EB-2014-0101
|
DecOrder_Cost Awards_Oshawa_corrected_20160203
|
Decision and Order on Cost Awards
|
2016-02-03
|
|
2016-02-03
|
EB-2014-0101
|
EP_CostClaim_Oshawa PUC_Randy Aiken Hotel Receipt_20160116
|
Cost Claim
|
|
2016-06-16
|
2016-06-16
|
EB-2014-0101
|
GOCC_CostClaimObjectionReply_Ltr_Oshawa_20160126
|
Cost Claim Objection Reply
|
|
2016-01-26
|
2016-01-26
|
EB-2014-0101
|
VECC_CostClaimObjectionReply_Oshawa_20150116
|
Cost Claim Objection Reply
|
|
2016-01-15
|
2016-01-15
|
EB-2014-0101
|
Oshawa_CostClaim_Comments_20160114
|
Cost Claim Objection Reply
|
|
2016-01-14
|
2016-01-14
|
EB-2014-0101
|
EP_CostClaim_Oshawa_Additional_Executed Affidavit - Aiken Hotel Receipt June 1-3_20160113
|
Cost Claim
|
|
2016-01-13
|
2016-01-13
|
EB-2014-0101
|
EP_CostClaim_Oshawa_Receipt_June 3 Pickle Barrel_20160113
|
Cost Claim
|
|
2016-01-13
|
2016-01-13
|
EB-2014-0101
|
GOCC_CostClaim_Oshawa_20160113
|
Cost Claim
|
|
2016-01-13
|
2016-01-13
|
EB-2014-0101
|
EP_CostClaim_Oshawa_20160110
|
Cost Claim
|
|
2016-01-11
|
2016-01-11
|
EB-2014-0101
|
VECC_Cost Claim_Oshawa_20160108
|
Cost Claim
|
|
2016-01-08
|
2016-01-08
|
EB-2014-0101
|
CCC_CostClaim_Oshawa_20160107
|
Cost Claim
|
|
2016-01-07
|
2016-01-07
|
EB-2014-0101
|
Final Rate Order_Oshawa_Custom IR_20151222
|
Rate Order
|
2015-12-22
|
|
2015-12-22
|
EB-2014-0101
|
SEC_CostClaim_Oshawa_20151222
|
Cost Claim
|
|
2015-12-22
|
2015-12-22
|
EB-2014-0101
|
OPUCN_Chapter2_Appendices_for 2015 to 2019_RUN_6_20151207
|
Draft Rate Order
|
|
2015-12-07
|
2015-12-07
|
EB-2014-0101
|
OPUCN_Chapter2_Appendices - Tab 2-PA for 2017 to 2019_20151207
|
Draft Rate Order
|
|
2015-12-07
|
2015-12-07
|
EB-2014-0101
|
Draft Rate Order_Oshawa_20151207
|
Draft Rate Order
|
|
2015-12-07
|
2015-12-07
|
EB-2014-0101
|
EnergyProbe_SUB_DRO_Oshawa_20151201
|
Submission
|
|
2015-12-01
|
2015-12-01
|
EB-2014-0101
|
EnergyProbe_SUB_Ltr_DRO_Oshawa_20151201
|
Submission
|
|
2015-12-01
|
2015-12-01
|
EB-2014-0101
|
OEB Staff_Comments_Oshawa_DraftRateOrder_20151130
|
Correspondence
|
2015-11-30
|
|
2015-11-30
|
EB-2014-0101
|
EB-2014-0101_OPUCN_ 2016_EDDVAR_Continuity_Schedule_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_2015_Weather Normalization Regression Model_Draft Rate Order_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Chapter2_Appendices_for 2015 to 2019_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Detailed_CA_model_2015_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Detailed_CA_model_2016_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Detailed_CA_model_2017_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Detailed_CA_model_2018_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Detailed_CA_model_2019_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_PILs Workform 2015_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_PILs Workform 2016_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_PILs Workform 2017_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_PILs Workform 2018_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_PILs Workform 2019_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_2015_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_2016_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_2017_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_2018_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_2019_RUN_6_xlsm_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
OPUCN_Draft Rate Order_20151123
|
Draft Rate Order
|
|
2015-11-23
|
2015-11-23
|
EB-2014-0101
|
dec_order_Oshawa PUC_20151112
|
Decision and Order
|
2015-11-12
|
|
2015-11-12
|
EB-2014-0101
|
OPUCN_ReplyARG_20150814
|
Applicant Reply Argument
|
|
2015-08-17
|
2015-08-17
|
EB-2014-0101
|
OEB_Email_Oshawa_Reply to REQ for Extension Final ARG_20150811
|
Correspondence
|
2015-08-11
|
|
2015-08-11
|
EB-2014-0101
|
OPUCN_LTR_Request for Brief Extension re Reply Argument_20150811
|
Correspondence
|
|
2015-08-11
|
2015-08-11
|
EB-2014-0101
|
CCC_ARG_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
VECC_ARG_OPCUN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
Energy Probe_ARG_Appendix B_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
Energy Probe_ARG_Appendix A-2_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
Energy Probe_ARG_Appendix A-1_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
Energy Probe_ARG_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
Energy Probe_ARG Ltr_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
SEC_ARG_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
GOCC_ARG_OPUCN_20150724
|
Intervenor Argument
|
|
2015-07-24
|
2015-07-24
|
EB-2014-0101
|
OEB Staff_ARG_OPUCN_Custom IR_20150717
|
Argument
|
2015-07-17
|
2015-07-17
|
2015-07-17
|
EB-2014-0101
|
OEB Staff_CvrLtr_Staff ARG_OPUCN_Custom IR_20150717
|
Argument
|
2015-07-17
|
2015-07-17
|
2015-07-17
|
EB-2014-0101
|
OPUCN_ARGChief_20150715
|
Applicant Argument in Chief
|
|
2015-07-15
|
2015-07-15
|
EB-2014-0101
|
Ex K4-1_Oral Hearing Exhibits_OPUCN_Rate Appl Updates - Revenue Req Impacts_20150709
|
Exhibits
|
|
2015-07-09
|
2015-07-09
|
EB-2014-0101
|
Transcript_Oral Hearing_Vol 4_Oshawa_20150709
|
Transcripts
|
|
2015-07-09
|
2015-07-09
|
EB-2014-0101
|
Ex J1-2 updated and uncorrected J2-11_OPUCN_undertaking responses_20150708
|
Undertaking Responses
|
|
2015-07-08
|
2015-07-08
|
EB-2014-0101
|
Ex J2-11_Corrected_OPUCN_Undertaking Response_20150708
|
Undertaking Responses
|
|
2015-07-08
|
2015-07-08
|
EB-2014-0101
|
Ex J1-1_J2-1-J2-10_ J2-12_J3-1 to J3-5_OPCN_Undertaking Responses_20150708
|
Undertaking Responses
|
|
2015-07-08
|
2015-07-08
|
EB-2014-0101
|
Ex 1_Tab H_Sch 3_OPUCN_Affidavit_Form A_CV_David Shpigler_20150707
|
Exhibits
|
|
2015-07-07
|
2015-07-07
|
EB-2014-0101
|
Ex 1_Tab H_Sch 1_OPUCN_Expert Affidavit_Form A_CV_Sid Ridgley_20150706
|
Application and Evidence
|
|
2015-07-06
|
2015-07-06
|
EB-2014-0101
|
Ex 1_Tab H_Sch 5_OPUCN_Affidavit_Form A_CV_Nick Brkic_20150706
|
Exhibits
|
|
2015-07-06
|
2015-07-06
|
EB-2014-0101
|
Ex K3-4_VECC_Oral Hearing Exhibits_OPUCN_Panel 3 VECC Cross-Examination Compendium_20150703
|
Exhibits
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Ex K3-3_VECC_Oral Hearing Exhibits_OPUCN_June 23rd update 2015-2019 CDM program impacts growth_July 2_scanned_20150703
|
Exhibits
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Ex K3-2_GOCC_Oral Hearing Exhibits_OPUCN_Document Aiding Cross-Examination on Long Term Debt_scanned_20150703
|
Exhibits
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Ex K3-1_SEC_Oral Hearing Exhibits_Cross-Examination Compendium_scanned_20150703
|
Exhibits
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Transcript_Oral Hearing_Vol 3_Oshawa_20150703
|
Transcripts
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Ex 1_Tab H_Sch 2_OPUCN_Affidavit_Form A_CV_Shawn Otal_20150703
|
Application and Evidence
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Ex 1_Tab H_Sch 4_OPUCN_Affidavit_Form A_CV_Mark Lowry_20150703
|
Application and Evidence
|
2015-07-03
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Ex J2_10_OPUCN_Undertaking Response_20150703
|
Undertaking Responses
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Ex J1-3_OPUCN_Undertaking Response_20150703
|
Undertaking Responses
|
|
2015-07-03
|
2015-07-03
|
EB-2014-0101
|
Transcript_Oral Hearing_Vol 2_Oshawa_20150702
|
Transcripts
|
|
2015-07-02
|
2015-07-02
|
EB-2014-0101
|
Ex J1-4_OPUCN_OH Undertaking Response_20150702
|
Undertaking Responses
|
|
2015-07-02
|
2015-07-02
|
EB-2014-0101
|
Ex J1-2_OPUCN_OH Undertaking Response_20150702
|
Undertaking Responses
|
|
2015-07-02
|
2015-07-02
|
EB-2014-0101
|
TC 2-9_OPUCN_Updated Undertaking Response_20150702
|
Undertaking Responses
|
|
2015-07-02
|
2015-07-02
|
EB-2014-0101
|
Ex K2-2_Oral Hearing Exhibits_OEB Staff summary tables Adjusted_2015702
|
Exhibits
|
|
2015-07-02
|
2015-07-02
|
EB-2014-0101
|
Ex K2-3_Oral Hearing Exhibits_OEB_PowerStream_EB-2015-0003 EP-6 OM and growth_20150702
|
Exhibits
|
|
2015-07-02
|
2015-07-02
|
EB-2014-0101
|
Ex K2-1_Oral Hearing Exhibits_OPUCN_Load Customer Forecast June 30 2015_20150702
|
Exhibits
|
|
2015-07-02
|
2015-07-02
|
EB-2014-0101
|
Ex K1-3_Oral Hearing Exhibits_OPUCN_SEC Cross-Examination Compendium_scanned_20150630
|
Exhibits
|
|
2015-06-30
|
2015-06-30
|
EB-2014-0101
|
Ex K1-6_Oral Hearing Exhibits_OPUCN_VECC Compendium No 2_scanned_20150630
|
Exhibits
|
|
2015-06-30
|
2015-06-30
|
EB-2014-0101
|
Ex K1-5_Oral Hearing Exhibits_OPUCN_VECC_Compendium_No 1_scanned_20150630
|
Exhibits
|
|
2015-06-30
|
2015-06-30
|
EB-2014-0101
|
Ex K1-4_Oral Hearing Exhibits_OPUCN_Energy Probe Cross Examination Compendium_scanned_20150630
|
Exhibits
|
|
2015-06-30
|
2015-06-30
|
EB-2014-0101
|
Ex K1-2_Oral Hearing Exhibits_OPUCN_LTR_June_23_Updates to Models re IRR_20150623_20150630
|
Exhibits
|
|
2015-06-30
|
2015-06-30
|
EB-2014-0101
|
Ex K1-1_Oral Hearing Exhibits_OPUCN_IRR_Ltr_updated spreadsheets_20150513_20150630
|
Exhibits
|
|
2015-06-30
|
2015-06-30
|
EB-2014-0101
|
Ex K_exhibit_list_Oral Hearing_OPUCN_updated_20150709
|
Exhibit List
|
|
2015-07-09
|
2015-07-09
|
EB-2014-0101
|
Ex J_undertaking_list_Oral Hearing_OSHAWA_EB-2014-0101_20150709
|
Undertaking List
|
|
2015-07-09
|
2015-07-09
|
EB-2014-0101
|
Transcript_Oral Hearing_Vol 2_Oshawa_20150630
|
Transcripts
|
|
2015-06-30
|
2015-06-30
|
EB-2014-0101
|
GOCC_Ltr_Attach_IO Lending Rates LDC_20150629
|
Correspondence
|
|
2015-06-29
|
2015-06-29
|
EB-2014-0101
|
GOCC_Ltr_Attach_Aid to Cross Examination_20150629
|
Correspondence
|
|
2015-06-29
|
2015-06-29
|
EB-2014-0101
|
GOCC_Ltr_Aid to Cross Exam_IO Lending Rates_20150629
|
Correspondence
|
|
2015-06-29
|
2015-06-29
|
EB-2014-0101
|
Ex 1_Tab A_Exhibit List_Updated_Oshawa_20150629
|
Exhibit List
|
|
2015-06-29
|
2015-06-29
|
EB-2014-0101
|
Ex 1_Tab A_Exhibit List_Updated_Oshawa_20150629
|
Application and Evidence
|
|
2015-06-29
|
2015-06-29
|
EB-2014-0101
|
Ex 1_Tab H_Sch 6_Form A_CV_Chris Stepanuik_Oshawa_20150629
|
Application and Evidence
|
|
2015-06-29
|
2015-06-29
|
EB-2014-0101
|
OPUCN_CvrLtr_Updated Exhibit List_Expert Affidavits_Form As and CVs_20150629
|
Correspondence
|
|
2015-06-29
|
2015-06-29
|
EB-2014-0101
|
EnergyProbe_Compendium_Oshawa_20150627
|
Correspondence
|
|
2015-06-27
|
2015-06-27
|
EB-2014-0101
|
EnergyProbe_Ltr_Compendium_Oshawa_20150627
|
Correspondence
|
|
2015-06-27
|
2015-06-27
|
EB-2014-0101
|
OPUCN_Detailed_CA_model_2019_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-24
|
2015-06-24
|
EB-2014-0101
|
OPUCN_Detailed_CA_model_2018_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-24
|
2015-06-24
|
EB-2014-0101
|
OPUCN_Detailed_CA_model_2017_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-24
|
2015-06-24
|
EB-2014-0101
|
OPUCN_Detailed_CA_model_2016_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-24
|
2015-06-24
|
EB-2014-0101
|
OPUCN_Detailed_CA_model_2015_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-24
|
2015-06-24
|
EB-2014-0101
|
OPUCN_Rev_Reqt_Work_Form_V4_2019_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_Rev_Reqt_Work_Form_V4_2018_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_Rev_Reqt_Work_Form_V4_2017_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_Rev_Reqt_Work_Form_V4_2016_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_Rev_Reqt_Work_Form_V4_2015_RUN_4_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_PILs Workform 2019_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_PILs Workform 2018_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_PILs Workform 2017_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_PILs Workform 2016_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_PILs Workform 2015_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_Weather Normalization Regression Model_RUN_4_xlsx_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_Chapter2_Appendices_for 2015 to 2019_RUN_4_xlsm_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
OPUCN_LTR_June_23_Updates to Models re IRR_20150623
|
Application and Evidence
|
|
2015-06-23
|
2015-06-23
|
EB-2014-0101
|
PO4_Oshawa_20150616
|
Procedural Order
|
2015-06-16
|
|
2015-06-16
|
EB-2014-0101
|
OPUCN_LTR_Issues for Oral Hearing_20150609
|
Correspondence
|
|
2015-06-09
|
2015-06-09
|
EB-2014-0101
|
OPUCN_Ltr_Outcome of Settlement Conference_20150605
|
Correspondence
|
|
2015-06-05
|
2015-06-05
|
EB-2014-0101
|
Decision on Issues List_PO3_Oshawa PUC_20150601
|
Decision
|
2015-06-01
|
|
2015-06-01
|
EB-2014-0101
|
Decision on Issues List_PO3_Oshawa PUC_20150601
|
Procedural Order
|
2015-06-01
|
|
2015-06-01
|
EB-2014-0101
|
Ex TC 2-4_UR_OPUCN_TC2-4_Updated_20150528
|
Undertaking Responses
|
|
2015-05-29
|
2015-05-29
|
EB-2014-0101
|
Ex TC 2-1 to 2-11_UR_OPUCN_Day2_20150528
|
Undertaking Responses
|
|
2015-05-28
|
2015-05-28
|
EB-2014-0101
|
Ex TC 1-1 to 1-21_UR_OPUCN_Day1_20150528
|
Undertaking Responses
|
|
2015-05-28
|
2015-05-28
|
EB-2014-0101
|
Ex TC exhibit_undertaking_list_May 21-22_OSHAWA_updated_20150528
|
Undertaking List
|
|
2015-05-26
|
2015-05-26
|
EB-2014-0101
|
TC_UR_OPUCN_Chapter2_Appendices_for 2015 to 2019_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Detailed_CA_model_2015_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Detailed_CA_model_2016_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Detailed_CA_model_2017_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Detailed_CA_model_2018_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Detailed_CA_model_2019_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_PILs Workform 2015_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCNTC_PILs Workform 2016_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_PILs Workform 2017_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_PILs Workform 2018_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_PILs Workform 2019_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Rev_Reqt_Work_Form_V4_2015_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Rev_Reqt_Work_Form_V4_2016_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Rev_Reqt_Work_Form_V4_2017_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Rev_Reqt_Work_Form_V4_2018_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_Rev_Reqt_Work_Form_V4_2019_RUN_3_xlsm_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC1-7_UR_Oshawa_Response to TC1_7_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC1-9_UR_Oshawa_Response to TC1_9_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC1-10_UR_OshawaResponse to TC1_10_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC1-13_UR_Oshawa_Response to TC1_13_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC2-4_UR_Oshawa_Response to TC2_4_PEG Rates_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC2-5_UR_Oshawa_Response to TC2_5_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC2-6_UR_Oshawa_Response to TC2_6_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_TC1_17 Table 4_4 Excel Workbook_xlsx_20150528
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
TC_UR_OPUCN_2015_Weather Normalization Regression Model_RUN_3_xlsx_20150527
|
Undertaking Responses
|
|
2015-05-27
|
2015-05-27
|
EB-2014-0101
|
OEB Staff_Proposed Draft Issues List_CvrLtr_Oshawa_20150526
|
Correspondence
|
|
2015-05-26
|
2015-05-26
|
EB-2014-0101
|
OEB Staff_Proposed Draft Issues List_Oshawa_20150526
|
Correspondence
|
|
2015-05-26
|
2015-05-26
|
EB-2014-0101
|
Transcripts_Technical Conference_Day 2_Oshawa_20150522
|
Transcripts
|
|
2015-05-22
|
2015-05-22
|
EB-2014-0101
|
Transcripts_Technical Conference_Day 1_Oshawa_20150521
|
Transcripts
|
|
2015-05-21
|
2015-05-21
|
EB-2014-0101
|
REDACTED_OEB EMAIL_OSHAWA_EB-2014-010_TechConference_20150520
|
Correspondence
|
2015-05-20
|
2015-05-20
|
2015-05-20
|
EB-2014-0101
|
OEB Staff_Ltr_Oshawa_Topics Technical Conference_20150519
|
Correspondence
|
2015-05-19
|
2015-05-19
|
2015-05-19
|
EB-2014-0101
|
SEC_EMAIL_Topics TC_OSHAWA_20150519
|
Correspondence
|
|
2015-05-19
|
2015-05-19
|
EB-2014-0101
|
VECC_Topics and additional TCQs_Oshawa_20150519
|
Correspondence
|
|
2015-05-19
|
2015-05-19
|
EB-2014-0101
|
EnergyProbe_EMAIL_Additional Note_OSHAWA_TC Topics_20150519
|
Correspondence
|
|
2015-05-19
|
2015-05-19
|
EB-2014-0101
|
GOCC_LTR_Technical Conference Topics_20150519
|
Correspondence
|
|
2015-05-19
|
2015-05-19
|
EB-2014-0101
|
CCC_Ltr_TC Topic Areas for Questions May 21_20150517
|
Correspondence
|
|
2015-05-17
|
2015-05-17
|
EB-2014-0101
|
Oshawa_EMAIL_TC_20150514
|
Correspondence
|
|
2015-05-14
|
2015-05-14
|
EB-2014-0101
|
OEB_Ltr_Oshawa_Technical Conference May 21_20150514
|
Correspondence
|
2015-05-14
|
|
2015-05-14
|
EB-2014-0101
|
IRR_6_updated_EB-2014-0101_OPUCN_2015_RTSR_Model_V4_RUN2_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_5_updated_EB-2014-0101_2015_Weather_Normalization_Regression_Model_RUN2_xlsx_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_4_updated_EB-2014-0101_OPUCN_Chapter2_Appendices_for 2015 to 2019_RUN2_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_3_updated_EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_RUN2_2015_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_3_updated_EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_RUN2_2015_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_3_updated_EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_RUN2_2015_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_3_updated_EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_RUN2_2015_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_3_updated_EB-2014-0101_OPUCN_Rev_Reqt_Work_Form_V4_RUN2_2015_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_2_updated_EB-2014-0101_OPUCN_PILs Workform 2019_RUN2_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_2_updated_EB-2014-0101_OPUCN_PILs Workform 2018_RUN2_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_2_updated_EB-2014-0101_OPUCN_PILs Workform 2017_RUN2_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_2_updated_EB-2014-0101_OPUCN_PILs Workform 2016_RUN2_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_2_updated_EB-2014-0101_OPUCN_PILs Workform 2015_RUN2_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_1_updated_EB-2014-0101_OPUCN_Detailed_CA_model_RUN2_2019_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_1_updated_EB-2014-0101_OPUCN_Detailed_CA_model_RUN2_2018_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_1_updated_EB-2014-0101_OPUCN_Detailed_CA_model_RUN2_2017_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_1_updated_EB-2014-0101_OPUCN_Detailed_CA_model_RUN2_2016_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
IRR_1_updated_EB-2014-0101_OPUCN_Detailed_CA_model_RUN2_2015_xlsm_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-13
|
2015-05-13
|
EB-2014-0101
|
OPUCN_IRR_Ltr_updated spreadsheets_20150513
|
Interrogatory Response from Applicant
|
|
2015-05-14
|
2015-05-14
|
EB-2014-0101
|
OPUCN_Ex 10_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 9_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 8_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 7_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 6_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 5_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 4_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 3_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 2_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_Ex 1_IRR_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
OPUCN_IRR_CovLtr_20150508
|
Interrogatory Response from Applicant
|
|
2015-05-08
|
2015-05-08
|
EB-2014-0101
|
PO2_Oshawa_COS 2015-2019_20150506
|
Procedural Order
|
2015-05-06
|
|
2015-05-06
|
EB-2014-0101
|
SEC_Ltr_OPUCN_Schedule_20150505
|
Correspondence
|
2015-05-04
|
2015-05-05
|
2015-05-04
|
EB-2014-0101
|
OPUCN_LTR_Request for Extension re IRRs_20150505
|
Correspondence
|
|
2015-05-05
|
2015-05-05
|
EB-2014-0101
|
EnergyProbe_Ltr_Oshawa CustomIR_Schedule_20150504
|
Correspondence
|
|
2015-05-04
|
2015-05-04
|
EB-2014-0101
|
OPUCN_LTR_Request for Extension re IRR_20150504
|
Correspondence
|
|
2015-05-04
|
2015-05-04
|
EB-2014-0101
|
GOCC_IR_Oshawa PUC_20150420
|
Interrogatories to Applicant
|
|
2015-04-20
|
2015-04-20
|
EB-2014-0101
|
CCC_IR_Oshawa_MSWord_20150420
|
Interrogatories to Applicant
|
|
2015-04-20
|
2015-04-20
|
EB-2014-0101
|
CCC_IR_Oshawa_20150420
|
Interrogatories to Applicant
|
|
2015-04-20
|
2015-04-20
|
EB-2014-0101
|
CCC_IR_CvrLtr_Oshawa_20150420
|
Interrogatories to Applicant
|
|
2015-04-20
|
2015-04-20
|
EB-2014-0101
|
VECC_IR_Oshawa_20150420
|
Interrogatories to Applicant
|
|
2015-04-20
|
2015-04-20
|
EB-2014-0101
|
SEC_IR_8-SEC-38_Oshawa_xlsx_20150417
|
Interrogatories to Applicant
|
|
2015-04-17
|
2015-04-17
|
EB-2014-0101
|
SEC_IR_Oshawa_MSWord_20150417
|
Interrogatories to Applicant
|
|
2015-04-17
|
2015-04-17
|
EB-2014-0101
|
SEC_IR_Oshawa_20150417
|
Interrogatories to Applicant
|
|
2015-04-17
|
2015-04-17
|
EB-2014-0101
|
OEB Staff_IR_CvrLtr_Oshawa_20150416
|
Interrogatories to Applicant
|
2015-04-16
|
2015-04-16
|
2015-04-16
|
EB-2014-0101
|
OEB Staff_IR_Oshawa PUC_5 yr Dx Rates_20150416
|
Interrogatories to Applicant
|
2015-04-16
|
2015-04-16
|
2015-04-16
|
EB-2014-0101
|
EnergyProbe_IR_Oshawa_MSWord_20150415
|
Interrogatories to Applicant
|
|
2015-04-15
|
2015-04-15
|
EB-2014-0101
|
EnergyProbe_IR_Oshawa_20150415
|
Interrogatories to Applicant
|
|
2015-04-15
|
2015-04-15
|
EB-2014-0101
|
EnergyProbe_IR_CvrLtr_Oshawa Custom IR_20150415
|
Interrogatories to Applicant
|
|
2015-04-15
|
2015-04-15
|
EB-2014-0101
|
GOCC_Ltr_Counsel Retained_Oshawa_20150407
|
Correspondence
|
|
2015-04-07
|
2015-04-07
|
EB-2014-0101
|
OPUCN_OEB Presentation_20150401
|
Correspondence
|
|
2015-04-01
|
2015-04-01
|
EB-2014-0101
|
OEB_Ltr_Oshawa Application Presentation_20150331
|
Correspondence
|
2015-03-31
|
2015-03-31
|
2015-03-31
|
EB-2014-0101
|
OPUCN_LTR_Presentation_20150331
|
Correspondence
|
|
2015-03-31
|
2015-03-31
|
EB-2014-0101
|
Applicant Intervenor List_Oshawa_updated_20150407
|
Intervenor List
|
|
2015-04-16
|
2015-04-16
|
EB-2014-0101
|
PO1_Oshawa_20150320_corrected_20150323
|
Procedural Order
|
2015-03-23
|
|
2015-03-23
|
EB-2014-0101
|
GOCC_IntrvREQ_Oshawa_20150309
|
Intervenor Request Letter
|
|
2015-03-09
|
2015-03-09
|
EB-2014-0101
|
CCC_IntrvREQ_Oshawa_20150303
|
Intervenor Request Letter
|
|
2015-03-03
|
2015-03-03
|
EB-2014-0101
|
Oshawa_Affidavit of Service_Published Notice_20150302
|
Affidavits of Service
|
|
2015-03-02
|
2015-03-02
|
EB-2014-0101
|
VECC_IntrvREQ_Oshawa20150227
|
Intervenor Request Letter
|
|
2015-02-27
|
2015-02-27
|
EB-2014-0101
|
NOA_Published_Feb25_OPUCN_20150224
|
Correspondence
|
|
2015-02-24
|
2015-02-24
|
EB-2014-0101
|
OPUCN_APPL_Ex 2_Rate Base_Updated_20150220
|
Application and Evidence
|
|
2015-02-20
|
2015-02-20
|
EB-2014-0101
|
OPUCN_APPL_CovLtr_Updated_20150220
|
Application and Evidence
|
|
2015-02-20
|
2015-02-20
|
EB-2014-0101
|
OPUCN_ APPL_Ex 1_Tab A_Exhibit List_Updated_20150220
|
Application and Evidence
|
|
2015-02-20
|
2015-02-20
|
EB-2014-0101
|
SEC_IntrvREQ_Oshawa_20150219
|
Intervenor Request Letter
|
|
2015-02-19
|
2015-02-19
|
EB-2014-0101
|
noa_Oshawa PUC_20150218
|
Notice of Application
|
2015-02-18
|
|
2015-02-18
|
EB-2014-0101
|
lod_Oshawa PUC_20150218
|
Letter of Direction
|
2015-02-18
|
|
2015-02-18
|
EB-2014-0101
|
EnergyProbe_IntrvREQ_Oshawa_2015-2019 Rates_20150117
|
Intervenor Request Letter
|
|
2015-02-17
|
2015-02-17
|
EB-2014-0101
|
EnergyProbe_CvrLtr_IntrvREQ_Oshawa_2015-2019 Rates_20150117
|
Intervenor Request Letter
|
|
2015-02-17
|
2015-02-17
|
EB-2014-0101
|
AckLtr_Oshawa_CustomIR_20150130
|
Acknowledgement Letter
|
2015-01-30
|
|
2015-01-30
|
EB-2014-0101
|
OPUCN_APPL_Rev_Reqt_Work_Form_V4_2019_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Rev_Reqt_Work_Form_V4_2018_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Rev_Reqt_Work_Form_V4_2017_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Rev_Reqt_Work_Form_V4_2016_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Rev_Reqt_Work_Form_V4_2015_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_PILs_Workform_2019_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_PILs_Workform_2018_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_PILs_Workform_2017_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_PILs_Workform_2016_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_PILs_Workform_2015_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Detailed_CA_model_2019_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Detailed_CA_model_2018_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Detailed_CA_model_2017_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Detailed_CA_model_2016_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Detailed_CA_model_2015_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Chapter2_Appendices_for_2015_to_2019_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_CA_Load_Profile_Model_Data_2019_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_CA_Load_Profile_Model_Data_2018_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_CA_Load_Profile_Model_Data_2017_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_CA_Load_Profile_Model_Data_2016_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_CA_Load_Profile_Model_Data_2015_RUN_1_20190129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Audited_FS_reconciled_to_Regulatory_Filings_2011 2012 2013_20150129_xlsx
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_2015_Weather_Normalization_Regression_Model_RUN_1_20150129_xlsx
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_2015_RTSR_Model_V4_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_2015_EDDVAR_Continuity_Schedule_RUN_1_20150129_xlsm
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 10_Custom IR Supporting Evidence_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 9_Deferral and Variance Accounts_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 8_Rate Design_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 7_Cost Allocation_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 6_Revenue Suffiency Deficiency_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 5_Cost of Capital and Capital Structure_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 4_Operating Costs_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 3_Operating Revenue_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 2_Rate Base_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_Ex 1_Administrative_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
OPUCN_APPL_CovLtr_20150129
|
Application and Evidence
|
|
2015-01-29
|
2015-01-29
|
EB-2014-0101
|
InterimRateOrder_Oshawa_2015custIR_EB-2014-0101_ 20141230
|
Interim rate order
|
2014-12-30
|
|
2014-12-30
|
EB-2014-0101
|
InterimRateOrder_Oshawa_2015CoS_EB-2014-0101_ 20141230
|
Interim rate order
|
2014-12-30
|
|
2014-12-30
|
EB-2014-0101
|
Oshawa_Ltr_TOR_LAW-8596289-v1_SEC OPUCN Interim Rates_20141224
|
Correspondence
|
|
2014-12-24
|
2014-12-24
|
EB-2014-0101
|
Attachment_Oshawa_Ltr_SEC OPUCN InterimRates_Request for Interim Rates_20141224
|
Correspondence
|
|
2014-12-24
|
2014-12-24
|
EB-2014-0101
|
SEC_Ltr_Oshawa_InterimRates_20141224
|
Correspondence
|
|
2014-12-24
|
2014-12-24
|
EB-2014-0101
|
Oshawa_PUC_ltr_2015COS_20141223
|
Correspondence
|
|
2014-12-23
|
2014-12-23
|