Search Results for: Records - Case Number=EB-2011-0354 - 275 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2011-0354 | exhibit_undertaking_list_Tech_Conf_EGDI_20120905 | Exhibits | Ontario Energy Board | 2013-01-30 at 3:54 PM | ||
EB-2011-0354 | exhibit_undertaking_list_oral_hearing_EGDI_20121119 | Exhibits | Ontario Energy Board | 2013-01-30 at 4:22 PM | ||
EB-2011-0354 | dec_order_cost_awards_Enbridge_20130419 | Decision and Order on Cost Awards | Ontario Energy Board | 2013-04-19 | 2013-04-19 | |
EB-2011-0354 | EGDI_A1-1-1 updated Exhibit List_20130322 | Application and Evidence | Ontario Energy Board | 2013-03-22 at 11:16 AM | ||
EB-2011-0354 | EGDI_Ltr_Cost Claims_20130307 | Correspondence | Ontario Energy Board | 2013-03-07 | 2013-03-07 | |
EB-2011-0354 | rate_order_EGDI_20130305 | Rate Order | Ontario Energy Board | 2013-03-05 | 2013-03-05 | |
EB-2011-0354 | EGDI_Reply_Comments_Final Rate Order_20130227 | Comments | Ontario Energy Board | 2013-02-27 | 2013-02-27 | |
EB-2011-0354 | CME_Comments_Draft Rate Order_20130221 | Comments | Ontario Energy Board | 2013-02-21 | 2013-02-21 | |
EB-2011-0354 | Energy Probe_Sub_Draft Rate Order_20130219 | Submission | Ontario Energy Board | 2013-02-20 | 2013-02-20 | |
EB-2011-0354 | Enbridge_Final Rate Order_20130214 | Rate Order | Ontario Energy Board | 2013-02-14 | 2013-02-14 | |
EB-2011-0354 | dec_equity_ratio_order_Enbridge_20130207 | Decision and Order | Ontario Energy Board | 2013-02-07 | 2013-02-07 | |
EB-2011-0354 | Bdltr_dec_lock-up_EGDI_20130204 | Correspondence | Ontario Energy Board | 2013-02-04 | 2013-02-04 | |
EB-2011-0354 | EGDI_ReplyArg_20121217 | Applicant Reply Argument | Ontario Energy Board | 2012-12-17 | 2012-12-17 | |
EB-2011-0354 | EGDI_ReplyArg_CovLtr_20121217 | Applicant Reply Argument | Ontario Energy Board | 2012-12-17 | 2012-12-17 | |
EB-2011-0354 | Bd_replyltr_ext_req_Enbridge_20121211 | Correspondence | Ontario Energy Board | 2012-12-11 | 2012-12-11 | |
EB-2011-0354 | EGDI_ltr_req_ext_ReplyArg_20121210 | Correspondence | Ontario Energy Board | 2012-12-10 | 2012-12-10 | |
EB-2011-0354 | SEC_Arg_EGDI_20121209 | Final Argument | Ontario Energy Board | 2012-12-09 | 2012-12-09 | |
EB-2011-0354 | CME_Arg_EGDI_20121207 | Intervenor Argument | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | CCC_Arg_Enbridge_20121207 | Argument | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | VECC_Arg_Enbridge_20121207 | Argument | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | BdStaff_SUB_Enbridge_20121207 | Submission | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | BdStaff_SUB_EGDI_covltr_20121207 | Submission | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | Energy Probe_Arg_20121206 | Argument | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | Energy Probe_Arg_covltr_20121206 | Argument | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | BOMA_Sub_Cost_of_Capital_20121206 | Submission | Ontario Energy Board | 2012-12-07 | 2012-12-07 | |
EB-2011-0354 | Enbridge_Arg-in-Chief_20121130 | Applicant Argument in Chief | Ontario Energy Board | 2012-11-30 | 2012-11-30 | |
EB-2011-0354 | Interim_Rate_Order_EGDI_20121129 | Interim rate order | Ontario Energy Board | 2012-11-29 | 2012-11-29 | |
EB-2011-0354 | Enbridge_Underrtaking_Resp_20121127 | Undertaking Responses | Ontario Energy Board | 2012-11-28 | 2012-11-28 | |
EB-2011-0354 | Ex_K2_1_20121119 | Exhibits | Ontario Energy Board | 2012-11-20 | 2012-11-20 | |
EB-2011-0354 | dec_Supplementary_Settlement_Agr_Open_Bill_Access_Prog_EGDI_20121126 | Decision | Ontario Energy Board | 2012-11-26 | 2012-11-26 | |
EB-2011-0354 | Ex_K 1_2_20121119 | Exhibits | Ontario Energy Board | 2012-11-19 | 2012-11-19 | |
EB-2011-0354 | Ex_K1_1_20121119 | Exhibits | Ontario Energy Board | 2012-11-19 | 2012-11-19 | |
EB-2011-0354 | Ex K1_3_20121119 | Submission | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | Transcript_Oral_Hearing_Vol 2_20121120 | Transcripts | Ontario Energy Board | 2012-11-20 at 6:55 PM | ||
EB-2011-0354 | Transcript_Oral_Hearing_Vol 1_20121119 | Transcripts | Ontario Energy Board | 2012-11-20 at 9:20 AM | ||
EB-2011-0354 | BOMA_Email_Sub_process_oral_hearing_20121114 | Correspondence | Ontario Energy Board | 2012-11-14 | 2012-11-14 | |
EB-2011-0354 | BOMA_#14 Opinion 486 B FERC January 15 2009_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#13 EB-2009-0084 Transcript - September 21 2009, Presentation Ms. Zvarich pp 47-59_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#11 Chapter 11 Reorganization of Utility Companies_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#10 Rev Written Evidence of Dr. Andrew Safir - May 8 2009_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#9 Duquesne Opinion_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#8 Duquesne Light Company v. Barasch_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#7 Chapter 9 - Rate of Return_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#6 OEB - Decision and Order EB-2010-0018_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#5 2011_electricity_yearbook_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#4 Report of the Board on COC_2nd gen_incentive regulation for Ont Electricity Distributors Dec 20 2006_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#3 Cannon Discussion Paper - Determination of ROE_Return on Rate Base for Electricity Distribution Utilities in Ont Dec1998_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#2 OEB - Decision with Reasons – Phase 1 EB-2006-0034_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_#1 National Energy Board - Reasons for Decision RH-4-2001_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | BOMA_Compendium Index_20121116 | Correspondence | Ontario Energy Board | 2012-11-16 | 2012-11-16 | |
EB-2011-0354 | dec_procedure_oral hearing_expert_current_evid_20121115 | Decision | Ontario Energy Board | 2012-11-15 | 2012-11-15 | |
EB-2011-0354 | CCC_CME_Joint Compendium_20121109 | Submission | Ontario Energy Board | 2012-11-15 | 2012-11-15 | |
EB-2011-0354 | CME_Sub_process_oral hearing_20121113 | Submission | Ontario Energy Board | 2012-11-13 | 2012-11-13 | |
EB-2011-0354 | VECC_Sub_process_oral_hearing_20121114 | Submission | Ontario Energy Board | 2012-11-14 | 2012-11-14 | |
EB-2011-0354 | CCC_Sub_process_oral_hearing_20121113 | Submission | Ontario Energy Board | 2012-11-14 | 2012-11-14 | |
EB-2011-0354 | BdStaff_Sub_process_oral hearing_20121113 | Submission | Ontario Energy Board | 2012-11-13 | 2012-11-13 | |
EB-2011-0354 | BdStaff_Sub_process_oral hearing_covltr_20121113 | Submission | Ontario Energy Board | 2012-11-13 | 2012-11-13 | |
EB-2011-0354 | EGDI_ReplyLtr_Interim Draft Rate Order_20121113 | Correspondence | Ontario Energy Board | 2012-11-13 | 2012-11-13 | |
EB-2011-0354 | EGDI_Sub_process_oral_hearing_20121113 | Submission | Ontario Energy Board | 2012-11-13 | 2012-11-13 | |
EB-2011-0354 | EGDI_Sub_process_oral_hearing_covltr_20121113 | Submission | Ontario Energy Board | 2012-11-13 | 2012-11-13 | |
EB-2011-0354 | SEC_Sub_cost of capital_E2_20121109 | Submission | Ontario Energy Board | 2012-11-12 | 2012-11-12 | |
EB-2011-0354 | CME_Comments_Draft Interim Rate Order_20121112 | Comments | Ontario Energy Board | 2012-11-12 | 2012-11-12 | |
EB-2011-0354 | EGDI_Sub_Supplementary_Settlement Agr_Issue D11_20121109 | Submission | Ontario Energy Board | 2012-11-09 | 2012-11-09 | |
EB-2011-0354 | EGDI_Sub_Supplementary_Settlement Agr_Issue D11_covltr_20121109 | Submission | Ontario Energy Board | 2012-11-09 | 2012-11-09 | |
EB-2011-0354 | EGDI_joint written statement_20121109 | Correspondence | Ontario Energy Board | 2012-11-09 | 2012-11-09 | |
EB-2011-0354 | EGDI_joint written statement_covltr_20121109 | Correspondence | Ontario Energy Board | 2012-11-09 | 2012-11-09 | |
EB-2011-0354 | EGDI_DRO_20121105 | Draft Rate Order | Ontario Energy Board | 2012-11-05 | 2012-11-05 | |
EB-2011-0354 | EGDI_DRO_covltr_20121105 | Draft Rate Order | Ontario Energy Board | 2012-11-05 | 2012-11-05 | |
EB-2011-0354 | dec_PO6_Enbridge_20121102 | Procedural Order | Ontario Energy Board | 2012-11-02 | 2012-11-02 | |
EB-2011-0354 | dec_PO6_Enbridge_20121102 | Decision | Ontario Energy Board | 2012-11-02 | 2012-11-02 | |
EB-2011-0354 | Experts_Ltr_Extension to Report_EGDI_20121031 | Correspondence | Ontario Energy Board | 2012-10-31 | 2012-10-31 | |
EB-2011-0354 | EGDI_Continuing ADR discussions_20121031 | Comments | Ontario Energy Board | 2012-10-31 | 2012-10-31 | |
EB-2011-0354 | EGDI_updated_Settlement Agreement_Appendices_20121026 | Settlement Agreement | Ontario Energy Board | 2012-10-30 | 2012-10-30 | |
EB-2011-0354 | EGDI_updated_D1_2_ Settlement Agreement_20121026 | Settlement Agreement | Ontario Energy Board | 2012-10-29 | 2012-10-29 | |
EB-2011-0354 | EGDI_updated_Settlement Agreement_cor_20121030 | Settlement Agreement | Ontario Energy Board | 2012-10-30 | 2012-10-30 | |
EB-2011-0354 | dec_Settlement AGR_po5_Enbridge_20121015 | Procedural Order | Ontario Energy Board | 2012-10-15 | 2012-10-15 | |
EB-2011-0354 | dec_Settlement AGR_po5_Enbridge_20121015 | Decision | Ontario Energy Board | 2012-10-15 | 2012-10-15 | |
EB-2011-0354 | BdStaff_Email_Hearing days cancelled_wk_October 15_20121011 | Correspondence | Ontario Energy Board | 2012-10-11 at 10:41 AM | ||
EB-2011-0354 | BdStaff_Email_Hearing days cancelled October 11 -12_20121003 | Correspondence | Ontario Energy Board | 2012-10-05 at 12:23 PM | ||
EB-2011-0354 | EGDI_Settlement Agr_appendicies_20121003 | Settlement Agreement | Ontario Energy Board | 2012-10-03 | 2012-10-03 | |
EB-2011-0354 | EGDI_Settlement Agr_20121003 | Settlement Agreement | Ontario Energy Board | 2012-10-03 | 2012-10-03 | |
EB-2011-0354 | EGDI_Settlement Agr_covltr_20121003 | Settlement Agreement | Ontario Energy Board | 2012-10-03 | 2012-10-03 | |
EB-2011-0354 | EGDI_Ltr_filing_Settlement Agr_email_20121002 | Correspondence | Ontario Energy Board | 2012-10-03 | 2012-10-03 | |
EB-2011-0354 | BdStaff_Email_Hearing day cancelled October 9_EGDI_20121001 | Correspondence | Ontario Energy Board | 2012-10-01 | 2012-10-01 | |
EB-2011-0354 | EGDI_Ltr_delay_Settlement Agreement_20120928 | Correspondence | Ontario Energy Board | 2012-09-28 | 2012-09-28 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.8_20120927 | Undertaking Responses | Ontario Energy Board | 2012-09-28 | 2012-09-28 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.8_covltr_20120927 | Undertaking Responses | Ontario Energy Board | 2012-09-28 | 2012-09-28 | |
EB-2011-0354 | EGDI_IRR_OBA_D11 HVAC_20120918 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-09-18 | 2012-09-18 | |
EB-2011-0354 | EGDI_IRR_OBA_D11 GEC_20120918 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-09-18 | 2012-09-18 | |
EB-2011-0354 | EGDI_CvrLtr_IRRs_Open Bill_20120918 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-09-18 | 2012-09-18 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.28_20120917 | Undertaking Responses | Ontario Energy Board | 2012-09-17 | 2012-09-17 | |
EB-2011-0354 | EGDI_Covltr_undertaking_resp_20120917 | Undertaking Responses | Ontario Energy Board | 2012-09-17 | 2012-09-17 | |
EB-2011-0354 | EGDI_JT2.13_Attachment20120914 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_JT2.13 updated 20120914 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_JT1.17_20120914 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_CvrLtr_Undertakings_20120914 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_I-B1-1_4_cor_20120913 | Application and Evidence | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.19_Attach 2_20120913 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.19_Attach 1_20120913 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.19_20120913 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.18_Attach_20120913 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.18_20120913 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.1_20120913 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_CvrLtr_Undertakings_20120913 | Undertaking Responses | Ontario Energy Board | 2012-09-14 | 2012-09-14 | |
EB-2011-0354 | EGDI_undertaking_resp_JT2.15_Attachment_20120912 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_undertaking_resp_JT2.33_20120912 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_undertaking_resp_JT2.17_20120912 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_undertaking_resp_JT2.13_20120912 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.27_20120912 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_undertaking_resp_JT1.12_20120912 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_CvrLtr_Undertakings_20120912 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_New_M2 Impact_Exhibits_20120912 | Application and Evidence | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_I-E1-20.3 updated_20120911 | Application and Evidence | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_I-E1-20.1 updated 20120911 | Application and Evidence | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_JT2_Undertakings Resp_20120911 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_JT1_Undertaking Resp_20110911 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_CvrLtr_Undertakings-IRR Updates_20120911 | Undertaking Responses | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_I-E2-7-3 updated 20120906 | Application and Evidence | Ontario Energy Board | 2012-09-06 | 2012-09-06 | |
EB-2011-0354 | EGDI_D2-6-1 updated 20120906 | Application and Evidence | Ontario Energy Board | 2012-09-06 | 2012-09-06 | |
EB-2011-0354 | EGDI_D1-18-1 corrected 20120906 | Application and Evidence | Ontario Energy Board | 2012-09-06 | 2012-09-06 | |
EB-2011-0354 | EGDI_A1-15-1 updated 20120906 | Application and Evidence | Ontario Energy Board | 2012-09-06 | 2012-09-06 | |
EB-2011-0354 | Energy Probe_outstanding_question_Tech_Conf_20120910 | Correspondence | Ontario Energy Board | 2012-09-10 | 2012-09-10 | |
EB-2011-0354 | EDGI_Intervenors_20120912 | Intervenor List | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | Bdltr_late_IntervReq_20120912 | Correspondence | Ontario Energy Board | 2012-09-12 | 2012-09-12 | |
EB-2011-0354 | EGDI_Ltr_LateIntrvREQ_20120910.pdf | Intervenor Request Letter | Ontario Energy Board | 2012-09-10 | 2012-09-10 | |
EB-2011-0354 | APPRO_Tech_Conf_UAF Questions_20120907 | Correspondence | Ontario Energy Board | 2012-09-07 | 2012-09-07 | |
EB-2011-0354 | Transcript_Tech_Conf_rev_20120906 | Transcripts | Ontario Energy Board | 2012-10-02 | 2012-10-02 | |
EB-2011-0354 | HVAC_IR_open_bill_20120907 | Interrogatories to Applicant | Ontario Energy Board | 2012-09-07 | 2012-09-07 | |
EB-2011-0354 | GEC_IR_Open Bill_Enbridge_20120907 | Interrogatories to Applicant | Ontario Energy Board | 2012-09-07 | 2012-09-07 | |
EB-2011-0354 | Transcript_Tech_Conf_20120905 | Transcripts | Ontario Energy Board | 2012-09-06 at 9:27 AM | ||
EB-2011-0354 | LIEN_IntervReq_20120905 | Intervenor Request Letter | Ontario Energy Board | 2012-09-05 | 2012-09-05 | |
EB-2011-0354 | Vista_Credit_IntervReq_20120905 | Intervenor Request Letter | Ontario Energy Board | 2012-09-05 | 2012-09-05 | |
EB-2011-0354 | Bdltr_late_IntervReq_20120905 | Correspondence | Ontario Energy Board | 2012-09-05 | 2012-09-05 | |
EB-2011-0354 | FRPO_TECHNICAL CONFERENCE QUESTIONS_EGDI_20120901 | Correspondence | Ontario Energy Board | 2012-09-01 | 2012-09-01 | |
EB-2011-0354 | EGD_Technical Conference Panels_20120831 | Correspondence | Ontario Energy Board | 2012-08-31 | 2012-08-31 | |
EB-2011-0354 | EGDI_Ltr_late_Interventions_20120831 | Correspondence | Ontario Energy Board | 2012-08-31 | 2012-08-31 | |
EB-2011-0354 | CME et al_IRR_# 41 Corrected_EGDI_20120830 | Interrogatory Response from Intervenor | Ontario Energy Board | 2012-08-30 | 2012-08-30 | |
EB-2011-0354 | Summitt Energy_INTV REQ_EGDI_20120830 | Intervenor Request Letter | Ontario Energy Board | 2012-08-30 | 2012-08-30 | |
EB-2011-0354 | CME et al_IRR_EGDI_20120829 | Interrogatory Response from Intervenor | Ontario Energy Board | 2012-08-29 | 2012-08-29 | |
EB-2011-0354 | EnerCare_IntervReq_20120829 | Intervenor Request Letter | Ontario Energy Board | 2012-08-29 | 2012-08-29 | |
EB-2011-0354 | Pollution Probe_IntervReq_20120829 | Intervenor Request Letter | Ontario Energy Board | 2012-08-29 | 2012-08-29 | |
EB-2011-0354 | po4_EGDI_20120829 | Procedural Order | Ontario Energy Board | 2012-08-29 | 2012-08-29 | |
EB-2011-0354 | EGDI_Comments_GEC_IntrvREQ_20120828 | Correspondence | Ontario Energy Board | 2012-08-28 | 2012-08-28 | |
EB-2011-0354 | EGDI_Technical Conference_Panel List_20120828 | Correspondence | Ontario Energy Board | 2012-08-28 | 2012-08-28 | |
EB-2011-0354 | EGDI_IR_Booth_CME et al_20120822 | Interrogatories to Intervenor | Ontario Energy Board | 2012-08-22 | 2012-08-22 | |
EB-2011-0354 | EGDI_IRR_I-O3-4.1 corrected 20120817 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-17 | 2012-08-17 | |
EB-2011-0354 | EGDI_IRR_I-D4-1.14 corrected 20120817 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-17 | 2012-08-17 | |
EB-2011-0354 | EGDI_IRR_I-D4-1.13 corrected 20120817 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-17 | 2012-08-17 | |
EB-2011-0354 | EGDI_IRR_I-D1-3.1 corrected 20120817 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-17 | 2012-08-17 | |
EB-2011-0354 | EGDI_IRR_I-B1-8.2 corrected 20120817 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-17 | 2012-08-17 | |
EB-2011-0354 | EGDI_IRR_I-B1-2.3 corrected 20120817 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-17 | 2012-08-17 | |
EB-2011-0354 | EGDI_CvrLtr_Corrected IRR_201208017 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-17 | 2012-08-17 | |
EB-2011-0354 | CME et al_Evd_Appendix A_20120816 | Intervenor Evidence | Ontario Energy Board | 2012-08-16 | 2012-08-16 | |
EB-2011-0354 | EGDI_Ltr_resp_HVAC_late interv_req_20120816 | Intervenor Request Letter | Ontario Energy Board | 2012-08-16 | 2012-08-16 | |
EB-2011-0354 | CME et al_Evd_20120816 | Intervenor Evidence | Ontario Energy Board | 2012-08-15 | 2012-08-15 | |
EB-2011-0354 | HVAC_Late INTV REQ_EGDI_20120810 | Intervenor Request Letter | Ontario Energy Board | 2012-08-10 | 2012-08-10 | |
EB-2011-0354 | EGDI_IRR_Issues_B_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-03 | 2012-08-03 | |
EB-2011-0354 | EGDI_IRR_I-H1-14 1_Corrected_20120809 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-09 | 2012-08-09 | |
EB-2011-0354 | EGDI_IRR_I-B3-5 2_Attachment 2 Corrected_20120809 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-09 | 2012-08-09 | |
EB-2011-0354 | EGDI_IRR_I-B2-1 8_Corrected_20120809 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-09 | 2012-08-09 | |
EB-2011-0354 | EGDI_CvrLtr_Corrected IRR_20120809 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-09 | 2012-08-09 | |
EB-2011-0354 | EGDI_APPL_H2-6-1_Updated_20120803 | Application and Evidence | Ontario Energy Board | 2012-08-08 | 2012-08-08 | |
EB-2011-0354 | EGDI_APPL_D1-3-1_Updated_20120803 | Application and Evidence | Ontario Energy Board | 2012-08-08 | 2012-08-08 | |
EB-2011-0354 | EGDI_APPL_A1-15-6_20120808 | Application and Evidence | Ontario Energy Board | 2012-08-08 | 2012-08-08 | |
EB-2011-0354 | EGDI_APPL_A1-9-1_Updated_20120803 | Application and Evidence | Ontario Energy Board | 2012-08-08 | 2012-08-08 | |
EB-2011-0354 | EGDI_APPL_CvrLtr_New-Corrected Evidence_20120803 | Application and Evidence | Ontario Energy Board | 2012-08-08 | 2012-08-08 | |
EB-2011-0354 | EGDI_Corrected Updated Evidence_20120803 | Exhibits | Ontario Energy Board | 2012-08-08 | 2012-08-08 | |
EB-2011-0354 | EGDI_IRR_I-E2-21 11_20120807 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_ CME CCC SEC VECC_I-E2-21 11_20120808 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_IssueO_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_IssueH_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_IssueG_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_IssueF_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_IssueE_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_IssueDV_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_IssueD_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_IRR_Issue C_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | EGDI_CvrLtr_IRRs_20120803 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-08-07 | 2012-08-07 | |
EB-2011-0354 | po3_Enbridge_20120802 | Procedural Order | Ontario Energy Board | 2012-08-02 | 2012-08-02 | |
EB-2011-0354 | EGDI_APPL_Corrected Updated Evidence_20120727 | Application and Evidence | Ontario Energy Board | 2012-07-27 | 2012-07-27 | |
EB-2011-0354 | VECC_REQ extension_EGDI_20120727 | Correspondence | Ontario Energy Board | 2012-07-27 | 2012-07-27 | |
EB-2011-0354 | SEC_IR_EGDI_20120706 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-06 | 2012-07-06 | |
EB-2011-0354 | CME_IR_EGDI_corrected_20120706 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-06 | 2012-07-06 | |
EB-2011-0354 | CCC_IR_EGDI_20120706 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-06 | 2012-07-06 | |
EB-2011-0354 | CME_CCC_SEC_VECC_IR_EGDI_20120705 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-05 | 2012-07-05 | |
EB-2011-0354 | FRPO_IR_EGDI_20120705 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-05 | 2012-07-05 | |
EB-2011-0354 | FRPO_IR_EGDI_cvr_ltr_20120705 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-05 | 2012-07-05 | |
EB-2011-0354 | JustEnergy_IR_EGDI_20120705 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-05 | 2012-07-05 | |
EB-2011-0354 | CME_IR_EGDI_20120705 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-05 | 2012-07-05 | |
EB-2011-0354 | APPRO_IR_EGDI_20120705 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-05 | 2012-07-05 | |
EB-2011-0354 | VECC_IR_EGDI_20120704 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-04 | 2012-07-04 | |
EB-2011-0354 | BdStaff_IR_EGDI_20120704 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-04 | 2012-07-04 | |
EB-2011-0354 | BdStaff_IR_covltr_EGDI_20120704 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-04 | 2012-07-04 | |
EB-2011-0354 | BOMA_IR_EGDI_20120703 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-03 | 2012-07-03 | |
EB-2011-0354 | BOMA_IR_cvr ltr_EGDI_20120703 | Interrogatories to Applicant | Ontario Energy Board | 2012-07-03 | 2012-07-03 | |
EB-2011-0354 | Energy Probe_IR_EGDI_20120627 | Interrogatories to Applicant | Ontario Energy Board | 2012-06-27 | 2012-06-27 | |
EB-2011-0354 | EGDI_APPL_Ex M_Impact Statement_20120601 | Application and Evidence | Ontario Energy Board | 2012-06-01 | 2012-06-01 | |
EB-2011-0354 | EGDI_APPL_Ex I_IRR_PreliminaryIssue_20120621 | Application and Evidence | Ontario Energy Board | 2012-06-21 | 2012-06-21 | |
EB-2011-0354 | EGDI_APPL_Corrected Exhibit_20120621 | Application and Evidence | Ontario Energy Board | 2012-06-21 | 2012-06-21 | |
EB-2011-0354 | EGDI_APPL_CvrLtr_Corrected Exhibit_20120621 | Application and Evidence | Ontario Energy Board | 2012-06-21 | 2012-06-21 | |
EB-2011-0354 | dec_order_issues list_enbridge_20120615 | Decision and Order | Ontario Energy Board | 2012-06-15 | 2012-06-15 | |
EB-2011-0354 | VECC_Reply SUB_EGDI_20120610 | Submission | Ontario Energy Board | 2012-06-11 | 2012-06-11 | |
EB-2011-0354 | CME_Sub_Issues_20120606 | Submission | Ontario Energy Board | 2012-06-06 | 2012-06-06 | |
EB-2011-0354 | EGDI_ReplySUB_Issues List_20120608 | Submission | Ontario Energy Board | 2012-06-08 | 2012-06-08 | |
EB-2011-0354 | SEC_Reply SUB_Draf Issues_EGDI_20120608 | Submission | Ontario Energy Board | 2012-06-08 | 2012-06-08 | |
EB-2011-0354 | EGDI_APPL_New Updated Evidence_20120608 | Application and Evidence | Ontario Energy Board | 2012-06-08 | 2012-06-08 | |
EB-2011-0354 | EGDI_APPL_cvr ltr_New-Updated Evidence_20120608 | Application and Evidence | Ontario Energy Board | 2012-06-08 | 2012-06-08 | |
EB-2011-0354 | Board Staff_Draft Issues List_EGDI_20120605 | Correspondence | Ontario Energy Board | 2012-06-05 | 2012-06-05 | |
EB-2011-0354 | EGD_Sub_Issues_20120606 | Submission | Ontario Energy Board | 2012-06-06 | 2012-06-06 | |
EB-2011-0354 | SEC_Sub_Issues_EGD_20120606 | Submission | Ontario Energy Board | 2012-06-06 | 2012-06-06 | |
EB-2011-0354 | FRPO_Sub_Issues_EGD_20120606 | Submission | Ontario Energy Board | 2012-06-07 | 2012-06-07 | |
EB-2011-0354 | EGDI_APPL_CvrLtr_New-Updated Evidence_20120601 | Application and Evidence | Ontario Energy Board | 2012-06-01 | 2012-06-01 | |
EB-2011-0354 | EGDI_APPL_New Updated Evidence_20120601 | Application and Evidence | Ontario Energy Board | 2012-06-01 | 2012-06-01 | |
EB-2011-0354 | EGDI_ReplySub_2011 Actual Data_20120530 | Submission | Ontario Energy Board | 2012-05-30 | 2012-05-30 | |
EB-2011-0354 | EGDI_New Updated Evidence_20120525 | Application and Evidence | Ontario Energy Board | 2012-05-25 | 2012-05-25 | |
EB-2011-0354 | EGDI_cvrltr_New Updated Evidence_20120525 | Application and Evidence | Ontario Energy Board | 2012-05-25 | 2012-05-25 | |
EB-2011-0354 | Energy Probe_SUB_2011 Actual Data20120524 | Submission | Ontario Energy Board | 2012-05-24 at 10:39 AM | ||
EB-2011-0354 | EGDI_SUB_2011 Actual Data_20120523 | Submission | Ontario Energy Board | 2012-05-23 | 2012-05-23 | |
EB-2011-0354 | EGDI_APPL_New Evidence_20120518 | Application and Evidence | Ontario Energy Board | 2012-05-18 | 2012-05-18 | |
EB-2011-0354 | dec_Preliminary Issue_po2_EGDI_20120516 | Procedural Order | Ontario Energy Board | 2012-05-16 | 2012-05-16 | |
EB-2011-0354 | dec_Preliminary Issue_po2_EGDI_20120516 | Decision | Ontario Energy Board | 2012-05-16 | 2012-05-16 | |
EB-2011-0354 | EGDI_ReplySub_USGAAP_20120502 | Submission | Ontario Energy Board | 2012-05-02 | 2012-05-02 | |
EB-2011-0354 | EGDI_CvrLtr_ReplySub_USGAAP_20120502 | Submission | Ontario Energy Board | 2012-05-02 | 2012-05-02 | |
EB-2011-0354 | CME_SUB_EGDI_Preliminary Issues_20120427 | Submission | Ontario Energy Board | 2012-04-27 | 2012-04-27 | |
EB-2011-0354 | SEC_SUB_EGDI_Preliminary Issues_20120427 | Submission | Ontario Energy Board | 2012-04-27 | 2012-04-27 | |
EB-2011-0354 | Energy Probe_SUB_Preliminary Issue_20120426 | Submission | Ontario Energy Board | 2012-04-26 | 2012-04-26 | |
EB-2011-0354 | BdStaff_SUB_Enbridge_20120427 | Submission | Ontario Energy Board | 2012-04-27 | 2012-04-27 | |
EB-2011-0354 | EGDI_Naming Structure of IR responses_20120418 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-04-18 | 2012-04-18 | |
EB-2011-0354 | EGDI_IRR_PreliminaryIssue_20120418 | Interrogatory Response from Applicant | Ontario Energy Board | 2012-04-18 | 2012-04-18 | |
EB-2011-0354 | APPRO_IR_EGDI_20120411 | Interrogatories to Applicant | Ontario Energy Board | 2012-04-11 | 2012-04-11 | |
EB-2011-0354 | Board Staff_IR_Preliminary Issue_EGDI_20120409 | Interrogatories to Applicant | Ontario Energy Board | 2012-04-09 | 2012-04-09 | |
EB-2011-0354 | Board Staff_cvr ltr_IR_Preliminary Issue_EGDI_20120409 | Interrogatories to Applicant | Ontario Energy Board | 2012-04-09 | 2012-04-09 | |
EB-2011-0354 | Energy Probe_IR_Preliminary Issues_EGDI_20120405 | Interrogatories to Applicant | Ontario Energy Board | 2012-04-05 | 2012-04-05 | |
EB-2011-0354 | Lacrooy_LTR COMMENT_EGDI_redacted_20120316 | Letter of Comment | Ontario Energy Board | 2012-03-16 | 2012-03-16 | |
EB-2011-0354 | po1_Enbridge_20120329 | Procedural Order | Ontario Energy Board | 2012-03-29 | 2012-03-29 | |
EB-2011-0354 | Fay_LTR COMMENT_EGDI_redacted_20120322 | Letter of Comment | Ontario Energy Board | 2012-03-22 | 2012-03-22 | |
EB-2011-0354 | O'Grady_LTR COMMENT_EGDI_redacted_20120325 | Letter of Comment | Ontario Energy Board | 2012-03-25 | 2012-03-25 | |
EB-2011-0354 | GHernandez_Ltr_Comment_Redacted_20120322 | Letter of Comment | Ontario Energy Board | 2012-03-22 | 2012-03-22 | |
EB-2011-0354 | Leis_LTR COMMENT_EGDI_redacted_20120319 | Letter of Comment | Ontario Energy Board | 2012-03-19 | 2012-03-19 | |
EB-2011-0354 | FRPO_INTRV REQ_20120320 | Intervenor Request Letter | Ontario Energy Board | 2012-03-20 | 2012-03-20 | |
EB-2011-0354 | Jason F. Stacey_INTV REQ_EGDI_20120319 | Intervenor Request Letter | Ontario Energy Board | 2012-03-19 | 2012-03-19 | |
EB-2011-0354 | VECC_INTV REQ_EGDI_20120315 | Intervenor Request Letter | Ontario Energy Board | 2012-03-15 | 2012-03-15 | |
EB-2011-0354 | APPRO_INTV REQ_EGDI_20120314 | Intervenor Request Letter | Ontario Energy Board | 2012-03-14 | 2012-03-14 | |
EB-2011-0354 | Chinkiwsky_LTR COMMENT_EGDI_redacted_20120312 | Letter of Comment | Ontario Energy Board | 2012-03-12 | 2012-03-12 | |
EB-2011-0354 | Hilwan_LTR COMMENT_EGDI_redacted_20120312 | Letter of Comment | Ontario Energy Board | 2012-03-12 | 2012-03-12 | |
EB-2011-0354 | SEC_INTV REQ_EGDI_20120313 | Intervenor Request Letter | Ontario Energy Board | 2012-03-13 | 2012-03-13 | |
EB-2011-0354 | OAPPA_INTV REQ_EGDI_20120312 | Intervenor Request Letter | Ontario Energy Board | 2012-03-12 | 2012-03-12 | |
EB-2011-0354 | IGUA_INTV REQ_20120312 | Intervenor Request Letter | Ontario Energy Board | 2012-03-12 | 2012-03-12 | |
EB-2011-0354 | Accenture_OBS REQ_20120312 | Observer Request Letter | Ontario Energy Board | 2012-03-12 | 2012-03-12 | |
EB-2011-0354 | CCC_INTV REQ_20120312 | Intervenor Request Letter | Ontario Energy Board | 2012-03-12 | 2012-03-12 | |
EB-2011-0354 | Morrice_LTR COMMENT_EGDI_redacted_20120310 | Letter of Comment | Ontario Energy Board | 2012-03-10 | 2012-03-10 | |
EB-2011-0354 | TCE_INTV REQ_EGDI_20120309 | Intervenor Request Letter | Ontario Energy Board | 2012-03-09 | 2012-03-09 | |
EB-2011-0354 | TransCanada_INTV REQ_EGI_20120309 | Intervenor Request Letter | Ontario Energy Board | 2012-03-09 | 2012-03-09 | |
EB-2011-0354 | TransAlta_INTV REQ_EGDI_20120309 | Intervenor Request Letter | Ontario Energy Board | 2012-03-09 | 2012-03-09 | |
EB-2011-0354 | JustEnergy_INTV REQ_20120308 | Intervenor Request Letter | Ontario Energy Board | 2012-03-08 | 2012-03-08 | |
EB-2011-0354 | ShellEnergy_INTV REQ_EGDI_20120307 | Intervenor Request Letter | Ontario Energy Board | 2012-03-07 | 2012-03-07 | |
EB-2011-0354 | BOMA_INTV REQ_20120306 | Intervenor Request Letter | Ontario Energy Board | 2012-03-06 | 2012-03-06 | |
EB-2011-0354 | EnergyProbe_INTV REQ_20120306 | Intervenor Request Letter | Ontario Energy Board | 2012-03-06 | 2012-03-06 | |
EB-2011-0354 | OPG_INTV REQ_20120305 | Intervenor Request Letter | Ontario Energy Board | 2012-03-05 | 2012-03-05 | |
EB-2011-0354 | Union_INTV REQ_EGDI_20120305 | Intervenor Request Letter | Ontario Energy Board | 2012-03-05 | 2012-03-05 | |
EB-2011-0354 | noa_Enbridge_20120302_fr_20120302 | Notice of Application | Ontario Energy Board | 2012-03-02 | 2012-03-02 | |
EB-2011-0354 | noa_Enbridge_2013 COS_20120302 | Notice of Application | Ontario Energy Board | 2012-03-02 | 2012-03-02 | |
EB-2011-0354 | lod_Enbridge_2013 COS_20120302 | Letter of Direction | Ontario Energy Board | 2012-03-02 | 2012-03-02 | |
EB-2011-0354 | CME_INTV REQ_EGDI_20120227 | Intervenor Request Letter | Ontario Energy Board | 2012-02-27 | 2012-02-27 | |
EB-2011-0354 | DEnergy_INTV REQ_EGDI_20120203 | Intervenor Request Letter | Ontario Energy Board | 2012-02-03 | 2012-02-03 | |
EB-2011-0354 | EGDI_APPL_2013 Rate Application_Compiled Files_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | ack_ltr_EGDI_2013 Rates_20120202 | Acknowledgement Letter | Ontario Energy Board | 2012-02-02 | 2012-02-02 | |
EB-2011-0354 | EGDI_APPL_Ex H_Rate Design_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | EGDI_APPL_Ex G_Cost Allocation_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | EGDI_APPL_Ex F_Revenue Sufficiency-Deficiency_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | EGDI_APPL_Ex E_Cost of Capital_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | EGDI_APPL_Ex D_Operating Cost_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | EGDI_APPL_Ex C_Operating Revenue_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | EGDI_APPL_Ex B_Rate Base_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
EB-2011-0354 | EGDI_APPL_Ex A_Administrative_20120621 | Application and Evidence | Ontario Energy Board | 2012-01-31 | 2012-01-31 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |