Search Results for: Records - Case Number=EB-2018-0056 - 154 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2018-0056 | Final Rate Order_NOTL_ 20190523.pdf | Rate Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-05-23 | 2019-05-23 | |
EB-2018-0056 | decision_order_Cost Awards_NOTL_20190517.pdf | Decision and Order on Cost Awards | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-05-17 | 2019-05-17 | |
EB-2018-0056 | VECC Reply Letter re Cost Objections of NOTL_20190506.pdf | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-05-06 | 2019-05-06 | |
EB-2018-0056 | NOTL_Cost eligibility_20190501.pdf | Applicant Reply on Cost Eligibility | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-05-01 | 2019-05-01 | |
EB-2018-0056 | 2019 NOTL Hydro Tariff of Rates_20190501.xlsx | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-05-01 | 2019-05-01 | |
EB-2018-0056 | NOTL Hydro 2019 Rates - Review and Variance Motion - Notice of Motion_20190429.pdf | Motion | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-29 | 2019-04-29 | |
EB-2018-0056 | FW: EB-2018-0056 Niagara-on-the-Lake Hydro 2019 CoS Application- Staff Submission on Draft Rate Order | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-26 | 2019-04-26 | |
EB-2018-0056 | SEC_NOTL_CostClaim_20190425 | Cost Claim | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-25 | 2019-04-25 | |
EB-2018-0056 | VECC_Cost Claim_NOTL_20180425.pdf | Cost Claim | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-25 | 2019-04-25 | |
EB-2018-0056 | OEB Staff_SUB_NOTL Hydro_20190425.pdf | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-25 | 2019-04-25 | 2019-04-25 |
EB-2018-0056 | NOTL Hydro 2019 Tariff Schedule and Bill Impact Model 20190424.xlsb | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-24 | 2019-04-24 | |
EB-2018-0056 | NOTL Hydro 2019 Rev Reqt Work Form 20190424.xlsm | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-24 | 2019-04-24 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendices 20190424.xlsm | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-24 | 2019-04-24 | |
EB-2018-0056 | NOTL Hydro 2019 Cost Allocation Model RUN5 20190424.xlsm | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-24 | 2019-04-24 | |
EB-2018-0056 | decision_order_NOTL Hydro_ 20190423_corrected.pdf | Decision and Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-23 | 2019-04-23 | |
EB-2018-0056 | OEB_Corres_NOTL_cover letter_Corrected DO_20190423.pdf | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-23 | 2019-04-23 | |
EB-2018-0056 | decision_order_NOTL Hydro_ 20190411.pdf | Decision and Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-11 | 2019-04-11 | |
EB-2018-0056 | NOTL Hydro 2019 Test Year Income Tax PILs 20190417.xlsm | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro 2019 Tariff Schedule and Bill Impact Model 20190417.xlsb | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro 2019 Rev Reqt Work Form 20190417.xlsm | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendix2C 20190417.xlsx | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendices 20190417.xlsm | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro 2019 DVA Continuity Schedule CoS 20190417.xlsb | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro 2019 Cost Allocation Model RUN4 20190417.xlsm | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro EB-2018-0056 Cover Letter - Decision and Order 20190417.pdf | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-04-17 | 2019-04-17 | |
EB-2018-0056 | NOTL Hydro 2019 Cost of Service Rate Application - Reply Argument_20190315 | Applicant Reply Argument | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-03-15 | 2019-03-15 | |
EB-2018-0056 | Board Staff_SUB_NOTL 20190304.pdf | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-03-04 | 2019-03-04 | 2019-03-04 |
EB-2018-0056 | VECC_ SUB_ARG_ NOTL_20190304.pdf | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-03-04 | 2019-03-04 | |
EB-2018-0056 | SEC_SUB_ARG_NOTL_20190304.pdf | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-03-04 | 2019-03-04 | |
EB-2018-0056 | NOTL Hydro_Argument in Chief_ 2019 Rates_20190219 | Applicant Argument in Chief | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-19 | 2019-02-19 | |
EB-2018-0056 | PO5_Niagara on the Lake Hydro_CoS_20190214 | Procedural Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-14 | 2019-02-14 | |
EB-2018-0056 | NOTL Hydro_2019 DVA Continuity Schedule CoS_20190208 | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-13 | 2019-02-13 | |
EB-2018-0056 | NOTL Hydro 2019 Cost Allocation Model RUN3 20190110.xlsm-20190211.xlsx | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-11 | 2019-02-11 | |
EB-2018-0056 | NOTL Hydro 2019 Rev Reqt Work Form 20190110.xlsm_20190211.xlsx | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-11 | 2019-02-11 | |
EB-2018-0056 | NOTL Hydro 2019 Load Forecast Wholesale 20190110_20190211.xlsx | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-11 at 10:36 AM | ||
EB-2018-0056 | NOTL _Corres_OEB_requesting extension for reply submissions_20190211.pdf | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-11 | 2019-02-11 | |
EB-2018-0056 | Dec_Partial Settlement Agreement_PO4_Niagara on the Lake Hydro_CoS_20190208 | Decision | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-08 | 2019-02-08 | |
EB-2018-0056 | Dec Partial Settlement Agreement_PO4_Niagara on the Lake Hydro_CoS_20190208 | Procedural Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-08 | 2019-02-08 | |
EB-2018-0056 | NOTLH 2019_Cost_Allocation_Model Includes ICM.XLSM_20190207.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-07 | 2019-02-07 | |
EB-2018-0056 | NOTLH 2019_Cost_Allocation_Model Excludes ICM_20190207.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-07 | 2019-02-07 | |
EB-2018-0056 | NiagaraontheLake_LTR_ to OEB K. Walli answering additional question_20190207.PDF | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-07 | 2019-02-07 | |
EB-2018-0056 | NiagaraontheLake_IRR_SUPP_SEC_Impact of Including ICM_20190207.PDF | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-07 | 2019-02-07 | |
EB-2018-0056 | VECC_HearingSubNOTL56_20190204.pdf | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-04 | 2019-02-04 | |
EB-2018-0056 | SEC_SUB_NOTL_Ltr_20190204.pdf | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-04 | 2019-02-04 | |
EB-2018-0056 | NOTL Hydro_Letter to K. Walli requesting written hearing_20190204.pdf | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-04 | 2019-02-04 | |
EB-2018-0056 | OEB Staff_Ltr_Niagara-on-the-Lake_Form of Hearing_20190204.pdf | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-02-04 | 2019-02-04 | 2019-02-04 |
EB-2018-0056 | Appendix 2 to NOTL Response to Supplementary SEC Interrogatories_20190130.XLSX | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-30 | 2019-01-30 | |
EB-2018-0056 | Appendix 1 to NOTL Response to Supplementary SEC Interrogatories_20190130.XLSX | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-30 | 2019-01-30 | |
EB-2018-0056 | NiagaraontheLake_IRR-SUPP-VECC-20190130.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-30 | 2019-01-30 | |
EB-2018-0056 | NiagaraontheLake_IRR_SUPP_OEB Staff_20190130.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-30 | 2019-01-30 | |
EB-2018-0056 | NiagaraontheLake_IRR_SUPP_SEC_20190130.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-30 | 2019-01-30 | |
EB-2018-0056 | VECC_IR_Niagara on the Lake_Extracts_20190125 | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-25 | 2019-01-25 | |
EB-2018-0056 | VECC_Suppl IR_NOTL_20190124 | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-25 | 2019-01-25 | |
EB-2018-0056 | SEC_NOTL_SuppIR_20190124.pdf | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-24 | 2019-01-24 | |
EB-2018-0056 | NOTL Hydro EB-2018-0056 Supplement IRs on the updated evidence_20190122 | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | 2019-01-22 |
EB-2018-0056 | OEB Staff_IRs_Niagara-on-the-Lake Hydro_covLtr_20190122 | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | 2019-01-22 |
EB-2018-0056 | NOTL Hydro Exhibit 4- Additional Evidence re. OMA Costs_20190118.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-18 | 2019-01-18 | |
EB-2018-0056 | NOTL Hydro 2019 Rev Reqt Work Form 20190111_20190117 | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-17 | 2019-01-17 | |
EB-2018-0056 | NOTL Hydro 2019 Load Forecast Wholesale 20190111_20190117 | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-18 at 10:51 AM | ||
EB-2018-0056 | NOTL Hydro 2019Cost Allocation Model RUN3 20190111_20190117 | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-17 | 2019-01-17 | |
EB-2018-0056 | EB-2018-0056 - Exhibit 2 - Additional Evidence re. Underground Voltage Conversion_20190117 | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-17 | 2019-01-17 | |
EB-2018-0056 | OEB staff_SUB_NOTL Hydro_Settlememt Proposal_20190117 | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-17 | 2019-01-17 | |
EB-2018-0056 | PO3_Niagara on the Lake Hydro_CoS_20190114 | Procedural Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-14 | 2019-01-14 | |
EB-2018-0056 | NOTL Hydro 2019 Test Year Income Tax PILs 20190111.xlsm.xlsx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NOTL Hydro 2019 Tariff Schedule and Bill Impact Model 20190111.xlsb | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendix2C 20190111.xlsx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendices 20190111.xlsm.xlsx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NOTL Hydro 2019 DVA Continuity Schedule CoS 20190111.xlsb | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NiagaraontheLake_LTR_Settlement Proposal_20190110.pdf | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-10 | 2019-01-10 | |
EB-2018-0056 | Niagaraonthe Lake_SettlementProposal_20190110.PDF | Settlement Proposal | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-10 | 2019-01-10 | |
EB-2018-0056 | NiagaraontheLake_LTR_attaching Updated Evidence Exhibits_20190111.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NiagaraontheLake_Ex_ 9_ Deferral and Variance Accounts_20190111.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NiagaraontheLake_Ex_5 Cost of Capital_20190111.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NiagaraontheLake_LTR_filing Supplementary Interrogatory Responses_20190111.pdf | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NiagaraontheLake_IRR_VECC_20190111.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NiagaraontheLake_IRR_SEC_20190111.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | NiagaraontheLake_IRR_OEB Staff_20190111.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0056 | PO2_Niagara on the Lake Hydro_20181221.pdf | Procedural Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-12-21 | 2018-12-21 | |
EB-2018-0056 | NiagaraontheLake_CORRES_Potential Settlement Propsal_20181218.PDF | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-12-18 | 2018-12-18 | |
EB-2018-0056 | Decision_Issues List_Niagara-on-the-Lake Hydro_ 20181206 | Decision | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-12-06 | 2018-12-06 | |
EB-2018-0056 | FW: EB-2018-0056 Niagara-on-the-Lake Hydro 2019 CoS Application- Staff Proposed Issues List | Submission | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-27 | 2018-11-27 | |
EB-2018-0056 | NOTLH_IRR_Appendix_4.STAFF.54.B 11-15 LDC CDM Pers Results_NOTL 20181120.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_EVD_StandbyCharges_20181120.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 Test year Income Tax PILs 20181120.xlsm | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 Tariff Schedule and Bill Impact Model 20181120.xlsb | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 Rev Reqt Work Form 20181120.xlsm | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 LRAMVA Work Form 3.0 20181120.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 Load Forecast Wholesale 20181120.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendix2C 20181120.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendices 20181120.xlsm | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 DVA Continuity Schedule CoS 20181120.xlsb | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTL Hydro 2019 Cost Allocation Model RUN2 20181120.xlsm | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_7.VECC.39A Weighting Factors 20181120.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_4.STAFF.54.A 2017 Final Results Report 20181120.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_2.SEC.16D Smart Grid Funding Application BESS 20181120.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_2.SEC.16C SGF-C- Budget 20181120.xls | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_2.SEC.16B Project Overview 20181120.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_2.SEC.16A SGF Agreement 20181120.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_1.SEC.12A Data Required for Cost Benchmarking 20181120.xlsx | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_Appendix_1.SEC.10A Advocacy Files 20181120.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | NOTLH_IRR_FINAL_20181120.pdf | Interrogatory Response from Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-11-20 | 2018-11-20 | |
EB-2018-0056 | SEC_NOTL_IRs_20181030.pdf | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-10-30 | 2018-10-30 | |
EB-2018-0056 | VECC_IR_NOTL0056_20181030.pdf | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-10-30 | 2018-10-30 | |
EB-2018-0056 | OEB_Staff_IR_Niagara-on-the-Lake Hydro_20181024 | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-10-24 | 2018-10-24 | |
EB-2018-0056 | OEB Staff_IR_Niagara-on-the-Lake Hydro_covLtr_20181024 | Interrogatories to Applicant | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-10-24 | 2018-10-24 | |
EB-2018-0056 | Community_Meeting_Summary_Niagara on the Lake_20181019 | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-10-19 | 2018-10-19 | |
EB-2018-0056 | PO1_Niagara on the Lake Hydro_ 20181010 | Procedural Order | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-10-10 | 2018-10-10 | |
EB-2018-0056 | VECC_INT_REQ_20181003.pdf | Intervenor Request Letter | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-10-03 | 2018-10-03 | |
EB-2018-0056 | NOTL Hydro Notice of Hearing Affidavit 2_20180921 | Affidavits of Service | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-09-20 | 2018-09-20 | |
EB-2018-0056 | lod_noa_NOTL Hydro_additional service_20180918 | Letter of Direction | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-09-18 | 2018-09-18 | |
EB-2018-0056 | NOTL _Affidavit of Service_20180911.pdf | Affidavits of Service | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-09-11 | 2018-09-11 | |
EB-2018-0056 | SEC_INT_REQ_20180911.pdf | Intervenor Request Letter | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-09-11 | 2018-09-11 | |
EB-2018-0056 | noa_NOTL_20180907 | Notice of Application | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-09-07 | 2018-09-07 | |
EB-2018-0056 | lod_noa_NOTL_20180907 | Letter of Direction | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-09-07 | 2018-09-07 | |
EB-2018-0056 | OEB_Corres_NOTL_20180905 | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-09-05 | 2018-09-05 | |
EB-2018-0056 | AckLtr_NOTL_20180824 | Acknowledgement Letter | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-24 | 2018-08-24 | |
EB-2018-0056 | NOTL Hydro 2019 RTSR Workform _20180823.xlsm | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Rev Reqt Work Form _20180823.xlsm | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 LRAMVA Work Form 3.0 _20180823.xlsx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Load Forecast Wholesale _20180823.xlsx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 GA Analysis Workform Appendix A _20180823.docx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 GA Analysis Workform_20180823.xlsb | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendix2C _20180823.xlsx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter2 Appendices _20180823.xlsm | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Filing Requirements Chapter 5 Appendix _20180823.xlsx | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 DVA Continuity Schedule CoS _20180823.xlsb | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Cost Allocation Model RUN1 _20180823.xlsm | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Tariff Schedule and Bill Impact Model-_20180823.xlsb | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 13 NOTL Hydro 2019 LRAMVA Work Form 3.0 _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 Test year Income Tax PILs _20180823.xlsm | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 12 NOTL Hydro 2019 Load Forecast Wholesale_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 11 NOTL Hydro 2019 GA Analysis Workform _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 10 NOTL Hydro 2019 Filing Requirements Chapter2 Appendix2C_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 9 NOTL Hydro 2019 Filing Requirements Chapter2 Appendices_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 8 NOTL Hydro 2019 Test year Income Tax PILs _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 7 NOTL Hydro 2019 RTSR Workform_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 5 NOTL Hydro 2019 DVA Continuity Schedule CoS_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 6 NOTL Hydro 2019 Rev Reqt Work Form _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 4 NOTL Hydro 2019 Cost Allocation Model RUN1 _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 3 NOTL Hydro 2019 Filing Requirements Chapter 5 Appendix_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 2 NOTL Hydro 2019 Tariff Schedule and Bill Impact Model_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | 1 NOTL Hydro Chapter 2 Appendices Checklist 2019 CoS_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 9 Deferral and Variance Accounts w Appendix_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 8 Rate Design w Appendix _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 7 Cost Allocations_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 6 Revenue Requirement w Appendix_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 5 Cost of Capital w Appendix_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 4 OMA w Appendix _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 3 Load and Other Revenue Forecast w Appendix_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Exhibit 2 Rate Base w Appendix _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro Checklist 2019 Cost of Service Application_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro 2019 CoS Master Table of Contents_20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | NOTL Hydro_APPL_Exhibit 1 Administrative Documents w Appendix _20180823.pdf | Application and Evidence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-08-23 | 2018-08-23 | |
EB-2018-0056 | Niagara-on-the-Lake Hydro_ Corres_community meeting notice letter_20180720.pdf | Correspondence | Niagara-on-the-Lake Hydro Inc. - Electricity Distributor | 2018-07-20 | 2018-07-20 | |