Advanced Regulatory Document Search (RDS)

 

Search Results for: Records - Case Number=EB-2009-0084 - 162 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2009-0084 document icon OEBLtr_2024 cost of capital updates_20231031 Correspondence Ontario Energy Board 2023-10-31 2023-10-31
EB-2009-0084 document icon OEB_ltr_2023_cost of capital-updates-20221020 Correspondence Ontario Energy Board 2022-10-20 2022-10-20
EB-2009-0084 document icon Appendix 1 2022 Cost of Capital Parameter Calculations 20211028 Correspondence Ontario Energy Board 2021-10-28 2021-10-28
EB-2009-0084 document icon OEB Ltr_2022 Cost of Capital Update_20211028 Correspondence Ontario Energy Board 2021-10-28 2021-10-28
EB-2009-0084 document icon OEB Ltr_2021Jan01_Cost of Capital Update_20201109 Correspondence Ontario Energy Board 2020-11-09 2020-11-09 2020-11-09
EB-2009-0084 document icon OEB Ltr_2021 Inflation updates_20201109 Correspondence Ontario Energy Board 2020-11-09 2020-11-09
EB-2009-0084 document icon OEB Ltr_Jan 1 2020 Cost of Capital Update_20191031 Notice Ontario Energy Board 2019-10-31 2019-10-31
EB-2009-0084 document icon OEB Ltr_Jan 1 2019 Cost of Capital Update_EB-2009-0084_20181122 Notice Ontario Energy Board 2018-11-22 2018-11-22
EB-2009-0084 document icon OEB Ltr_Jan 1 2018 Cost of Capital Update_EB-2009-0084_20171123 Notice Ontario Energy Board 2017-11-23 2017-11-23
EB-2009-0084 document icon OEB Ltr_Jan 1 2017 Cost of Capital Update_20161027 Notice Ontario Energy Board 2016-10-27 2016-10-27
EB-2009-0084 document icon OEB_CvrLtr_Cost of Capital_OEB Staff Report_EB-2009-0084_20160114 Staff Report to the Board Ontario Energy Board 2016-01-14 2016-01-14
EB-2009-0084 document icon OEB Staff Report_Cost of Capital Review_EB-2009-0084_20160114 Staff Report to the Board Ontario Energy Board 2016-01-14 2016-01-14
EB-2009-0084 document icon OEB_Ltr_2015 Jan 01_Cost of Capital Update_20151015 Notice Ontario Energy Board 2015-10-15 2015-10-15
EB-2009-0084 document icon OEB_Ltr_2015_Jan_1_Cost_of_Capital_update_20141120 Notice Ontario Energy Board 2014-11-20 2014-11-20
EB-2009-0084 document icon REDACTED_OEB_Ltr-Template_Request for Estimates_20130920 Correspondence Ontario Energy Board 2013-09-20 2013-09-20
EB-2009-0084 document icon OEB Ltr_Cost of Capital Parameter Updates for 2014 Cost of Service APPL_20131125 Notice Ontario Energy Board 2013-11-25 2013-11-25
EB-2009-0084 document icon Ltr_3_Redacted Reply_EB-2009-0084_20131015 Correspondence Ontario Energy Board 2013-10-15 2013-10-15
EB-2009-0084 document icon Ltr_5_Redacted Reply_EB-2009-0084_20131008 Correspondence Ontario Energy Board 2013-10-08 2013-10-08
EB-2009-0084 document icon Ltr_1_Redacted Reply_EB-2009-0084_20131004 Correspondence Ontario Energy Board 2013-10-04 2013-10-04
EB-2009-0084 document icon Ltr_4_Redacted Reply_EB-2009-0084_20130920 Correspondence Ontario Energy Board 2013-09-20 2013-09-20
EB-2009-0084 document icon OEB_Ltr_2013 May1 Cost of Capital update_EB-2009-0084_20130214 Notice Ontario Energy Board 2013-02-14 2013-02-14
EB-2009-0084 document icon Ltr_1_redacted reply_EB-2009-0084_20120917 Correspondence Ontario Energy Board 2012-09-17 2012-09-17
EB-2009-0084 document icon Ltr_4_redacted reply_EB-2009-0084_20121014 Correspondence Ontario Energy Board 2012-10-14 2012-10-14
EB-2009-0084 document icon Ltr_5_redacted reply_EB-2009-0084_20120928 Correspondence Ontario Energy Board 2012-09-28 2012-09-28
EB-2009-0084 document icon REDACTED_Brdltr_Est Request_20120913 Correspondence Ontario Energy Board 2012-09-13 2012-09-13
EB-2009-0084 document icon BrdLtr_2013Jan01_Cost_of_Capital_update_20121115 Correspondence Ontario Energy Board 2012-11-15 2012-11-15
EB-2009-0084 document icon OEB_Ltr_2012Jan01_Cost of Capital Parameters_20111110 Correspondence Ontario Energy Board 2011-11-10 2011-11-10
EB-2009-0084 document icon Ltr_5_BA_redacted version_EB-2009-0084_20101029 Correspondence Ontario Energy Board 2010-10-29 2010-10-29
EB-2009-0084 document icon Ltr_5_redacted reply_EB-2009-0084_20110921 Correspondence Ontario Energy Board 2011-09-21 2011-09-21
EB-2009-0084 document icon Ltr_4_redacted reply_EB-2009-0084_20110919 Correspondence Ontario Energy Board 2011-09-19 2011-09-19
EB-2009-0084 document icon Ltr_1_redacted reply_EB-2009-0084_20111110 Correspondence Ontario Energy Board 2011-10-11 2011-10-11
EB-2009-0084 document icon Ltr_3_BA_redacted version_EB-2009-0084_20101019 Correspondence Ontario Energy Board 2010-11-04 2010-11-04
EB-2009-0084 document icon Ltr_4_BA_redacted version_EB-2009-0084_20101014 Correspondence Ontario Energy Board 2010-10-14 2010-10-14
EB-2009-0084 document icon Ltr_2_BA_redacted version_EB-2009-0084_20101014 Correspondence Ontario Energy Board 2010-10-14 2010-10-14
EB-2009-0084 document icon Ltr_1_BA_redacted version_EB-2009-0084_20101018 Correspondence Ontario Energy Board 2010-10-18 2010-10-18
EB-2009-0084 document icon Dec_Order_Cost Awards_CoC_20100226 Decision and Order on Cost Awards Ontario Energy Board 2010-02-26 2010-02-26
EB-2009-0084 document icon 2010 Spread Estimate 5 _REDACTED_20100224 Correspondence Ontario Energy Board 2010-02-19 at 1:44 PM
EB-2009-0084 document icon 2010 Spread Estimate 1_REDACTED_20100224 Correspondence Ontario Energy Board 2010-02-17 at 9:46 AM
EB-2009-0084 document icon 2010 Spread Estimate 3_REDACTED_20100224 Correspondence Ontario Energy Board 2010-02-16 at 11:08 AM
EB-2009-0084 document icon 2010 Spread Estimate 4_REDACTED_20100224 Correspondence Ontario Energy Board 2010-02-12 at 1:56 PM
EB-2009-0084 document icon 2010 Spread Estimate 2_REDACTED_20100224 Correspondence Ontario Energy Board 2010-02-04 at 5:25 PM
EB-2009-0084 document icon Brdltr_2010 Cost of Capital Parameters_20100224 Correspondence Ontario Energy Board 2010-02-24 2010-02-24
EB-2009-0084 document icon EGDI_CoC_CostClaimOBJ_20100129 Cost Claim Objection Ontario Energy Board 2010-01-29 2010-01-29
EB-2009-0084 document icon OEB_Ltr_REQ_estimate_20090120 Correspondence Ontario Energy Board 2010-01-20 2010-01-20 2010-01-20
EB-2009-0084 document icon HONI_CostClaimOBJ_CoC_updated_20100122 Cost Claim Objection Ontario Energy Board 2010-01-22 2010-01-22
EB-2009-0084 document icon CME_Extension Cost Claim_CoC_20100106 Cost Claim Ontario Energy Board 2010-01-06 2010-01-06
EB-2009-0084 document icon BOMA_Correspondence_Contact Change_20100106 Correspondence Ontario Energy Board 2010-01-06 2010-01-06
EB-2009-0084 document icon CCC_Extension Cost Claim_20091218_EMAIL Cost Claim Ontario Energy Board 2009-12-23 2009-12-23
EB-2009-0084 document icon CCC_Extension Cost Claim_20091218 Cost Claim Ontario Energy Board 2009-12-23 2009-12-23
EB-2009-0084 document icon NoH_Cost Awards_Ltr_CoC_20091218 Notice of Hearing Ontario Energy Board 2009-12-18 2009-12-18
EB-2009-0084 document icon NoH_Att B_Revised_CostClaim Summary Forms_20100105 Notice of Hearing Ontario Energy Board 2009-12-18 2009-12-18
EB-2009-0084 document icon ReportoftheBoard_CostofCapital_20091211.pdf Report of the OEB Ontario Energy Board 2009-12-11 2009-12-11
EB-2009-0084 document icon cvr_ltr_ReportoftheBoard_CostofCapital_20091211.pdf Report of the OEB Ontario Energy Board 2009-12-11 2009-12-11
EB-2009-0084 document icon IGUA_Correspondence_Quebec_Gaz Metro_EB-2009-0084_20091209 Correspondence Ontario Energy Board 2009-12-09 2009-12-09
EB-2009-0084 document icon IGUA_Ltr_Fed Court of Appeal_Cost of Capital_20091111 Correspondence Ontario Energy Board 2009-11-11 2009-11-11
EB-2009-0084 document icon CCC CME VECC_Comments Ltr_correction_20091110 Comments Ontario Energy Board 2009-11-10 2009-11-10
EB-2009-0084 document icon EDA_Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon Energy Probe_Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon Concentric-EGDI-HONi-CLD_Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon CLD_ Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon CCC CME VECC_Comments_CoC_corrected_20091110 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon EGDI_Comments_Cost_of_Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon IGUA_Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon PWU_Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon SEC_Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon UNION_Comments_Cost of Capital_20091030 Comments Ontario Energy Board 2009-10-30 2009-10-30
EB-2009-0084 document icon CCC CME VECC_Comments_Ltr_Cost of Capital_20091029 Comments Ontario Energy Board 2009-10-29 2009-10-29
EB-2009-0084 document icon GLPTLP_Comments_Cost of Capital_20091029 Comments Ontario Energy Board 2009-10-29 2009-10-29
EB-2009-0084 document icon LPMA_BOMA_Comments_Cost of Capital_20091029 Comments Ontario Energy Board 2009-10-29 2009-10-29
EB-2009-0084 document icon OPG_Comments_CovLtr_Cost of Capital 20091026 Comments Ontario Energy Board 2009-10-26 2009-10-26
EB-2009-0084 document icon OPG_Comments_Cost of Capital_200910126 Comments Ontario Energy Board 2009-10-26 2009-10-26
EB-2009-0084 document icon OEB Ltr_Extended Due Date_Final Written Comments_20091023 Notice Ontario Energy Board 2009-10-23 2009-10-23
EB-2009-0084 document icon Schools_Ltr_Request for Extension_OEB_20091020 Correspondence Ontario Energy Board 2009-10-20 2009-10-20
EB-2009-0084 document icon Booth_ref_Merrill Lynch_PeterKind_Presentation_Oct 6_20091007 Comments Ontario Energy Board 2009-10-07 2009-10-07
EB-2009-0084 document icon EnergyProbe_Presentation_Swartz_20091006 Comments Ontario Energy Board 2009-10-06 2009-10-06
EB-2009-0084 document icon OEB TRANSCRIPT_DAY3_corrected_20091006 Transcripts Ontario Energy Board 2009-10-06 2009-10-06
EB-2009-0084 document icon OEB_Ltr_Further Written Comments_20091005 Notice Ontario Energy Board 2009-10-05 2009-10-05
EB-2009-0084 document icon Booth_OEB Presentation_2009Oct6_20091005 Acknowledgement Letter Ontario Energy Board 2009-10-05 2009-10-05
EB-2009-0084 document icon EMAIL_URGENT_EB-2009-0084 Stakeholder conference postponed to week of Oct 5-D ecos_20090923 Email-External Ontario Energy Board 2009-09-23 2009-09-23
EB-2009-0084 document icon OEB response_ SEC_ltr_Sept16_20090918 Correspondence Ontario Energy Board 2009-09-18 2009-09-18
EB-2009-0084 document icon EGDI_Presentation Ref_RBC ROE Report jan 2009_Carmichael_20090921 Comments Ontario Energy Board 2009-09-21 2009-09-21
EB-2009-0084 document icon OEB_Transcript_Day2_Consultation_20090922 Transcripts Ontario Energy Board 2009-09-22 2009-09-22
EB-2009-0084 document icon OEB_Transcript_Day1_Consultation_20090921 Transcripts Ontario Energy Board 2009-09-21 2009-09-21
EB-2009-0084 document icon TD Securities_Presentation_H Holloway_20090921 Comments Ontario Energy Board 2009-09-21 2009-09-21
EB-2009-0084 document icon Sun Life Financial_Presentation_A Zvarich_20090921 Comments Ontario Energy Board 2009-09-21 2009-09-21
EB-2009-0084 document icon Scotia Capital_Presentation_S Dafoe_20090921 Comments Ontario Energy Board 2009-09-21 2009-09-21
EB-2009-0084 document icon Macquarie Capital Markets Canada_Presentation_M Akman_20090921 Comments Ontario Energy Board 2009-09-21 2009-09-21
EB-2009-0084 document icon IGUA_Ltr_20091809 Correspondence Ontario Energy Board 2009-09-18 2009-09-18
EB-2009-0084 document icon SEC_OEB_Corresp_20090916 Correspondence Ontario Energy Board 2009-09-16 2009-09-16
EB-2009-0084 document icon Enersource_CLD_HONI_presentation_J M Coyne_20090914 Comments Ontario Energy Board 2009-09-15 2009-09-15
EB-2009-0084 document icon Enersource_CLD_HONI_presentation cov ltr_20090914 Comments Ontario Energy Board 2009-09-15 2009-09-15
EB-2009-0084 document icon GLPTLP_Presentation_J Dalton_20090914 colour Comments Ontario Energy Board 2009-09-14 2009-09-14
EB-2009-0084 document icon EProbe Presentation_L P Schwartz_20090914 Comments Ontario Energy Board 2009-09-15 2009-09-15
EB-2009-0084 document icon GLPTLP_Presentation_J Dalton_20090914 Comments Ontario Energy Board 2009-09-15 2009-09-15
EB-2009-0084 document icon EDA_Presentation_K McShane_20090914 Comments Ontario Energy Board 2009-09-14 2009-09-14
EB-2009-0084 document icon EGDI_Presentation_CovLtr_20090914 Comments Ontario Energy Board 2009-09-14 2009-09-14
EB-2009-0084 document icon EGDI_Presentation_Concentric_J M Coyne_20090914 Comments Ontario Energy Board 2009-09-14 2009-09-14
EB-2009-0084 document icon EGDI_Presentation_Carmichael_20090914 Comments Ontario Energy Board 2009-09-14 2009-09-14
EB-2009-0084 document icon Union_ Presentation_J Vander Weide_20090914 Comments Ontario Energy Board 2009-09-14 2009-09-14
EB-2009-0084 document icon THESL_Comments_re CLD Hydro One Comments_CoC_20090910 Submission Ontario Energy Board 2009-09-10 2009-09-10
EB-2009-0084 document icon EnergyProbe_Comments_CoC_20090909 Comments Ontario Energy Board 2009-09-09 2009-09-09
EB-2009-0084 document icon Booth_CCC-VECC-CME-IGUA-LPMA-BOMA_Comments_CoC_ROE Adj_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon PWU_Comments_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon CLD_Hydro One_Comments_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon SEC_Comments_CoC_20090909 Comments Ontario Energy Board 2009-09-09 2009-09-09
EB-2009-0084 document icon GLPTLP_Comments_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon EDA_Comments_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon FortisOntario_Comments_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon EGDI_Comments_CoC_corrected_20090909 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon BOMA_LPMA_Comments_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon OPG_Comments_CvrLtr_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon OPG_Comments_CoC_20090908 Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon UNION_Comments_CoC_20090908.pdf Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon CME_Comments_CoC_20090908.pdf Comments Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon dec_CostEligibility_Supplemental_20090908.pdf Cost Eligibility Decision Ontario Energy Board 2009-09-08 2009-09-08
EB-2009-0084 document icon OEB_capital_markets_20090902 Correspondence Ontario Energy Board 2009-09-02 2009-09-02
EB-2009-0084 document icon CCC_LTR_OEB Questions_Cost of Capital_20090814 Correspondence Ontario Energy Board 2009-08-14 2009-08-14
EB-2009-0084 document icon OEB_Ltr_Sept Stakeholder Conference_Cost of Capital_20090811 Notice Ontario Energy Board 2009-08-11 2009-08-11
EB-2009-0084 document icon BOMA_Cost Eligibility Request_COC_20090807 Cost Eligibility Request Ontario Energy Board 2009-08-07 2009-08-07
EB-2009-0084 document icon Enersource_CLD_LTR_Extension_Cost of Capital_20090807 Correspondence Ontario Energy Board 2009-08-07 2009-08-07
EB-2009-0084 document icon HONI_Ltr_extension request_COC_EB-2009-0084_20090806 Correspondence Ontario Energy Board 2009-08-06 2009-08-06
EB-2009-0084 document icon Board_ltr_CostofCapital_20090224 Correspondence Ontario Energy Board 2009-02-24 2009-02-24
EB-2009-0084 document icon EGDI_LTR_REQUEST_Extension_Cost of Capital_20090804 Correspondence Ontario Energy Board 2009-08-04 2009-08-04
EB-2009-0084 document icon OEB_Attachment B_EB-2009-0084 Issues List_20090730 Notice Ontario Energy Board 2009-07-30 2009-07-30
EB-2009-0084 document icon OEB_CvrLtr and Attachment A_Cost of Capital_20090730 Notice Ontario Energy Board 2009-07-30 2009-07-30
EB-2009-0084 document icon Bd Staff_Cannon CAMPUT presentation_SUB_COC_20090703_Link to OEB July 30 Ltr Submission Ontario Energy Board 2009-07-29 2009-07-29
EB-2009-0084 document icon CCPA_Participant_REQ_Email_20090720 Intervenor Request Letter Ontario Energy Board 2009-07-20 2009-07-20
EB-2009-0084 document icon IGUA_Ltr_COC_Expert_20090707 Correspondence Ontario Energy Board 2009-07-07 2009-07-07
EB-2009-0084 document icon Energy Probe_Ltr_COC_Expert_20090706 Correspondence Ontario Energy Board 2009-07-06 2009-07-06
EB-2009-0084 document icon HONI_LTR_CoC_Expert_Consultant_20090706 Correspondence Ontario Energy Board 2009-07-06 2009-07-06
EB-2009-0084 document icon CCC_VECC_Ltr_CoC_Expert_20090706 Correspondence Ontario Energy Board 2009-07-06 2009-07-06
EB-2009-0084 document icon EGDI_Ltr_CoC_Expert_20090706 Correspondence Ontario Energy Board 2009-07-06 2009-07-06
EB-2009-0084 document icon Letter_Notice_Cost of Capital Review_EB-2009-0084_20090618 Notice Ontario Energy Board 2009-06-18 2009-06-18
EB-2009-0084 document icon EDA_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-21 2009-04-21
EB-2009-0084 document icon OPG_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-20 2009-04-20
EB-2009-0084 document icon Great Lakes Power GLPTLP_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-20 2009-04-20
EB-2009-0084 document icon EnergyProbe_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-20 2009-04-20
EB-2009-0084 document icon Stephen Dafoe_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon Sun Life_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon CCC_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon SEC_Comments_CoC_20090416 Comments Ontario Energy Board 2009-04-16 2009-04-16
EB-2009-0084 document icon Enersource_CLD_SUB_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon HONI_Comments_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon Union_Comments_CoC_ROE_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon LPMA_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon VECC_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon IGUA_Comments_Coc_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon EGDI_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon ChathamKent_Middlesex_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon PWU_Comments_CoC_20090417 Comments Ontario Energy Board 2009-04-17 2009-04-17
EB-2009-0084 document icon CME_Comments_CoC_20090416 Comments Ontario Energy Board 2009-04-16 2009-04-16
EB-2009-0084 document icon Dec_Cost Eligibility_EB-2009-0084_20090414 Cost Eligibility Decision Ontario Energy Board 2009-04-14 2009-04-14
EB-2009-0084 document icon Ashley Janson_ManitobaHydro_Observer REQ_email_20090318 Observer Request Letter Ontario Energy Board 2009-03-18 2009-03-18
EB-2009-0084 document icon EnergyProbe_Participant_Cost eligibility_20090323 Intervenor Request Letter Ontario Energy Board 2009-03-24 2009-03-24
EB-2009-0084 document icon CCC_Participant REQ_Cost eligibility_20090323 Intervenor Request Letter Ontario Energy Board 2009-03-23 2009-03-23
EB-2009-0084 document icon VECC_Participant REQ_Cost eligibility_20090323 Intervenor Request Letter Ontario Energy Board 2009-03-23 2009-03-23
EB-2009-0084 document icon EGDI_Participant REQ_20090323 Intervenor Request Letter Ontario Energy Board 2009-03-23 2009-03-23
EB-2009-0084 document icon CME_Participant REQ_Cost eligibility_20090323 Intervenor Request Letter Ontario Energy Board 2009-03-23 2009-03-23
EB-2009-0084 document icon IGUA_Participant REQ_Cost eligibility_20090323 Intervenor Request Letter Ontario Energy Board 2009-03-23 2009-03-23
EB-2009-0084 document icon SEC_Participant REQ_Cost eligibility_EB-2009-0084 CoC_20090323 Intervenor Request Letter Ontario Energy Board 2009-03-23 2009-03-23
EB-2009-0084 document icon LPMA_Participant_REQ_cost eligibility_20090320 Intervenor Request Letter Ontario Energy Board 2009-03-20 2009-03-20
EB-2009-0084 document icon Board_ltr_Cost of Capital_20090316 Notice Ontario Energy Board 2009-03-16 2009-03-16
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received