Search Results for: Records - Case Number=EB-2015-0072 - 127 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2015-0072 | Ack_Ltr_MP Status_Grimsby Power_20161101 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-11-01 | 2016-11-01 | |
EB-2015-0072 | Grimsby_Notification_MMPT_20161031 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-10-31 | 2016-10-31 | |
EB-2015-0072 | Energ Probe_Executed Affidavit_Grimsby Power_20161027 | Cost Claim | Grimsby Power Incorporated - Electricity Distributor | 2016-10-27 | 2016-10-27 | |
EB-2015-0072 | dec_order_Cost Awards_Grimsby Power_20161028 | Decision and Order on Cost Awards | Grimsby Power Incorporated - Electricity Distributor | 2016-10-28 | 2016-10-28 | |
EB-2015-0072 | Grimsby Power_Cost Claim Obj_20161007 | Cost Claim Objection | Grimsby Power Incorporated - Electricity Distributor | 2016-10-07 | 2016-10-07 | |
EB-2015-0072 | SEC_Cost Claim_Grimsby Power_20161003 | Cost Claim | Grimsby Power Incorporated - Electricity Distributor | 2016-10-01 | 2016-10-01 | |
EB-2015-0072 | Energy Probe_Cost Claim_Grimsby Power_20160929 | Cost Claim | Grimsby Power Incorporated - Electricity Distributor | 2016-09-29 | 2016-09-29 | |
EB-2015-0072 | VECC_Cost Claim_Grimsby Power_20160929 | Cost Claim | Grimsby Power Incorporated - Electricity Distributor | 2016-09-29 | 2016-09-29 | |
EB-2015-0072 | Rate_Order_Grimsby Power_20160922 | Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-09-22 | 2016-09-22 | |
EB-2015-0072 | REVISED dec_order_Grimsby Power_20160922 | Decision and Order | Grimsby Power Incorporated - Electricity Distributor | 2016-09-22 | 2016-09-22 | |
EB-2015-0072 | Grimsby_DRO_Rev_Deadline_20160915 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-09-15 | 2016-09-15 | |
EB-2015-0072 | Grimsby_DRO_Rev_Filing_Requirements_Chapter2_Appendices_20160915 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-09-15 | 2016-09-15 | |
EB-2015-0072 | Grimsby_DRO_Detailed CA Model Run4_20160914 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-09-15 | 2016-09-15 | |
EB-2015-0072 | Grimsby_DRO_Rev_Test_Year_Income_Tax_PILs_Workform_DRAFT_20160915 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-09-15 | 2016-09-15 | |
EB-2015-0072 | Grimsby_DRO_Rev_Reqt_Work_Form_V6_20160915 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-09-15 | 2016-09-15 | |
EB-2015-0072 | Grimsby_DRO_Rev_20160915 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-09-15 | 2016-09-15 | |
EB-2015-0072 | OEB Staff_SUB_Grimsby Power DRO_20160907 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-09-07 | 2016-09-07 | |
EB-2015-0072 | EnergyProbe_SUB_DRO_Grimsby Power_20160902 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-09-02 | 2016-09-02 | |
EB-2015-0072 | Grimsby_DRO_Filing_Requirements_Chapter2_Appendices_20160830 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-08-30 | 2016-08-30 | |
EB-2015-0072 | Grimsby_Detailed CA Model Run4_20160830 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-08-30 | 2016-08-30 | |
EB-2015-0072 | Grimsby_DRO_Test_year_Income Tax_PILs_Workform_DRAFT_20160830 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-08-30 | 2016-08-30 | |
EB-2015-0072 | Grimsby_DRO_Rev Reqt Work Form_V6_201600830 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-08-30 | 2016-08-30 | |
EB-2015-0072 | Grimsby_DRO_20160830 | Draft Rate Order | Grimsby Power Incorporated - Electricity Distributor | 2016-08-30 | 2016-08-30 | |
EB-2015-0072 | dec_order_Grimsby Power_20160818 | Decision and Order | Grimsby Power Incorporated - Electricity Distributor | 2016-08-18 | 2016-08-18 | |
EB-2015-0072 | Grimsby Power_ReplyARG_20160809 | Applicant Reply Argument | Grimsby Power Incorporated - Electricity Distributor | 2016-08-09 | 2016-08-09 | |
EB-2015-0072 | VECC_FinalSUB_Grimsby Power_20160729 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-07-29 | 2016-07-29 | |
EB-2015-0072 | EnergyProbe_cvrltr_SUB_Grimsby Power 2016 COS Rates_20160729 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-08-02 | 2016-08-02 | |
EB-2015-0072 | EnergyProbe_SUB_Grimsby Power 2016 COS Rates_20160729 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-07-29 | 2016-07-29 | |
EB-2015-0072 | OEBstaff_Final SUB_Grimsby_20160729 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-07-29 | 2016-07-29 | |
EB-2015-0072 | SEC_FinalARG_Grimsby Power_20160729 | Final Argument | Grimsby Power Incorporated - Electricity Distributor | 2016-07-29 | 2016-07-29 | |
EB-2015-0072 | NPEI_BriefofAuthorities_Grimsby Power_20160729 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-07-29 | 2016-07-29 | |
EB-2015-0072 | NEPI_ReplySUB_Grimsby Power_20160729 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-07-29 | 2016-07-29 | |
EB-2015-0072 | Grimsby_Revised Settlement_Proposal_20160728 | Settlement Proposal | Grimsby Power Incorporated - Electricity Distributor | 2016-07-28 | 2016-07-28 | |
EB-2015-0072 | Exhibit K1.5_SEC_GPI_OMA_Compendium_20160713 | Exhibits | Grimsby Power Incorporated - Electricity Distributor | 2016-07-26 | 2016-07-26 | |
EB-2015-0072 | Grimsby Power_Undertaking Responses_20160721 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-21 | 2016-07-21 | |
EB-2015-0072 | PO 3_Interim Rate Order_Grimsby Power_20160715 | Interim rate order | Grimsby Power Incorporated - Electricity Distributor | 2016-07-15 | 2016-07-15 | |
EB-2015-0072 | PO 3_Interim Rate Order_Grimsby Power_20160715 | Procedural Order | Grimsby Power Incorporated - Electricity Distributor | 2016-07-15 | 2016-07-15 | |
EB-2015-0072 | Transcripts_Grimsby Power_Vol 2_20160714 | Transcripts | Grimsby Power Incorporated - Electricity Distributor | 2016-07-14 | 2016-07-14 | |
EB-2015-0072 | Transcript_Grimsby Power Inc_Vol 1_20160713 | Transcripts | Grimsby Power Incorporated - Electricity Distributor | 2016-07-13 | 2016-07-13 | |
EB-2015-0072 | VECC_Compendium_Grimsby_20160713 | Cross Examination Material | Grimsby Power Incorporated - Electricity Distributor | 2016-07-13 | 2016-07-13 | |
EB-2015-0072 | Grimsby_KPMG Presentation Slides_20160712 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-07-12 | 2016-07-12 | |
EB-2015-0072 | Grimsby_Corres_Witness Panel Composition_CVs_20160712 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-07-12 | 2016-07-12 | |
EB-2015-0072 | OEBstaff Compendium_Diff in PILs 4 Scenarios_Grimsby Hydro_20160712 | Cross Examination Material | Grimsby Power Incorporated - Electricity Distributor | 2016-07-12 | 2016-07-12 | |
EB-2015-0072 | OEBstaff_Compendium_PILs Grimsby_Oral Hearing_20160712 | Cross Examination Material | Grimsby Power Incorporated - Electricity Distributor | 2016-07-12 | 2016-07-12 | |
EB-2015-0072 | OEBstaff_Compendium_OM&A per cust 2014-2016_Grimsby Power_20160712 | Cross Examination Material | Grimsby Power Incorporated - Electricity Distributor | 2016-07-12 | 2016-07-12 | |
EB-2015-0072 | OEBstaff_Compendium spreadsheet_Grimsby Power_20160712 | Cross Examination Material | Grimsby Power Incorporated - Electricity Distributor | 2016-07-12 | 2016-07-12 | |
EB-2015-0072 | EnergyProbe_Compendium_Grimsby Power_20160712 | Cross Examination Material | Grimsby Power Incorporated - Electricity Distributor | 2016-07-12 | 2016-07-12 | |
EB-2015-0072 | Grimsby_Tech_Conf_JT1.8_Test_Year_Income_Tax_PILs_Workform_DRAFT_NWTC_Out Reg Accnts Out_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-11 | 2016-07-11 | |
EB-2015-0072 | Grimsby_Tech_Conf_Test_Year_Income_Tax_PILs_Workform_DRAFT_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-08 | 2016-07-08 | |
EB-2015-0072 | Grimsby_Tech_Conf_JT1.8_Test_Year_Income_Tax_PILs_Workform_DRAFT_NWTC_In Reg Accnts In_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-08 | 2016-07-08 | |
EB-2015-0072 | Grimsby_Tech_Conf_JT1.8_Test_Year_Income_Tax_PILs_Workform_DRAFT_NWTC In Reg Accnts Out_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-08 | 2016-07-08 | |
EB-2015-0072 | Grimsby_Tech_Conf_Undertaking Responses_Appendix A_NWTC Tx Rtrn_2012 to 2015_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-08 | 2016-07-08 | |
EB-2015-0072 | Grimsby_Tech_Conf_Undertaking Responses_Appendix A_NWTC Tx Rtrn_2009 to 2011_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-08 | 2016-07-08 | |
EB-2015-0072 | Grimsby_Tech_Conf_Undertaking Responses_Appendix A_NWTC Tx Rtrn_2005 to 2008_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-08 | 2016-07-08 | |
EB-2015-0072 | Grimsby_Tech_Conf_Undertaking Responses_20160708 | Undertaking Responses | Grimsby Power Incorporated - Electricity Distributor | 2016-07-08 | 2016-07-08 | |
EB-2015-0072 | Grimsby_Add_Evidence_Test_Year_Income_Tax_PILs_Workform_DRAFT_20160629 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-29 | 2016-06-29 | |
EB-2015-0072 | Transcript_Tech Conference_Grimsby Power_20160706 | Transcripts | Grimsby Power Incorporated - Electricity Distributor | 2016-07-06 | 2016-07-06 | |
EB-2015-0072 | Grimsby_Energy_Probe_Materials for Oral Hearing_20160630 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-30 | 2016-06-30 | |
EB-2015-0072 | OEBStaff_SUB_Grimsby Power_20160630 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-06-30 | 2016-06-30 | |
EB-2015-0072 | Grimsby_Add Evidence_Rev_Reqt_Work_Form_V6_20160629 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-29 | 2016-06-29 | |
EB-2015-0072 | Grimsby_Appl_KPMG Report_20160629 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-29 | 2016-06-29 | |
EB-2015-0072 | Grimsby_cvrltr_addl_Appl_20160629 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-29 | 2016-06-29 | |
EB-2015-0072 | PO2_Grimsby Power_20160627 | Procedural Order | Grimsby Power Incorporated - Electricity Distributor | 2016-06-27 | 2016-06-27 | |
EB-2015-0072 | Grimsby_Ltr_Evidence_Update_20160627 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-27 | 2016-06-27 | |
EB-2015-0072 | Grimsby_SettlementP_Test_Year_Income_Tax_PILs_Workform_DRAFT_20160624 | Settlement Proposal | Grimsby Power Incorporated - Electricity Distributor | 2016-06-24 | 2016-06-24 | |
EB-2015-0072 | Grimsby_SettlementP_Detailed_CA_Model_Run3_20160624 | Settlement Proposal | Grimsby Power Incorporated - Electricity Distributor | 2016-06-24 | 2016-06-24 | |
EB-2015-0072 | Grimsby_SettlementP_2016_Rev_Reqt_Work_Form_V6_20160624 | Settlement Proposal | Grimsby Power Incorporated - Electricity Distributor | 2016-06-24 | 2016-06-24 | |
EB-2015-0072 | Grimsby_SettlementP_2016_Load_Forecast_2016_COP_Forecast_20160624 | Settlement Proposal | Grimsby Power Incorporated - Electricity Distributor | 2016-06-24 | 2016-06-24 | |
EB-2015-0072 | Grimsby_Settlement Proposal_20160624 | Settlement Proposal | Grimsby Power Incorporated - Electricity Distributor | 2016-06-24 | 2016-06-24 | |
EB-2015-0072 | Energy_Probe_Correspondence_20160626 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-26 | 2016-06-26 | |
EB-2015-0072 | OEBltr_Grimsby Power_Granting Extn_Settlement Prop_20160617 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-17 | 2016-06-17 | |
EB-2015-0072 | Grimsby_Ltr_Settlement_Proposal_Deadline_20150616 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-06-16 | 2016-06-16 | |
EB-2015-0072 | Grimsby_Energy_Probe_Clarification_Response 20160520 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-05-20 | 2016-05-20 | |
EB-2015-0072 | Dec_Issues List_Grimsby_20160520 | Decision | Grimsby Power Incorporated - Electricity Distributor | 2016-05-20 | 2016-05-20 | |
EB-2015-0072 | Energy Probe Clarification Questions Ltr OEB_20160517 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2016-05-17 | 2016-05-17 | |
EB-2015-0072 | Grimsby_IRR_2016 Load Forecast_2016 COP_Forecast_20160516 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-16 | 2016-05-16 | |
EB-2015-0072 | SEC_Grimsby_DecUnd_20160513 | Declaration and Undertakings | Grimsby Power Incorporated - Electricity Distributor | 2016-05-13 | 2016-05-13 | |
EB-2015-0072 | Grimsby_IRR_7_Staff_43_a_Cost_Allocation_Model_V3_3_20160513 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-13 | 2016-05-13 | |
EB-2015-0072 | Grimsby_IdentificationofConfidentialLtr_IRR_20160511 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-12 | 2016-05-12 | |
EB-2015-0072 | Grimsby_CvLtr_IRR_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-09 | 2016-05-09 | |
EB-2015-0072 | Grimsby_IRR_Billing Collecting Weighting_Analysis_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | Grimsby_IRR_EDDVAR_Continuity Schedule_CoS_v2_6_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | Grimsby_IRR_Detailed_CA_Model_Run2_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | Grimsby_IRR_RTSR MODEL_V4_0_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | Grimsby_IRR_Test year Income Tax_PILs_Workform_DRAFT_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | Grimsby_IRR_Filing Requirements_Chapter2_Appendices_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | Grimsby_IRR_Rev_Reqt_Work_Form_V6_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | Grimsby_IR_20160506 | Interrogatory Response from Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-05-06 | 2016-05-06 | |
EB-2015-0072 | SEC_IR_Grimsby Power_20160415 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-15 | 2016-04-15 | |
EB-2015-0072 | NPEI_IR_Grimsby Power_20160415 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-15 | 2016-04-15 | |
EB-2015-0072 | NPEI_CovLtr_IR_Grimsby Power_20160415 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-15 | 2016-04-15 | |
EB-2015-0072 | VECC_IR_Grimsby Power_20160415 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-15 | 2016-04-15 | |
EB-2015-0072 | OEBStaff_IR_Grimsby Power_20160413 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-13 | 2016-04-13 | |
EB-2015-0072 | OEBStaff_IR_cvrltr_Grimsby Power_20160413 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-13 | 2016-04-13 | |
EB-2015-0072 | Energy Probe_IR_Grimsby Power_20160408 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-08 | 2016-04-08 | |
EB-2015-0072 | Energy Probe_cvr ltr_IR_Grimsby Power_20160408 | Interrogatories to Applicant | Grimsby Power Incorporated - Electricity Distributor | 2016-04-07 at 11:48 PM | ||
EB-2015-0072 | D Nielson_Comments_Grimsby Power_20160318_Redacted | Letter of Comment | Grimsby Power Incorporated - Electricity Distributor | 2016-03-18 | 2016-03-18 | |
EB-2015-0072 | PO1_Grimsby Power CoS_20160401 | Procedural Order | Grimsby Power Incorporated - Electricity Distributor | 2016-04-01 | 2016-04-01 | |
EB-2015-0072 | Grimsby Power_SupplementarySUB_20160331 | Submission | Grimsby Power Incorporated - Electricity Distributor | 2016-03-31 | 2016-03-31 | |
EB-2015-0072 | COGECO_IntrvREQ_Grimsby Power_20160318 | Intervenor Request Letter | Grimsby Power Incorporated - Electricity Distributor | 2016-03-18 | 2016-03-18 | |
EB-2015-0072 | Grimsby_Affidavit of Service_20160308 | Affidavits of Service | Grimsby Power Incorporated - Electricity Distributor | 2016-03-08 | 2016-03-08 | |
EB-2015-0072 | Notice_Grimsby Power_20160303 | Notice | Grimsby Power Incorporated - Electricity Distributor | 2016-03-03 | 2016-03-03 | |
EB-2015-0072 | lod_Grimsby Power_20160303 | Letter of Direction | Grimsby Power Incorporated - Electricity Distributor | 2016-03-03 | 2016-03-03 | |
EB-2015-0072 | SEC_IntrvREQ_Grimsby Power_20160129 | Intervenor Request Letter | Grimsby Power Incorporated - Electricity Distributor | 2016-01-29 | 2016-01-29 | |
EB-2015-0072 | NPEI_IntrvReq_Grimsby Hydro_20160128 | Intervenor Request Letter | Grimsby Power Incorporated - Electricity Distributor | 2016-01-28 | 2016-01-28 | |
EB-2015-0072 | VECC_intrv REQ_Grimsby_20160127 | Intervenor Request Letter | Grimsby Power Incorporated - Electricity Distributor | 2016-01-27 | 2016-01-27 | |
EB-2015-0072 | EnergyProbe_IntrvREQ_Grimsby Power COS_20160105 | Intervenor Request Letter | Grimsby Power Incorporated - Electricity Distributor | 2016-01-06 | 2016-01-06 | |
EB-2015-0072 | EnergyProbe_IntrvREQ_cvrltr_Grimsby Power COS_20160105 | Intervenor Request Letter | Grimsby Power Incorporated - Electricity Distributor | 2016-01-06 | 2016-01-06 | |
EB-2015-0072 | ack_ltr_Grimsby_20151230 | Acknowledgement Letter | Grimsby Power Incorporated - Electricity Distributor | 2015-12-30 | 2015-12-30 | |
EB-2015-0072 | Grimsby_Filing_Requirements_Chapter2_Appendices_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_2016_Load_Forecast_COP_Forecast_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_Test_Year_Income_PILS_Workform_Draft_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_RTSR_Model_V4_0_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_Rev_Reqt_Work_Form_V6_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_EDDVAR_Continuity_Schedule_CoS_v2_6_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_Detailed_CA_Model_Run1_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_9_Deferral and Variance Accounts_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_8_Rate Design_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_7_Cost Allocation_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_6_Calculation of Revenue Deficiency_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_5_Cost of Capital and Capital Structure_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_4_Operating Expenses_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_3_Operating Revenue_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit 2_Rate Base_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_Exhibit_1_Administrative Documents_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby_APPL_CvLtr_20151223 | Application and Evidence | Grimsby Power Incorporated - Electricity Distributor | 2015-12-23 | 2015-12-23 | |
EB-2015-0072 | Grimsby Power_Delay_CoS Filing_20150313 | Correspondence | Grimsby Power Incorporated - Electricity Distributor | 2015-03-12 | 2015-03-12 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |