EB-2014-0096
|
Certification_Destruction_Randy_Aiken_20150724
|
Declaration and Undertakings
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0096
|
dec_order_costs_NPEI_20150713
|
Decision and Order on Cost Awards
|
2015-07-13
|
|
2015-07-13
|
EB-2014-0096
|
Energy Probe Costs Submission Executed Affidavit_20150703
|
Cost Claim
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0096
|
VECC Cost Claim_NPEI_20150619
|
Cost Claim
|
|
2015-06-19
|
2015-06-19
|
EB-2014-0096
|
Energy Probe_Cost Claim_20150616
|
Cost Claim
|
|
2015-06-16
|
2015-06-16
|
EB-2014-0096
|
SEC_Cost Claim_20150616
|
Cost Claim
|
|
2015-06-16
|
2015-06-16
|
EB-2014-0096
|
Rate Order Niagara Penninsula_20150611
|
Rate Order
|
2015-06-11
|
|
2015-06-11
|
EB-2014-0096
|
NPEI_ltr_response to comments of EP_20150528
|
Correspondence
|
|
2015-05-28
|
2015-05-28
|
EB-2014-0096
|
Bdstaff_sub_DRO_NiagaraPeninsula_20150526
|
Submission
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0096
|
BdStaff_sub_covltr_DRO NiagaraPeninsula 20150526
|
Submission
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0096
|
NPEI_2015_Cost_Allocation_Model_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
Energy Probe_Comments DRO_20150526
|
Correspondence
|
|
2015-05-25
|
2015-05-25
|
EB-2014-0096
|
NPEI_Cover Letter Additional Information_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_Fixed Variable Revenue after Decision and Order May 21 2015
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_Appendix 2-P Cost Allocation_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_Stranded Meter Rate Rider_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_Draft Rate Order_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_Draft Accounting Order WCA Percentage Deferral Account_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_Cover Letter_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_Bill Impacts_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_2015_Rev_Reqt_Work_Form_V5_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
NPEI_2015_EDDVAR_Continuity Schedule_20150521
|
Draft Rate Order
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0096
|
dec_order_Niagara Penninsula_20150514
|
Decision and Order
|
2015-05-14
|
|
2015-05-14
|
EB-2014-0096
|
Interim Rate Order_Niagara_20150428
|
Rate Order
|
2015-04-28
|
|
2015-04-28
|
EB-2014-0096
|
NPEI_undertakings list _H_20150317
|
Undertaking List
|
|
2015-03-17
|
2015-03-17
|
EB-2014-0096
|
NPEI_exhibits list_20150315
|
Exhibit List
|
|
|
2015-04-21 at 9:40 AM
|
EB-2014-0096
|
EX_K1.4_20150313
|
Exhibits
|
|
2015-03-13
|
2015-03-13
|
EB-2014-0096
|
EX_K1.2_20150313
|
Exhibits
|
|
2015-03-13
|
2015-03-13
|
EB-2014-0096
|
EX_K1.1_20150313
|
Exhibits
|
|
2015-03-13
|
2015-03-13
|
EB-2014-0096
|
NPEI_ReplySUB_20150407
|
Submission
|
|
2015-04-07
|
2015-04-07
|
EB-2014-0096
|
SEC_final argument_20150327
|
Final Argument
|
|
2015-03-27
|
2015-03-27
|
EB-2014-0096
|
VECC Submission_NPEI_ 20150327
|
Submission
|
|
2015-03-27
|
2015-03-27
|
EB-2014-0096
|
Energy Probe_ Argument_20150326
|
Submission
|
|
2015-03-27
|
2015-03-27
|
EB-2014-0096
|
OEBstaff_ltr_Sub_NPEI_27032015
|
Submission
|
|
2015-03-27
|
2015-03-27
|
EB-2014-0096
|
OEBstaff_Sub_NPEI_27032015
|
Submission
|
|
2015-03-27
|
2015-03-27
|
EB-2014-0096
|
NPEI_Amended Proposed Partial Settlement Agreement_20150325
|
Settlement Proposal
|
|
2015-03-25
|
2015-03-25
|
EB-2014-0096
|
NPEI_J1.1 and J1.2_undertaking responses_20150323
|
Undertaking Responses
|
|
2015-03-23
|
2015-03-23
|
EB-2014-0096
|
Transcript_NPEI Volume 1_20150317
|
Transcripts
|
|
2015-03-17
|
2015-03-17
|
EB-2014-0096
|
EnergyProbe_Confidentiality Form_Randy Aiken_NPEI_2015 COS Rates_20150314
|
Declaration and Undertakings
|
|
2015-03-14
|
2015-03-14
|
EB-2014-0096
|
EnergyProbe_Confidentiality Form_Randy Aiken_NPEI_2015 COS Rates_20150314
|
Declaration and Undertakings
|
|
2015-03-14
|
2015-03-14
|
EB-2014-0096
|
EX_K1.3_20150313
|
Exhibits
|
|
2015-03-13
|
2015-03-13
|
EB-2014-0096
|
Energy Probe_Compendium_cvrltr_NPEI 2015 Rates_20150313
|
Pre-Hearing Material
|
|
2015-03-13
|
2015-03-13
|
EB-2014-0096
|
PO3_NPEI_20150305
|
Procedural Order
|
2015-03-05
|
|
2015-03-05
|
EB-2014-0096
|
OEBStaff_Ltr_Sub_SetPro_NPEI_20150304
|
Submission
|
|
2015-03-04
|
2015-03-04
|
EB-2014-0096
|
BdStaff_Sub_SetPro_NPEI_20150304
|
Submission
|
|
2015-03-04
|
2015-03-04
|
EB-2014-0096
|
NPEI_PartialSettlementAgreement_20150225
|
Settlement Agreement
|
|
2015-02-25
|
2015-02-25
|
EB-2014-0096
|
NPEI_2015_RTSR MODEL_V4_0_20140626_Settlement_20150225
|
Settlement Proposal
|
|
2015-02-25
|
2015-02-25
|
EB-2014-0096
|
NPEI_2015_EDDVAR_Continuity_Schedule_CoS_v2_4_20140718_Settlement_20150225
|
Settlement Proposal
|
|
2015-02-25
|
2015-02-25
|
EB-2014-0096
|
NPEI_2015_Cost_Allocation_Model_V3_2_20140626_Settlement_20150225
|
Settlement Proposal
|
|
2015-02-25
|
2015-02-25
|
EB-2014-0096
|
Brd_ltr_SettlementFiling_Extension 20150225
|
Correspondence
|
2015-02-25
|
|
2015-02-25
|
EB-2014-0096
|
NPEI_LTR_Extension to File Partial Settlement Agreement_20150223
|
Correspondence
|
|
2015-02-23
|
2015-02-23
|
EB-2014-0096
|
Brd_ltr_SettlementFiling_Extension_20150212
|
Correspondence
|
2015-02-12
|
|
2015-02-12
|
EB-2014-0096
|
NPEI_ltr_partial settlement_20150206
|
Correspondence
|
|
2015-02-06
|
2015-02-06
|
EB-2014-0096
|
NPEI_ 2014 updated projected at Settlement App 2BA_20150203
|
Pre-Hearing Material
|
|
2015-02-03
|
2015-02-03
|
EB-2014-0096
|
NPEI_settlement conference_document E_20150203
|
Pre-Hearing Material
|
|
2015-02-03
|
2015-02-03
|
EB-2014-0096
|
NPEI_settlement conference_document D_20150203
|
Pre-Hearing Material
|
|
2015-02-03
|
2015-02-03
|
EB-2014-0096
|
NPEI_settlement conference_document C_20150203
|
Pre-Hearing Material
|
|
2015-02-03
|
2015-02-03
|
EB-2014-0096
|
NPEI_settlement conference_document B_20150203
|
Pre-Hearing Material
|
|
2015-02-03
|
2015-02-03
|
EB-2014-0096
|
NPEI_settlement conference_document A_20150203
|
Pre-Hearing Material
|
|
2015-02-03
|
2015-02-03
|
EB-2014-0096
|
NPEI_undertaking response_2015_Test_year_Income_Tax_PILs_Workform_V3_ with NPC estimate revenue20150
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_Rev_Reqt_Work_Form_V5_ with NPC estimate revenue_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_Cost_Allocation_Model_V3_2_with NPC estimate revenue_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_Test_year_Income_Tax_PILs_Workform_V3_20150129_Modified forSBD_201529
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_RTSR MODEL_V4_0_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_Rev_Reqt_Work_Form_V5_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_Filing_Requirements_Chapter2_Appendices_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_EDDVAR_Continuity_Schedule_CoS_v2_4_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_undertaking response_2015_Cost_Allocation_Model_V3_2_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
NPEI_Undertaking responses_JT1.1-JT1.15_20150129
|
Undertaking Responses
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0096
|
Issues List Decision_Niagara Peninsula_20150129
|
Decision
|
2015-01-29
|
|
2015-01-29
|
EB-2014-0096
|
Niagara Peninsula Energy Inc_Technical Conference_Transcript_revised_vol1_20150120
|
Transcripts
|
|
2015-01-27
|
2015-01-27
|
EB-2014-0096
|
NPEI_ProposedIssuesList_20150123
|
Submission
|
|
2015-01-23
|
2015-01-23
|
EB-2014-0096
|
NPEI_ProposedIssuesList_Ltr_20150123
|
Submission
|
|
2015-01-23
|
2015-01-23
|
EB-2014-0096
|
PO2_NPEI_20150122
|
Procedural Order
|
2015-01-22
|
|
2015-01-22
|
EB-2014-0096
|
Niagara Peninsula Energy Inc_undertakings list_20150120
|
Undertaking List
|
|
|
2015-02-03 at 10:45 AM
|
EB-2014-0096
|
Niagara Peninsula Energy Inc_exhibit list_20150120
|
Exhibit List
|
|
2015-01-20
|
2015-01-20
|
EB-2014-0096
|
EX_KT 1.3_20150120
|
Exhibits
|
|
2015-01-20
|
2015-01-20
|
EB-2014-0096
|
EX_KT 1.1_20150120
|
Exhibits
|
|
2015-01-20
|
2015-01-20
|
EB-2014-0096
|
EX_KT 1.2_20150120
|
Exhibits
|
|
2015-01-20
|
2015-01-20
|
EB-2014-0096
|
Niagara Peninsula Energy Inc_Technical Conference_transcript_vol1_20150120
|
Transcripts
|
|
2015-01-20
|
2015-01-20
|
EB-2014-0096
|
VECC_Technical Conference Questions._20150116
|
Correspondence
|
|
2015-01-16
|
2015-01-16
|
EB-2014-0096
|
SchoolEC_TC_questions_20150116
|
Correspondence
|
|
2015-01-16
|
2015-01-16
|
EB-2014-0096
|
Board staff Ltr_All Parties_Technical Conference Topics_20150116
|
Correspondence
|
|
2015-01-16
|
2015-01-16
|
EB-2014-0096
|
EnergyProbe_Technical Conference questions__20150115
|
Correspondence
|
|
2015-01-15
|
2015-01-15
|
EB-2014-0096
|
Board Ltr_All Parties_Technical Conference Confirmation_20150116
|
Correspondence
|
2015-01-16
|
|
2015-01-16
|
EB-2014-0096
|
NPEI_LTR_Settlement Conference_20150115
|
Correspondence
|
|
2015-01-15
|
2015-01-15
|
EB-2014-0096
|
NPEI_LTR_Settlement Conference_20150114
|
Correspondence
|
|
2015-01-14
|
2015-01-14
|
EB-2014-0096
|
NPEI_IRR_SEC23_ for Deprec on Capital Contributions_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_Weather Normalization Regression Model_2015_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_2015_Test_year_Income_Tax_PILs_Workform_V3_20140626Modified for SBD_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_2015_RTSR MODEL_V4_0_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_2015_Rev_Reqt_Work_Form_V5_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_2015_Filing_Requirements_Chapter2_Appendices_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_2015_EDDVAR_Continuity_Schedule_CoS_v2_4_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_2015_Cost_Allocation_Model_V3_2_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_IRR_2-staff-10_raw_data_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
NPEI_2015 COS_IRR_20141223
|
Interrogatory Response from Applicant
|
|
2014-12-23
|
2014-12-23
|
EB-2014-0096
|
VECC_IR_NPEI_20141202
|
Interrogatories to Applicant
|
|
2014-12-02
|
2014-12-02
|
EB-2014-0096
|
SEC_IR_NiagaraPeninsula_20141203
|
Interrogatories to Applicant
|
|
2014-12-03
|
2014-12-03
|
EB-2014-0096
|
EP_IR_NPEI 2015 COS_20141202
|
Interrogatories to Applicant
|
|
2014-12-02
|
2014-12-02
|
EB-2014-0096
|
BdStaff_IR_NPEI_20141128
|
Interrogatories to Applicant
|
|
2014-11-28
|
2014-11-28
|
EB-2014-0096
|
BdStaff_IR_cvr_ltr_NPEI_20141128
|
Interrogatories to Applicant
|
|
2014-11-28
|
2014-11-28
|
EB-2014-0096
|
PO1_NiagaraPeninsula_20141118
|
Procedural Order
|
2014-11-18
|
|
2014-11-18
|
EB-2014-0096
|
NPEI_Affidavit_20141029
|
Affidavits of Service
|
|
2014-10-29
|
2014-10-29
|
EB-2014-0096
|
EP_intrv_REQ_20141028
|
Intervenor Request Letter
|
|
2014-10-29
|
2014-10-29
|
EB-2014-0096
|
EP_intrv_REQ_cvr_ltr_20141028
|
Intervenor Request Letter
|
|
2014-10-29
|
2014-10-29
|
EB-2014-0096
|
SEC_intrv_REQ_20141024
|
Intervenor Request Letter
|
|
2014-10-23
|
2014-10-23
|
EB-2014-0096
|
VECC_Intrv_REQ_NiagaraPeninsula_20141024
|
Intervenor Request Letter
|
|
2014-10-24
|
2014-10-24
|
EB-2014-0096
|
Niagara_notice_published_20141023
|
Notice
|
|
2014-10-23
|
2014-10-23
|
EB-2014-0096
|
Lod_Niagara Peninsula_20141022
|
Letter of Direction
|
2014-10-22
|
|
2014-10-22
|
EB-2014-0096
|
Notice_NiagaraPeninsula_unpublished_20141022
|
Notice
|
2014-10-22
|
|
2014-10-22
|
EB-2014-0096
|
ack_ltr_Peninsula_20140930
|
Acknowledgement Letter
|
2014-09-30
|
|
2014-09-30
|
EB-2014-0096
|
NPEI_DSP - OPA Letter of Comment_20140924.pdf
|
Comments
|
|
2014-09-24
|
2014-09-24
|
EB-2014-0096
|
Niagara_appl_CoS_Test_year_income_Tax_PILs_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Weather Normalization Regression_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Rev_Reqt_Work_Form_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_RTSR Model_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_DSP_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 9_Deferral and Variance_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 8_Rate Design_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Cost Allocation Model_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_EDDVAR_Continuity Sched_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 7_Cost Allocation_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 6_Revenue Requirement_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 5_Cost of Capital_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 4_Operating Costs_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 3_Operating Revenue_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_Exhibit 2_Rate Base_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
Niagara_appl_CoS_chapter 2_20140923
|
Application and Evidence
|
|
2014-09-23
|
2014-09-23
|
EB-2014-0096
|
NPEI_Ltr_Delay in Filing_20140819
|
Correspondence
|
|
2014-08-19
|
2014-08-19
|