Search Results for: Records - Case Number=EB-2020-0230 - 118 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2020-0230 | OEB SUP Contact Name Change_20220404 | Correspondence | Independent Electricity System Operator - IESO | 2022-04-04 | 2022-04-04 | |
EB-2020-0230 | OEB response letter_IESO_20220323 | Correspondence | Independent Electricity System Operator - IESO | 2022-03-23 | 2022-03-23 | |
EB-2020-0230 | IESOLtr_2021_Fees_Withdrawl_Reply_20220311 | Correspondence | Independent Electricity System Operator - IESO | 2022-03-11 | 2022-03-11 | |
EB-2020-0230 | OEB_Staff_SUB_IESO_Fee_Withdrawal_20220308 | Submission | Independent Electricity System Operator - IESO | 2022-03-08 | 2022-03-08 | |
EB-2020-0230 | VECC_Ltr_IESO Fee Structure_20220308 | Correspondence | Independent Electricity System Operator - IESO | 2022-03-08 | 2022-03-08 | |
EB-2020-0230 | PO4_IESO_Approval 2020_2021 RevREQ_20220301 | Procedural Order | Independent Electricity System Operator - IESO | 2022-03-01 | 2022-03-01 | |
EB-2020-0230 | IESO_Withdrawal Request_Attach 1_Stakeholder Presentation_20220223 | Correspondence | Independent Electricity System Operator - IESO | 2022-02-23 | 2022-02-23 | |
EB-2020-0230 | IESO_Request_withdrawal_Registration Fee Increase_20220223 | Correspondence | Independent Electricity System Operator - IESO | 2022-02-23 | 2022-02-23 | |
EB-2020-0230 | decision_order_cost awards_IESO_20211216 | Decision and Order on Cost Awards | Independent Electricity System Operator - IESO | 2021-12-16 | 2021-12-16 | |
EB-2020-0230 | SUP_Conf_Certificat of Destruction_IESO_20211129 | Correspondence | Independent Electricity System Operator - IESO | 2021-11-28 | 2021-11-28 | |
EB-2020-0230 | OSEA_CostClaim_IESO_20211125 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-25 | 2021-11-25 | |
EB-2020-0230 | CME_CostClaim_IESO_20211125 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-25 | 2021-11-25 | |
EB-2020-0230 | VECC_CostClaim_IESO_20211125 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-25 | 2021-11-25 | |
EB-2020-0230 | APPRO_Cost_Claim_20211125 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-25 | 2021-11-25 | |
EB-2020-0230 | AMPCO_Cost Claim_IESO_20211124 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-24 | 2021-11-24 | |
EB-2020-0230 | ED_CostClaim_20211125 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-25 | 2021-11-25 | |
EB-2020-0230 | SEC_CostClaim_IESO_20211125 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-25 | 2021-11-25 | |
EB-2020-0230 | SPA_Certificate of Destruction_20211124 | Correspondence | Independent Electricity System Operator - IESO | 2021-11-24 | 2021-11-24 | |
EB-2020-0230 | Power Advisory_ Cost Claim_20211124 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-24 | 2021-11-24 | |
EB-2020-0230 | Tom Ladanyi_Confidentiality_certificate_destruction_20211123 | Correspondence | Independent Electricity System Operator - IESO | 2021-11-23 | 2021-11-23 | |
EB-2020-0230 | SEC_CertDestruction_MR_IESO_20211123 | Correspondence | Independent Electricity System Operator - IESO | 2021-11-23 | 2021-11-23 | |
EB-2020-0230 | Energy Probe_Cost Claim_20211123 | Cost Claim | Independent Electricity System Operator - IESO | 2021-11-23 | 2021-11-23 | |
EB-2020-0230 | IESO_Corres_OEB_2022InterimUsageFees_20211123 | Correspondence | Independent Electricity System Operator - IESO | 2021-11-23 | 2021-11-23 | |
EB-2020-0230 | decision_order_IESO_ 20211118 | Decision and Order | Independent Electricity System Operator - IESO | 2021-11-18 | 2021-11-18 | |
EB-2020-0230 | OEB Staff_Submission_Settlement Proposal_20211020 | Submission | Independent Electricity System Operator - IESO | 2021-10-20 | 2021-10-20 | |
EB-2020-0230 | 3.1 OEB 28_Updated_20211012 | Settlement Proposal | Independent Electricity System Operator - IESO | 2021-10-12 | 2021-10-12 | |
EB-2020-0230 | S-1-1 Attachment 1 - IESO Response to Intervenor Settlement Conference Questions_20211012 | Settlement Proposal | Independent Electricity System Operator - IESO | 2021-10-12 | 2021-10-12 | |
EB-2020-0230 | 4.4 SEC 23 - Attachment 1 - MRP Energy - Integrated Project Plan_20211012 | Settlement Proposal | Independent Electricity System Operator - IESO | 2021-10-12 | 2021-10-12 | |
EB-2020-0230 | 4.4 SEC 23_Updated_20211012 | Settlement Proposal | Independent Electricity System Operator - IESO | 2021-10-12 | 2021-10-12 | |
EB-2020-0230 | S-1-1 Settlement Proposal_IESO_EB-2020-0230_20211012 | Settlement Proposal | Independent Electricity System Operator - IESO | 2021-10-12 | 2021-10-12 | |
EB-2020-0230 | IESO_Settlement Proposal Cover Ltr_2020-2021 Fees_20211012 | Settlement Proposal | Independent Electricity System Operator - IESO | 2021-10-12 | 2021-10-12 | |
EB-2020-0230 | IESO_IRRs_Issue 4.0_Corrected 20210923 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-23 | 2021-09-23 | |
EB-2020-0230 | IESO_IRRs_Issue 1.0_Corrected 20210923 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-23 | 2021-09-23 | |
EB-2020-0230 | IESO_IRRs_Issue 3.0_Corrected 20210923 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-23 | 2021-09-23 | |
EB-2020-0230 | OEB Staff_SUB_Confidentiality_IESO_20210921 | Submission | Independent Electricity System Operator - IESO | 2021-09-21 | 2021-09-21 | |
EB-2020-0230 | IESO_Ltr_Settlement Notification_20210921 | Correspondence | Independent Electricity System Operator - IESO | 2021-09-21 | 2021-09-21 | |
EB-2020-0230 | IESO_IRRs_Issue 2.0_Updated_20210914 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-14 | 2021-09-14 | |
EB-2020-0230 | SEC_Declaration and Undertakings_MR_IESO_20210914 | Declaration and Undertakings | Independent Electricity System Operator - IESO | 2021-09-14 | 2021-09-14 | |
EB-2020-0230 | PO3_IESO_2020_2021_RR_20210914 | Procedural Order | Independent Electricity System Operator - IESO | 2021-09-14 | 2021-09-14 | |
EB-2020-0230 | IESO_IRR_Issue 1.0_Corrected 20210913 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-13 | 2021-09-13 | |
EB-2020-0230 | 1.1 SEC 2 Attachment 1_Corrected_BP_Presentation.pdf1.1 SEC 2 Attachment 1_Corrected_20210913 | Exhibits | Independent Electricity System Operator - IESO | 2021-09-13 | 2021-09-13 | |
EB-2020-0230 | 1.1 SEC 1 Attachment 1_Corrected_Director's_Meeting Overview_20210913 | Exhibits | Independent Electricity System Operator - IESO | 2021-09-13 | 2021-09-13 | |
EB-2020-0230 | IESO_IRR_Issue 4.0_20210909.pdf | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-10 | 2021-09-10 | |
EB-2020-0230 | IESO_IRR_Issue 3.0_20210909 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-10 | 2021-09-10 | |
EB-2020-0230 | IESO_IRR_Issue 2.0_20210909 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-10 | 2021-09-10 | |
EB-2020-0230 | IESO_IRR_Issue 1.0_20210909 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-10 | 2021-09-10 | |
EB-2020-0230 | A-1-1_Updated_Exhibit List_20210909 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-10 | 2021-09-10 | |
EB-2020-0230 | IESO_IRR_Issue 5.0_20210909 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-10 | 2021-09-10 | |
EB-2020-0230 | IESO_CvrLtr_IRR_EB-2020-0230_20210909 | Interrogatory Response from Applicant | Independent Electricity System Operator - IESO | 2021-09-10 | 2021-09-10 | |
EB-2020-0230 | AMPCO_IR_IESO_20210820 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-20 | 2021-08-20 | |
EB-2020-0230 | AMPCO_Cvr_LTR_IESO_20210820 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-20 | 2021-08-20 | |
EB-2020-0230 | VECC_IR_IESO_20210820 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-20 | 2021-08-20 | |
EB-2020-0230 | CME_IR_IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | CME_Ltr_IR_IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | EDA_IR_IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | EDA_Cvr Ltr_IR_IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | OEBStaff_IR_ IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | 2021-08-19 |
EB-2020-0230 | ED_IR_IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | SEC_IESO_IR_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | APPrO_IR_IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | Power Advisory_IR_IESO_REASCWA_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | OSEA_IR_IESO_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | PWU_IR_IESO_RevenueRequirement_20210819 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-19 | 2021-08-19 | |
EB-2020-0230 | EnergyProbe_IR_IESO Fees_20210817 | Interrogatories to Applicant | Independent Electricity System Operator - IESO | 2021-08-17 | 2021-08-17 | |
EB-2020-0230 | decision_Issues List_IESO Fees_20210812 | Decision | Independent Electricity System Operator - IESO | 2021-08-12 | 2021-08-12 | |
EB-2020-0230 | IESO_Reply_Submissions_20210729 | Submission | Independent Electricity System Operator - IESO | 2021-07-29 | 2021-07-29 | |
EB-2020-0230 | SEC_SUB_IESO_ISSUE LIST_20210729 | Submission | Independent Electricity System Operator - IESO | 2021-07-29 | 2021-07-29 | |
EB-2020-0230 | EDA_Corres_Contact Information Correction - 20210728 | Correspondence | Independent Electricity System Operator - IESO | 2021-07-28 | 2021-07-28 | |
EB-2020-0230 | G-2-3 Attachment 1 - IESO Regulatory Scorecard_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | PO2_IESO Fees_20210723 | Procedural Order | Independent Electricity System Operator - IESO | 2021-07-23 | 2021-07-23 | |
EB-2020-0230 | Applicant and Intervenor List_IESO_rev 1_20210722 | Intervenor List | Independent Electricity System Operator - IESO | 2021-07-23 | 2021-07-23 | 2021-07-23 |
EB-2020-0230 | AMPCO_SUB_IESO_Issues List_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-23 | 2021-07-23 | |
EB-2020-0230 | Energy Probe_SUB_Issues List_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-23 | 2021-07-23 | |
EB-2020-0230 | CME_SUB_IESO Issues_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-22 | 2021-07-22 | |
EB-2020-0230 | EDA_SUB_Comments_IESO Fees Issues List_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-22 | 2021-07-22 | |
EB-2020-0230 | VECC_IssuesList_IESO_0230_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-22 | 2021-07-22 | |
EB-2020-0230 | OSEA_SUB_draft issues_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-22 | 2021-07-22 | |
EB-2020-0230 | ED_SUB_IssuesListComments_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-22 | 2021-07-22 | |
EB-2020-0230 | OEB Staff Submission on Draft Issues List_20210722 | Submission | Independent Electricity System Operator - IESO | 2021-07-22 | 2021-07-22 | 2021-07-22 |
EB-2020-0230 | CanREA ESC OWA_INT REQ_Funding_Supplemental Sub_IESO_20210716 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-07-16 | 2021-07-16 | |
EB-2020-0230 | OEB_IntrvREQ Reply_Power Advisory_CanREA OWA ESC_20210721 | Intervenor Request Objection | Independent Electricity System Operator - IESO | 2021-07-21 | 2021-07-21 | |
EB-2020-0230 | po1_IESO_ 20210715 | Procedural Order | Independent Electricity System Operator - IESO | 2021-07-15 | 2021-07-15 | |
EB-2020-0230 | Evolugen_INT REQ_20210702 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-07-02 | 2021-07-02 | |
EB-2020-0230 | CanREA_ ESC_ OWA_INT_IESO_20210702 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-07-02 | 2021-07-02 | |
EB-2020-0230 | APPrO_INT REQ_20210702 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-07-02 | 2021-07-02 | |
EB-2020-0230 | CME_INT REQ_20210702 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-07-02 | 2021-07-02 | |
EB-2020-0230 | ED_INT_REQ_20210630 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-30 | 2021-06-30 | |
EB-2020-0230 | OPG_INT_REQ_IESO_20210630 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-30 | 2021-06-30 | |
EB-2020-0230 | OSEA_IntrvREQ_20210630 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-30 | 2021-06-30 | |
EB-2020-0230 | VECC_INT_REQ_IESO_20210629 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-29 | 2021-06-29 | |
EB-2020-0230 | Energy Probe_INT_REQ_IESO_20210628 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-25 | 2021-06-25 | |
EB-2020-0230 | SUP_INT_ REQ_IESO_20210625 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-24 | 2021-06-24 | |
EB-2020-0230 | EDA_INT REQ_IESO_20210624 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-24 | 2021-06-24 | |
EB-2020-0230 | AMPCO_INT_REQ_IESO_20210623 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-23 | 2021-06-23 | |
EB-2020-0230 | HQ Energy Marketing_INT_REQ_20210623 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-23 | 2021-06-23 | |
EB-2020-0230 | PWU_Participant REQ_RevenueRequirement_20210623 | Participation Request Letter | Independent Electricity System Operator - IESO | 2021-06-23 | 2021-06-23 | |
EB-2020-0230 | Affidavit_Miriam Heinz_20210618 | Affidavits of Service | Independent Electricity System Operator - IESO | 2021-06-18 | 2021-06-18 | |
EB-2020-0230 | SEC_INT REQ_IESO_20210618 | Intervenor Request Letter | Independent Electricity System Operator - IESO | 2021-06-18 | 2021-06-18 | |
EB-2020-0230 | notice_IESO_FR_20210611 | Notice | Independent Electricity System Operator - IESO | 2021-06-11 | 2021-06-11 | |
EB-2020-0230 | notice_IESO_20210611 | Notice | Independent Electricity System Operator - IESO | 2021-06-11 | 2021-06-11 | |
EB-2020-0230 | lod_notice_IESO_20210611 | Letter of Direction | Independent Electricity System Operator - IESO | 2021-06-11 | 2021-06-11 | |
EB-2020-0230 | Completeness_Letter_IESO_20210610 | Correspondence | Independent Electricity System Operator - IESO | 2021-06-10 | 2021-06-10 | |
EB-2020-0230 | IESOLtr_OEB_FIPPA_20210602 | Correspondence | Independent Electricity System Operator - IESO | 2021-06-02 | 2021-06-02 | |
EB-2020-0230 | IESO_APP_2020-2021 RRS_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-28 | 2021-05-28 | |
EB-2020-0230 | Acknowledgement_Letter_IESO_2020-2021_20210528 | Acknowledgement Letter | Independent Electricity System Operator - IESO | 2021-05-28 | 2021-05-28 | |
EB-2020-0230 | G-2-3 Attachment 1 - IESO Regulatory Scorecard_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | IESO_CvrLtr_2020-2021 Fees_EB-2020-0230_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | E-3-1 Attachment 1 - Service Life Comparison and Amortization Expense_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | E-1-2 Attachment 2 - Capital Expenditure Summary_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | E-1-2 Attachment 1 - Appendix 2-AA - Capital Projects_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | D-1-3 Attachment 1 - Appendix 2-K- Employee Costs_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | D-1-1 Attachment 3 - Appendix 2-JC - OMA Programs Table_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | D-1-1 Attachment 2 - Appendix 2-JB - OMA Cost Driver Table_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | D-1-1 Attachment 1 - Summary of OMA Expenses_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | C-3-1 Attachment 1 - Other Funding Sources_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | C-1-1 Attachment 1 - Load and Forecast Volume_20210527 | Application and Evidence | Independent Electricity System Operator - IESO | 2021-05-27 | 2021-05-27 | |
EB-2020-0230 | OEBltr_IESO 2021 Interim Fees_20201221 | Correspondence | Independent Electricity System Operator - IESO | 2020-12-21 | 2020-12-21 | |
EB-2020-0230 | IESOLtr_InterimFees_20201204 | Correspondence | Independent Electricity System Operator - IESO | 2020-12-04 | 2020-12-04 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |