Search Results for: Records - Case Number=EB-2019-0055 - 84 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2019-0055 | dec_order_Cost Awards_Newmarket-Tay_20200529 | Decision and Order on Cost Awards | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-05-29 | 2020-05-29 | |
EB-2019-0055 | SEC_Cover Letter_cost claim_Newmarket Revised_20200525 | Cost Claim | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-05-25 | 2020-05-25 | |
EB-2019-0055 | NTRZ_MRZ_Revised Tariff_20200430 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-30 | 2020-04-30 | |
EB-2019-0055 | OEB ltr_Newmarket-Tay_revised_tariff_20200430 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-30 | 2020-04-30 | |
EB-2019-0055 | NTPower_Revised Confirmaton of Tariff of Rates and Charges_20200430 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-30 | 2020-04-30 | |
EB-2019-0055 | NTPower_Confirmaton of Tariff of Rates and Charges_20200428 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-28 | 2020-04-28 | |
EB-2019-0055 | SEC_Cost Claim_20200428 | Cost Claim | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-28 | 2020-04-28 | |
EB-2019-0055 | VECC_Cost Claim_20200428 | Cost Claim | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-28 | 2020-04-28 | |
EB-2019-0055 | NTPower_correspondence_20200422 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-22 | 2020-04-22 | |
EB-2019-0055 | NTPowerNTRZ_IR_Rate Gen Model_20200421 | Rate Model | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-21 | 2020-04-21 | |
EB-2019-0055 | NTPowerNTRZ_IR_LRAMVA_20200421 | Rate Model | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-21 | 2020-04-21 | |
EB-2019-0055 | NTPowerMRZ_IR_Rate Gen Model_20200421 | Rate Model | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-21 | 2020-04-21 | |
EB-2019-0055 | NTPowerMRZ_IR_LRAMVA_20200421 | Rate Model | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-21 | 2020-04-21 | |
EB-2019-0055 | dec_rate order_Newmarket-Tay_20200421 | Rate Order | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-21 | 2020-04-21 | |
EB-2019-0055 | dec_rate order_Newmarket-Tay_20200421 | Decision | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-04-21 | 2020-04-21 | |
EB-2019-0055 | NT Power_ReplySub_20200327 | Submission | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-27 | 2020-03-27 | |
EB-2019-0055 | po3_Newmarket-Tay_20200323 | Procedural Order | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-23 | 2020-03-23 | |
EB-2019-0055 | OEB_Staff_SUB_Newmarket-Tay_2020_20200319 | Submission | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-19 | 2020-03-19 | |
EB-2019-0055 | NTPower_Updated Cost Allocation Tables 1 to 5_20200312 | Settlement Proposal | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-12 | 2020-03-12 | |
EB-2019-0055 | NTPower_Appendix H Settlement updated NTRZ_SUB_CA_20200312 | Settlement Proposal | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-12 | 2020-03-12 | |
EB-2019-0055 | NTPower_Appendix H Settlement updated MRZ_SUB_CA_20200312 | Settlement Proposal | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-12 | 2020-03-12 | |
EB-2019-0055 | NTPower_Responses to Pre-Settlement Clarification Questions_20200312 | Settlement Proposal | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-12 | 2020-03-12 | |
EB-2019-0055 | NTPower_Partial SettlementProposal_20200312 | Settlement Proposal | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-03-12 | 2020-03-12 | |
EB-2019-0055 | NTPowerNTRZ_IR_SUB_CA_20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPowerMRZ_IR_SUB_CA_20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPowerNTRZ_IR_LRAMVA_20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPowerMRZ_IR_LRAMVA_20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPowerNTRZ_IR_Rate Gen Model_20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPowerMRZ_IR_Rate Gen Model_20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix I VECC IR 3_c 4_c 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix H Staff IR 12_c 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix G Staff IR 2_e 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix F Staff IR 2_e 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix E SEC IR 1_e 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix D SEC IR 1_a 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix C SEC IR 2_b 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix B SEC IR 3 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Appendix A SEC IR 1_f 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR_Responses 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | NTPower_IR Cover letter 20200207 | Interrogatory Response from Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-02-07 | 2020-02-07 | |
EB-2019-0055 | PO2_Newmarket-Tay Power_20200130 | Procedural Order | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-30 | 2020-01-30 | |
EB-2019-0055 | Newmarket-Tay_request filing extension_IRR_20200128 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-28 | 2020-01-28 | |
EB-2019-0055 | OEBStaff_NTPower_Rate Gen Model_updated_20200117 | Interrogatories to Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-17 | 2020-01-17 | |
EB-2019-0055 | OEBStaff_NTPower_Gen Model_updated_20200117 | Interrogatories to Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-17 | 2020-01-17 | |
EB-2019-0055 | OEB staff_IR_Newmarket-Tay Power_20200117 | Interrogatories to Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-17 | 2020-01-17 | |
EB-2019-0055 | VECC_IRs_20200117 | Interrogatories to Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-17 | 2020-01-17 | |
EB-2019-0055 | SEC_IRs_20200117 | Interrogatories to Applicant | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-16 | 2020-01-16 | |
EB-2019-0055 | NT Power_Cost Allocation settlement-Jan 2011_20200116 | Submission | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-16 | 2020-01-16 | |
EB-2019-0055 | PO1_Newmarket-Tay Power_20200107 | Procedural Order | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2020-01-07 | 2020-01-07 | |
EB-2019-0055 | NTPower_Affidavit_20191220 | Affidavits of Service | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-20 | 2019-12-20 | |
EB-2019-0055 | Notice_rev_Newmarket Tay_20191219 | Notice | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-19 | 2019-12-19 | |
EB-2019-0055 | lod_rev_Newmarket Tay_20191219 | Letter of Direction | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-19 | 2019-12-19 | |
EB-2019-0055 | SEC_IntrvREQ_20191219 | Intervenor Request Letter | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-19 | 2019-12-19 | |
EB-2019-0055 | VECC_IntrvREQ_20191219 | Intervenor Request Letter | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-19 | 2019-12-19 | |
EB-2019-0055 | NTPower_Affidavit_20191209 | Affidavits of Service | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-09 | 2019-12-09 | |
EB-2019-0055 | notice_Newmarket-Tay_published_revised_20191206 | Notice | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-06 | 2019-12-06 | |
EB-2019-0055 | notice_Newmarket-Tay_unpublished_20191205 | Notice | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-05 | 2019-12-05 | |
EB-2019-0055 | lod_Newmarket-Tay_20191205 | Letter of Direction | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-12-05 | 2019-12-05 | |
EB-2019-0055 | OEB_Completeness Letter_Newmarket-Tay_20191125 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-25 | 2019-11-25 | |
EB-2019-0055 | NTPowerMRZ_Appl_App3_Rate Gen Model_updated_20191120 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-22 | 2019-11-22 | |
EB-2019-0055 | NTPowerNTRZ_Appl_App3_Rate Gen Model_updated_20191120 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-22 | 2019-11-22 | |
EB-2019-0055 | Ack ltr _Newmarket-Tay_20191115 | Acknowledgement Letter | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-15 | 2019-11-15 | |
EB-2019-0055 | NTPower_SUB_Exh_2019111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerMRZ_SUB_CA_2019111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerNTRZ_SUB_CA_2019111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPower_SUB_CA_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPower_LTR_CA_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerMRZ_Appl_PCReport_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerMRZ_Appl_App5_LRAMVA_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerMRZ_Appl_App4_GAAnalysis_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerMRZ_Appl_App3_Rate Gen Model_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerNTRZ_Appl_PCReport_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerNTRZ_Appl_App5_LRAMVA_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerNTRZ_Appl_App4_GAAnalysis_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPowerNTRZ_Appl_App3_Rate Gen Model_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPower_Appl_2020MRZRates_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPower_Appl_2020NTRZRates_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | NTPower_LTR_IRM_20191111 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-11 | 2019-11-11 | |
EB-2019-0055 | OEB_ltr Newmarket-Tay _20191101 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-11-01 | 2019-11-01 | |
EB-2019-0055 | NTPower_LTR_IRM_20191031 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-10-31 | 2019-10-31 | |
EB-2019-0055 | NT Power_Ltr_Reply to OEB Sept 27 2019 letter_20191011 | Correspondence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-10-11 | 2019-10-11 | |
EB-2019-0055 | 2019 Cost Allocation Model NTRZ Final_20190912 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-09-12 | 2019-09-12 | |
EB-2019-0055 | 2019 NT Power rate zones cost allocation application with appendices_20190912 | Application and Evidence | 2019-09-12 | 2019-09-12 | ||
EB-2019-0055 | 2019 Cost Allocation Model MRZ Final_20190912 | Application and Evidence | Newmarket-Tay Power Distribution Ltd. - Electricity Distributor | 2019-09-12 | 2019-09-12 | |