Search Results for: Records - Case Number=EB-2023-0052 - 139 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2023-0052 | dec_order_Cost Awards_Synergy_20240425_eSigned | Decision and Order on Cost Awards | Synergy North Corporation - Electricity Distributor | 2024-04-25 | 2024-04-25 | |
EB-2023-0052 | AMPCO_Cost Claim_20240416 | Cost Claim | Synergy North Corporation - Electricity Distributor | 2024-04-16 | 2024-04-16 | |
EB-2023-0052 | VECC_Cost Claim_20240416 | Cost Claim | Synergy North Corporation - Electricity Distributor | 2024-04-16 | 2024-04-16 | |
EB-2023-0052 | CCC_Cost Claim_20240416 | Cost Claim | Synergy North Corporation - Electricity Distributor | 2024-04-16 | 2024-04-16 | |
EB-2023-0052 | SEC_Cost Claim_20240416 | Cost Claim | Synergy North Corporation - Electricity Distributor | 2024-04-16 | 2024-04-16 | |
EB-2023-0052 | Synergy North_Cost acceptance letter_20240411 | Cost Claim Objection | Synergy North Corporation - Electricity Distributor | 2024-04-11 | 2024-04-11 | |
EB-2023-0052 | dec_rate_order_Synergy North_20240328_eSigned | Decision; Rate Order | Synergy North Corporation - Electricity Distributor | 2024-03-28 | 2024-03-28 | |
EB-2023-0052 | OEB_Staff_Letter_Synergy North_20240229 | Correspondence | Synergy North Corporation - Electricity Distributor | 2024-02-29 | 2024-02-29 | |
EB-2023-0052 | SNC_2024_Tariff_Sheet_20240201_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | SNC_2024_Rev Reqt Workform_20240201_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | TB_2024_Tariff_Schedule_and_Bill_Impact_Model_Update_20231110_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | TB_2024_Tariff_Schedule_and_Bill_Impact_Model_20240201_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | SNC_Revised_Settlement_ Proposal_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | SNC_Letter_Settlement Proposal Corrections_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | KN_2024_Tariff_Schedule_and_Bill_Impact_Model_Update_20231110_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | KN_2024_Tariff_Schedule_and_Bill_Impact_Model_20240218 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2024-02-18 | 2024-02-18 | |
EB-2023-0052 | OEB_Staff_Submission_Synergy North_20240115 | Submission | Synergy North Corporation - Electricity Distributor | 2024-01-15 | 2024-01-15 | |
EB-2023-0052 | TB_2024_DVA Continuity Schedule_CoS_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024_Rev Reqt Workform_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024 Cost Allocated Model_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024_Chapter2_Appendices_Settlement_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024_Benchmarking Spreadsheet Forecast Model_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | KN_2024_Tariff Schedule_Bill Impact Model_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | KN_2024_DVA Continuity Schedule_CoS_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024_RTSR Workform_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | TB_2024_Tariff Schedule_Bill Impact Model_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024_Test year Income Tax PILs_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024 Tariff Sheet_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024 Tariff Sheet_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024_Load Forecast_Settlement_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_2024_DVA Continuity Schedule_CoS_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_SettlementP_CoS_20231222 | Settlement Proposal | Synergy North Corporation - Electricity Distributor | 2023-12-22 | 2023-12-22 | |
EB-2023-0052 | SNC_Response to Letter of Comment_J Jonassen_20231214 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-12-21 | 2023-12-21 | |
EB-2023-0052 | OEB ltr_granting extension_Synergy North_20231215_eSigned | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-12-15 | 2023-12-15 | |
EB-2023-0052 | SNC_Request for Extension_20231214 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-12-14 | 2023-12-14 | |
EB-2023-0052 | J Jonassen_Ltr Comment_Redacted_20231211 | Letter of Direction | Synergy North Corporation - Electricity Distributor | 2023-12-11 | 2023-12-11 | |
EB-2023-0052 | SNC_Ltr_to_OEB_Settlement_20231122 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-11-22 | 2023-11-22 | |
EB-2023-0052 | TB_2024_Tariff_Schedule_and_Bill_Impact_Model__20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | TB_2024_DVA_Continuity_Schedule_CoS_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_Response to Letter of Comment_A Huzan_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 9_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 7_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 6_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 5_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 4_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 2_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 1_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2024_Revenue Requirement Workform_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2024_Load Forecast_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2024_DVA_Continuity_Schedule_CoS_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_7-Staff-59 Att. 2 (CA Model with old profiles)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_7-Staff-59 Att. 1 (Updated 2004 load profiles)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_3-VECC-34 Att. 5 (Load Forecast CDM Update)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_3-VECC-34 Att. 3 (CDM Results 2020-2022)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | TB_2024_Tariff_Sheet_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | TB_2024_Tariff_Sheet_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_Response to Letter of Comment_TW Jewell_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_Response to Letter of Comment_T Jewell_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_Response to Letter of Comment_R Mancuso_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 8_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_Exhibit 3_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_IRR_cvltr_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2024_Test_year_Income_Tax_PILs_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2024_RTSR_Workform_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2024_Cost_Allocation_Model_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2024_Chapter2_Appendices_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_4-AMPCO-27 Revised Appendix 2K_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_3-VECC-24 (TB GSlt50 2023 actuals)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_3-VECC-22 (KN Res 2023 actuals)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_3-VECC-19 (TB Res 2023 actuals)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2-AMPCO-5 - 2AA (In-Service Basis)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | KN_2024_Tariff_Schedule_and_Bill_Impact_Model_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_3-VECC-34 Att. 2 (KN LRAMVA)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_3-VECC-34 Att. 1 (TB LRAMVA)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2-SEC-18 - 2AA Forecast_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2-SEC-16 - 2-AB ( In-Service Basis)_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | SNC_2-SEC-10 - DSP Tabular Form of Health Index_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | KN_2024_Tariff_Sheet_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | KN_2024_Tariff_Sheet_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | KN_2024_DVA_Continuity_Schedule_CoS_20231110 | Interrogatory Response from Applicant | Synergy North Corporation - Electricity Distributor | 2023-11-10 | 2023-11-10 | |
EB-2023-0052 | AMPCO_IR_SNC_20231020 | Interrogatories to Applicant | Synergy North Corporation - Electricity Distributor | 2023-10-23 | 2023-10-23 | |
EB-2023-0052 | VECC_IR_SynergyNorth_20231020 | Interrogatories to Applicant | Synergy North Corporation - Electricity Distributor | 2023-10-20 | 2023-10-20 | |
EB-2023-0052 | SEC_IR_SNC_20231020 | Interrogatories to Applicant | Synergy North Corporation - Electricity Distributor | 2023-10-20 | 2023-10-20 | |
EB-2023-0052 | CCC_IRs_SNC_2024_20231020 | Interrogatories to Applicant | Synergy North Corporation - Electricity Distributor | 2023-10-20 | 2023-10-20 | |
EB-2023-0052 | OEBstaff_IRs_Synergy North_20231020 | Interrogatories to Applicant | Synergy North Corporation - Electricity Distributor | 2023-10-20 | 2023-10-20 | |
EB-2023-0052 | decision_Issues List_Synergy North_20231013_eSigned | Decision | Synergy North Corporation - Electricity Distributor | 2023-10-13 | 2023-10-13 | |
EB-2023-0052 | OEB Staff_Letter_Proposed Issues List_Synergy North_20231004 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-10-04 | 2023-10-04 | |
EB-2023-0052 | PO 1_Synergy North_20230927_eSigned | Procedural Order | Synergy North Corporation - Electricity Distributor | 2023-09-27 | 2023-09-27 | |
EB-2023-0052 | CCC_IntrvREQ_20230925 | Intervenor Request Letter | Synergy North Corporation - Electricity Distributor | 2023-09-25 | 2023-09-25 | |
EB-2023-0052 | AMPCO_IntrvREQ_20230925 | Intervenor Request Letter | Synergy North Corporation - Electricity Distributor | 2023-09-25 | 2023-09-25 | |
EB-2023-0052 | VECC_IntrvREQ_20230925 | Intervenor Request Letter | Synergy North Corporation - Electricity Distributor | 2023-09-25 | 2023-09-25 | |
EB-2023-0052 | SNC_Exhibit _2_Updated_20230921 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-09-22 | 2023-09-22 | |
EB-2023-0052 | KN_2024_GA_Analysis_Workform_Updated_20230921 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-09-22 | 2023-09-22 | |
EB-2023-0052 | TB_2024_GA_Analysis_Workform_Updated_20230921 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-09-22 | 2023-09-22 | |
EB-2023-0052 | SNC_Exhibit_1_Updated_20230921 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-09-22 | 2023-09-22 | |
EB-2023-0052 | Synergy North_Error Checking_Responses_OEB_20230923 | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-09-22 | 2023-09-22 | |
EB-2023-0052 | SEC_IntrvREQ_20230920 | Intervenor Request Letter | Synergy North Corporation - Electricity Distributor | 2023-09-20 | 2023-09-20 | |
EB-2023-0052 | R Mancuso_ltr Comment_Redacted_20230914 | Letter of Comment | Synergy North Corporation - Electricity Distributor | 2023-09-14 | 2023-09-14 | |
EB-2023-0052 | TW Jewell_ltr Comment_Redacted_20230914 | Letter of Comment | Synergy North Corporation - Electricity Distributor | 2023-09-14 | 2023-09-14 | |
EB-2023-0052 | T Jewell_ltr Comment_Redacted_20230914 | Letter of Comment | Synergy North Corporation - Electricity Distributor | 2023-09-14 | 2023-09-14 | |
EB-2023-0052 | A Huzan_ltr Comment_Redacted_20230914 | Letter of Comment | Synergy North Corporation - Electricity Distributor | 2023-09-14 | 2023-09-14 | |
EB-2023-0052 | SNC_Affidavit_20230913 | Affidavits of Service | Synergy North Corporation - Electricity Distributor | 2023-09-13 | 2023-09-13 | |
EB-2023-0052 | Notice_Synergy North_20230906 | Notice | Synergy North Corporation - Electricity Distributor | 2023-09-06 | 2023-09-06 | |
EB-2023-0052 | LoD_Synergy North_20230906_eSigned | Letter of Direction | Synergy North Corporation - Electricity Distributor | 2023-09-06 | 2023-09-06 | |
EB-2023-0052 | OEB_Completeness_Letter_Synergy North_2024 CoS Appl_20230830_eSigned | Correspondence | Synergy North Corporation - Electricity Distributor | 2023-08-30 | 2023-08-30 | |
EB-2023-0052 | ack ltr_Synergy North_20230818_eSigned | Acknowledgement Letter | Synergy North Corporation - Electricity Distributor | 2023-08-18 | 2023-08-18 | |
EB-2023-0052 | SNC_TB_2024_GA_Analysis_Workform_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_TB_2024_DVA_Continuity_Schedule_CoS_20230816.xlsb | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_TB_2023_Tariff_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Tariff_of_Rates_and_Charges_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit_4_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit _9_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit _5_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit _2_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Test_year_Income_Tax_PILs_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Revenue Requirement Workform_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Load_Profile_Derivation_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_DVA_Continuity_Schedule_CoS_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_TB_2024_Tariff_Schedule_and_Bill_Impact_Model__20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_TB_2023_Tariff_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Tariff_of_Rates_and_Charges_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit_8_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit_1_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit _7_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit _6_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_Exhibit _3_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_RTSR_Workform_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Load Forecast_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Cost_Allocation_Model_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024 COS Checklist_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024 COS Checklist_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_KN_2024_Tariff_Schedule_and_Bill_Impact_Model_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_KN_2023_Tariff_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Chapter2_Appendices_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Chapter 2 Appendices_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_2024_Benchmarking_Spreadsheet_Forecast_Model_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_KN_2024_GA_Analysis_Workform_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_KN_2024_DVA_Continuity_Schedule_CoS_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
EB-2023-0052 | SNC_KN_2023_Tariff_20230816 | Application and Evidence | Synergy North Corporation - Electricity Distributor | 2023-08-16 | 2023-08-16 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |