Search Results for: Records - Case Number=EB-2022-0002 - 107 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2022-0002 | Dec_Order_on Cost Awards_IESO_20220912_signed | Decision and Order on Cost Awards | Independent Electricity System Operator - IESO | 2022-09-12 | 2022-09-12 | |
EB-2022-0002 | VECC_Cost Claim_20220907 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-06 | 2022-09-06 | |
EB-2022-0002 | SEC_ Cost Claim_20220907 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-06 | 2022-09-06 | |
EB-2022-0002 | ED_Cost Claim_20220907 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-06 | 2022-09-06 | |
EB-2022-0002 | PAL_Cost Claim_20220907 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-06 | 2022-09-06 | |
EB-2022-0002 | CME_Cost Claim_20220907 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-06 | 2022-09-06 | |
EB-2022-0002 | CCMBC_Cost Claim_20220907 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-06 | 2022-09-06 | |
EB-2022-0002 | OSEA_Cost Claim_20220907 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-06 | 2022-09-06 | |
EB-2022-0002 | EP_IMG_Cost Claim _IESO_20220901 | Cost Claim | Independent Electricity System Operator - IESO | 2022-09-01 | 2022-09-01 | |
EB-2022-0002 | Energy Probe_Req_Cost Claim Extension_rev 20220831 | Correspondence | Independent Electricity System Operator - IESO | 2022-08-31 | 2022-08-31 | |
EB-2022-0002 | Energy Probe_Req_Cost Claim Extension_20220831 | Correspondence | Independent Electricity System Operator - IESO | 2022-08-31 | 2022-08-31 | |
EB-2022-0002 | AMPCO_Cost Claim_IESO_20220826 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-26 | 2022-08-26 | |
EB-2022-0002 | OSEA_Cost Claim_IESO_20220819 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-18 | 2022-08-18 | |
EB-2022-0002 | OEB ltr_filing extension cost claims_IESO_20220818_Signed | Correspondence | Independent Electricity System Operator - IESO | 2022-08-18 | 2022-08-18 | |
EB-2022-0002 | SEC_Cost Claim_IESO_20220818 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-17 | 2022-08-17 | |
EB-2022-0002 | Power Advisory_Cost Claim_IESO_20220818 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-17 | 2022-08-17 | |
EB-2022-0002 | Power Advisory_TY_Cost claim_IESO_addition_20220718 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-18 | 2022-08-18 | |
EB-2022-0002 | Power Advisory_SS_Cost claim_IESO_addition_20220718 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-18 | 2022-08-18 | |
EB-2022-0002 | Power Advisory_JCA_Cost claim_IESO_addition_20220718 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-18 | 2022-08-18 | |
EB-2022-0002 | CME_Cost Claim_IESO_20220817 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-17 | 2022-08-17 | |
EB-2022-0002 | VECC_Cost Claim_IESO_20220817 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-17 | 2022-08-17 | |
EB-2022-0002 | ED_Cost Claim_IESO_20220817 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-16 | 2022-08-16 | |
EB-2022-0002 | CCMBC_Cost Claim_IESO_20220815 | Cost Claim | Independent Electricity System Operator - IESO | 2022-08-14 | 2022-08-14 | |
EB-2022-0002 | dec_order_IESO_2022_20220811_signed | Decision and Order | Independent Electricity System Operator - IESO | 2022-08-11 | 2022-08-11 | |
EB-2022-0002 | IESO_Confidentiality Request_EB-2022-0002_20220613 | Correspondence | Independent Electricity System Operator - IESO | 2022-06-13 | 2022-06-13 | |
EB-2022-0002 | OEB Staff Sub_on Settlement Proposal_20220720 | Submission | Independent Electricity System Operator - IESO | 2022-07-20 | 2022-07-20 | |
EB-2022-0002 | I-1-1 Settlement Proposal_EB-2022-0002_20220713 | Settlement Proposal | Independent Electricity System Operator - IESO | 2022-07-13 | 2022-07-13 | |
EB-2022-0002 | I-1-2 Settlement Conference Clarification Questions_EB-2022-0002_20220713 | Settlement Proposal | Independent Electricity System Operator - IESO | 2022-07-13 | 2022-07-13 | |
EB-2022-0002 | IESO_IRRs_Issue 5.0_EB-2022-0002_Corrected_20220713 | Settlement Proposal | Independent Electricity System Operator - IESO | 2022-07-13 | 2022-07-13 | |
EB-2022-0002 | IESO_Ltr re Settlement Proposal_EB-2022-0002_20220713 | Settlement Proposal | Independent Electricity System Operator - IESO | 2022-07-13 | 2022-07-13 | |
EB-2022-0002 | IESO_Settlement Notification Ltr_20220616 | Correspondence | Independent Electricity System Operator - IESO | 2022-06-16 | 2022-06-16 | |
EB-2022-0002 | IESO_Redacted_Schedule 13 5.1 SEC 18 Attachment 1 IESO Internal Audit Report_Project Management_20220613 | Submission | Independent Electricity System Operator - IESO | 2022-06-13 | 2022-06-13 | |
EB-2022-0002 | IESO_A-1-1 - Exhibit List_Update_20220612 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-12 | 2022-06-12 | |
EB-2022-0002 | IESO_IRRs_Issue 1.0_Updated_20220612 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-12 | 2022-06-12 | |
EB-2022-0002 | IESO_IRRs_Issue 5.0_Updated_20220612 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-12 | 2022-06-12 | |
EB-2022-0002 | IESO_IRR_Issue 1.0_Corrected_20220608 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-08 | 2022-06-08 | |
EB-2022-0002 | IESO_H-1.3-2-1.3 AMPCO 9 Attachment 1 - Appendix 2-AA Revised | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | IESO_IRRs_Issue 5.0_20220603 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | IESO_IRRs_Issue 4.0_20220603 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | IESO_IRRs_Issue 3.0_20220603 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | IESO_IRRs_Issue 2.0_20220603 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | IESO_IRRs_Issue 1.0_20220603 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | IESO_A-1-1 - Exhibit List_Update_20220603 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | IESO_CvrLtr_IRRs_20220603 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2022-06-03 | 2022-06-03 | |
EB-2022-0002 | EDA - IntrvRequest_Add_20220518 | Correspondence | Independent Electricity System Operator - IESO | 2022-05-18 | 2022-05-18 | |
EB-2022-0002 | AMPCO_IR_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | CME_IR_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | ED_IRs_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | EDA_Cvr_Letter_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | EDA_IR_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | SEC_IR_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | OEB Staff_IRs_IESO_20220513_signed | Interrogatories to Applicant | 2022-05-13 | 2022-05-13 | ||
EB-2022-0002 | SUP_IRs_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | REASCWA_IRS_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | Energy Probe_IRs_ IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | OSEA_IR_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | CCMBC_IRs_IESO_20220513 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-13 | 2022-05-13 | |
EB-2022-0002 | PWU_IRs_IESO_20220512 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2022-05-12 | 2022-05-12 | |
EB-2022-0002 | Dec_on Confidentiality and Issues List_202200506_signed | Decision | Independent Electricity System Operator - IESO | 2022-05-06 | 2022-05-06 | |
EB-2022-0002 | IESO Ltr re Comments on Issues List_2022 RRS_20220504 | Submission | Independent Electricity System Operator - IESO | 2022-05-04 | 2022-05-04 | |
EB-2022-0002 | VECC_Sub_IssuesList_IESO0002_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-05-02 | 2022-05-02 | |
EB-2022-0002 | AMPCO_Submission_on Draft Issues List_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 | 2022-04-29 | |
EB-2022-0002 | SEC_Submission_on Draft Issues List_IESO Fee_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 | 2022-04-29 | |
EB-2022-0002 | ED_Ltr comment_ draft issues list_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 | 2022-04-29 | |
EB-2022-0002 | CME_No comments_Draft Issues List_20220429 | Submission | 2022-04-29 | 2022-04-29 | ||
EB-2022-0002 | CCMBC_SUB_on draft Issues List_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 at 12:07 PM | ||
EB-2022-0002 | OEB Staff_Submission_ on draft Issues List_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 | 2022-04-29 | |
EB-2022-0002 | Energy Probe_No comments_re issues list_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 | 2022-04-29 | |
EB-2022-0002 | REASCWA_Power advisory _Submission on Draft Issues List_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 | 2022-04-29 | |
EB-2022-0002 | OSEA_Submission_on draft issues list_20220429 | Submission | Independent Electricity System Operator - IESO | 2022-04-29 | 2022-04-29 | |
EB-2022-0002 | PO1_IESO Fees_20220422 | Procedural Order | Independent Electricity System Operator - IESO | 2022-04-22 | 2022-04-22 | |
EB-2022-0002 | OSEA_IntrvReq_IESO_20220408 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-08 | 2022-04-08 | |
EB-2022-0002 | Power Advisory REASCWA_IntvRQST_20220407 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-08 | 2022-04-08 | |
EB-2022-0002 | ED_IntReq_IESO_20220407 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-07 | 2022-04-07 | |
EB-2022-0002 | CCMBC_IntervREQ_IESO_20220407 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-07 | 2022-04-07 | |
EB-2022-0002 | PWU_IntrvREQ_IESO_20220405 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-05 | 2022-04-05 | |
EB-2022-0002 | CME_IntrvREQ_IESO_20220405 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-05 | 2022-04-05 | |
EB-2022-0002 | EP_intvRQST_IESO_20220405 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-05 | 2022-04-05 | |
EB-2022-0002 | VECC_IntrvREQ_IESO_22Fees_0002_20220404 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-04 | 2022-04-04 | |
EB-2022-0002 | SocietyUP_IntvRQST_IESO_20220404 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-04 | 2022-04-04 | |
EB-2022-0002 | B-2-1 2021 Annual Report and Audited Financial Statements_20220404 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-04-04 | 2022-04-04 | |
EB-2022-0002 | IESO_Ltr re Evidence Update_2022 RRS_20220404 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-04-04 | 2022-04-04 | |
EB-2022-0002 | OPG_IntvRQST_IESO_20220401 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-04-01 | 2022-04-01 | |
EB-2022-0002 | AMPCO_IntervREQ_IESO_20220330 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-03-30 | 2022-03-30 | |
EB-2022-0002 | SEC_IntrvREQ_IESO_20220329 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-03-29 | 2022-03-29 | |
EB-2022-0002 | HQ energy Marketing Inc._IntvRQST_20220328 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-03-28 | 2022-03-28 | |
EB-2022-0002 | IESO_Affidavit of Ben Weir_2022 RRS_20220325 | Affidavits of Service | Independent Electricity System Operator - IESO | 2022-03-25 | 2022-03-25 | |
EB-2022-0002 | EDA_IntvRQST_20220325 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2022-03-25 | 2022-03-25 | |
EB-2022-0002 | Notice_IESO_FR_20220321 | Notice | Independent Electricity System Operator - IESO | 2022-03-21 | 2022-03-21 | |
EB-2022-0002 | Notice_IESO_EN_20220321 | Notice | Independent Electricity System Operator - IESO | 2022-03-21 | 2022-03-21 | |
EB-2022-0002 | LOD_Notice_IESO-20220321signed | Letter of Direction | Independent Electricity System Operator - IESO | 2022-03-21 | 2022-03-21 | |
EB-2022-0002 | Completeness_Letter_IESO_20220318signed | Correspondence | Independent Electricity System Operator - IESO | 2022-03-18 | 2022-03-18 | |
EB-2022-0002 | IESO_Revised Draft Issues List_2022 RRS_20220310 | Correspondence | Independent Electricity System Operator - IESO | 2022-03-10 | 2022-03-10 | |
EB-2022-0002 | AckLtr_IESO_20220308signed | Acknowledgement Letter | Independent Electricity System Operator - IESO | 2022-03-08 | 2022-03-08 | |
EB-2022-0002 | E-2-1 Attachment 3 - Project Charter (MAST) (Redacted) | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | E-2-1 Attachment 2 - Project Charter (DLRT) (Redacted) | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-07 | 2022-03-07 | |
EB-2022-0002 | G-2-3 - IESO 2022 Regulatory Scorecard_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | E-3-1 Attachment 1 - Service Life Comparison and Amortization Expense_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | E-2-1 Attachment 1 - Capital Projects (Appendix 2-AA)_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | D-1-3 Attachment 1- Employee Costs (Appendix 2-K)_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | D-1-1 Attachment 3 - OM&A Business Unit Table (Appendix 2-JC)_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | D-1-1 Attachment 2 - OM&A Cost Driver Table (Appendix 2-JB)_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | IESO_CvrLtr_2022 RRS_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | D-1-1 Attachment 1 - Summary of OM&A Expenses (Appendix 2-JA)_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | C-3-1 Attachment 1 - Other Funding Sources_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | C-1-1 Attachment 1 - Load and Forecast Volumes_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
EB-2022-0002 | IESO_APP_2022 RRS_20220304 | Application and Evidence | Independent Electricity System Operator - IESO | 2022-03-04 | 2022-03-04 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |