Search Results for: Records - Case Number=eb-2009-0139 - 164 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2009-0139 document icon THESL_ltr_ext req cost allocation study_20100729 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-08-04 2010-08-04
EB-2009-0139 document icon THESL_CostAllocation_ltr_20100729 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-07-29 2010-07-29
EB-2009-0139 document icon amended_dec_order_cost_awards_THESL_20100611 Decision and Order on Cost Awards Toronto Hydro-Electric System Limited - Electricity Distributor 2010-06-11 2010-06-11
EB-2009-0139 document icon dec_order_cost_awards_THESL_20100608 Decision and Order Toronto Hydro-Electric System Limited - Electricity Distributor 2010-06-08 2010-06-08
EB-2009-0139 document icon SEC_cost_claim_20100503 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2010-05-04 2010-05-04
EB-2009-0139 document icon rate_order_THESL_20100429 Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-29 2010-04-29
EB-2009-0139 document icon THESL_ReplySuB_on Comments_DRO_20100427 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-26 2010-04-26
EB-2009-0139 document icon BOMA_Comments_DRO_20100423 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-23 2010-04-23
EB-2009-0139 document icon VECC_Comments_DRO_20100424 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-23 2010-04-23
EB-2009-0139 document icon SEC_Comments_DRO_20100423 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-23 2010-04-23
EB-2009-0139 document icon THESL_Sch01_Rev_Reqt_Work_Form_20100419 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-19 2010-04-19
EB-2009-0139 document icon THESL_DRO_20100419 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-19 2010-04-19
EB-2009-0139 document icon THESL_DRO_Ltr_20100419 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-19 2010-04-19
EB-2009-0139 document icon dec_THESL_20100409 Decision Toronto Hydro-Electric System Limited - Electricity Distributor 2010-04-09 2010-04-09
EB-2009-0139 document icon VECC_cross_exam_THESL_Rev_Transcript_20100203 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon VECC_cross_exam_Infrastructure Ontario_ LDC_Rates_20100203 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_reply_sub_20100224 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-24 2010-02-24
EB-2009-0139 document icon exhibit_undertaking_list_oral_hearing_20100208 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-23 at 12:30 PM
EB-2009-0139 document icon Exh_K4_20100204 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon Exh_K3_20100204 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon Exh_K2_20100204 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon Exh_K7_20100208 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-08 2010-02-08
EB-2009-0139 document icon Exh_K6_20100208 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-08 2010-02-08
EB-2009-0139 document icon Exh_K5_20100205 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-05 2010-02-05
EB-2009-0139 document icon Exh_K1_20100204 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon Energy_Probe_Arg_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-22 2010-02-22
EB-2009-0139 document icon SEC_Arg_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-22 2010-02-22
EB-2009-0139 document icon CCC_Arg_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-19 2010-02-19
EB-2009-0139 document icon SSMWG_Arg_covltr_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-19 2010-02-19
EB-2009-0139 document icon SSMWG_Arg_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-19 2010-02-19
EB-2009-0139 document icon VECC_ARG_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-19 2010-02-19
EB-2009-0139 document icon BOMA_Arg_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-19 2010-02-19
EB-2009-0139 document icon Pollution_Probe_Arg_20100219 Intervenor Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-19 2010-02-19
EB-2009-0139 document icon BoardStaff_SUB_THESL_COS_cvr_ltr_20100218.pdf Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-18 2010-02-18 2010-02-18
EB-2009-0139 document icon BoardStaff_SUB_THESL_COS_20100218.pdf Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-25 2010-02-18 2010-02-25
EB-2009-0139 document icon THESL_Arg_In_Chief_Settlement_Arg_20100212 Applicant Argument in Chief Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-12 2010-02-12
EB-2009-0139 document icon THESL_undertaking_resp_J1-J3_20100208 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-08 2010-02-08
EB-2009-0139 document icon Transcript_oral_hearing_Vol 3_20100208 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-08 2010-02-08
EB-2009-0139 document icon Transcript_oral_hearing_Vol 2_rev_20100205 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-05 2010-02-05
EB-2009-0139 document icon SSMWG_ProductionBrief_20100204 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon SSMWG_Rev IRR 10_EVD_THESL_20100204 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon SSMWG_Rev IRR 3_EVD_VECC_20100204 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon SSMWG_CovLet_EVD_20100204 Intervenor Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon SSMWG_EVD_Updated_20100204 Intervenor Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon Transcript_oral_hearing_Vol 1_20100204 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon Pollution_Probe_cross_exam_ref_20100204 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-04 2010-02-04
EB-2009-0139 document icon THESL_update_evd_I1_T1_Sch1_20100203 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_update_evd_E1_T5_Sch1_20100203 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_update_evd_E1_T4_Sch2_20100203 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_amend_cor_evd_R1_T10_S12_SSMWG_REV_20100203 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_amend_cor_A1_T09_S02_17_rev_20100202 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_amend_cor_evd_E1_T06_S01_pg1_20100202 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_amendments_corrections_evd_covltr_20100202 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-03 2010-02-03
EB-2009-0139 document icon THESL_CVs_Updated_20100201 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-02-01 2010-02-01
EB-2009-0139 document icon THESL_IRR_PProbe_Update_20100128 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-28 2010-01-28
EB-2009-0139 document icon THESL_Settlement_Proposal_covltr_20100122 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-25 2010-01-25
EB-2009-0139 document icon THESL_Settlement_Proposal_rev_20100122 Settlement Proposal Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-25 2010-01-25
EB-2009-0139 document icon dec_motion_po5_THESI_20100122 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-22 2010-01-22
EB-2009-0139 document icon dec_motion_po5_THESI_20100122 Decision Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-22 2010-01-22
EB-2009-0139 document icon SSMWG IRR_THESL_20100108 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-08 2010-01-08
EB-2009-0139 document icon SSMWG IRR_VECC_20100108 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-08 2010-01-08
EB-2009-0139 document icon PollutionProbe_Reply_SUB_20100108.pdf Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-08 2010-01-08
EB-2009-0139 document icon Pollution_Probe_motion_IR_20091215 Motion Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-15 2009-12-15
EB-2009-0139 document icon BOMA_INT_Contact_Info_20100106.pdf Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2010-01-06 2010-01-06
EB-2009-0139 document icon VECC_IR_SSMWG_20091230 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-31 2009-12-31
EB-2009-0139 document icon THESL_Resp_Sub_PollutionProbe_Motion_20091230 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-30 2009-12-30
EB-2009-0139 document icon THESL_IR_EVD_SSMWG_20091230 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-30 2009-12-30
EB-2009-0139 document icon THESL_IR_and_Sub_covltr_20091230 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-30 2009-12-30
EB-2009-0139 document icon dec_po4_THESL_20091222.pdf Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-22 2009-12-22
EB-2009-0139 document icon dec_po4_THESL_20091222.pdf Decision Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-22 2009-12-22
EB-2009-0139 document icon SSMWG_evid_20091215 Intervenor Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-15 2009-12-15
EB-2009-0139 document icon THESL_F2_T02_S01_20091207 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-07 2009-12-07
EB-2009-0139 document icon THESL_F2_T01_S01_20091207 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-07 2009-12-07
EB-2009-0139 document icon THESL_D1_T03_S01_20091207 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-07 2009-12-07
EB-2009-0139 document icon THESL_C1_T03_S01_AppendixA_20091207 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-07 2009-12-07
EB-2009-0139 document icon THESL_C1_T03_S01_20091207 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-07 2009-12-07
EB-2009-0139 document icon THESL_Ltr_updates_corrections_20091207 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-07 2009-12-07
EB-2009-0139 document icon SSMWG_ltr_req_ext_evid_20091209 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-10 2009-12-10
EB-2009-0139 document icon R1_T11_S50_COS ROLLUP_V00_20091204.pdf Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-04 2009-12-04
EB-2009-0139 document icon THESL_IRR_consolidated_20091201 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-02 2009-12-02
EB-2009-0139 document icon THESL_updated_corrected_evid_covltr_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_E1_T05_S01_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_E1_T04_S02_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_E1_T04_S01_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_A1_T03_S01_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_M1_T03_S01_200911301 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_K1_T08_S02_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_K1_T08_S01_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_J1_T02_S05_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_updated_corrected_evid_E1_T06_S01_20091130 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_BOMA_EXR1_T3_SCH13_AppendixA_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_SEC_rev_Sch 33 Attach_EFGH_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_SEC_rev_Sch 33 Attach_ABCD_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_SEC_rev_20091201 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_VECC_rev_20091201 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_SSMWG_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_PollutionProbe_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_EnergyProbe_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_CCC_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_BOMA_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_AMPCO_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_BoardStaff_rev_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon THESL_IRR_covltr_20091130 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-12-01 2009-12-01
EB-2009-0139 document icon SEC_IR_revised_THESL_20091120 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-20 2009-11-20
EB-2009-0139 document icon dec_po3_THESL_20091117 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-17 2009-11-17
EB-2009-0139 document icon dec_po3_THESL_20091117 Decision Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-17 2009-11-17
EB-2009-0139 document icon SEC_Email_THESL_ltr_IR_20091116 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-16 2009-11-16
EB-2009-0139 document icon THESL_ltr_IR_20091116 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-16 2009-11-16
EB-2009-0139 document icon Energy_Probe_IR_THESL_20091116 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-16 2009-11-16
EB-2009-0139 document icon AMPCO_IR_THESL_20091113 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-16 2009-11-16
EB-2009-0139 document icon SSMWG_IR_THESL_20091113 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-13 2009-11-13
EB-2009-0139 document icon CCC_IR_THESL_20091113 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-13 2009-11-13
EB-2009-0139 document icon SEC_IR_attach_stats_data_20091113 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-13 2009-11-13
EB-2009-0139 document icon SEC_IR_20091113 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-13 2009-11-13
EB-2009-0139 document icon Pollution_Probe_IR_THESI_20091113 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-13 2009-11-13
EB-2009-0139 document icon VECC_IR_THESL_20091113 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-13 2009-11-13
EB-2009-0139 document icon Energy_Probe_ltr_filing_delay_20091111 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-11 2009-11-11
EB-2009-0139 document icon BOMA_IR_THESL_20091112 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-12 2009-11-12
EB-2009-0139 document icon BdStaff_IR_THESL_20091110 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-10 2009-11-10
EB-2009-0139 document icon BdStaff_IR_THESL_cvrltr_20091110 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-10 2009-11-10
EB-2009-0139 document icon issues_list_dec_po2_20091110 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2009-11-10 2009-11-10
EB-2009-0139 document icon Pollution_Probe_ltr_additional_draft_issues_list_20091030 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-30 2009-10-30
EB-2009-0139 document icon THESL_ltr_draft_issues_list_20091030 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-30 2009-10-30
EB-2009-0139 document icon CUPE_ltr_20091028 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-28 2009-10-28
EB-2009-0139 document icon PollutionProbe_ltr_draft_issues_list_20091026.pdf Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon CCC_ltr_draft_issues_list_20091026 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon AMPCO_ltr_draft_issues_list_20091026 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-27 at 9:37 AM
EB-2009-0139 document icon VECC_ltr_draft_issues_list_20091023 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-23 2009-10-23
EB-2009-0139 document icon SSMWG_ltr_draft_issues_list_20091026 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon Board Letter_THESL_CUPEOneLetter_20091026 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon BOMA_ltr_draft_issues_list_20091026 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon SEC_ltr_draft_issues_list_20091026 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon Toronto_Hydro_Ltr_draft_issues_list_20091026 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon CUPE_ltr_req_for_extension_20091023 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-23 2009-10-23
EB-2009-0139 document icon BOMA_comments_20091026 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-26 2009-10-26
EB-2009-0139 document icon GFlood_Ltr_comment_20090929 Letter of Comment Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon po1_THESL_20091019 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-19 2009-10-19
EB-2009-0139 document icon CUPE_interv_req_20091008 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-09 2009-10-09
EB-2009-0139 document icon SSMWG_Intervention_REQ_20090928 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-28 2009-09-28
EB-2009-0139 document icon PProbe_interv_req_20091001 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-10-01 2009-10-01
EB-2009-0139 document icon AMPCO_Interv_REQ_20090926 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-28 2009-09-28
EB-2009-0139 document icon VECC_interv_req_20090926 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-28 2009-09-28
EB-2009-0139 document icon CCC_interv_req_20090925 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-28 2009-09-28
EB-2009-0139 document icon SEC_additional_contact_Email_20090929 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon THESL_Cover_Updates_signed_20090928 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon C1_T03_S02_2-3_SLAS_REV29SEP2009_V01 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon C1_T03_S02_2-2_SLAS_REV29SEP2009_V01 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon C1_T03_S02_2-1_SLAS_REV29SEP2009_V02 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon Q1_T02_S01_SUSTAINING CAPITAL_PROGRESS_REV29SE2009_V12 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon TorontoHydro_APPL_20090929 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon TorontoHydro_APPL_updates_20090929 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon TorontoHydro_APPL_Rev_20090929 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-29 2009-09-29
EB-2009-0139 document icon LScott_comment_Email_20090923 Letter of Comment Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-23 2009-09-23
EB-2009-0139 document icon OPA_interv_req_20090923 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-23 2009-09-23
EB-2009-0139 document icon EProbe_Interv_Req_20090921 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-21 2009-09-21
EB-2009-0139 document icon BOMA_Interv_Req_20080918 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-18 2009-09-18
EB-2009-0139 document icon SEC_Interv_Req_20090918 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-18 2009-09-18
EB-2009-0139 document icon NoAH_THESL_FR_20090916 Notice of Application and Notice of Hearing Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-16 2009-09-16
EB-2009-0139 document icon NoAH_THESL_20090916 Notice of Application and Notice of Hearing Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-16 2009-09-16
EB-2009-0139 document icon LoD_THESL_20090916 Letter of Direction Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-16 2009-09-16
EB-2009-0139 document icon P1_T01_S02_OEB REV_REQ_WORK FORM_20090828 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-11 at 3:39 PM
EB-2009-0139 document icon Ackltr_Toronto_Hydro_20090902 Acknowledgement Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2009-09-02 2009-09-02
EB-2009-0139 document icon THESL_APPL_20090828 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-08-28 2009-08-28
EB-2009-0139 document icon THESL's_Ltr_2010_EDR_Application_20090708 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2009-07-08 2009-07-08
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received