Search Results for: Records - Case Number=EB-2013-0115 - 140 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2013-0115 | OEB reply_VECC_Cost Awards_20140811 | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-08-11 | 2014-08-11 | |
EB-2013-0115 | VECC_REPLY_Decisions on Cost Awards_20130703 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-07-03 | 2014-07-03 | |
EB-2013-0115 | dec_order_Cost Awards_Burlington Hydro_20140702 | Decision and Order on Cost Awards | Burlington Hydro Inc. - Electricity Distributor | 2014-07-02 | 2014-07-02 | |
EB-2013-0115 | Burlington Hydro_Evd_MEARIE 3_20140627 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-06-27 | 2014-06-27 | |
EB-2013-0115 | Burlington Hydro_Evd_MEARIE 2_20140627 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-06-27 | 2014-06-27 | |
EB-2013-0115 | Burlington Hydro_Evd_MEARIE 1_20140627 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-06-27 | 2014-06-27 | |
EB-2013-0115 | Burlington Hydro_E10T1S31Att1_20140627 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-06-27 | 2014-06-27 | |
EB-2013-0115 | Burlington Hydro_Ltr_Filing_20140627 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-06-27 | 2014-06-27 | |
EB-2013-0115 | Burlington Hydro_Ltr_CostClaims_201406011 | Cost Claim Objection | Burlington Hydro Inc. - Electricity Distributor | 2014-06-11 | 2014-06-11 | |
EB-2013-0115 | VECC_Cost Claim_20140604 | Cost Claim | Burlington Hydro Inc. - Electricity Distributor | 2014-06-06 | 2014-06-06 | |
EB-2013-0115 | Burlington Hydro_Reply_CostClaims_20140602 | Cost Claim Objection | Burlington Hydro Inc. - Electricity Distributor | 2014-06-02 | 2014-06-02 | |
EB-2013-0115 | dec_order_Confidentiality_Burlington_Oakville_Veridian_2013 CoS_20140529 | Decision and Order | Burlington Hydro Inc. - Electricity Distributor | 2014-05-29 | 2014-05-29 | |
EB-2013-0115 | SEC_Cost Claim_Burlington_20140528 | Cost Claim | Burlington Hydro Inc. - Electricity Distributor | 2014-05-28 | 2014-05-28 | |
EB-2013-0115 | Energy Probe_Cost Claim_Burlington Hydro_20140604 | Cost Claim | Burlington Hydro Inc. - Electricity Distributor | 2014-05-22 | 2014-05-22 | |
EB-2013-0115 | dec_RateOrder_Burlington_20140515 | Rate Order | Burlington Hydro Inc. - Electricity Distributor | 2014-05-15 | 2014-05-15 | |
EB-2013-0115 | dec_RateOrder_Burlington_20140515 | Decision and Order | Burlington Hydro Inc. - Electricity Distributor | 2014-05-15 | 2014-05-15 | |
EB-2013-0115 | Bdstaff_SUB_BHI_20140506 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-05-07 | 2014-05-07 | |
EB-2013-0115 | BdStaff_SUB_Covltr_BHI_20140507 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-05-07 | 2014-05-07 | |
EB-2013-0115 | Burlington Hydro_PSA_AttB_EstimatedBillImpacts-GAincl_20140501 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_PSA_AttB_EstimatedBillImpacts-GAexcl_20140501 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_PSA_AttN_2014CDMAdjLoadForecast_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttM-EB-2013-0115 Cost Allocation Model-20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttL-MDMRBalance_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttK-REX1DeploymentData-140424pm_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttJBurlington Hydro_RRWF_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttI-EDVAAR Continuity Schedules_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttH-EB-2013-0115 BHI 2014 RTSR Model Settlement Conference April 17 2014_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttG-BHI 2014 CoS - Test_year_Income_Tax_PILs_Workform_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttF-CostOfPower_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttE- Chapter2_Appendices_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttD.6-Correction DVA Rate Riders_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttD.5 - Stranded Meters_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttD.4-UpdatedCostOfPower_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttD.3-PropertyTax_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttD.2-PILsMethodology_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttD.1-Postage TreeTrimming_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttC-IssuesList_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_AttB-Estimated Bill Impacts_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-04-28 | 2014-04-28 | |
EB-2013-0115 | Burlington Hydro_AttA-Draft Rate Order_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_ProposedSettlementAgreement_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burlington Hydro_CvrLtr_20140506 | Settlement Agreement | Burlington Hydro Inc. - Electricity Distributor | 2014-05-01 | 2014-05-01 | |
EB-2013-0115 | Burglinton Hydro_OEBApp2-K Ice storm Over Time Costs Removed_20140319.pdf | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_IRR 123 Attachment 5_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_IRR 123 Attachment 4_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_IRR 123 Attachment 3_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_IRR 123 Attachment 2_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_IRR 123 Attachment 1_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Clarifying Question 7 Attachment 5_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Clarifying Question 7 Attachment 4_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Clarifying Question 7 Attachment 3_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Clarifying Question 7 Attachment 2_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Clarifying Question 7 Attachment 1_20140317.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Stranded Meter Rate Rider Recalculation_20140319.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Fixed Asset Continuity_20140319.xlsx | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Cost Allocation Model_20140319.xlsm | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_CDM Load Forecast Adjustment_20140319.xlsm | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_RRWF_20140319.xlsm | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_ PILs Workform_20140319.xlsm | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Clarifying Questions_20140318.pdf | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_Cvr Ltr_Clarifying Questions_20140327.pdf | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-03-28 | 2014-03-28 | |
EB-2013-0115 | Burlington Hydro_SUB_Confidentiality_20140410.pdf | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-04-10 | 2014-04-10 | |
EB-2013-0115 | Burlington Hydro_CvrLtr_Confidentiality_20140410.pd | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-04-10 | 2014-04-10 | |
EB-2013-0115 | SEC_Burlington_ConfSub_20140403 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-04-10 | 2014-04-10 | |
EB-2013-0115 | Board_ltr_Granting Extension for Settlement Prop_Burlington_20140410 | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-04-10 | 2014-04-10 | |
EB-2013-0115 | Burlington Hydro_Ltr_ExtendFilingDate_20140409.pdf | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-04-09 | 2014-04-09 | |
EB-2013-0115 | BdStaff_SUB_CONF_20140403 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0115 | BdStaff_SUB_Covltr_20140403 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0115 | Board Ltr_Granting Extension for Settlement Prop_Burlington_20140403 | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-04-03 | 2014-04-03 | |
EB-2013-0115 | Burlington Hydro_Ltr_ExtendFilingDate_20140402.pdf | Correspondence | Burlington Hydro Inc. - Electricity Distributor | 2014-04-02 | 2014-04-02 | |
EB-2013-0115 | SEC_BurlingtonHydro_JCS_DeclarationUndertaking_20140401.pdf | Declaration and Undertakings | Burlington Hydro Inc. - Electricity Distributor | 2014-04-01 | 2014-04-01 | |
EB-2013-0115 | po4_Burlington Hydro_20140319 | Procedural Order | Burlington Hydro Inc. - Electricity Distributor | 2014-03-19 | 2014-03-19 | |
EB-2013-0115 | SEC_Burlington_Motion_ReplySUB_20140318 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-03-18 | 2014-03-18 | |
EB-2013-0115 | Burlington Hydro_SUB_Motion_Production_20140317.pdf | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-03-17 | 2014-03-17 | |
EB-2013-0115 | Burlington Hydro_cvr ltr_SUB_Motion_Production_20140317.pdf | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-03-17 | 2014-03-17 | |
EB-2013-0115 | BdStaff_SUB_PO3_20140314 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-03-14 | 2014-03-14 | |
EB-2013-0115 | BdStaff_SUB_Covltr_PO3_20140314 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-03-14 | 2014-03-14 | |
EB-2013-0115 | SEC_Burlington_DecUnd_20140312.pdf | Declaration and Undertakings | Burlington Hydro Inc. - Electricity Distributor | 2014-03-12 | 2014-03-12 | |
EB-2013-0115 | Notice of Motion_po3_Burlington_20140312 | Procedural Order | Burlington Hydro Inc. - Electricity Distributor | 2014-03-12 | 2014-03-12 | |
EB-2013-0115 | SEC_NoticeofMotion_Burlington Hydro_20130311.pdf | Motion | Burlington Hydro Inc. - Electricity Distributor | 2014-03-11 | 2014-03-11 | |
EB-2013-0115 | Burlington Hydro_IRR_SEC 9b_20140311.pdf | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-03-11 | 2014-03-11 | |
EB-2013-0115 | Burlington Hydro_Ltr IRR SEC 9b_20140311.pdf | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-03-11 | 2014-03-11 | |
EB-2013-0115 | Burlington Hydro_cvr ltr_IRR_ re Confidential material_20140227 | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_Summary of Changes_20140227.xlsx | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_RTSR Model_20140227.xlsm | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_RRWF_20140227.xlsm | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_PILs_Workform_20140227.xlsm | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_EDVAAR Model_20140227.xlsm | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_Cost Allocation Model_20140227.xlsm | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_BillImpacts_GAincl_20140227.xlsm | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_BillImpacts-GAexcl_20140227.xlsm | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_20140227.pdf | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Burlington Hydro_IRR_cvr ltr_20140227.pdf | Interrogatory Response from Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-27 | 2014-02-27 | |
EB-2013-0115 | Energy Probe_IR_Burlington Hydro_20140205 | Interrogatories to Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-05 | 2014-02-05 | |
EB-2013-0115 | Energy Probe_cvr ltr_IR_Burlington Hydro_20140205 | Interrogatories to Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-05 | 2014-02-05 | |
EB-2013-0115 | VECC_IRs_Burlington_20140206 | Interrogatories to Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-06 | 2014-02-06 | |
EB-2013-0115 | SEC_Burlington_IRs_20140206 | Interrogatories to Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-02-06 | 2014-02-06 | |
EB-2013-0115 | BdStff_IR_BHI_20140130 | Interrogatories to Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-01-30 | 2014-01-30 | |
EB-2013-0115 | BdStaff_IR_Covltr_BHI_20140130 | Interrogatories to Applicant | Burlington Hydro Inc. - Electricity Distributor | 2014-01-30 | 2014-01-30 | |
EB-2013-0115 | po2_Burlington Hydro_20140121 | Procedural Order | Burlington Hydro Inc. - Electricity Distributor | 2014-01-21 | 2014-01-21 | |
EB-2013-0115 | VECC_SUB_Burlington_20140114 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-01-14 | 2014-01-14 | |
EB-2013-0115 | Burlington Hydro_Draft Issues List_SUB_20140113 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-01-13 | 2014-01-13 | |
EB-2013-0115 | Energy Probe_IssuesList SUB_Burlington Hydro_20130110 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-01-10 | 2014-01-10 | |
EB-2013-0115 | Energy Probe _CvrLtr_Issues List SUB_Burlington_20140110 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-01-10 | 2014-01-10 | |
EB-2013-0115 | SEC_Burlington_IssuesListSub_20140110 | Submission | Burlington Hydro Inc. - Electricity Distributor | 2014-01-10 | 2014-01-10 | |
EB-2013-0115 | NoA_Burlington Hydro_Published_20131218 | Notice of Application | Burlington Hydro Inc. - Electricity Distributor | 2013-12-18 | 2013-12-17 | 2013-12-18 |
EB-2013-0115 | PO1_Burlington Hydro_20131217 | Procedural Order | Burlington Hydro Inc. - Electricity Distributor | 2013-12-17 | 2013-12-17 | |
EB-2013-0115 | HydroOne Bramption_Ack Ltr_Observer_Burlington_20131216 | Acknowledgement Letter | Burlington Hydro Inc. - Electricity Distributor | 2013-12-16 | 2013-12-16 | |
EB-2013-0115 | Affidavit_Burlington_2014 CoS_20131206 | Affidavits of Service | Burlington Hydro Inc. - Electricity Distributor | 2013-12-06 | 2013-12-06 | |
EB-2013-0115 | VECC_IntvnrREQ_Burlington_20131126 | Intervenor Request Letter | Burlington Hydro Inc. - Electricity Distributor | 2013-11-26 | 2013-11-26 | |
EB-2013-0115 | SEC_IntnvrREQ_Burlington_20131119 | Intervenor Request Letter | Burlington Hydro Inc. - Electricity Distributor | 2013-11-19 | 2013-11-19 | |
EB-2013-0115 | HydroOne Brampton_ObsvrREQ_Burlington_20131119 | Observer Request Letter | Burlington Hydro Inc. - Electricity Distributor | 2013-11-19 | 2013-11-19 | |
EB-2013-0115 | Energy Probe_IntvnrREQ_Burlington_20131118 | Intervenor Request Letter | Burlington Hydro Inc. - Electricity Distributor | 2013-11-19 | 2013-11-19 | |
EB-2013-0115 | NoA_Unpublished_Burlington_2014 CoS_20131113 | Notice of Application | Burlington Hydro Inc. - Electricity Distributor | 2013-11-13 | 2013-11-13 | |
EB-2013-0115 | LoD_Burlington_2014 CoS_20131113 | Letter of Direction | Burlington Hydro Inc. - Electricity Distributor | 2013-11-13 | 2013-11-13 | |
EB-2013-0115 | BurlingtonHydro_APPL_131025 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-25 | 2013-10-25 | |
EB-2013-0115 | BurlingtonHydro_Cvr Ltr_20131025 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-25 | 2013-10-25 | |
EB-2013-0115 | Ack_Ltr_Incomplete_Burlington_2014 CoS_20131023 | Acknowledgement Letter | Burlington Hydro Inc. - Electricity Distributor | 2013-10-23 | 2013-10-23 | |
EB-2013-0115 | BHI 2014 CoS_BillImpact_Corrected_20131016 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-16 | 2013-10-16 | 2013-10-16 |
EB-2013-0115 | Ack_Ltr_Burlington_2014CoS_20131009 | Acknowledgement Letter | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI 2014 CoS - Cost of Service Checklist_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS Tariff Sheet in Track Changes_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - LoadForecastBackgroundData_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - Filing_Requirements_Chapter2_Appendices_for 2014_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI_2014 CoS_Final Verified Annual 2012 CDM Report_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - Test_year_Income_Tax_PILs_Workform_V2 0_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - Tariff Sheet_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - EDVAAR Model - without 1508_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - RTSR _20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - Rev_Reqt_Work_Form_V4_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - LRAMVA calcs v1.01_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - Cost Allocation Model V3_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-01 | 2013-10-01 | |
EB-2013-0115 | BHI 2014 CoS - Exhibit 9 - DVA_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI 2014 CoS - Exhibit 8 - RateDesign_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI 2014 CoS - Exhibit 7 - Cost Allocation_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI 2014 CoS - Exhibit 6 - Revenue Deficiency or Surplus_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI 2014 CoS - Exhibit 5 - Cost of Capital _20131007 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI 2014 CoS - Exhibit 4 - OMA _20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI_2014CoS_Exhibit 3 - Revenues_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI_2014 CoS_Exhibit 2 - Rate Base_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
EB-2013-0115 | BHI 2014 CoS - Exhibit 1 - Administration_20130901 | Application and Evidence | Burlington Hydro Inc. - Electricity Distributor | 2013-10-09 | 2013-10-09 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |