2017-0364 document icon Order-in-Council_East West Tie Line_20190130 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2019-01-30 2019-01-30
EB-2017-0364 document icon Ltr_OEB_HONI_EWT_20190124 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2019-01-24 2019-01-24
EB-2017-0364 document icon FFCC ltr to Minister of Energy_20180926 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon Sioux Lookout Chamber of Comm ltr to Minister of Energy_20180925 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-09-25 2018-09-25
EB-2017-0364 document icon City of Thunde Bay ltr to Minster of Energy_20180921 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-09-21 2018-09-21
EB-2017-0364 document icon NOMA ltr to Minister of Energy_20180917 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-09-17 2018-09-17
EB-2017-0364 document icon Common Voice Northwest ltr to Minister of Energy_20180923 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-09-23 2018-09-23
EB-2017-0364 document icon TBCEDC ltr to Minister of Energy_20180917 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-09-17 2018-09-17
EB-2017-0364 document icon TB Chamber of Comm ltr to Minister of Energy_20180919 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon HONI_LSL_SUB_20190115.pdf Submission Hydro One Networks Inc. - Electricity Transmitter 2019-01-15 2019-01-15
EB-2017-0364 document icon Dec_Order_EWT-LSL_20181220 Decision and Order Hydro One Networks Inc. - Electricity Transmitter 2018-12-20 2018-12-20
EB-2017-0364 document icon OEB_ltr_DecisionAdvance Review_EWT-LSL_20181218 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-12-18 2018-12-18
EB-2017-0364 document icon OEB_ltr_All Parties_EWT_LSL_20181130 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-30 2018-11-30
EB-2017-0364 document icon HONI_OEB - ToR Sept 5 2018_20181128 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-28 2018-11-28
EB-2017-0364 document icon HONI_Lake Superior Link AD ENG_20181128 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-28 2018-11-28
EB-2017-0364 document icon HONI_Lake Superior Link AD FR_20181128 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-28 2018-11-28
EB-2017-0364 document icon HONI_Lake Superior Link Flyer_20181128 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-28 2018-11-28
EB-2017-0364 document icon HONI_Ltr_response MFN_20181127 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-27 2018-11-27
EB-2017-0364 document icon HONI_LtrComment_20181127 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-27 2018-11-27
EB-2017-0364 document icon PRFN_Letter to HONI_OEB_Declaration Order Seeking Exemption_OEA Act_20181126 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-26 2018-11-26
EB-2017-0364 document icon MFN_Ltr_ReplyARG_HONI_EB-2017-0182 -0194 -0364_Nov 12, 2018_20181116 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-16 2018-11-16
EB-2017-0364 document icon HONI_LTR_20181119 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-19 2018-11-19
EB-2017-0364 document icon MFN_ltr_response HONI reply submission_20181113 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-13 2018-11-13
EB-2017-0364 document icon NextBridge_ReplyARG_20181110_Corrected Applicant Reply Argument Hydro One Networks Inc. - Electricity Transmitter 2018-11-12 2018-11-12
EB-2017-0364 document icon NextBridge_ReplyARG_20181109 Applicant Reply Argument Hydro One Networks Inc. - Electricity Transmitter 2018-11-09 2018-11-09
EB-2017-0364 document icon HONI_Reply submission_0181109 Applicant Reply Argument Hydro One Networks Inc. - Electricity Transmitter 2018-11-09 2018-11-09
EB-2017-0364 document icon Ack Ltr_letter of comment_M Gravelle MPP_20181107 Acknowledgement Letter Hydro One Networks Inc. - Electricity Transmitter 2018-11-07 2018-11-07
EB-2017-0364 document icon Thunder Bay_MPP_correspondence_20181025_Redacted Comments Hydro One Networks Inc. - Electricity Transmitter 2018-10-25 2018-10-25
EB-2017-0364 document icon Thunder Bay_MPP_correspondence_20181016 Comments Hydro One Networks Inc. - Electricity Transmitter 2018-10-16 2018-10-16
EB-2017-0364 document icon MECP_Response ltr to OEB_20181106 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-06 2018-11-06
EB-2017-0364 document icon OEBltr_HONI_NB_East West Tie_20181106 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-06 2018-11-06
EB-2017-0364 document icon HONI_Ltr_EWT_LSL_20181106 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-06 2018-11-06
EB-2017-0364 document icon OEBResponse_Township of Terrace Bay_HONI_Nextbridge Combined_20181102 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-02 2018-11-02
EB-2017-0364 document icon Township of Terrace Bay_letter of comment_20181101 Comments Hydro One Networks Inc. - Electricity Transmitter 2018-11-01 2018-11-01
EB-2017-0364 document icon OEB Staff_sub_NextBridge_Hydro One_20181031_Revised Submission Hydro One Networks Inc. - Electricity Transmitter 2018-11-01 2018-11-01
EB-2017-0364 document icon VECC Submission_EWT Combined Proceeding_20181101 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-11-01 2018-11-01
EB-2017-0364 document icon OEB Letter to MECP_EWT_LSL_20181101 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-01 2018-11-01
EB-2017-0364 document icon OEB Staff_sub_NextBridge_Hydro One_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon MECP_LTR_EWT_LSL_20181101 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-11-01 2018-11-01
EB-2017-0364 document icon CCC_FinalArgument_EWT_HON_NB_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon BFN_ Final Submission_Combined Hearing_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon BFN_CvrLtr_Submission_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon PWU_SUB_transmission line_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon SEC_NB_HON_EWT_LSL_FinalArgument_20181031_Redacted Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon MNO_SUB_EWT_LSL_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon BLP_BookofAuthorities_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon BLP_FinalSUB_2018103 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon IESO_Submission_EWT_LSL_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon IESO_CvrLtr_Submisson_EWT_LSL_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon NextBridge_ReplyARG_20181031 Applicant Reply Argument Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon Anwaatin_SUB_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon HONI_Response to NextBridge_20181031 Applicant Reply Argument Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon BZA_FinalSUB2_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon LLFN_SUB_EWT_LSL_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon MFN_Argument_EWT_LSL_20181031 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-10-31 2018-10-31
EB-2017-0364 document icon HONI_ltr_EWT_LSL_20181030 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-30 2018-10-30
EB-2017-0364 document icon HONI_LTR_EWT_LSL_20181029 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-29 2018-10-29
EB-2017-0364 document icon Thunder Bay_MPP_correspondence_20181025_Redacted Comments Hydro One Networks Inc. - Electricity Transmitter 2018-10-25 2018-10-25
EB-2017-0364 document icon HONI_ARGChief_20181022 Applicant Argument in Chief Hydro One Networks Inc. - Electricity Transmitter 2018-10-22 2018-10-22
EB-2017-0364 document icon NextBridge_ARGChief_20181022 Applicant Argument in Chief Hydro One Networks Inc. - Electricity Transmitter 2018-10-22 2018-10-22
EB-2017-0364 document icon Thunder Bay_MPP_correspondence_20181016 Comments Hydro One Networks Inc. - Electricity Transmitter 2018-10-16 2018-10-16
EB-2017-0364 document icon OEB correspondence _EWT_LSL_20181015 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-15 2018-10-15
EB-2017-0364 document icon NextBridge_UndertakingResponse_J6 1_20181015 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-10-15 2018-10-15
EB-2017-0364 document icon HONI_UndertakingResponse_JT4 1__20181015 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-10-15 2018-10-15
EB-2017-0364 document icon Nextbridge Chart_Exhi K7 1_20181012 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-12 2018-10-12
EB-2017-0364 document icon NextBridge_Number 8 Operations Maintenance_Exhi K6 2_20181011 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-11 2018-10-11
EB-2017-0364 document icon Environmental assessmentact act_RSO1990_Exhi K7 2_20181012 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-12 2018-10-12
EB-2017-0364 document icon Transcripts_Volume 7_EWT_LSL_combined hearing_20181012 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-12 2018-10-12
EB-2017-0364 document icon HONI_UndertakingResponse_JT4 1_20181012 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-10-12 2018-10-12
EB-2017-0364 document icon Addendum to the 2017 Updated Assessment_Exhi K4 4_20181011 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-11 2018-10-11
EB-2017-0364 document icon EWT LP response to OEB Staff IR_Exhi K4 3_20181011 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-11 2018-10-11
EB-2017-0364 document icon OEB Staff Summary of the Evidence on Costs_EWT_LSL_Exhi K4 2_20181009 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-09 2018-10-09
EB-2017-0364 document icon NextBridge_Undertaking J5 1_breakdown timing__20181012 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-10-12 2018-10-12
EB-2017-0364 document icon Transcripts_Volume 6_EWT_LSL_Combined hearing_20181011 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-11 2018-10-11
EB-2017-0364 document icon HONI_Compendium for Cross-Examination_20181011 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-11 2018-10-11
EB-2017-0364 document icon VECC Compendium_NextBridge_20181011 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-11 2018-10-11
EB-2017-0364 document icon Transcripts_Volume 5_EWT_LSL_combined hearing_20181010 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-10 2018-10-10
EB-2017-0364 document icon BZA_Appendix 2 1X_Indigenous consultation and record log table_20181010 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-10 2018-10-10
EB-2017-0364 document icon PWU_Compendium_EWT_LSL_combined hearing_20181010 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-10 2018-10-10
EB-2017-0364 document icon NextBridge_Project Spend cost table to Date_20181008 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-10 2018-10-10
EB-2017-0364 document icon SEC_EWTLSL_NextBridgePanel_NB_Exhi K5 1__20181010 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-10 2018-10-10
EB-2017-0364 document icon BZA_Compendium of Docs for Next Bridge Cross Exam_20181010 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-10 2018-10-10
EB-2017-0364 document icon Transcripts_Volume 4_revised_EWT_LSL_Combined hearing_20181009 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-09 2018-10-09
EB-2017-0364 document icon HONI_list of documents for cross examination_20181009 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-09 2018-10-09
EB-2017-0364 document icon HONI_ltr_NextBridge_docs for cross examination_20181009 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-09 2018-10-09
EB-2017-0364 document icon VECC Panel 1 Hydro One LSL Compendium_20181009 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-09 2018-10-09
EB-2017-0364 document icon BZA_Compendium_Cross-examination_Material_IESO_20181009 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-09 2018-10-09
EB-2017-0364 document icon NextBridge_September 28 2018_ ltr from Ministry of Environment_20181005 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-05 2018-10-05
EB-2017-0364 document icon NextBridge_August 3 2018_ltr _Min of Tourism_20181005 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-05 2018-10-05
EB-2017-0364 document icon HONI_UndertakingResponses_JT 2 1_JT 3 1_20181005 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-10-05 2018-10-05
EB-2017-0364 document icon Transcripts_Volume 3_EWT_LSL_Combined Oral Hearing_20181004 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-04 2018-10-04
EB-2017-0364 document icon OEBltr_Response_Minister of Energy_EWT Combined_20181003 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-04 2018-10-04
EB-2017-0364 document icon Letter_Minister of Energy_EWT Combined_20181002 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon Dwijen Bharad_Letter of Comment_20181002_Redacted Comments Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon MNO_Ltr_HONI_EWT_LSL_20181004 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-04 2018-10-04
EB-2017-0364 document icon Anwaatin_Hydro One Panel Compendium_Addendum_20181003 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-03 2018-10-03
EB-2017-0364 document icon Transcripts_Volume 2_EWT_LSL_Combined Oral Hearing_20181003 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-03 2018-10-03
EB-2017-0364 document icon SEC_EWTLSL_HydroOnePanel_Compendium_Rev_20181003 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-03 2018-10-03
EB-2017-0364 document icon HONI_ltr_EWT_LSL_20181003 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-03 2018-10-03
EB-2017-0364 document icon Anwaatin_Hydro One Panel Compendium_20181003 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-03 2018-10-03
EB-2017-0364 document icon SEC_EWTLSL_HydroOnePanel_Compendium_20181002 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon Transcripts_Volume 1_EWT_LSL_Combined Oral Hearing_20181002 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon BZA_Compendium_Cross-examination_Material_20181002 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon BLP_Compendium_Cross-examination_Material_20181002 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon HONI_Kartiga Thavaraj_dec_undertaking_20181002 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon SNC-Lavalin_Janet Oh dec-undertaking_20181002 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon IESO_UpdatedIRR_NB6_20181002 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon MNO_Provisional_Compendium_Cross-Examination_Materials_20181002 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge Compendium for Cross-Examination of Hydro One - Volume 1 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge Compendium for Cross-Examination of Hydro One - Volume 2 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge_B-15-1 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge_Exhibit JT2.19 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge_HONI_IR response to Board Staff 17 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge_HONI_IR response to NB 24 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge_HONI_IR response to NB 44 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge_PO2_UpperCanada_HONI_20180301 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon OEBResponse_President_Sioux Lookout CC_HONI_Nextbridge Combined_20181002 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon OEBResponse_Quad Council_HONI_Nextbridge Combined_20181002 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon Hearing Schedule Combined Oct 2-3-4-9-11-12-2018 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon HONI_LSL_UpdatedIRRS_20181001 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon NextBridge_Declaration_Undertaking_D.Stevens_20181002 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-10-02 2018-10-02
EB-2017-0364 document icon RSMIN_comments_20181001 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon NextBridge_OEB_Minimum Technical Requirement for OEWTL_20181001 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon NextBridge_SNC Lavlin_class action_2012 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon NextBridge_Interim Condensed _FS__20181001 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon NextBridge_Galloping tutorial_2007.ppt Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon NextBridge_Cover Letter_Cross Examination Materials_20181001 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon John McGrath_Letter of Comment_20181001_Redacted Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon Quad Council_letter of comment_20181001 Letter of Comment Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon IESO_Ltr_CVs_EWT_LSL_20181001 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon NextBridge_LTR_Confidential Interrogatories Cover Letter_20181001 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon PO8_HONI_UCT Combined_20181001 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-10-01 2018-10-01
EB-2017-0364 document icon LLFN_Declaraion and undertaking_20180928 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-28 2018-09-28
EB-2017-0364 document icon NextBridge_ReplyARG_20180928 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-28 2018-09-28
EB-2017-0364 document icon BLP_LTR_EWT-LSL_20180928 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-28 2018-09-28
EB-2017-0364 document icon SEC_HONI_Nextbridge_Corr_20180928 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-28 2018-09-28
EB-2017-0364 document icon NextBridge_Letter_Access_Confidential_Materials _20180928 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-28 2018-09-28
EB-2017-0364 document icon HONI_Declaration and Undertaking_Robert Warren_20180928 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-28 2018-09-28
EB-2017-0364 document icon HONI_EWT_LSL_Ltr Re ConfidentialDocuments_20180928 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-28 2018-09-28
EB-2017-0364 document icon OEB_ltr_NextBridge_reply submissions_deadline extension_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon OEBResponse_TBCC_HONI_Nextbridge Combined_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon OEBResponse_Sioux Lookout CC_HONI_Nextbridge Combined_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon OEBResponse_NOMA_HONI_Nextbridge Combined_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon OEBResponse_FFCC_HONI_Nextbridge Combined_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon OEBResponse_Common Voice NW_HONI_Nextbridge Combined_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon OEBResponse_City of TB_HONI_Nextbridge Combined_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon OEBResponse_CEDC_HONI_Nextbridge Combined_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon HONI_Ltr to OEB_EWT_LSL_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon Anwaatin_DecUndertaking_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon NextBridge_Declaration and Undertakings_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon BZA_DEC_Undertaking_MM_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon BZA_DEC_Undertaking_EE_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon BZA_CvrLtr_DecUnd_EWT_LSL_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon NextBridge_Confidentiality_OBJ_20180927 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon BLP_LTR_Conf_Undertaking_EWT-LSL_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon PWU_DEC_Undertaking_RS_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon PWU_DEC_Undertaking_BK_20180926 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon PWU_DEC_Undertaking_AB_20180926 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon PWU_CvrLtr_DecUnd_EWT_LSL_20180927 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon MNO_ltr_EWT_LSL_20180927 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-27 2018-09-27
EB-2017-0364 document icon CCC_MRB_Confidentiality_declaration_undertaking_20180926 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon SEC_UCT_EWT_LSL_DecUnd_MR_201800926 Declaration and Undertakings Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon NextBridge_LTR_ Development Costs Reply Extension_20180926 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon PO7_HONI_UCT Combined_20180926 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon dec_order_cost awards_HONI_Lake Superior Motion_20180926 Decision and Order on Cost Awards Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon NextBridge_Exhibit_A-3-1_updated_20180926 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon NextBridge_LTR_EWT-LSL_20180926 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-26 2018-09-26
EB-2017-0364 document icon HONI_CombinedHearing_CVs_20180925 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-25 2018-09-25
EB-2017-0364 document icon NextBridge_Additional IRR_Combined_20180924 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon I-05-22-01.xlsm Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon HONI_LSL_IRRS_TAB3-TAB11_20180924 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon HONI_LSL_IRRS_TAB2_20180924 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon HONI_LSL_IRRS_TAB1_PART3_20180924 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon HONI_LSL_IRRS_TAB1_PART2_20180924 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon IESO_IRRs_EWT_LSL_20180924 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon IESO_CvrLtr_IRRs_EWT_LSL_20180924 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon HONI_LSL_IRRS_TAB1_PART1_20180924 Interrogatory Response from Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon Anwaatin_LTR_IntrvREQ Revision_20180924 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-09-24 2018-09-24
EB-2017-0364 document icon PO6_HONI_UCT Combined_20180921 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-09-21 2018-09-21
EB-2017-0364 document icon Anwaatin_IntrvREQ_20180920 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-09-20 2018-09-20
EB-2017-0364 document icon OEB Staff_sub_NextBridge Development Costs_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon VECC_ SUB_NextBridge_ Development_Costs_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon CCC_SUB_NextBridge_Development_Costs_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon MNO_SUB_NextBridge_Development_Costs_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon HONI_SUB_NextBridge_Development_Costs_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon SEC_Nextbridge_DevCosts_Sub_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon BZA_SUB_Nextbridge_Development_Costs_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon PO5_HONI_UCT Combined_20180919 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon Intervention List_East West Tie_20180919 Intervenor List Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon BLP_SUB_Nextbridge_Development_Costs_20180919 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-09-19 2018-09-19
EB-2017-0364 document icon LL#58FN_EVD_20180914 Intervenor Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-09-14 2018-09-14
EB-2017-0364 document icon HONI_Memo_GRT_TOR_20180912 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon HONI_ack_receipt_TOR_HONI_review by GRT_20180912 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon LL#58FN_IR_HONI_20180912 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon LL#58FN_IR_NextBridge_20180912 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon OEB_Staff_IR_IESO_EWT_LSL_20180912 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon ELLCA_IR_HONI_20180912 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon SEC_HONI_Nextbridge_IESO_IRs_20180912 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon BZA_IR_IESO_20180912 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon HONI_LSL_Affidavit_of_Service_20180912 Affidavits of Service Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon CCC_IR_IESO_20180912 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon PWU_IR_IESO_20180912 Interrogatory Response from Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-09-12 2018-09-12
EB-2017-0364 document icon NextBridge_ARGChief_Development_Costs_20180911 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-09-10 2018-09-10
EB-2017-0364 document icon MFN_Intrv_REQ_20180907 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-09-07 2018-09-07
EB-2017-0364 document icon PO4_HONI_UCT_Combined_20180907 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-09-07 2018-09-07
EB-2017-0364 document icon East Loon Lake Campers Assoc_Intrv_Req_20180904 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-09-04 2018-09-04
EB-2017-0364 document icon HONI_ToR_LSL_20180905 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-09-05 2018-09-05
EB-2017-0364 document icon PO3_HONI_UCT_Combined_20180831 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-08-31 2018-08-31
EB-2017-0364 document icon OEB staff_IR_NextBridge_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon OEB staff_IR_HONI_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon CCC_IR_to HONI_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon VECC_IR_to NextBridge_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon VECC_IR_to HONI_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon HONI_IR_to NextBridge_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon BZA_IR_HONI_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon BZA_IR_Nextbridge_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon IESO_IR_Hydro One_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon IESO_IR_NextBridge_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon BLP_IR_HONI_20180830(3) Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon MNO_IR_to_Nextbridge_HONI_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon SEC_HONI_Nextbridge_IRs_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon PWU_IR_HONI_20180830 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-30 2018-08-30
EB-2017-0364 document icon Long Lake 58FN_IntrvREQ_20180829 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-08-29 2018-08-29
EB-2017-0364 document icon NextBridge_Interrogatories_to_IESO_20180829 Interrogatories to Intervenor Hydro One Networks Inc. - Electricity Transmitter 2018-08-29 2018-08-29
EB-2017-0364 document icon NextBridge_Interrogatories_to_HONI_20180828 Interrogatories to Applicant Hydro One Networks Inc. - Electricity Transmitter 2018-08-28 2018-08-28
EB-2017-0364 document icon BFN Cost Claim_20180828 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-08-22 2018-08-22
EB-2017-0364 document icon BLP_CostClaim_20180822 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-08-22 2018-08-22
EB-2017-0364 document icon BZA_ltr_OEB_re_PO1_20180827 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-08-27 2018-08-27
EB-2017-0364 document icon PO2_HONI_UCT_Combined_20180827 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-08-27 2018-08-27
EB-2017-0364 document icon HONI_Letter to OEB re ltc application_20180823 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-08-23 2018-08-23
EB-2017-0364 document icon intvr_req_BLP_20180822 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-08-22 2018-08-22
EB-2017-0364 document icon BLP_CostClaim_revised_20180821 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-08-21 2018-08-21
EB-2017-0364 document icon SEC_NextbridgeHydroOne_Ltr_PO1_20180816 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-08-16 2018-08-16
EB-2017-0364 document icon BLP_CostClaim_HONI_revised_20180815 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-08-15 2018-08-15
EB-2017-0364 document icon BZA_Ltr_HONI cost claim_20180815 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-08-15 2018-08-15
EB-2017-0364 document icon VECC Cost Claim_refiled_20180815 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-08-15 2018-08-15
EB-2017-0364 document icon MNO_cost claim_supplemental_20180816 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-08-16 2018-08-16
EB-2017-0364 document icon PO 1_HONI_UCT Combined_20180813 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-08-13 2018-08-13
EB-2017-0364 document icon BLP_response to HONI_cost claim objection_20180810 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-08-10 2018-08-10
EB-2017-0364 document icon Notice_HONI_LSL_Cree_20180809 Notice Hydro One Networks Inc. - Electricity Transmitter 2018-08-09 2018-08-09
EB-2017-0364 document icon Notice_HONI_LSL_Ojibway_20180809 Notice Hydro One Networks Inc. - Electricity Transmitter 2018-08-09 2018-08-09
EB-2017-0364 document icon Notice_HONI_LSL_French_20180809 Notice Hydro One Networks Inc. - Electricity Transmitter 2018-08-09 2018-08-09
EB-2017-0364 document icon Notice_HONI_LSL_Eng_20180809 Notice Hydro One Networks Inc. - Electricity Transmitter 2018-08-09 2018-08-09
EB-2017-0364 document icon lod_HONI_LSL_20180809 Letter of Direction Hydro One Networks Inc. - Electricity Transmitter 2018-08-09 2018-08-09
EB-2017-0364 document icon HONI_LSL_CostsObj_Attachment 1_20180803 Cost Claim Objection Hydro One Networks Inc. - Electricity Transmitter 2018-08-03 2018-08-03
EB-2017-0364 document icon HONI_LSL_CostsObj_20180803 Cost Claim Objection Hydro One Networks Inc. - Electricity Transmitter 2018-08-03 2018-08-03
EB-2017-0364 document icon NextBridge_Cost ClaimOBJ_20180802 Cost Claim Objection Hydro One Networks Inc. - Electricity Transmitter 2018-08-02 2018-08-02
EB-2017-0364 document icon BLP First Nations_Cost claim_20180801 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-08-01 2018-08-01
EB-2017-0364 document icon VECC Cost Claim_NextBridge Motion_20180727 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-07-27 2018-07-27
EB-2017-0364 document icon CCC_CostClaim_NextbridgeHON_motion_20180726 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-07-26 2018-07-26
EB-2017-0364 document icon BZA_LTR_CostClaim_20180727 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-07-27 2018-07-27
EB-2017-0364 document icon BFN_Cost Claim_20180726 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-07-26 2018-07-26
EB-2017-0364 document icon MNO_Cost_Claim_20180726 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-07-26 2018-07-26
EB-2017-0364 document icon Addendum to the 2017 Updated Assessment for the EWT Need_20180726 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-07-26 2018-07-26
EB-2017-0364 document icon IESO_CvrLtr__IESO Impact Analysis_2018-07-26 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-07-26 2018-07-26
EB-2017-0364 document icon BZA_CostClaim_20180725 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-07-25 2018-07-25
EB-2017-0364 document icon SEC_HONI_LSL_NB_Motion_CostClaim_20180720 Cost Claim Hydro One Networks Inc. - Electricity Transmitter 2018-07-20 2018-07-20
EB-2017-0364 document icon dec_order_motion_20180719 Decision and Order Hydro One Networks Inc. - Electricity Transmitter 2018-07-19 2018-07-19
EB-2017-0364 document icon IESO_LtrOEB_Impact Analysis_20180629 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-06-29 2018-06-29
EB-2017-0364 document icon CPT MFN_correspondence_Hydro One_LSL_20180620 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-06-20 2018-06-20
EB-2017-0364 document icon OEB ltr_LSL Motion_IESO_20180614 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-06-14 2018-06-14
EB-2017-0364 document icon Exhibit K2.2 HONI Supplemental Compendium of Materials_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-06 2018-06-06
EB-2017-0364 document icon Exhibit K2.1 HONI Compendium of Materials_Motion Hearing_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-06 2018-06-06
EB-2017-0364 document icon Transcripts_Nextbridge LSL_Motion Hearing_20180605 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-06-05 2018-06-05
EB-2017-0364 document icon Exhibit K1 9 CCC Book of Authorities_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 8 CCC Book of References_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 7 Book of Authorities of the Power Workers Union_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 6 Transcript Brief of the School Energy Coalition_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 5 Compendium and the Authorities of The School Energy Coalition_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 4 BZA Book of Authorities_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 3 Compendium and Authorities of OEB Staff_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 2 Ms Strachans Book of Authorities_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon Exhibit K1 1 Mr. Stevens Brief of Documents and Authorities_20180604 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon BFN Written Submissions_20180605 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-05 2018-06-05
EB-2017-0364 document icon Transcripts_Nextbridge LSL_Motion Hearing_20180604 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon VECC Submission_NextBridge_HONI_Motion_20180604 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon OEB Staff Compendium_Authorities_20180604 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-04 2018-06-04
EB-2017-0364 document icon BZA_Book of Reference_20180601 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon CCC_BOR_HONI_Nextbridge_20180106 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon BZA_Book of Authorities_20180601 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon CCC_Book of Authorities_20180601 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon SEC_HONI_NextbridgeMotion_CompendiumAuthorities Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon HONI_Compendium_20180601 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon NextBridge_Book of Documents and Authorities for Motion_20180601 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon MNO_Book_of_Authorities_20180601 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon MOECC_Undertaking Response JT 1 31_20180531 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-06-01 2018-06-01
EB-2017-0364 document icon BLP_Book of Authorities_20180531 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-05-31 2018-05-31
EB-2017-0364 document icon BLP_Argument_HONI_ Hearing of Motion_20180531 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-05-31 2018-05-31
EB-2017-0364 document icon PWU_Book of Authorities_20180531 Argument Hydro One Networks Inc. - Electricity Transmitter 2018-05-31 2018-05-31
EB-2017-0364 document icon NextBridge_Cover Letter_Undertakings_20180525 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-05-25 2018-05-25
EB-2017-0364 document icon HONI_LSL_TC_Undertakings_20180525.pdf Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-05-25 2018-05-25
EB-2017-0364 document icon NextBridge_Undertaking ResponsesJT1 2 to JT 1 29_20180525 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-05-25 2018-05-25
EB-2017-0364 document icon MOECC_Undertaking JT1 30_Response Part 2_ 20180525 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-05-25 2018-05-25
EB-2017-0364 document icon MOECC_Undertaking JT1 30_Response Part 1_ 20180525 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-05-25 2018-05-25
EB-2017-0364 document icon NextBridge_Cover Letter_transcript corrections_20180525 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-25 2018-05-25
EB-2017-0364 document icon PO2_HONI_Hearing of Motion_20180518 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-05-18 at 5:15 PM
EB-2017-0364 document icon Exhibit KT2.3_EWT_Motion_Technical conference_20180517 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-05-17 2018-05-17
EB-2017-0364 document icon Exhibit KT2.2_EWT_Motion_Technical conference_20180517 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-05-17 2018-05-17
EB-2017-0364 document icon Exhibit KT2.1_EWT_Motion_Technical Conference_20180517 Exhibits Hydro One Networks Inc. - Electricity Transmitter 2018-05-17 2018-05-17
EB-2017-0364 document icon Final Transcripts_HONI_Motion_Technical Conference_20180517 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-05-17 2018-05-17
EB-2017-0364 document icon BLP First Nations_Undertaking Response_JT 1 1_20180517 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-05-17 2018-05-17
EB-2017-0364 document icon NextBridge_Undertaking ResponsesJT1 13 JT 1 14_20180517 Undertaking Responses Hydro One Networks Inc. - Electricity Transmitter 2018-05-17 2018-05-17
EB-2017-0364 document icon HONI_letter of intent_EWT_20170922 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2017-09-22 2017-09-22
EB-2017-0364 document icon Transcripts_HONI_Motion_Technical Conference_20180516 Transcripts Hydro One Networks Inc. - Electricity Transmitter 2018-05-17 2018-05-17
EB-2017-0364 document icon HONI_Response to MNO letter_20180516 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-16 2018-05-16
EB-2017-0364 document icon HONI_LSLProject_CVs_20180515 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-15 2018-05-15
EB-2017-0364 document icon MNO_CVs_Motion_HONI_LSL_20180515 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-15 2018-05-15
EB-2017-0364 document icon NextBridge_CVs_Motion_HONI LSL_20180515 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-15 2018-05-15
EB-2017-0364 document icon MNO_LTR_to_HONI_20180514 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-14 2018-05-14
EB-2017-0364 document icon HONI_LSLMotionCorrectionofEvidence_20180511 Application and Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-11 2018-05-11
EB-2017-0364 document icon HONI_Update_LSLMotion_AdditionalEvidence_20180511 Application and Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-11 2018-05-11
EB-2017-0364 document icon OEB ltr_LSL motion_resBZA_20180509 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-09 2018-05-09
EB-2017-0364 document icon BZA_EVD_20180509 Intervenor Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-09 2018-05-09
EB-2017-0364 document icon BZA_LTR_Request_to_File_Evidence_20180508 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-08 2018-05-08
EB-2017-0364 document icon BLP First Nations_EVD_20180507 Intervenor Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-07 2018-05-07
EB-2017-0364 document icon HONI_LSLMotion_AdditionalEvidence_20180507 Application and Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-07 2018-05-07
EB-2017-0364 document icon MNO_EVD_20180507 Intervenor Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-07 2018-05-07
EB-2017-0364 document icon Batchewana First Nations_LPL_EVD_20170507 Intervenor Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-07 2018-05-07
EB-2017-0364 document icon MOECC_LPL project_EVD_20180507 Intervenor Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-05-07 2018-05-07
EB-2017-0364 document icon MNO_LTR_Request_to_File_Evidence_20180502 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-02 2018-05-02
EB-2017-0364 document icon OEB ltr_MNO_LSL Motion_20180503 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-03 2018-05-03
EB-2017-0364 document icon MNO_LTR_Request_to_File_Evidence_20180502 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-05-02 2018-05-02
EB-2017-0364 document icon NextBridge_Additional Material_20180430 Submission Hydro One Networks Inc. - Electricity Transmitter 2018-04-30 2018-04-30
EB-2017-0364 document icon PO1_HONI_Hearing of Motion_20180427 Procedural Order Hydro One Networks Inc. - Electricity Transmitter 2018-04-27 2018-04-27
EB-2017-0364 document icon HONI_Letter to OEB_Motion_20180426 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-04-26 2018-04-26
EB-2017-0364 document icon Bamkushwada_IntvnrREQ_20180419 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-19 2018-04-19
EB-2017-0364 document icon Batchewana First Nations_IntrvREQ_20180418 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-18 2018-04-18
EB-2017-0364 document icon CCC_IntrvREQ_letter.HON.EWT.Motion_20180417 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-17 2018-04-17
EB-2017-0364 document icon PWU_IntrvREQ_20180416 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-16 2018-04-16
EB-2017-0364 document icon HONI_Ltr_Hearing of Motion_20180416 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-04-16 2018-04-16
EB-2017-0364 document icon MOECC_intrvREQ_20170416 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-16 2018-04-16
EB-2017-0364 document icon BLPFirstNations_IntrvREQ_20180413 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-13 2018-04-13
EB-2017-0364 document icon AMPCO_IntervReq_LakeSupLink_20180413 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-13 2018-04-13
EB-2017-0364 document icon Biinjitiwaabik_Zaaging_Anishinaabek_IntrvREQ_20180412 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-13 2018-04-13
EB-2017-0364 document icon VECC_IntervReq_H1_LakeSupLink_20180412 Intervenor Request Letter Hydro One Networks Inc. - Electricity Transmitter 2018-04-12 2018-04-12
EB-2017-0364 document icon ltr_MNO miniister of Energy_HONI Lake Superior Link Project_20180406 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-04-06 2018-04-06
EB-2017-0364 document icon Notice of hearing_motion_Hydro One_20180406 Notice Hydro One Networks Inc. - Electricity Transmitter 2018-04-06 2018-04-06
EB-2017-0364 document icon HONI_s92_LSL_Additional Evidence_20180329 Application and Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-03-29 2018-03-29
EB-2017-0364 document icon HONI_S92_LSL_APPL_20180215 Application and Evidence Hydro One Networks Inc. - Electricity Transmitter 2018-03-22 2018-03-22
EB-2017-0364 document icon BLP_HONI Consultations_Lake Superior Link_20180307 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-03-07 2018-03-07
EB-2017-0364 document icon HONI_s92_LSLAPPL_LtrToOEB_20180306.pdf Correspondence Hydro One Networks Inc. - Electricity Transmitter 2018-03-06 2018-03-06
EB-2017-0364 document icon Nextbridge_Motion_Lake Superior Link_20180228 Motion Hydro One Networks Inc. - Electricity Transmitter 2018-02-28 2018-02-28
EB-2017-0364 document icon ack_ltr_Hydro One_20180220 Acknowledgement Letter Hydro One Networks Inc. - Electricity Transmitter 2018-02-20 2018-02-20
EB-2017-0364 document icon HONI_EWT Appl Delay_20171221 Correspondence Hydro One Networks Inc. - Electricity Transmitter 2017-12-21 2017-12-21
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received