Search Results for: Records - Case Number=EB-2011-0140 - 477 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2011-0140 document icon dec_Order_Vary_east west tie_20161208 Decision and Order Ontario Energy Board 2016-12-08 2016-12-08
EB-2011-0140 document icon NextBridge_EWT_Update_20150624 Correspondence Ontario Energy Board 2015-06-24 2015-06-24
EB-2011-0140 document icon NextBridge_EWT_Response to 20150122 Decision and Order_20150515 Correspondence Ontario Energy Board 2015-05-15 2015-05-15
EB-2011-0140 document icon Nextbridge_Correspondence_20150415 Correspondence Ontario Energy Board 2015-04-23 2015-04-15 2015-04-23
EB-2011-0140 document icon NextBridge_EWT Report_20150422 Post Hearing Filings Ontario Energy Board 2015-04-23 2015-04-23
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20150122 Acknowledgement Letter Ontario Energy Board 2015-01-28 2015-01-28
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20150122 Post Hearing Filings Ontario Energy Board 2015-01-22 2015-01-22
EB-2011-0140 document icon Dec_Order_et_EWT_20150122 Decision and Order Ontario Energy Board 2015-01-22 2015-01-22
EB-2011-0140 document icon amd_licence_et_uppercanada_20150122 Licence Ontario Energy Board 2015-01-22 2015-01-22
EB-2011-0140 document icon NextBridge_Development Schedule_20150115 Correspondence Ontario Energy Board 2015-01-14 2015-01-14
EB-2011-0140 document icon NextBridge-OPA Response to OEB Letter_EB-2011-0140_20141219 Submission Ontario Energy Board 2014-12-19 2014-12-19
EB-2011-0140 document icon Bdltr_re project delay_20141028 Correspondence Ontario Energy Board 2014-10-29 2014-10-29
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20141027 Acknowledgement Letter Ontario Energy Board 2014-10-27 2014-10-27
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20141022 Post Hearing Filings Ontario Energy Board 2014-10-22 2014-10-22
EB-2011-0140 document icon OPA - EWT Development Schedule 2014 09 30 Correspondence Ontario Energy Board 2014-10-01 2014-10-01
EB-2011-0140 document icon Wawa &Algoma_Cost Claim_20140930 Cost Claim Ontario Energy Board 2014-09-30 2014-09-30
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140922 Post Hearing Filings Ontario Energy Board 2014-09-23 2014-09-23
EB-2011-0140 document icon Municipality of Wawa_Response_20140916 Correspondence Ontario Energy Board 2014-09-17 2014-09-17
EB-2011-0140 document icon Bdltr_InfoReqUCT_20140904 Correspondence Ontario Energy Board 2014-09-04 2014-09-04
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140826 Acknowledgement Letter Ontario Energy Board 2014-08-26 2014-08-26
EB-2011-0140 document icon Wawa_ltr ToNextbridge_20140826 Correspondence Ontario Energy Board 2014-08-25 2014-08-25
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140822 Post Hearing Filings Ontario Energy Board 2014-08-22 2014-08-22
EB-2011-0140 document icon NCO_CvrLet_CertDestrctn_20140818 Declaration and Undertakings Ontario Energy Board 2014-08-18 2014-08-18
EB-2011-0140 document icon NCO_CertDestrctn_20140818 Declaration and Undertakings Ontario Energy Board 2014-08-18 2014-08-18
EB-2011-0140 document icon NextBridge_Ltr_US GAAP Standard_20140814 Correspondence Ontario Energy Board 2014-08-15 2014-08-15
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140725 Acknowledgement Letter Ontario Energy Board 2014-07-25 2014-07-25
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140722 Post Hearing Filings Ontario Energy Board 2014-07-22 2014-07-22
EB-2011-0140 document icon Iccon_LTR_East-West Tie _Certificate of Destruction _20140709 Correspondence Ontario Energy Board 2014-07-09 2014-07-09
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140626 Acknowledgement Letter Ontario Energy Board 2014-06-26 2014-06-26
EB-2011-0140 document icon Certificate Destruction_JGirvan_20140523 Correspondence Ontario Energy Board 2014-06-23 2014-06-23
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140620 Post Hearing Filings Ontario Energy Board 2014-06-23 2014-06-23
EB-2011-0140 document icon Certificate of Destruction_J Mark Rodger_20140530 Correspondence Ontario Energy Board 2014-05-30 2014-05-30
EB-2011-0140 document icon Certificate of Destruction_John Vellone_20140530 Correspondence Ontario Energy Board 2014-05-30 2014-05-30
EB-2011-0140 document icon Harrison Pensa_Certificate of Destruction_EW Tie Proceeding_20140530 Correspondence Ontario Energy Board 2014-05-30 2014-05-30
EB-2011-0140 document icon Steve Teal_Certificate of Destruction_EW Tie Proceeding_20140530 Correspondence Ontario Energy Board 2014-05-30 2014-05-30
EB-2011-0140 document icon EWT LP_Certificate of destruction_20140527 Correspondence Ontario Energy Board 2014-05-27 2014-05-27
EB-2011-0140 document icon CCC-Certificate1 of Destruction - EB-2011-0140 (RBW) Correspondence Ontario Energy Board 2014-05-27 2014-05-27
EB-2011-0140 document icon ack_ltr_UCT Reporting_20140522 Acknowledgement Letter Ontario Energy Board 2014-05-23 2014-05-23
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140522 Post Hearing Filings Ontario Energy Board 2014-05-22 2014-05-22
EB-2011-0140 document icon OPA_UpdateReport_EWT_20140505 Correspondence Ontario Energy Board 2014-05-05 2014-05-05
EB-2011-0140 document icon PWU_LTR_CertDEST_20140428 Correspondence Ontario Energy Board 2014-04-28 2014-04-28
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140424 Acknowledgement Letter Ontario Energy Board 2014-04-24 2014-04-24
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140422 Post Hearing Filings Ontario Energy Board 2014-04-22 2014-04-22
EB-2011-0140 document icon Upper Canada_Certificate of Destruction_20140416 Correspondence Ontario Energy Board 2014-04-17 2014-04-17
EB-2011-0140 document icon CNPI_Certificate of Destruction_20140408 Correspondence Ontario Energy Board 2014-04-08 2014-04-08
EB-2011-0140 document icon UCT_Certificates of Destruction_20140403 Correspondence Ontario Energy Board 2014-04-03 2014-04-03
EB-2011-0140 document icon OEB_review_UCT Reporting_20140326 Correspondence Ontario Energy Board 2014-03-26 2014-03-26
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140324 Acknowledgement Letter Ontario Energy Board 2014-03-24 2014-03-24
EB-2011-0140 document icon NextBridge_EWT Monthly Report_20140321 Post Hearing Filings Ontario Energy Board 2014-03-21 2014-03-21
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140226 Acknowledgement Letter Ontario Energy Board 2014-02-26 2014-02-26
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140224 Post Hearing Filings Ontario Energy Board 2014-02-24 2014-02-24
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140124 Acknowledgement Letter Ontario Energy Board 2014-01-24 2014-01-24
EB-2011-0140 document icon NextBridge_EWT_Monthly Report_20140122 Post Hearing Filings Ontario Energy Board 2014-01-22 2014-01-22
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20140106 Correspondence Ontario Energy Board 2014-01-06 2014-01-06
EB-2011-0140 document icon NextBridge_EWT Monthly Report_20131220 Post Hearing Filings Ontario Energy Board 2013-12-20 2013-12-20
EB-2011-0140 document icon MNO_TBAY Presentation_EXBT H.3.2_20130502 Exhibits Ontario Energy Board 2013-12-11 2013-12-11
EB-2011-0140 document icon MNO_ltr_Cost Award Payment_20131206 Correspondence Ontario Energy Board 2013-12-06 2013-12-06
EB-2011-0140 document icon OEB_review_UCT Reporting_20131121 Correspondence Ontario Energy Board 2013-12-02 2013-12-02
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20131122 Acknowledgement Letter Ontario Energy Board 2013-11-22 2013-11-22
EB-2011-0140 document icon UCTNextBridge_Monthlyreport without CP_20131121 Submission Ontario Energy Board 2013-11-21 2013-11-21
EB-2011-0140 document icon Ack_ltr_UCT Reporting_20131025 Acknowledgement Letter Ontario Energy Board 2013-10-25 2013-10-25
EB-2011-0140 document icon OEB_review_UCT Reporting_20131111 Correspondence Ontario Energy Board 2013-11-11 2013-11-11
EB-2011-0140 document icon UCT_Monthly Report _20131021 Submission Ontario Energy Board 2013-10-21 2013-10-21
EB-2011-0140 document icon MNO_Ltr to OEB re PRFN Motion_20131012 Motion Ontario Energy Board 2013-10-22 2013-10-22
EB-2011-0140 document icon OPA_CvrLtr_NeedUpdateReport_20131008 Correspondence Ontario Energy Board 2013-10-08 2013-10-08
EB-2011-0140 document icon OPA_NeedUpdateReport_20131008 Correspondence Ontario Energy Board 2013-10-08 2013-10-08
EB-2011-0140 document icon Dec_Order_UCT reporting_20130926 Decision and Order Ontario Energy Board 2013-09-26 2013-09-26
EB-2011-0140 document icon Dec_Order_on Phase 2 Cost Awards_20131001 Decision and Order on Cost Awards Ontario Energy Board 2013-10-01 2013-10-01
EB-2011-0140 document icon UCT_Amended Draft Accounting Order_20130926 Correspondence Ontario Energy Board 2013-09-25 2013-09-25
EB-2011-0140 document icon UCT_Ltr_20130920 Correspondence Ontario Energy Board 2013-09-20 2013-09-20
EB-2011-0140 document icon AltaLink_Letter_Confirmation of Ongoing Public Disclosure_20130910 Correspondence Ontario Energy Board 2013-09-10 2013-09-10
EB-2011-0140 document icon HONI_Ltr_CostAward_20130916 Correspondence Ontario Energy Board 2013-09-16 2013-09-16
EB-2011-0140 document icon CCC_CostClaim_20130830 Cost Claim Ontario Energy Board 2013-08-30 2013-08-30
EB-2011-0140 document icon PRFN_CostClaim_rev1_20130829 Cost Claim Ontario Energy Board 2013-08-30 2013-08-30
EB-2011-0140 document icon SEC_Cost Claim_20130829 Cost Claim Ontario Energy Board 2013-08-29 2013-08-29
EB-2011-0140 document icon Algoma Coalition Cost Claim dated August 28, 2013 Cost Claim Ontario Energy Board 2013-08-29 2013-08-29
EB-2011-0140 document icon Northwatch_CostClaim_20130828 Cost Claim Ontario Energy Board 2013-08-28 2013-08-28
EB-2011-0140 document icon CityofThunderBay_NOMA_NOACC_CostClaim_20130828 Cost Claim Ontario Energy Board 2013-08-28 2013-08-28
EB-2011-0140 document icon UCT_Compliance Filing_20130828 Submission Ontario Energy Board 2013-08-28 2013-08-28
EB-2011-0140 document icon OPA_Ltr_20130827 Correspondence Ontario Energy Board 2013-08-27 2013-08-27
EB-2011-0140 document icon NAN_Cost Claim_20130827 Cost Claim Ontario Energy Board 2013-08-27 2013-08-27
EB-2011-0140 document icon MNO_Cost Claim_EWT Designation_20130826 Cost Claim Ontario Energy Board 2013-08-26 2013-08-26
EB-2011-0140 document icon PRFN_Ojibways-CostClaim_20130823.pdf Cost Claim Ontario Energy Board 2013-08-26 2013-08-26
EB-2011-0140 document icon PRFN_CostClaim_20130823 Cost Claim Ontario Energy Board 2013-08-26 2013-08-26
EB-2011-0140 document icon Municipality of Wawa_Cost Claim_20130812 Cost Claim Ontario Energy Board 2013-08-12 2013-08-12
EB-2011-0140 document icon Dec_Order_Phase 2_East-West Tie_20130807 Decision and Order Ontario Energy Board 2013-08-07 2013-08-07
EB-2011-0140 document icon East-West Tie_Lock-up_Letter_20130731 Correspondence Ontario Energy Board 2013-07-31 2013-07-31
EB-2011-0140 document icon Dec_Order on Motion to Review_Cost Awards_20120925 Decision and Order on Cost Awards Ontario Energy Board 2012-09-25 2012-09-25
EB-2011-0140 document icon PRFN_LTR_Correction of Record_20130703 Correspondence Ontario Energy Board 2013-07-03 2013-07-03
EB-2011-0140 document icon ELP_LTR_Clarification of Record_20130625 Correspondence Ontario Energy Board 2013-06-25 2013-06-25
EB-2011-0140 document icon UCT_LTR_Correction of Record_20130614 Correspondence Ontario Energy Board 2013-06-14 2013-06-14
EB-2011-0140 document icon UCT_ReplySub_20130603 Submission Ontario Energy Board 2013-06-03 2013-06-03
EB-2011-0140 document icon ATL_ReplySUB_20130603 Submission Ontario Energy Board 2013-06-03 2013-06-03
EB-2011-0140 document icon ATL_CovLtr_to reply SUB_20130603 Correspondence Ontario Energy Board 2013-06-03 2013-06-03
EB-2011-0140 document icon RES_ReplySub_20130603 Submission Ontario Energy Board 2013-06-03 2013-06-03
EB-2011-0140 document icon ICN-TPT_Reply Sub_20130603 Submission Ontario Energy Board 2013-06-03 2013-06-03
EB-2011-0140 document icon ELP_ReplySUB_20130603 Submission Ontario Energy Board 2013-06-03 2013-06-03
EB-2011-0140 document icon CNPI_ReplySUB_20130603 Submission Ontario Energy Board 2013-06-03 2013-06-03
EB-2011-0140 document icon bd_Ltr_RSMIN_20130514 Correspondence Ontario Energy Board 2013-05-14 2013-05-14
EB-2011-0140 document icon Northwatch_SUB_East-West Tie_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon MNO_Sub_EastWest Tie_20130510 Submission Ontario Energy Board 2013-05-10 2013-05-10
EB-2011-0140 document icon CCC_Sub_EastWestTie_20130510 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon CCC_Sub_cvrltr_20130510 Correspondence Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon NOMA-NOACC_SUB_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon SEC_Sub_EastWestTie_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon OPRFN_SUB_East-West Tie_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon HONI_SUB_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon IESO_SUB_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon IESO_cvrltr_SUB_20130509 Correspondence Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon PWU_SUB_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon Algoma_Sub_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon Red sky Métis _Sub_East-West-Tie_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon OPA_SUBPhase2_20130509 Submission Ontario Energy Board 2013-05-09 2013-05-09
EB-2011-0140 document icon Transcript_Oral Session_East West Tie-REVISED_20130503 Transcripts Ontario Energy Board 2013-05-07 2013-05-07
EB-2011-0140 document icon City_Thunder Bay_OralSub_East-West Tie_20130506 Submission Ontario Energy Board 2013-05-06 2013-05-06
EB-2011-0140 document icon Algoma_Coalition_OralSub_20130506 Submission Ontario Energy Board 2013-05-06 2013-05-06
EB-2011-0140 document icon MNO_OralSub_East-West Tie_20130502 Submission Ontario Energy Board 2013-05-02 2013-05-02
EB-2011-0140 document icon Transcript_Oral Sessions_East-West Tie_20130502 Transcripts Ontario Energy Board 2013-05-03 at 9:44 AM
EB-2011-0140 document icon Schedule_East West Tie_ThunderBay_20130501 Correspondence Ontario Energy Board 2013-05-01 2013-05-01
EB-2011-0140 document icon PO7_Eat-West Tie_20130429 Procedural Order Ontario Energy Board 2013-04-29 2013-04-29
EB-2011-0140 document icon MNO_Letter_20130426 Correspondence Ontario Energy Board 2013-04-26 2013-04-26
EB-2011-0140 document icon IESO_LTR_Change_of_Contact_20130424 Correspondence Ontario Energy Board 2013-04-24 2013-04-24
EB-2011-0140 document icon UCT_Arg-in-Chief_20130418 Applicant Argument in Chief Ontario Energy Board 2013-04-18 2013-04-18
EB-2011-0140 document icon RES_Arg-in-Chief_20130418 Applicant Argument in Chief Ontario Energy Board 2013-04-18 2013-04-18
EB-2011-0140 document icon ICN-TPT_Arg-in-Chief_20130418 Applicant Argument in Chief Ontario Energy Board 2013-04-18 2013-04-18
EB-2011-0140 document icon ELP_Arg-in-Chief_20130418 Applicant Argument in Chief Ontario Energy Board 2013-04-18 2013-04-18
EB-2011-0140 document icon ATL_Arg-in-Chief_20130418 Applicant Argument in Chief Ontario Energy Board 2013-04-18 2013-04-18
EB-2011-0140 document icon ATL_CovLtr_Arg-in-Chief_20130418 Applicant Argument in Chief Ontario Energy Board 2013-04-18 2013-04-18
EB-2011-0140 document icon CNPI_Arg-in-Chief_20130418 Applicant Argument in Chief Ontario Energy Board 2013-04-18 2013-04-18
EB-2011-0140 document icon Updated Intervention List_20130409 Intervenor List Ontario Energy Board 2013-04-11 2013-04-11
EB-2011-0140 document icon BdStaff_Sub_East-West Tie_20130408 Submission Ontario Energy Board 2013-04-08 2013-04-08
EB-2011-0140 document icon bdStaff_Sub_East-west Tie_Cvrltr_20130408 Submission Ontario Energy Board 2013-04-08 2013-04-08
EB-2011-0140 document icon Iccon_TPT_IRRs_20130328 Interrogatories to Intervenor Ontario Energy Board 2013-04-01 2013-04-01
EB-2011-0140 document icon UCT_IRR_OEB_Corrected_20130328.pdf Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon ELP_IRRs_Cross_Rope_Stucture_Movie Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon ATL_IRRs_OEB_20130328 Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon ELP_IRR_OEB_20130328 Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon CNPI_IRR_OEB_20130328 Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon RES_Specific_IRRs.20130328 Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon RES_IRRs_CoverLetter20130328 Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon RES_IRRs_All_Applicants_20130328 Interrogatory Response from Applicant Ontario Energy Board 2013-03-28 2013-03-28
EB-2011-0140 document icon PRFN_Letter_East-West Tie_20130327 Correspondence Ontario Energy Board 2013-03-27 2013-03-27
EB-2011-0140 document icon Clarification re IRS_30-31 and 25_20130321 Interrogatories to Applicant Ontario Energy Board 2013-03-21 2013-03-21
EB-2011-0140 document icon Pic River_correspondence_20120320 Correspondence Ontario Energy Board 2013-03-20 2013-03-20
EB-2011-0140 document icon Clarification of IR 22_ from the IESO_20130312 Interrogatories to Applicant Ontario Energy Board 2013-03-12 2013-03-12
EB-2011-0140 document icon Pic River First Nation_Ltr_20130308 Correspondence Ontario Energy Board 2013-03-08 2013-03-08
EB-2011-0140 document icon PO6_IRs_East-West Tie_20130304 Procedural Order Ontario Energy Board 2013-03-04 2013-03-04
EB-2011-0140 document icon MNO_Ltr_reIntervention_20120222 Correspondence Ontario Energy Board 2013-02-22 2013-02-22
EB-2011-0140 document icon RES_cvrltr_NON-CONFIDENTIAL_FINANCIALSTATEMENT_20130206 Application and Evidence Ontario Energy Board 2013-02-06 2013-02-06
EB-2011-0140 document icon RES_IR_ELP_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon RES_IR_UCT_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon PRFN_IRs_ALL_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon PRFN_IRs_cvrltr_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon IESO_IRs_ALL_cvrltr_20120130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon IESO_IRs_ALL_20120130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon MNO_IRs_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon Northwatch_IRS_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon SEC_IR_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon UCT_IRs_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon NOACC-NOMA_IRscvrltr_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon NOACC-NOMA_IRs_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon ATL_IR_CovLtr_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon ATL_IRs_All _20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon RES_IR_AltaLink_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon RES_IRs_CoverLtr_ALL_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon RES_IR_CNPI_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon RES_IR_Iccon_TPT_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon HONI_IR_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon OPA_IRs_ Board_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon ICCON_TPT_IRS_cvrltr_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon ICCON_TPT_IRS_ALL_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon ELP_IRs_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon bdStaff_ Proposed_IRs_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon bdstaff_proposed_IRS_cvrltr_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon PWU_IR_ELP_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon PWU_IR_CNPI_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon PWU_IR_AltaLink_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon CNPI_IR_All_20130130 Interrogatories to Applicant Ontario Energy Board 2013-01-30 2013-01-30
EB-2011-0140 document icon Bdltr_reIESO - OPA_20130128 Correspondence Ontario Energy Board 2013-01-28 2013-01-28
EB-2011-0140 document icon Bd_replyltr_ELP_20130128 Correspondence Ontario Energy Board 2013-01-28 2013-01-28
EB-2011-0140 document icon RES_APP_non-confidential_20130128 Application and Evidence Ontario Energy Board 2013-01-28 2013-01-28
EB-2011-0140 document icon CCC_IRs_Board_20120128 Interrogatories to Applicant Ontario Energy Board 2013-01-28 2013-01-28
EB-2011-0140 document icon ELP_LTR_RES_NONCONFINFO_20130125 Correspondence Ontario Energy Board 2013-01-25 2013-01-25
EB-2011-0140 document icon Dec_Order_RESConfidentiality_20130123 Decision and Order Ontario Energy Board 2013-01-23 2013-01-23
EB-2011-0140 document icon RES_Replyltr_Confidentiality_20130118 Correspondence Ontario Energy Board 2013-01-18 2013-01-18
EB-2011-0140 document icon ELP_ltr_RES Confidentiality_20120115 Correspondence Ontario Energy Board 2013-01-15 2013-01-15
EB-2011-0140 document icon SEC_ltr_RES_Confidentiality_20130115 Correspondence Ontario Energy Board 2013-01-15 2013-01-15
EB-2011-0140 document icon Metis_Letter_MOE_East West Tie Concerns_20130115 Correspondence Ontario Energy Board 2013-01-15 2013-01-15
EB-2011-0140 document icon RES_APPL_ExMtoP_Designation_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon RES_APPL_ExL_Designation_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon RES_APPL_ExAtoK_Designation_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon AltaLink_ Ltr_RES Confidentiality Claim_20130114 Correspondence Ontario Energy Board 2013-01-14 2013-01-14
EB-2011-0140 document icon Bd_reply ltr_RES_20130111 Correspondence Ontario Energy Board 2013-01-11 2013-01-11
EB-2011-0140 document icon RES_Ltr_Confidentialfiling_20130110 Correspondence Ontario Energy Board 2013-01-10 2013-01-10
EB-2011-0140 document icon PO5_East-West Tie_20130108 Procedural Order Ontario Energy Board 2013-01-08 2013-01-08
EB-2011-0140 document icon Bdltr_Data room filing_20120108 Correspondence Ontario Energy Board 2013-01-08 2013-01-08
EB-2011-0140 document icon UCT_APPL_Designation_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon UCT_APPL_Designation_CovLtr_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon ICN-TPT_APPL_DESIGNATION_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon ELP_APPL_Designation_Part_3_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon ELP_APPL_Designation_Part_2_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon ELP_APPL_Designation_Part_1_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon CNPI_APPL_Designation_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon ATL_APPL_Designation_20130104 Application and Evidence Ontario Energy Board 2013-01-04 2013-01-04
EB-2011-0140 document icon Brdltr_PRFN_DU_20121219 Correspondence Ontario Energy Board 2012-12-19 2012-12-19
EB-2011-0140 document icon MOE_Hydro-One_Bruce_Milton_Ex_K8-1 Exhibits Ontario Energy Board 2012-12-19 at 9:26 AM
EB-2011-0140 document icon Hanser_Declaration and Undertaking_20121218 Declaration and Undertakings Ontario Energy Board 2012-12-18 2012-12-18
EB-2011-0140 document icon Hanser Pensa LLP_Request for Confidential Doc_20121218 Correspondence Ontario Energy Board 2012-12-18 2012-12-18
EB-2011-0140 document icon UCT_Declaration and Undertaking_20121212 Declaration and Undertakings Ontario Energy Board 2012-12-12 2012-12-12
EB-2011-0140 document icon Attachment to_Bdltr_20121211 Correspondence Ontario Energy Board 2012-12-11 2012-12-11
EB-2011-0140 document icon Bd response to DM Imbrogno_East-West Tie_20121211 Correspondence Ontario Energy Board 2012-12-11 2012-12-11
EB-2011-0140 document icon UCT_ Declaration_and_Undertaking _20121210. Declaration and Undertakings Ontario Energy Board 2012-12-10 2012-12-10
EB-2011-0140 document icon Ministry Ltr_East West Tie_Consultation with First Nations _Metis_20121126 Correspondence Ontario Energy Board 2012-12-04 2012-12-04
EB-2011-0140 document icon Bdltr_East-West Tie_Guidance_20121121 Correspondence Ontario Energy Board 2012-11-21 2012-11-21
EB-2011-0140 document icon Bd_reply letter_ALTextention rqst_20121120 Correspondence Ontario Energy Board 2012-11-20 2012-11-20
EB-2011-0140 document icon PRFN_Comments on Board's Cost Decision_20121120 Correspondence Ontario Energy Board 2012-11-20 2012-11-20
EB-2011-0140 document icon ATL_Ltr_20121116 Correspondence Ontario Energy Board 2012-11-16 2012-11-16
EB-2011-0140 document icon OEB ltr_HONI_EWTie Proceeding_Dec&Undertakings_20121114 Correspondence Ontario Energy Board 2012-11-14 2012-11-14
EB-2011-0140 document icon Bd_ltr_re Iccon and MNO_Declaration&Undertakings_20121019 Declaration and Undertakings Ontario Energy Board 2012-10-19 2012-10-19
EB-2011-0140 document icon TPT_Rvsd Rqst_re Declaration and Undertakings_20121107 Declaration and Undertakings Ontario Energy Board 2012-11-07 2012-11-07
EB-2011-0140 document icon ICCON_Declation and Undertaking_20121016 Declaration and Undertakings Ontario Energy Board 2012-10-16 2012-10-16
EB-2011-0140 document icon MetisDeclaration - Salter_20121015 Declaration and Undertakings Ontario Energy Board 2012-10-15 2012-10-15
EB-2011-0140 document icon MetisDeclaration - Burega_20121015 Declaration and Undertakings Ontario Energy Board 2012-10-15 2012-10-15
EB-2011-0140 document icon OEB ltr_GVegh_D&U TPT_20121005 Correspondence Ontario Energy Board 2012-10-05 2012-10-05
EB-2011-0140 document icon Iccon_withdrawalLtr _Dec&Undertaking_20120711 Correspondence Ontario Energy Board 2012-07-11 2012-07-11
EB-2011-0140 document icon Bd letter_InfoReq_20121002 Correspondence Ontario Energy Board 2012-10-02 2012-10-02 2012-10-02
EB-2011-0140 document icon RES_Letter_PhilipPoon_20120927 Correspondence Ontario Energy Board 2012-09-28 2012-09-28
EB-2011-0140 document icon Dec_Order on Motion to Review_Cost Awards_20120925 Decision on Motion Ontario Energy Board 2012-09-25 2012-09-25 2012-09-25
EB-2011-0140 document icon TPT Declaration and Undertakings 20120925 Declaration and Undertakings Ontario Energy Board 2012-09-25 2012-09-25
EB-2011-0140 document icon Dec_Order_on Cost Awards_20121709 Decision and Order on Cost Awards Ontario Energy Board 2012-09-18 2012-09-18
EB-2011-0140 document icon AltaLink_AddInfoREQ_to HONI_20120914 Correspondence Ontario Energy Board 2012-09-14 2012-09-14
EB-2011-0140 document icon EWT LP_Letter_20120829 Correspondence Ontario Energy Board 2012-08-29 2012-08-29
EB-2011-0140 document icon NAN_cost Claim_extension_20120824 Correspondence Ontario Energy Board 2012-08-24 2012-08-24
EB-2011-0140 document icon Board_ltr_to Algoma and PRFN_Cost claim_20120824 Correspondence Ontario Energy Board 2012-08-24 2012-08-24
EB-2011-0140 document icon Bd Ltr_RES_Declaration&Undertakings_20120824 Correspondence Ontario Energy Board 2012-08-23 2012-08-23
EB-2011-0140 document icon HONI_LTR_Cost_Objections_20120820 Cost Claim Objection Ontario Energy Board 2012-08-20 2012-08-20
EB-2011-0140 document icon RES_Cover Letter to OEB Regarding Stantec Declaration and Undertakings_20120813 Declaration and Undertakings Ontario Energy Board 2012-08-13 2012-08-13
EB-2011-0140 document icon RES_DeclarationandUndertaking_MikeVoll_20120813 Declaration and Undertakings Ontario Energy Board 2012-08-13 2012-08-13
EB-2011-0140 document icon RES_DeclarationandUndertaking_DirkFrailey_20120813 Declaration and Undertakings Ontario Energy Board 2012-08-13 2012-08-13
EB-2011-0140 document icon RES_DeclarationandUndertaking_JamesDykes_20120813 Declaration and Undertakings Ontario Energy Board 2012-08-13 2012-08-13
EB-2011-0140 document icon RES_Declaration&undetaking_Bjorn_20120812 Correspondence Ontario Energy Board 2012-08-13 2012-08-13
EB-2011-0140 document icon RES_DeclarationandUndertaking_ PeterPrier_20120809 Declaration and Undertakings Ontario Energy Board 2012-08-10 2012-08-10
EB-2011-0140 document icon RES_DeclarationandUndertaking_ Larry Galajda_20120809 Declaration and Undertakings Ontario Energy Board 2012-08-10 2012-08-10
EB-2011-0140 document icon RES_DeclarationandUndertaking_ RobNadolny_20120809 Declaration and Undertakings Ontario Energy Board 2012-08-10 2012-08-10
EB-2011-0140 document icon Northwatch_ Cost Claim extension_reply_20120809 Correspondence Ontario Energy Board 2012-08-09 2012-08-09
EB-2011-0140 document icon AMPCO_Cost Claim_Extension_reply_20120809 Correspondence Ontario Energy Board 2012-08-09 2012-08-09
EB-2011-0140 document icon PRFN_responseLetter_HONI_reCost claim_20120808 Correspondence Ontario Energy Board 2012-08-08 2012-08-08
EB-2011-0140 document icon HONI_LTR_Cost_Objections_20120802 Cost Claim Objection Ontario Energy Board 2012-08-02 2012-08-02
EB-2011-0140 document icon EWT_LTTR_20120731 Correspondence Ontario Energy Board 2012-08-01 at 1:51 PM
EB-2011-0140 document icon PO4_E-W Tie_20120727 Procedural Order Ontario Energy Board 2012-07-27 2012-07-27
EB-2011-0140 document icon SEC_E-WTie_HONIObjectionReply_20120723 Correspondence Ontario Energy Board 2012-07-24 2012-07-24
EB-2011-0140 document icon NCO_response_ltr_HONI objection_20120723 Correspondence Ontario Energy Board 2012-07-23 2012-07-23
EB-2011-0140 document icon PicRiver_FirstNation_response to HONI Objection_20120723 Correspondence Ontario Energy Board 2012-07-23 2012-07-23
EB-2011-0140 document icon MNO_Response Letter_ to OEB re HONI Objection_20120723 Correspondence Ontario Energy Board 2012-07-23 2012-07-23
EB-2011-0140 document icon Stantec_comments_onHONIltr_20120719 Correspondence Ontario Energy Board 2012-07-19 2012-07-19
EB-2011-0140 document icon CCC_Comments Letter_HONI'sObjection_20120718 Correspondence Ontario Energy Board 2012-07-18 2012-07-18
EB-2011-0140 document icon BrdLtr_ inviting reponse to objection approved_20120718 Correspondence Ontario Energy Board 2012-07-18 2012-07-18
EB-2011-0140 document icon HONI_ObjDecandUndertakings_20120716 Correspondence Ontario Energy Board 2012-07-16 2012-07-16
EB-2011-0140 document icon Dec_Order_Phase1_EWT_20120712 Decision and Order Ontario Energy Board 2012-07-12 2012-07-12
EB-2011-0140 document icon Ltr_to HONI and GLPI_EWT Declarations and Undertakings_20120711 Correspondence Ontario Energy Board 2012-07-11 2012-07-11
EB-2011-0140 document icon Iccon_Declaration and Undertaking_20120706 Declaration and Undertakings Ontario Energy Board 2012-07-11 2012-07-11
EB-2011-0140 document icon CNPI_Declaration and Undertaking_DK_20120706 Declaration and Undertakings Ontario Energy Board 2012-07-06 2012-07-06
EB-2011-0140 document icon TPT Declaration and Undertaking 20120706 Declaration and Undertakings Ontario Energy Board 2012-07-06 2012-07-06
EB-2011-0140 document icon UCT_Decl_and_Undertaking_Galler_20120705 Declaration and Undertakings Ontario Energy Board 2012-07-05 2012-07-05
EB-2011-0140 document icon CNPI_Declaration and Undertaking_AT_20120705 Declaration and Undertakings Ontario Energy Board 2012-07-05 2012-07-05
EB-2011-0140 document icon CNPI_Declaration and Undertaking_20120705 Declaration and Undertakings Ontario Energy Board 2012-07-05 2012-07-05
EB-2011-0140 document icon NCO_CvrLet_Dec&undertkg_20120705 Declaration and Undertakings Ontario Energy Board 2012-07-05 2012-07-05
EB-2011-0140 document icon NCO_E-WTie_DeclUndtkg_20120705 Declaration and Undertakings Ontario Energy Board 2012-07-05 2012-07-05
EB-2011-0140 document icon CCC_Decl and Undertaking of J. Girvan_20120704 Declaration and Undertakings Ontario Energy Board 2012-07-04 2012-07-04
EB-2011-0140 document icon CCC_Decl and Undertaking of R Warren_20120704 Declaration and Undertakings Ontario Energy Board 2012-07-04 2012-07-04
EB-2011-0140 document icon PWU_Declaration and Undertaking_20120704 Declaration and Undertakings Ontario Energy Board 2012-07-04 2012-07-04
EB-2011-0140 document icon RES_COVERLETDECLARATION_AND_UNDERTAKING20120703 Declaration and Undertakings Ontario Energy Board 2012-07-04 2012-07-04
EB-2011-0140 document icon RES_DECLARATIONANDUNDERTAKING_NALINSAHNI20120703 Declaration and Undertakings Ontario Energy Board 2012-07-04 2012-07-04
EB-2011-0140 document icon RES_DECLARATION_UNDERTAKING_JANETMACNEIL20120703 Declaration and Undertakings Ontario Energy Board 2012-07-04 2012-07-04
EB-2011-0140 document icon RES_DECLARATION_AND_UNDERTAKING_VIVEKBAKSHI20120703 Declaration and Undertakings Ontario Energy Board 2012-07-04 2012-07-04
EB-2011-0140 document icon RES_DECLARATION_AND_UNDERTAKING_ALLYSONROY20120703 Declaration and Undertakings Ontario Energy Board 2012-07-03 at 7:55 AM
EB-2011-0140 document icon EWT_CounselDeclarationUndertaking_20120629 Declaration and Undertakings Ontario Energy Board 2012-06-29 2012-06-29
EB-2011-0140 document icon PRFN_C Godby_S Teal_Declaration and Undertaking_20120703 Declaration and Undertakings Ontario Energy Board 2012-07-03 2012-07-03
EB-2011-0140 document icon PRFN_Letter to Board_Declarations and Undertakings_20120703 Declaration and Undertakings Ontario Energy Board 2012-07-03 2012-07-03
EB-2011-0140 document icon MNO_A Monem_Declaration and Undertaking_20120703 Declaration and Undertakings Ontario Energy Board 2012-07-03 2012-07-03
EB-2011-0140 document icon MNO_Declaration and Undertaking_JasonMadden_20120629 Declaration and Undertakings Ontario Energy Board 2012-06-29 2012-06-29
EB-2011-0140 document icon RES_DECLARATIONANDUNDERTAK_AndrewSalem_20120629 Declaration and Undertakings Ontario Energy Board 2012-06-29 2012-06-29
EB-2011-0140 document icon RES_DECLARATION&UNDERTAKING_HelenNewland_20120629 Declaration and Undertakings Ontario Energy Board 2012-06-29 2012-06-29
EB-2011-0140 document icon HONI_EWTReport5c_Part8of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_Part7of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_Part6of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_Part5of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_Part4of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_Part3of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_Part2of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_Part1of8_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport7_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport1e_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport1d_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport1c_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport1b_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon AffidavitMEngelberg Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5c_CompensationAmounts_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport6_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5b_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport5a_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport4_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport3c_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport3a_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport2b_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport2a_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon FW: EB-2011-0140 - OEB East West Tie - Hydro One Networks Documents - Email 3 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONIPages 101-113HONI_EWTReport1f_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONIPages 51-100HONI_EWTReport1f_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_SUB_ProdDocs_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONIPages 1-50HONI_EWTReport1f_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon HONI_EWTReport1a_20120628 Submission Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon EWT_CounselDeclarationUndertaking_Keizer_20120629 Declaration and Undertakings Ontario Energy Board 2012-06-29 2012-06-29
EB-2011-0140 document icon PWU_Dec&undertaking_OEB_20120627 Declaration and Undertakings Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon ICCON_Declaration&Undertaking_P. Duffy_20120627 Declaration and Undertakings Ontario Energy Board 2012-06-28 2012-06-28
EB-2011-0140 document icon Iccon CovLtr_Dec&undertaking_20120627 Declaration and Undertakings Ontario Energy Board 2012-06-27 2012-06-27
EB-2011-0140 document icon ICCON_Declaration& Undertaking_G. Zacher_20120627 Declaration and Undertakings Ontario Energy Board 2012-06-27 2012-06-27
EB-2011-0140 document icon GLPT Productions _RedactedSubmission_ 20120627 Submission Ontario Energy Board 2012-06-27 2012-06-27
EB-2011-0140 document icon Altalink Ltr Counsels Declaration&Undertaking_20120627 Correspondence Ontario Energy Board 2012-06-27 2012-06-27
EB-2011-0140 document icon Altalink_ Mark Rodger Declaration& Undertaking_20120627 Correspondence Ontario Energy Board 2012-06-27 2012-06-27
EB-2011-0140 document icon Altalink_ J. Vellone Declaration & Undertaking_20120627 Correspondence Ontario Energy Board 2012-06-27 2012-06-27
EB-2011-0140 document icon SEC_EWT_DeclarationUndertaking_20120615 Declaration and Undertakings Ontario Energy Board 2012-06-15 2012-06-15
EB-2011-0140 document icon Partial_dec order_phase1_East-West Tie_20120614 Decision and Order Ontario Energy Board 2012-06-14 2012-06-14
EB-2011-0140 document icon Bd_Letter_Re no hearing_20120525 Correspondence Ontario Energy Board 2012-05-25 2012-05-25
EB-2011-0140 document icon Northwatch_ReplySUB_Phase1_EWT_20120522 Submission Ontario Energy Board 2012-05-23 2012-05-23
EB-2011-0140 document icon CNPI_ReplySUB_Phase1_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon HONI_ReplySub_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon HO inc_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-23 at 9:18 AM
EB-2011-0140 document icon PWU_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon GLPT_EWT LP_Phase 1_ReplySUB_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon Iccon_ReplySUB_Phase1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon TPT_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon EWT LP_ReplySUB_PHASE1_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon NCO_ReplySUB_Phase 1_cvrltr_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon NCO_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon Algoma Coalition_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon ALGOMA COALITION_Reply SUB_Phase 1_Appendix B_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon PRFN_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon RES_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon MNO_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon MNO_ReplySUB_Phase 1_cvr ltr_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon AltaLink_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon AltaLink_ReplySUB_Phase 1_cvr ltr_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon IESO_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon IESO_ReplySUB_Phase 1_cvr ltr_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon UCT_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon Enbridge Inc_ReplySUB_Phase 1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon SEC_ReplySUB_Phase1_EWT_20120522 Submission Ontario Energy Board 2012-05-22 2012-05-22
EB-2011-0140 document icon OPA_ReplySUB_Phase 1_EWT_20120518 Submission Ontario Energy Board 2012-05-18 2012-05-18
EB-2011-0140 document icon Dllion_Ltr_20120516 Correspondence Ontario Energy Board 2012-05-16 2012-05-16
EB-2011-0140 document icon OPA_CR Part 4 (s18-29)_ EWT_20120509 Correspondence Ontario Energy Board 2012-05-10 2012-05-10
EB-2011-0140 document icon OPA_CR Part 3 (s15-17)_ EWT_20120509 Correspondence Ontario Energy Board 2012-05-10 2012-05-10
EB-2011-0140 document icon OPA_CR Part 2 (s9-14)_ EWT_20120509 Correspondence Ontario Energy Board 2012-05-10 2012-05-10
EB-2011-0140 document icon OPA_CR Part 1 (s1-8)_EWT_20120509 Correspondence Ontario Energy Board 2012-05-10 2012-05-10
EB-2011-0140 document icon OPA_Cvr_Ltr_EWT_20120509 Correspondence Ontario Energy Board 2012-05-10 2012-05-10
EB-2011-0140 document icon PO3_E-WTieLine_20120508 Procedural Order Ontario Energy Board 2012-05-09 2012-05-09
EB-2011-0140 document icon EWTLP_LTR_re_Extension_20120509 Correspondence Ontario Energy Board 2012-05-09 2012-05-09
EB-2011-0140 document icon RES_letterRe_Extension_20120509 Correspondence Ontario Energy Board 2012-05-09 2012-05-09
EB-2011-0140 document icon CCC_SUB_Phase1_20120508 Submission Ontario Energy Board 2012-05-08 2012-05-08
EB-2011-0140 document icon Altalink L P_Request for extention_20120508 Correspondence Ontario Energy Board 2012-05-08 2012-05-08
EB-2011-0140 document icon CNPI_Ex2_Phase1_20120507 Submission Ontario Energy Board 2012-05-08 2012-05-08
EB-2011-0140 document icon NCO_Sub_Phase1_20120507 Submission Ontario Energy Board 2012-05-08 2012-05-08
EB-2011-0140 document icon NCO_CvrLtr_Phase1_20120508 Submission Ontario Energy Board 2012-05-08 2012-05-08
EB-2011-0140 document icon MNO_SUB_PHASE_I_20120508.pdf Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon CNPI_CvrLet_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon CNPI_SUB_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon CNPI_Ex1_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon Iccon_SUB_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon RES_cvrltr_SUB_PHASE1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon RES_SUB_PHASE1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon NAN_SUB_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon IESO_SUB_Phase 1_ 20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon SEC_EWT_Phase1_Sub_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon Northwatch_SUB_Phase 1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon EWTLP_SUB_PHASE1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon GLPT_ Sub_ Phase 1_ 20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon NOACC-NOMA_CovLtr_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon NOACC-NOMA_Sub_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon HONI_SUB_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon TPT_SUB_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon AltaLink_SUB_Phase_1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon AltaLink_CovLtr_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon OPA_SUB_Phase 1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon PWU_SUB_EWT Phase 1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon UCT_SUB_Phase 1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon Ojibways_Sub_Phase1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon Enbridge Inc_SUB_Phase 1_20120507 Submission Ontario Energy Board 2012-05-07 2012-05-07
EB-2011-0140 document icon OPA_Ltr_20120504 Correspondence Ontario Energy Board 2012-05-04 2012-05-04
EB-2011-0140 document icon Bd_replyLetter_ PRFN_20120502 Correspondence Ontario Energy Board 2012-05-02 2012-05-02
EB-2011-0140 document icon PRFN_ltr_20120430 Correspondence Ontario Energy Board 2012-04-30 2012-04-30
EB-2011-0140 document icon Bdstaff_email_re EW Tie documents list_20120409 Correspondence Ontario Energy Board 2012-04-09 2012-04-09
EB-2011-0140 document icon GLPT_Sub_ East-West Tie Document list_20122603 Submission Ontario Energy Board 2012-03-26 2012-03-26
EB-2011-0140 document icon HONi_sub_ East-West Tie documents list w descriptions_20120409 Submission Ontario Energy Board 2012-04-09 2012-04-09
EB-2011-0140 document icon Bd Letter_TPT_Re H1 GLPT Info_20120426 Correspondence Ontario Energy Board 2012-04-26 2012-04-26
EB-2011-0140 document icon Bdstaff_submission_20120424 Submission Ontario Energy Board 2012-04-24 2012-04-24
EB-2011-0140 document icon Cvrltr_Bdstaff_Submission_20120424 Submission Ontario Energy Board 2012-04-24 2012-04-24
EB-2011-0140 document icon TPT_Ltr_Disclosure Request_20120420 Correspondence Ontario Energy Board 2012-04-20 2012-04-20
EB-2011-0140 document icon PO2_East-West tie line_20120416 Procedural Order Ontario Energy Board 2012-04-16 2012-04-16
EB-2011-0140 document icon Energy Probe_SUB_Cost Eligibility_EWT_20120410 Submission Ontario Energy Board 2012-04-11 at 3:32 AM
EB-2011-0140 document icon CCC_SUB_Cost Eligibility_20120411 Submission Ontario Energy Board 2012-04-10 at 4:47 PM
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received