Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2013-0147 | Kitchener-Wilmot_Ltr_Confidentiality REQ_20130621_signed | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | Dec_Order_KWHI_EB-2013-0147_EB-2014-0055_20141023 | Decision and Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-10-23 | 2014-10-23 | |
EB-2013-0147 | DecOrder_CostAwards_EB-2013-0147_20140605 | Decision and Order on Cost Awards | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-06-05 | 2014-06-05 | |
EB-2013-0147 | EP_KWHI_Costs Executed Affidavit_20140519 | Cost Claim | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-05-19 | 2014-05-19 | |
EB-2013-0147 | EnergyProbe_CostClaim_KWHI_20140508 | Cost Claim | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-05-08 | 2014-05-08 | |
EB-2013-0147 | RateOrderFinal_KWHI_20140501 | Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0147 | KWHI_EB-2013-0147_201404017_DRO Comments_20140421 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-21 | 2014-04-21 | |
EB-2013-0147 | Filing_Requirements_Chapter2_Appendices Appendix 2-V to 2-Z_20140421 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-21 | 2014-04-21 | |
EB-2013-0147 | Filing_Requirements_Chapter2_Appendices Appendix 2-V to 2-Z_xlsm_20140417 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-17 | 2014-04-17 | |
EB-2013-0147 | KWHI_Comments_DRO_EB-2013-0147_201404017 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-17 | 2014-04-17 | |
EB-2013-0147 | BrdStaff_SUB_DRO_KWHI_20140411 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-11 | 2014-04-11 | |
EB-2013-0147 | BdStaff_CvrLtr_SUB_DRO_20140411 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-11 | 2014-04-11 | |
EB-2013-0147 | KWHI_EB-2013-0147_Draft Tariff_20140404_staff_comments_drf_20140411 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-11 | 2014-04-11 | |
EB-2013-0147 | KWHI_EB-2013-0147_Draft Tariff_20140404_staff_comments_drf_20140411 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-11 | 2014-04-11 | |
EB-2013-0147 | VECC_Cost Claim_KWHI_20140408 | Cost Claim | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-08 | 2014-04-08 | |
EB-2013-0147 | KWHI_EB-2013-0147_Rate Rider Calculations_20140404 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-04 | 2014-04-04 | |
EB-2013-0147 | KWHI_EB-2013-0147_Revenue Requirement Workform_xlsm_20140403 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0147 | KWHI_EB-2013-0147_Cost Allocation Model_xlsm_2013040 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0147 | KWHI_EB-2013-0147_2014_Test_year_Income_Tax_PILs_Workform_xlsm_20140403 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0147 | KWHI_EB-2013-0147_Draft Rate Order_20140403 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0147 | KWHI_EB-2013-0147_Corrected_Revenue Requirement Workform_20140404 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-04 | 2014-04-04 | |
EB-2013-0147 | KWHI_EB-2013-0147_Draft Tariff_20140404 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-04 | 2014-04-04 | |
EB-2013-0147 | KWHI_EB-2013-0147_ Corrected_Draft Rate Order_20140404 | Draft Rate Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-04 | 2014-04-04 | |
EB-2013-0147 | EnergyProbe_Comments_DRO_KWHI_20140407 | Comments | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-07 | 2014-04-07 | |
EB-2013-0147 | EnergyProbe_Comments_Ltr_DRO_KWHI_20140407 | Comments | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-07 | 2014-04-07 | |
EB-2013-0147 | SEC_Motion to Review_KWHI_see EB-2014-0155_20140403 | Motion to Review | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0147 | SEC_CostClaim_KWHI_20140325 | Cost Claim | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-03-25 | 2014-03-25 | |
EB-2013-0147 | Dec_Order_KWHI_EB-2013-0147_20140320 | Decision and Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-03-20 | 2014-03-20 | |
EB-2013-0147 | KitchenerWilmot_reply_SUB_20140206 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-02-06 | 2014-02-06 | |
EB-2013-0147 | EXHIBIT LIST_KWHI_20140109 | Exhibit List | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-09 | 2014-01-09 | |
EB-2013-0147 | UNDERTAKING LIST_KWHI_20140109 | Undertaking List | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-09 | 2014-01-09 | |
EB-2013-0147 | Ex K1-4_KWHI_Working Capital_20140109 | Exhibits | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-09 | 2014-01-09 | |
EB-2013-0147 | Ex K1-2_KWHI_Energy Probe Compendium_20140109 | Exhibits | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-09 | 2014-01-09 | |
EB-2013-0147 | Ex K1-3_KWHI_VECC Compendium_20140109 | Exhibits | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-09 | 2014-01-09 | |
EB-2013-0147 | EX K1-1_KWHI_Witness Panel Composition_20140109 | Exhibits | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-09 | 2014-01-09 | |
EB-2013-0147 | SEC_Sub_Kitchener_Final Argument_20140120 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-30 | 2014-01-30 | |
EB-2013-0147 | VECC_SUB_Final Argument_KWHI_20140123.docx | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-23 | 2014-01-23 | |
EB-2013-0147 | BdStaff_SUB_KWHI_20140123 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-23 | 2014-01-23 | |
EB-2013-0147 | BdStaff_SUB ltr_KWHI_20140123 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-23 | 2014-01-23 | |
EB-2013-0147 | EnergyProbe_SUB_KWHI_201 COS_Argument_20140123 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-23 | 2014-01-23 | |
EB-2013-0147 | EnergyProbe_SUB Ltr_KWHI_201 COS_Argument_20140123 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-23 | 2014-01-23 | |
EB-2013-0147 | KWHI_UndertakingResponses_J1-1 to J1-9_20140116 | Undertaking Responses | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-16 | 2014-01-16 | |
EB-2013-0147 | Transcript_Vol 1_Oral Hearing_EB-2013-0147_20140109 | Transcripts | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-09 | 2014-01-09 | |
EB-2013-0147 | KWHI_Ltr_Witness Panel Composition_20140108 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-08 | 2014-01-08 | |
EB-2013-0147 | VECC_Correspondence_Compendiumv2_20130108 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-08 | 2014-01-08 | |
EB-2013-0147 | Energy Probe_Correspondence_Compendium Final_KWHI_20140106 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2014-01-06 | 2014-01-06 | |
EB-2013-0147 | Interim_Rate_Order_PO_3_KWHI_2014COS_20131206 | Interim rate order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-12-06 | 2013-12-06 | |
EB-2013-0147 | Interim_Rate_Order_PO_3_KWHI_2014COS_20131206 | Procedural Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-12-06 | 2013-12-06 | |
EB-2013-0147 | KWHI_Load Forecasting Model 2014_xlsx_20131203 | Settlement Proposal | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-12-03 | 2013-12-03 | |
EB-2013-0147 | KWHI_Appendix 2-ED and FA Continuity Schedules_xlsx_20131203 | Settlement Proposal | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-12-03 | 2013-12-03 | |
EB-2013-0147 | KWHI_2013_Rev_Reqt_Work_Form_xlsm_20131203 | Settlement Proposal | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-12-03 | 2013-12-03 | |
EB-2013-0147 | KWHI_2013_Cost_Allocation_Model_xlsm_20131203 | Settlement Proposal | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-12-03 | 2013-12-03 | |
EB-2013-0147 | KWHI_Settlement_Proposal_cor_EB-2013-147_20131203 | Settlement Proposal | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-12-04 | 2013-12-04 | |
EB-2013-0147 | KWHI_Ltr_REQ extensionSP_20131129 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-11-29 | 2013-11-29 | |
EB-2013-0147 | KWHI_UR_Tracking sheet RRM update 20131030.xlsx_20131105 | Undertaking Responses | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-11-05 | 2013-11-05 | |
EB-2013-0147 | KWHI_UR_Revised Appendix 2-ED and Appendix 2-B - Nov 05.xlsx_20131105 | Undertaking Responses | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-11-05 | 2013-11-05 | |
EB-2013-0147 | KWHI_UR_2013_Rev_Reqt_Work_Form_20131030_revised.xlsm_20131105 | Undertaking Responses | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-11-05 | 2013-11-05 | |
EB-2013-0147 | KWHI_UR_REVISED 2013_Cost_Allocation_Model_V3_xlsm_20131105 | Undertaking Responses | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-11-05 | 2013-11-05 | |
EB-2013-0147 | KWHI_UR_Load Forecasting Model 2014-Undertakings_xlsx_20131105 | Undertaking Responses | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-11-05 | 2013-11-05 | |
EB-2013-0147 | KWHI_Undertaking Responses_EB-2013-0147_20131105.pdf | Undertaking Responses | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-11-05 | 2013-11-05 | |
EB-2013-0147 | Transcript_TC_KWHI_20131028 | Transcripts | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-28 | 2013-10-28 | |
EB-2013-0147 | KWHI_Load Forecasting Model-Final with IR Chart_20131028 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-27 | 2013-10-27 | |
EB-2013-0147 | KWHI_Load Forecasting Model-3-VECC-13 e_20131028 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-27 | 2013-10-27 | |
EB-2013-0147 | KWHI_Load Forecasting Model 2014-TC Final-adjusted for CDM_20131028 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-27 | 2013-10-27 | |
EB-2013-0147 | KWHI_TC_IRR_20131028 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-27 | 2013-10-27 | |
EB-2013-0147 | BoardStaff_CvrLtr_IR_TCQs_KWHI_20131024 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-24 | 2013-10-24 | |
EB-2013-0147 | BoardStaff_IR_TCQs_KWHI_20131024 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-24 | 2013-10-24 | |
EB-2013-0147 | VECC_IR_TCQs_Issues_KWHI_20131024 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-24 | 2013-10-24 | |
EB-2013-0147 | EnergyProbe_IR_TCQs_Kitchener Wilmot_2014COS_20131022 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-23 | 2013-10-23 | |
EB-2013-0147 | EnergyProbe_IR CvrLtr_TCQs_Kitchener Wilmot_2014COS_20131022 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-23 | 2013-10-23 | |
EB-2013-0147 | PO_2_KWHI_2014COS_20131018 | Procedural Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-18 | 2013-10-18 | |
EB-2013-0147 | KWHI_IRR_Load Forecasting Model-3-EP-19_xlsx_20131018 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-18 | 2013-10-18 | |
EB-2013-0147 | KWHI_IRR_Revised_2013_Rev_Reqt_Work_Form_20131011_xlsm_20131017 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-17 | 2013-10-17 | |
EB-2013-0147 | KWHI_IRR_Revised_2013_Rev_Reqt_Work_Form_20131011_20131017 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-17 | 2013-10-17 | |
EB-2013-0147 | KWHI_IRR_2014 RTSR MODEL_V4.0_20131015_xlsm_20131015 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-15 | 2013-10-15 | |
EB-2013-0147 | KWHI_IRR_Load Forecasting Model 2014-IR Final_xlsx_20131015 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-15 | 2013-10-15 | |
EB-2013-0147 | KWHI_IRR_Filing_Requirements_Chapter2_Appendices_for 2014_xlsm_20131015 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-15 | 2013-10-15 | |
EB-2013-0147 | KWHI_IRR_2013_Rev_Reqt_Work_Form_20131011_xlsm_20131015 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-15 | 2013-10-15 | |
EB-2013-0147 | KWHI_IR Responses_EB_2013_0147_20131015 | Interrogatory Response from Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-15 | 2013-10-15 | |
EB-2013-0147 | SEC_IR_KWHI_20131001 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0147 | VECC_IR_Kitchener-Wilmot Hydro_20130924 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-24 | 2013-09-24 | |
EB-2013-0147 | VECC_IR_Kitchener-Wilmot Hydro_word_20130924 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-24 | 2013-09-24 | |
EB-2013-0147 | Energy Probe_IR_Kitchener Wilmot_word_2014COS_20130920 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-20 | 2013-09-20 | |
EB-2013-0147 | Energy Probe_IR_Kitchener Wilmot_2014COS_20130920 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-20 | 2013-09-20 | |
EB-2013-0147 | Energy Probe_IR_ltr_Kitchener Wilmot_2014COS_20130920 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-20 at 5:57 PM | ||
EB-2013-0147 | BdStaff_IR_CvrLtr_KWHI_EB_2013_0147_20130919 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-19 | 2013-09-19 | 2013-09-19 |
EB-2013-0147 | BdStaff_IR_KWHI_EB_2013_0147_20130919 | Interrogatories to Applicant | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-19 | 2013-09-19 | 2013-09-19 |
EB-2013-0147 | KWHI_Submission_20130913 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-13 | 2013-09-13 | |
EB-2013-0147 | Board Ltr_KWHI_req for confidentiality_20130913 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-13 | 2013-09-13 | |
EB-2013-0147 | KWHI_EB-2013-0147_Reply_Submission_20130910 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-10 | 2013-09-10 | |
EB-2013-0147 | BdStaff_SUB_KWHydro_Confidentiality_20130906 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-09-06 | 2013-09-06 | 2013-09-06 |
EB-2013-0147 | KWHI_Dion Durrell_Assoc_Report_20130828 | Submission | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-28 | 2013-08-28 | |
EB-2013-0147 | Applicant and Intervention List_KWHI_PO1_cor_20130823 | Intervenor List | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-22 | 2013-08-22 | |
EB-2013-0147 | PO_1_KWHI_2014COS_cor_20130822 | Procedural Order | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-22 | 2013-08-22 | |
EB-2013-0147 | SEC_CvrLtr_IntvnrREQ_late_KWHI_20130815 | Intervenor Request Letter | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-19 | 2013-08-19 | |
EB-2013-0147 | SEC_IntvnrREQ_late_KWHI_20130815 | Intervenor Request Letter | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-19 | 2013-08-19 | |
EB-2013-0147 | KWHI_REVISED - Selected Filing_Requirements_Chapter2_Appendices_xlsm_20130813 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-13 | 2013-08-13 | |
EB-2013-0147 | KWHI_REVISED_Appendix 2-Z_xlsx_20130813 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-13 | 2013-08-13 | |
EB-2013-0147 | KitchenerWilmot_EB-2013-0147_Request for Information_20130813 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-13 | 2013-08-13 | |
EB-2013-0147 | KWHI_REVISED 2013_Cost_Allocation_Model_V3_xlsm_ 08082013 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-09 | 2013-08-09 | |
EB-2013-0147 | KWHI_REVISED - Selected Filing_Requirements_Chapter2_Appendices_xlsm_08092013 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-09 | 2013-08-09 | |
EB-2013-0147 | KWHI_REVISED_2013_Rev_Reqt_Work_Form_V3_xlsm_20130809 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-09 | 2013-08-09 | |
EB-2013-0147 | KitchenerWilmot_EB-2013-0147_Request for Information_20130809 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-09 | 2013-08-09 | |
EB-2013-0147 | VECC_intrv_REQ_20130801 | Intervenor Request Letter | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-01 | 2013-08-01 | |
EB-2013-0147 | Bd_ltr_NewFilingRequirementInfo_KWHydro_20130801 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-08-01 | 2013-08-01 | |
EB-2013-0147 | Kitchener-Wilmot Hydro Inc_NOA_20130722 | Notice of Application | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-07-22 | 2013-07-22 | |
EB-2013-0147 | Kitchener-Wilmot Hydro Inc_EB-2013-0147_NOA_20130719 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-07-19 | 2013-07-19 | |
EB-2013-0147 | Kitchener-Wilmot_Affidavit_EB-2013-0147_NOA_20130719 | Affidavits of Service | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-07-19 | 2013-07-19 | |
EB-2013-0147 | NOAH_KWHydro_EB_2013_0147_20130716 | Notice of Application and Notice of Hearing | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-07-16 | 2013-07-16 | |
EB-2013-0147 | LOD_NOAH_KWHydro_EB_2013_0147_20130716 | Letter of Direction | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-07-16 | 2013-07-16 | |
EB-2013-0147 | EnergyProbe_IntvrREQ_Kitchener-Wilmot_20120625 | Intervenor Request Letter | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-25 | 2013-06-25 | |
EB-2013-0147 | KWHI_APPL_REDACTED_EB-2013-0147_20130621 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | KWHI_dec_order_Kitchener Wilmot_RTSRModel_20130404_xlsm_20130621 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | KWHI_ REVISED - 2013_Cost_Allocation_Model_V3 FINAL_20130621 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | KWHI_REVISED - Filing_Requirements_Chapter2_Appendices_V1-1_20130621 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | KWHI_REVISED 2013_Rev_Reqt_Work_Form_V3_20130621 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | KWHI_REVISED 2013_Test_year_IncomeTax_PILs_Workform_V2_20130617_20130621 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | Kitchener-Wilmot_Ltr_Confidentiality REQ_20130621 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-21 | 2013-06-21 | |
EB-2013-0147 | KWHI_APPL_Addendum_redacted_17May_20130611 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-11 | 2013-06-11 | |
EB-2013-0147 | KWHI_FRR 31Z-Appendix N - 2010-2012 xlsx_20130611 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-11 | 2013-06-11 | |
EB-2013-0147 | KWHI_Ltr_ConfidentialityREQ_20130611 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-11 | 2013-06-11 | |
EB-2013-0147 | KWHI_APPL_Addendum One_20130611 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-11 | 2013-06-11 | |
EB-2013-0147 | AckLtr_Incomplete_KWHydro_EB_2013_0147_20130606 | Acknowledgement Letter | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-06-06 | 2013-06-06 | |
EB-2013-0147 | AckLtr_KWHydro_EB_2013_0147_20130523 | Acknowledgement Letter | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-23 | 2013-05-23 | |
EB-2013-0147 | KWHI_APPL_Cost Allocation Model 2014_xlsm_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_APPL_Cost Allocation Model 2014_xlsm_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_APPL_Filing Requirements_xlsm_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_APPL_Load Forecasting Model 2014_xlsm_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_APPL_PILS Workform 2014_xlsm_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_APPL_Retail Transmission Service Rates 2014_xlsm_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_APPL_Revenue Requirement Workform 2014_xlsm_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_APPL_A_COS2014_NOA-PILS_20130517 | Application and Evidence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-05-17 | 2013-05-17 | |
EB-2013-0147 | KWHI_Ltr_2014 Rebasing Delay in Filing_20130424 | Correspondence | Kitchener-Wilmot Hydro Inc. - Electricity Distributor | 2013-04-24 | 2013-04-24 | |