Search Results for: Records - Case Number=EB-2015-0275 - 131 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2015-0275 | dec_order on cost awards_IESO_20170606 | Decision and Order on Cost Awards | Independent Electricity System Operator - IESO | 2017-06-06 | 2017-06-06 | |
EB-2015-0275 | VECC_Ltr_Changes in Counsel_20170427 | Correspondence | Independent Electricity System Operator - IESO | 2017-04-27 | 2017-04-27 | |
EB-2015-0275 | Updated_APPrO_CostClaim_IESO Fees 2016_20170116_20170208 | Cost Claim | Independent Electricity System Operator - IESO | 2017-02-08 | 2017-02-08 | |
EB-2015-0275 | Energy Probe_Cost Claim_Executed Affidavit_IESO Fees_20170204 | Cost Claim | Independent Electricity System Operator - IESO | 2017-02-06 | 2017-02-06 | |
EB-2015-0275 | OSEA_CostClaim_IESO_20170113 | Cost Claim | Independent Electricity System Operator - IESO | 2017-01-13 | 2017-01-13 | |
EB-2015-0275 | AMPCO_CostClaim_IESO_signed_20170117 | Cost Claim | Independent Electricity System Operator - IESO | 2017-01-17 | 2017-01-17 | |
EB-2015-0275 | IESO_CostClaim_Reply Ltr_20170120 | Cost Claim Objection Reply | Independent Electricity System Operator - IESO | 2017-01-20 | 2017-01-20 | |
EB-2015-0275 | SEC_CostClaim_IESO Fees_20170119 | Cost Claim | Independent Electricity System Operator - IESO | 2017-01-19 | 2017-01-19 | |
EB-2015-0275 | EnergyProbe_CostClaim_IESO Fees_20170117 | Cost Claim | Independent Electricity System Operator - IESO | 2017-01-17 | 2017-01-17 | |
EB-2015-0275 | APPrO_CostClaim_IESO Fees 2016_20170116 | Cost Claim | Independent Electricity System Operator - IESO | 2017-01-16 | 2017-01-16 | |
EB-2015-0275 | CME_Cost Claim_IESO Fees_20170117 | Cost Claim | Independent Electricity System Operator - IESO | 2017-01-16 | 2017-01-16 | |
EB-2015-0275 | VECC_Cost Claim_IESO_EB 2015-0275_20170112 | Cost Claim | Independent Electricity System Operator - IESO | 2017-01-12 | 2017-01-12 | |
EB-2015-0275 | Dec_Order_IESO_20161229 | Decision and Order | Independent Electricity System Operator - IESO | 2016-12-29 | 2016-12-29 | |
EB-2015-0275 | IESO_ReplyComments_20161222 | Comments | Independent Electricity System Operator - IESO | 2016-12-22 | 2016-12-22 | |
EB-2015-0275 | IESO_CvrLtr_ReplyComments_Issue2.0_20161222 | Comments | Independent Electricity System Operator - IESO | 2016-12-22 | 2016-12-22 | |
EB-2015-0275 | OEBStaff_Comments_IESOfees_20161220 | Comments | Independent Electricity System Operator - IESO | 2016-12-20 | 2016-12-20 | 2016-12-20 |
EB-2015-0275 | SEC_Comments_IESO_Fees_Sub_20161220 | Comments | Independent Electricity System Operator - IESO | 2016-12-20 | 2016-12-20 | |
EB-2015-0275 | HQEM and APPrO_Comments_LTR_IESO revised usage fee proposal_2016122 | Comments | Independent Electricity System Operator - IESO | 2016-12-20 | 2016-12-20 | |
EB-2015-0275 | BOMA_CostClaim_IESO_20161214 | Cost Claim | Independent Electricity System Operator - IESO | 2016-12-15 | 2016-12-15 | |
EB-2015-0275 | PO5_IESO_20161215 | Procedural Order | Independent Electricity System Operator - IESO | 2016-12-15 | 2016-12-15 | |
EB-2015-0275 | IESO_SUB_CovLtr_SubmissionIssue2_2016-12-14 | Submission | Independent Electricity System Operator - IESO | 2016-12-14 | 2016-12-14 | |
EB-2015-0275 | IESO_SUB_A-1-3 Submission on Usage Fee_IESO_20161214 | Submission | Independent Electricity System Operator - IESO | 2016-12-14 | 2016-12-14 | |
EB-2015-0275 | Dec_Order _IESO_EB-2015-0275_20161201 | Decision and Order | Independent Electricity System Operator - IESO | 2016-12-01 | 2016-12-01 | |
EB-2015-0275 | IESO_2016 Fees_ReplySub_20161021 | Submission | Independent Electricity System Operator - IESO | 2016-10-21 | 2016-10-21 | |
EB-2015-0275 | IESO_2016 Fees_CvrLtr_ReplySub_20161021 | Submission | Independent Electricity System Operator - IESO | 2016-10-21 | 2016-10-21 | |
EB-2015-0275 | HQEM and APPrO_SUB_corrected_IESO_20161019 | Submission | Independent Electricity System Operator - IESO | 2016-10-19 | 2016-10-19 | |
EB-2015-0275 | OEB Staff_SUB_IESO_2016 Fees_20161014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | 2016-10-14 |
EB-2015-0275 | OEB Staff_SUB CvrLTR_IESO_20161014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | 2016-10-14 |
EB-2015-0275 | EnergyProbe_SUB_IESO_20161014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | |
EB-2015-0275 | SEC_SUB_IESO_20161014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | |
EB-2015-0275 | SEP_SUB_IESO_20161014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | |
EB-2015-0275 | HQEM_and_APPrO_SUB_CvrLtr_SUB _IESO_20151014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | |
EB-2015-0275 | HQEM_and_APPrO_SUB_IESO_Unsettled Issue_20161014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | |
EB-2015-0275 | VECC_SUB_IESO_20161014 | Submission | Independent Electricity System Operator - IESO | 2016-10-14 | 2016-10-14 | |
EB-2015-0275 | IESO_SUB_AIC_2016 Fees unsettled issue_20161007 | Submission | Independent Electricity System Operator - IESO | 2016-10-07 | 2016-10-07 | |
EB-2015-0275 | IESO_CvrLtr_AIC_20161007 | Submission | Independent Electricity System Operator - IESO | 2016-10-07 | 2016-10-07 | |
EB-2015-0275 | PO4_IESO_EB-2015-0275_20160928 | Procedural Order | Independent Electricity System Operator - IESO | 2016-09-28 | 2016-09-28 | |
EB-2015-0275 | HQEM and APPrO_Ltr_IESO_Clarification_re_written_hearing_20160923 | Correspondence | Independent Electricity System Operator - IESO | 2016-09-23 | 2016-09-23 | |
EB-2015-0275 | OEB_Ltr_G Vegh_HQEM APPrO_IESO_20160921 | Correspondence | Independent Electricity System Operator - IESO | 2016-09-21 | 2016-09-21 | |
EB-2015-0275 | OEB Staff_SUB_IESO Settlement Proposal_20160914 | Submission | Independent Electricity System Operator - IESO | 2016-09-14 | 2016-09-14 | |
EB-2015-0275 | OEB Staff_covr ltr_sub_IESO_SettlementProposal_20160914 | Submission | Independent Electricity System Operator - IESO | 2016-09-14 at 3:21 PM | ||
EB-2015-0275 | HQEM_and_APPrO_LTR_re written hearing 20160909 | Correspondence | Independent Electricity System Operator - IESO | 2016-09-09 | 2016-09-09 | |
EB-2015-0275 | S-1-1_IESO_Settlement_Proposal_20160907 | Settlement Proposal | Independent Electricity System Operator - IESO | 2016-09-07 | 2016-09-07 | |
EB-2015-0275 | IESO_CvrLtr_SettlementProposal_2016-09-07 | Settlement Proposal | Independent Electricity System Operator - IESO | 2016-09-07 | 2016-09-07 | |
EB-2015-0275 | HQEM-APPRO 14_IR_Corrected_20160907 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-09-07 | 2016-09-07 | |
EB-2015-0275 | ENERGY_PROBE 8_IR_Corrected_20160907 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-09-07 | 2016-09-07 | |
EB-2015-0275 | A-1-2_Updated_2016-09-07_Exhibit List_updated_20160907 | Exhibit List | Independent Electricity System Operator - IESO | 2016-09-07 | 2016-09-07 | |
EB-2015-0275 | OEB Ltr_Settlement Extension_20160829 | Correspondence | Independent Electricity System Operator - IESO | 2016-08-29 | 2016-08-29 | |
EB-2015-0275 | IESO_Ltr_SettlementProposal_20160826 | Correspondence | Independent Electricity System Operator - IESO | 2016-08-26 | 2016-08-26 | |
EB-2015-0275 | IESO_IRR_CvrLtr_Replacement_20160728 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-28 | 2016-07-28 | |
EB-2015-0275 | IESO_IRR_VECC 5 Att 2 Grade Structure - Mgmt Group wo Execs June 4 2015_20160728 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-28 | 2016-07-28 | |
EB-2015-0275 | IESO_IRR_VECC 5 Att 1 Grade Structure - Executives July 17 2015_corrected_20160728 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-28 | 2016-07-28 | |
EB-2015-0275 | IESO_IRR_ENERGY PROBE 6 Att 1 IESO - Grade Structure - Executives -July 17 2015_corrected_20160728 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-28 | 2016-07-28 | |
EB-2015-0275 | HQEM and APPrO_LTR_Timing of issue discussion at settlement conference_20160726 | Correspondence | Independent Electricity System Operator - IESO | 2016-07-26 | 2016-07-26 | |
EB-2015-0275 | IESO_IRR_ENERGY PROBE 7_Att 1_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_IRR_ENERGY PROBE 6_Att 3_VPRoles_Point Evaluation_HayGroup_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_IRR_ISSUE_3.0-5.4_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_IRR_ISSUE_2.1-2.4_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_IRR_ISSUE_6.0-6.2_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_A-2-1_Updated_Exhibit List_20160722 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_IRR_ISSUE_1.0-1.5_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_IRR_ISSUE_2.0_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | IESO_IRR_CvrLtr_20160722 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2016-07-22 | 2016-07-22 | |
EB-2015-0275 | AMPCO_IR_IESO_201630_corrected_20160701 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | OSEA_IR_IESO_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | VECC_IR_IESO_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | OEB Staff_IR_IESO_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | 2016-06-30 |
EB-2015-0275 | SEC_IESO_IR_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | HQEM-APPrO_IR_IESO_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | CME_IR_IESO_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | BOMA_IR_IESO_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | Energy Probe_IR_IESO_20160630 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-30 | 2016-06-30 | |
EB-2015-0275 | Society of Energy Professionals_SEP_IR_IESO_20160629 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2016-06-29 | 2016-06-29 | |
EB-2015-0275 | Dec_Issues List_PO3_IESO_2016 Fees_20160617 | Procedural Order | Independent Electricity System Operator - IESO | 2016-06-17 | 2016-06-17 | |
EB-2015-0275 | Dec_Issues List_PO3_IESO_2016 Fees_20160617 | Decision | Independent Electricity System Operator - IESO | 2016-06-17 | 2016-06-17 | |
EB-2015-0275 | HQEM_Ltr_Add Contact REQ_20160615 | Correspondence | Independent Electricity System Operator - IESO | 2016-06-15 | 2016-06-15 | |
EB-2015-0275 | BOMA_Ltr_IESO Comments Reply_20160601 | Correspondence | Independent Electricity System Operator - IESO | 2016-06-01 | 2016-06-01 | |
EB-2015-0275 | IESO_Comments_CvrLtr_ReplyDraftIssues_20160531 | Comments | Independent Electricity System Operator - IESO | 2016-05-31 | 2016-05-31 | |
EB-2015-0275 | AMPCO_Comments_IESO_DIL_20160526 | Comments | Independent Electricity System Operator - IESO | 2016-05-26 | 2016-05-26 | |
EB-2015-0275 | CME_Comments Ltr_IESO_draft issues list_20160526 | Comments | Independent Electricity System Operator - IESO | 2016-05-26 | 2016-05-26 | |
EB-2015-0275 | APPrO and HQEM_Comments_LTR_Issues list_20160526 | Comments | Independent Electricity System Operator - IESO | 2016-05-26 | 2016-05-26 | |
EB-2015-0275 | OEB Staff_Submission_Draft Issues List_IESO Fees_20160526 | Comments | Independent Electricity System Operator - IESO | 2016-05-26 | 2016-05-26 | |
EB-2015-0275 | BOMA_Comments_draft issues list_20160426 | Comments | Independent Electricity System Operator - IESO | 2016-05-26 | 2016-05-26 | |
EB-2015-0275 | Energy Probe_Comments on Draft Issues List_20160526 | Comments | Independent Electricity System Operator - IESO | 2016-05-26 | 2016-05-26 | |
EB-2015-0275 | Energy Probe_Ltr-Comments on Draft Issues List_20160526 | Comments | Independent Electricity System Operator - IESO | 2016-05-26 | 2016-05-26 | |
EB-2015-0275 | PO2_IESO 2016 Fees_20160218 | Procedural Order | Independent Electricity System Operator - IESO | 2016-05-18 | 2016-05-18 | |
EB-2015-0275 | B-1-1_IESO_Att 4 Elenchus-IESO 2015 Cost Allocation Model_xlsx_20160513 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-05-13 | 2016-05-13 | |
EB-2015-0275 | B-1-2_IESO_Discussion of Cost Allocation Study_20160513 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-05-13 | 2016-05-13 | |
EB-2015-0275 | B-1-1_IESO_Att 3_Elenchus-IESO 2016 Fees Evidence_20160513 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-05-13 | 2016-05-13 | |
EB-2015-0275 | B-1-1_IESO_2016 Rev Req and Usage Fee Methodology_Updated_20160513 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-05-13 | 2016-05-13 | |
EB-2015-0275 | A-1-2_IESO_Exhibit List_Updated_20160513 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-05-13 | 2016-05-13 | |
EB-2015-0275 | IESO_CvrLtr_APPL_20160513 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-05-13 | 2016-05-13 | |
EB-2015-0275 | Appendix A_List of Participants_PO1_IESO_corrected_20160419 | Intervenor List | Independent Electricity System Operator - IESO | 2016-04-19 | 2016-04-19 | 2016-04-19 |
EB-2015-0275 | PO1_IESO_2016 Revenue Requirement_20160418 | Procedural Order | Independent Electricity System Operator - IESO | 2016-04-18 | 2016-04-18 | |
EB-2015-0275 | HydroQuebecEnergy Marketing_Ltr_IESO_settlement conference timing_20160412 | Correspondence | Independent Electricity System Operator - IESO | 2016-04-12 | 2016-04-12 | |
EB-2015-0275 | IESO_Letter_EB-2015-0275_20160411 | Correspondence | Independent Electricity System Operator - IESO | 2016-04-11 | 2016-04-11 | |
EB-2015-0275 | IESO_Updated_EVD_20160331 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-03-31 | 2016-03-31 | |
EB-2015-0275 | IESO_CvrLtr_Supp EVD_20160331 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-03-31 | 2016-03-31 | |
EB-2015-0275 | Energy Probe_IntrvREQ_IESO_201603156 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-03-15 | 2016-03-15 | |
EB-2015-0275 | Energy Probe_IntrcREQ_Ltr_IESO_201603156 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-03-15 | 2016-03-15 | |
EB-2015-0275 | AMPCO_IntervReq_IESO_CostEligReq_20160302 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-03-02 | 2016-03-02 | |
EB-2015-0275 | IESO_Affidavit_20160301 | Affidavits of Service | Independent Electricity System Operator - IESO | 2016-03-01 | 2016-03-01 | |
EB-2015-0275 | APPrO_IntervReq_IESO_CostEligReq_Attach_20160229 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-29 | 2016-02-29 | |
EB-2015-0275 | APPrO_IntervReq_IESO_CostEligReq_20160229 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-29 | 2016-02-29 | |
EB-2015-0275 | OPG_IntervReq_IESO_20160229 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-29 | 2016-02-29 | |
EB-2015-0275 | VECC_IntervReq_CostEligReq_IESO_20160229 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-29 | 2016-02-29 | |
EB-2015-0275 | CME_IntrvREQ_CostEligREQ_IESO_20160226 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-25 | 2016-02-25 | |
EB-2015-0275 | Manitoba Hydro_IntrvREQ_IESO_20160226 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-26 | 2016-02-26 | |
EB-2015-0275 | Powerex Corp_IntrvREQ_IESO_20160229 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-26 | 2016-02-26 | |
EB-2015-0275 | OSEA_IntrvREQ_CostEligREQ_IESO_20160226 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-26 | 2016-02-26 | |
EB-2015-0275 | Hydro Québec Energy Marketing_HQEM_IntrvREQ_IESO_2016RRS_20160224 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-24 | 2016-02-24 | |
EB-2015-0275 | Notice_IESO_EB-2015-0275_ENG_published 20160218 | Notice | Independent Electricity System Operator - IESO | 2016-02-18 | 2016-02-18 | |
EB-2015-0275 | Notice_IESO_EB-2015-0275_FRE_published_20160218 | Notice | Independent Electricity System Operator - IESO | 2016-02-18 | 2016-02-18 | |
EB-2015-0275 | PWU_IntrvREQ_IESO_expenditures and revenues_20160223 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-23 | 2016-02-23 | |
EB-2015-0275 | ShellEnergy_IntrvREQ_IESO_20160222 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-22 | 2016-02-22 | |
EB-2015-0275 | SEC_IntrvREQ_CostEligREQ_IES0_20160222 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-22 | 2016-02-22 | |
EB-2015-0275 | Notice_LOD_IESO_20160217 | Letter of Direction | Independent Electricity System Operator - IESO | 2016-02-17 | 2016-02-17 | |
EB-2015-0275 | Notice_IESO_FRE_20160217 | Notice | Independent Electricity System Operator - IESO | 2016-02-17 | 2016-02-17 | |
EB-2015-0275 | Notice_IESO_ENG_20160217 | Notice | Independent Electricity System Operator - IESO | 2016-02-17 | 2016-02-17 | |
EB-2015-0275 | SEP_IntrvREQ_IESO_EB-2015-0275_20160209 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-02-09 | 2016-02-09 | |
EB-2015-0275 | ack_ltr_IESO 2016 Fees_2016 Expenditure and Revenue Requirement Submission_20160121 | Acknowledgement Letter | Independent Electricity System Operator - IESO | 2016-01-21 | 2016-01-21 | |
EB-2015-0275 | BOMA_IntrvREQ_CostEligREQ_IESO_20160120 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2016-01-20 | 2016-01-20 | |
EB-2015-0275 | B-1-1_IESO_Att 2 Elenchus-IESO 2015 Cost Allocation Model_20160119 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-01-19 | 2016-01-19 | |
EB-2015-0275 | IESO_APPL_EVD Revenue Requirement Submission_EB-2015-0275_20160119 | Application and Evidence | Independent Electricity System Operator - IESO | 2016-01-19 | 2016-01-19 | |
EB-2015-0275 | IESO_Ltr_EMAIL_additional service EB-2013-0381 EB-2013-0326_20161222 | Correspondence | Independent Electricity System Operator - IESO | 2015-12-22 | 2015-12-22 | |
EB-2015-0275 | Dec_InterimOrder_IESO_20151222 | Interim order | Independent Electricity System Operator - IESO | 2015-12-22 | 2015-12-22 | |
EB-2015-0275 | IESO_OEB Dec Interim Order served to intervenors_IESO_EMAIL_20151222 | Correspondence | Independent Electricity System Operator - IESO | 2015-12-22 | 2015-12-22 | |
EB-2015-0275 | Dec_InterimOrder_IESO_20151222 | Decision and Order | Independent Electricity System Operator - IESO | 2015-12-22 | 2015-12-22 | |
EB-2015-0275 | IESO_Ltr_InterimFees_20151222 | Correspondence | Independent Electricity System Operator - IESO | 2015-12-22 | 2015-12-22 | |
EB-2015-0275 | IESO_Ltr_ InterimFees_20151216 | Correspondence | Independent Electricity System Operator - IESO | 2015-12-16 | 2015-12-16 | |
EB-2015-0275 | IESO_Ltr_2016 ExpenditureRevenue Requirement delay_20151102 | Correspondence | Independent Electricity System Operator - IESO | 2015-11-02 | 2015-11-02 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |