Search Results for: Records - Case Number=EB-2011-0011 - 130 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2011-0011 | dec_order_THESL_cost awards_20110909 | Decision and Order on Cost Awards | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-09-09 | 2011-09-09 | |
EB-2011-0011 | OEB_Corresp_THES_20110809 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-08-09 | 2011-08-09 | |
EB-2011-0011 | THESL_response to decision_corr_20110803 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-08-03 | 2011-08-03 | |
EB-2011-0011 | PO4_THESL_CDM_20110720 | Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-07-20 | 2011-07-20 | |
EB-2011-0011 | dec_order_THESL_CDM_20110712 | Decision and Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-07-12 | 2011-07-12 | |
EB-2011-0011 | THESL_ltr_KMDR corresp_20110708 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-07-08 | 2011-07-08 | |
EB-2011-0011 | KMDR Research _comment_20110705 | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-07-05 | 2011-07-05 | ||
EB-2011-0011 | THESL_reply_SUB_20110601 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-06-01 | 2011-06-01 | |
EB-2011-0011 | THESL_reply_SUB_cvr ltr_20110601 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-06-01 | 2011-06-01 | |
EB-2011-0011 | SEC_SUB_THESL_20110524 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-24 | 2011-05-24 | |
EB-2011-0011 | SEC_SUB_THESL_cvltr_20110524 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-24 | 2011-05-24 | |
EB-2011-0011 | LIEN_SUB_THESL_20110526 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-26 | 2011-05-26 | |
EB-2011-0011 | EnergyProbe_SUB_THESL_20110524 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-24 | 2011-05-24 | |
EB-2011-0011 | CCC_SUB_THESL_20110525 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-25 | 2011-05-25 | |
EB-2011-0011 | IESO_SUB_THESL_20110525 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-25 | 2011-05-25 | |
EB-2011-0011 | OPA_SUB_THESL_20110525 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-25 | 2011-05-25 | |
EB-2011-0011 | OPA_SUB_THESL_cvr ltr_20110525 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-25 | 2011-05-25 | |
EB-2011-0011 | Submission dates - EB-2011-0011 THESL - CDM Programs | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-25 at 11:33 AM | ||
EB-2011-0011 | AMPCO_SUB_THESL_20110524 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-24 | 2011-05-24 | |
EB-2011-0011 | Bdstaff_SUB_THESL_20110524 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-24 | 2011-05-24 | 2011-05-24 |
EB-2011-0011 | BdStaff_SUB_THESL_cvrltr_20110524 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-24 | 2011-05-24 | 2011-05-24 |
EB-2011-0011 | VECC_SUB_20110524 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-24 | 2011-05-24 | |
EB-2011-0011 | THESL_IRR_correction documentation_20110401 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2011-0011 | THESL_ArgChief_20110509 | Applicant Argument in Chief | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-09 | 2011-05-09 | |
EB-2011-0011 | THESL_ArgChief_cover_ltr_20110509 | Applicant Argument in Chief | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-09 | 2011-05-09 | |
EB-2011-0011 | THESL_Und_RESP_J2.1_J2.2_J2.4_J2.7_J3.1_J3.2_20110505 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-05 | 2011-05-05 | |
EB-2011-0011 | OPA_Undertaking response_J3.3_J3.4_J3.5_J3.6_J3.7_20110505 | Undertaking Responses | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-05 | 2011-05-05 | |
EB-2011-0011 | EX_K3.6_20110503 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | EX_K3.5_20110503 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | EX_K3.4_20110503 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | EX_K3.3_20110503 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | EX_K3.2_20110503 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | EX_K3.1_20110503 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | EX_K2.3_20110502 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-02 | 2011-05-02 | |
EB-2011-0011 | EX_K2.2_20110502 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-02 | 2011-05-02 | |
EB-2011-0011 | EX_K2.1_20110502 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-02 | 2011-05-02 | |
EB-2011-0011 | THESL_transcript_vol3_20110503 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | THESL_transcript_vol2_20110502 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-03 | 2011-05-03 | |
EB-2011-0011 | OPA_CovLtr_THESL_20110502 | Pre-Hearing Material | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-02 | 2011-05-02 | |
EB-2011-0011 | OPA_witness statement _20110502 | Pre-Hearing Material | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-02 | 2011-05-02 | |
EB-2011-0011 | OPA_Evd_CV_JMcNally_20110502 | Pre-Hearing Material | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-05-02 | 2011-05-02 | |
EB-2011-0011 | EX_K1.4_20110428 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-28 | 2011-04-28 | |
EB-2011-0011 | EX_K1.3_20110428 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-28 | 2011-04-28 | |
EB-2011-0011 | EX_K1.2_20110428 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-28 | 2011-04-28 | |
EB-2011-0011 | Ex_K1.1_20110428 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-29 at 11:53 AM | ||
EB-2011-0011 | THESL_transcript_vol1_20110428 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-28 | 2011-04-28 | |
EB-2011-0011 | THESL_intervention list_20110429 | Intervenor List | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-29 at 11:21 AM | ||
EB-2011-0011 | THESL_CDM Programs_post hearing response_20110428 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-28 | 2011-04-28 | |
EB-2011-0011 | dec_order_THESL_PP Motion_costs_20110427 | Decision and Order on Cost Awards | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-27 | 2011-04-27 | 2011-04-27 |
EB-2011-0011 | SEC_Dec&Undertaking_200110426 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-27 | 2011-04-27 | |
EB-2011-0011 | THESL_IRR_SEC_TRCforMURBDR_20110421 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2011-0011 | THESL_IRR_OSEA_20110425 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2011-0011 | THESL_IRR_ CDM CVletter_20110425 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2011-0011 | THESL_IRR_draft evaluation plans_20110425 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2011-0011 | THESL_IRR_CV's_20110425 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2011-0011 | THESL_IRR_all parties_20110425 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2011-0011 | OPA_corr_to THESL re CDM apllication_20110425 | Pre-Hearing Material | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-25 | 2011-04-25 | |
EB-2011-0011 | PollutionProbe_no position on outstanding issues_20110418 | Pre-Hearing Material | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-18 | 2011-04-18 | |
EB-2011-0011 | THESL_Motion_Cost Objection_Ltr_20110415 | Cost Claim Objection Reply | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-15 | 2011-04-15 | |
EB-2011-0011 | GEC_withdrawal ltr_20110413 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-13 | 2011-04-13 | |
EB-2011-0011 | Bdstaff_costs submission_PollProbeMotion_20110412 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-12 | 2011-04-12 | 2011-04-12 |
EB-2011-0011 | Bdstaff_cost SUB_PollProbe Motion_cvrltr_20110412 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-12 | 2011-04-12 | 2011-04-12 |
EB-2011-0011 | OESA_reply re cost eligibility_20110411 | Correspondence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-11 | 2011-04-11 | |
EB-2011-0011 | THESL_transcript_dec_vol1_ 20110405 | Decision | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-05 | 2011-04-05 | |
EB-2011-0011 | THESL_transcript_dec_vol1_ 20110405 | Transcripts | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-05 | 2011-04-05 | |
EB-2011-0011 | EX_KM1.1_20110405 | Exhibits | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-05 | 2011-04-05 | |
EB-2011-0011 | THESL_IRR_MURDBR_20110404 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | THESL_IRR_MandT_20110404 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | THESL_IRR_HSBP_20110404 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | THESL_IRR_FRWH_20110404 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | THESL_IRR_CEMLC_20110404 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | THESL_IRR_loaddata2010_20110404 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | THESL_IRR_loaddata2009_20110404 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | THESL_IRR_20110401 | Interrogatory Response from Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-04 | 2011-04-04 | |
EB-2011-0011 | LIEN_SUB_THESL_to PO2_20110401 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2011-0011 | THESL_SUB_toPO2_20110401 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2011-0011 | OPA_SUB_THESL_20110401 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2011-0011 | OPA_SUB_THESL_covLtr_20110401 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2011-0011 | SEC_SUB_toPO2_THESL_20110401 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | |
EB-2011-0011 | Bdstaff_SUB_THESL_Pollution Probe Motion_20110401 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | 2011-04-01 |
EB-2011-0011 | Bdstaff_SUB_cvrLtr_THESL_20110401 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-04-01 | 2011-04-01 | 2011-04-01 |
EB-2011-0011 | PO3_noh_THESL_20110331 | Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-31 | 2011-03-31 | 2011-03-31 |
EB-2011-0011 | GEC_SUB_20110329 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-29 | 2011-03-29 | |
EB-2011-0011 | PO2_noh_Motion to Review_Pollution Probe Issues_20110325 | Notice of Hearing | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-25 | 2011-03-25 | 2011-03-25 |
EB-2011-0011 | PO2_noh_Motion to Review_Pollution Probe Issues_20110325 | Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-25 | 2011-03-25 | 2011-03-25 |
EB-2011-0011 | OSEA_IR_THESL_20110324 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-24 | 2011-03-24 | |
EB-2011-0011 | AMPCO_IR_THESL_revision_20110321 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-23 | 2011-03-23 | |
EB-2011-0011 | Poll Probe_motion_to_review_issuesList_20110322 | Motion to Review | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-22 | 2011-03-22 | |
EB-2011-0011 | AMPCO_IR_THESL_20110318 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-21 | 2011-03-21 | |
EB-2011-0011 | CCC_IR_THESL_20110321 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-21 | 2011-03-21 | |
EB-2011-0011 | CEEA_IR_THESL_20110318 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-18 | 2011-03-18 | |
EB-2011-0011 | SEC_IR_THESL_20110318 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-18 | 2011-03-18 | |
EB-2011-0011 | LIEN_IR_THESL_20110318 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-18 | 2011-03-18 | |
EB-2011-0011 | Bdstaff_IR_THESL_20110315 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-15 | 2011-03-15 | 2011-03-15 |
EB-2011-0011 | Bdstaff_IR_cvrltr_THESL_20110315 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-15 | 2011-03-15 | 2011-03-15 |
EB-2011-0011 | PollutionProbe_IR_THESL_20110315 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-15 | 2011-03-15 | |
EB-2011-0011 | dec_issues&cost elig_THESL_20110311 | Cost Eligibility Decision | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-11 | 2011-03-11 | 2011-03-11 |
EB-2011-0011 | VECC_IR_THESL_20110309 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-09 | 2011-03-09 | |
EB-2011-0011 | GEC_IR_THESL_20110307 | Interrogatories to Applicant | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-08 | 2011-03-08 | |
EB-2011-0011 | SEC_Submission_issueslist_20110228 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-03-01 | 2011-03-01 | |
EB-2011-0011 | PollutionProbe_SUB_issueslist_20110228 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-28 | 2011-02-28 | |
EB-2011-0011 | CEEA_SUB_costobjection_20110228 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-28 | 2011-02-28 | |
EB-2011-0011 | THESL_SUB_issueslist_20110225 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-25 | 2011-02-25 | |
EB-2011-0011 | GEC_SUB_issueslist_20110224 | Submission | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-24 | 2011-02-24 | |
EB-2011-0011 | po1_dec_cost_eligibility_THESL_20110218 | Cost Eligibility Decision | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-18 | 2011-02-18 | 2011-02-18 |
EB-2011-0011 | po1_dec cost eligibility_THESL_20110218 | Procedural Order | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-18 | 2011-02-18 | 2011-02-18 |
EB-2011-0011 | OPA_intrv_REQ_20110107 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-07 | 2011-02-07 | |
EB-2011-0011 | PGallant_cost elig objection_redacted_ 20110207 | Cost Eligibility Objection | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-07 | 2011-02-07 | |
EB-2011-0011 | ConsumersCouncil_intrv_REQ_20110203 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-03 | 2011-02-03 | |
EB-2011-0011 | Horizon_intrv_REQ_20110203 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-03 | 2011-02-03 | |
EB-2011-0011 | Veridian_intrv_REQ_20110203 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-03 | 2011-02-03 | |
EB-2011-0011 | EnergyProbe_intrv_REQ_20110203 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-03 | 2011-02-03 | |
EB-2011-0011 | EnergyProfiles_obsrv_REQ_20110202 | Observer Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-02 | 2011-02-02 | |
EB-2011-0011 | AMPCO_intrv_REQ_20110202 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-02 | 2011-02-02 | |
EB-2011-0011 | LIEN_intrv_REQ_20110202 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-02 | 2011-02-02 | |
EB-2011-0011 | HONI_intrv_REQ_20110201 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-02-01 | 2011-02-01 | |
EB-2011-0011 | CEEA_intrv_REQ_20110128 | Intervenor Argument | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-28 | 2011-01-28 | |
EB-2011-0011 | NKashyap_obsrv_REQ_redacted_20110129 | Observer Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-31 | 2011-01-31 | |
EB-2011-0011 | GEC_intrv_REQ_ltr_20110128 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-28 | 2011-01-28 | |
EB-2011-0011 | UNION_obsv_REQ_20110128 | Observer Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-28 | 2011-01-28 | |
EB-2011-0011 | PollProbe_intrv_REQ_20110127 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2011-0011 | OSEA_intrv_REQ_20110127 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2011-0011 | SEC_intrv_REQ_20110126 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-26 | 2011-01-26 | |
EB-2011-0011 | VECC_intrv_REQ_20110127 | Intervenor Request Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-27 | 2011-01-27 | |
EB-2011-0011 | noa&h_lod_THESL_20110124 | Letter of Direction | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-24 | 2011-01-21 | 2011-01-24 |
EB-2011-0011 | noa&h_THESL_FR_20110124 | Notice of Application and Notice of Hearing | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-24 | 2011-01-21 | 2011-01-24 |
EB-2011-0011 | noa&h_THESL_20110124 | Notice of Application and Notice of Hearing | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-24 | 2011-01-21 | 2011-01-24 |
EB-2011-0011 | ack ltr THESL EB-2011-0011 EMAIL | Acknowledgement Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-14 | 2011-01-14 | |
EB-2011-0011 | ack_ltr_THESL_EB20110011 | Acknowledgement Letter | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-14 | 2011-01-14 | |
EB-2011-0011 | THESL_APPL_CDMPrograms_20110110 | Application and Evidence | Toronto Hydro-Electric System Limited - Electricity Distributor | 2011-01-10 | 2011-01-10 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |