EB-2015-0029
|
APPrO_Cost Claim_rev_Joanna Kyriazis_20160224
|
Cost Claim
|
|
2016-02-24
|
2016-02-24
|
EB-2015-0029
|
APPrO_Cost Claim_rev_CARY FERGUSON_20160224
|
Cost Claim
|
|
2016-02-24
|
2016-02-24
|
EB-2015-0029
|
IGUA_LTR_Green Investment Fund Attribution_2016080
|
Post Hearing Filings
|
|
2016-08-08
|
2016-08-08
|
EB-2015-0029
|
UNION_Ltr_2015-2020 DSM Plan_Green Investment Fund Letter_20160728
|
Correspondence
|
|
2016-07-28
|
2016-07-28
|
EB-2015-0029
|
Dec_rate order_DSM_Enbridge_20160512
|
Decision and Order
|
2016-05-12
|
|
2016-05-12
|
EB-2015-0029
|
App D_EGDI_Final_Rate_Order_20160512
|
Decision and Order
|
2016-05-12
|
|
2016-05-12
|
EB-2015-0029
|
App C_EGDI_Final_Rate_Order_20160512
|
Decision and Order
|
2016-05-12
|
|
2016-05-12
|
EB-2015-0029
|
APP B_EGDI_Final_Rate_Order_20160512
|
Decision and Order
|
2016-05-12
|
|
2016-05-12
|
EB-2015-0029
|
App A_EGDI_Final_Rate_Order_20160512
|
Decision and Order
|
2016-05-12
|
|
2016-05-12
|
EB-2015-0029
|
dec_order_cost awards_EGDI_Union Combined_20160510
|
Decision and Order on Cost Awards
|
2016-05-10
|
|
2016-05-10
|
EB-2015-0029
|
EGDI_Reply_Letter_DRO_20160503
|
Correspondence
|
|
2016-05-03
|
2016-05-03
|
EB-2015-0029
|
Dec_DSM_Union_Rate Order_20160505
|
Decision and Order
|
2016-05-05
|
|
2016-05-05
|
EB-2015-0029
|
OEB_Staff_Sub_Enbridge_DSM_DRO_20160429
|
Submission
|
|
2016-04-29
|
2016-04-29
|
EB-2015-0029
|
ED_AmendedCostClaimAffidavit_20160217
|
Cost Claim
|
|
|
2016-04-27 at 10:59 AM
|
EB-2015-0029
|
EGDI_Draft_Final_Rate_Order_20160426
|
Draft Rate Order
|
|
2016-04-26
|
2016-04-26
|
EB-2015-0029
|
UNION_Ltr_2015-2020 DSM Plan DRO_OEB Request_20160420
|
Correspondence
|
|
2016-04-20
|
2016-04-20
|
EB-2015-0029
|
OEB_ltr_Union DRO_20160415
|
Correspondence
|
2016-04-15
|
|
2016-04-15
|
EB-2015-0029
|
UNION_SUB_2015-2020 DSM Plan Draft Rate Order Response_20160406
|
Submission
|
|
2016-04-06
|
2016-04-06
|
EB-2015-0029
|
TRIM: OEB correspondence for EB-2015-0049 Enbridge Gas Distribution Inc. and EB-2015-0029 Union Gas Limited email
|
Correspondence
|
2016-03-24
|
|
2016-03-24
|
EB-2015-0029
|
FW: GEC's cost claims EB-2015-0029 EB-2015-0049
|
Cost Claim
|
|
2016-03-24
|
2016-03-24
|
EB-2015-0029
|
OEB_Staff_Sub_Union_DSM_DRO_20160329
|
Submission
|
|
2016-03-29
|
2016-03-29
|
EB-2015-0029
|
OEB_ltr_DRO_Request_20160324
|
Correspondence
|
2016-03-24
|
|
2016-03-24
|
EB-2015-0029
|
OEBStaff_Req_comment_extension_DRO_20160317
|
Correspondence
|
|
2016-03-17
|
2016-03-17
|
EB-2015-0029
|
UNION_DRO_2015-2020 DSM Plan_20160314
|
Draft Rate Order
|
|
2016-03-14
|
2016-03-14
|
EB-2015-0029
|
EB-2015-0029 Union & EB-2015-0049 EGDI - DSM Plans - Energy Probe ExecutedAffidavit
|
Cost Claim
|
|
2016-02-25
|
2016-02-25
|
EB-2015-0029
|
APPrO_EB-2015-0029 and 2015-0049 - Cost Claim LISA DEMARCO
|
Cost Claim
|
|
2016-02-22
|
2016-02-22
|
EB-2015-0029
|
APPrO_EB-2015-0029 and 2015-0049 - Cost Claim JOANNA KYRIAZIS
|
Cost Claim
|
|
2016-02-22
|
2016-02-22
|
EB-2015-0029
|
APPrO_EB-2015-0029 and 2015-0049 - Cost Claim CARY FERGUSON
|
Cost Claim
|
|
2016-02-22
|
2016-02-22
|
EB-2015-0029
|
Revised Decision and Order_Enbridge_Union_DSM_20160224
|
Decision and Order
|
2016-02-24
|
|
2016-02-24
|
EB-2015-0029
|
GEC_costs_correspondence_20160223
|
Correspondence
|
|
2016-02-23
|
2016-02-23
|
EB-2015-0029
|
VECC Cost Claim Union - EGDI_20160219
|
Cost Claim
|
|
2016-02-19
|
2016-02-19
|
EB-2015-0029
|
OSEA_CostClaim_20160219
|
Cost Claim
|
|
2016-02-19
|
2016-02-19
|
EB-2015-0029
|
LIEN_CorrectedPagesforCostClaim_20160219
|
Cost Claim
|
|
2016-02-19
|
2016-02-19
|
EB-2015-0029
|
Chris Young CV_20160218
|
Cost Claim
|
|
2016-02-18
|
2016-02-18
|
EB-2015-0029
|
Chris Young CV Addendum_20160218
|
Cost Claim
|
|
2016-02-18
|
2016-02-18
|
EB-2015-0029
|
EGDI_Revised_AccountingOrder_20160217
|
Submission
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
UNION_Ltr_DSM Plan_Revised Accounting Order_20160217
|
Correspondence
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
EGDI_CostsObj_20160217
|
Cost Claim Objection
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
UNION_Ltr_Comments_Cost Claim_DSM Plan_20160217
|
Correspondence
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Costs_UnionKM_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Costs_EGD_KM_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
RII costs_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Cost_Claim_for_Hearing_Form EB-2015-0049 Enbridge RFaesy_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Cost_Claim_for_Hearing_Form EB-2015-0049 Enbridge JGrevatt_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Cost_Claim_for_Hearing_Form EB-2015-0049 Enbridge CNeme_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Cost_Claim_for_Hearing_Form EB-2015-0029 Union JWillson_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Cost_Claim_for_Hearing_Form EB-2015-0029 Union JGrevat
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Cost_Claim_for_Hearing_Form EB-2015-0029 Union CNeme.xlsm
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Memo responding to questions from OEB_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Poch Union Cost_Claim_for_Hearing_Form_eff-20140602
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
Poch EGD Cost_Claim_for_Hearing_Form_eff-20140602
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
GEC_cost claim_ltr_20160217
|
Cost Claim
|
|
2016-02-17
|
2016-02-17
|
EB-2015-0029
|
OEB_Staff_Sub_Union_EGD_DSM_Plan_DAO_20160210
|
Submission
|
|
2016-02-10
|
2016-02-10
|
EB-2015-0029
|
SEC_Cost Claim_EGDI_Union_DSM_20160210
|
Cost Claim
|
|
2016-02-10
|
2016-02-10
|
EB-2015-0029
|
EGDI_Response_SEC_Ltr_20160208
|
Correspondence
|
|
2016-02-08
|
2016-02-08
|
EB-2015-0029
|
OGVG_COST CLAIM_0029_20160204
|
Cost Claim
|
|
2016-02-08
|
2016-02-08
|
EB-2015-0029
|
Energy Probe Costs Executed Affidavit Cost Claim_20160205
|
Cost Claim
|
|
2016-02-08
|
2016-02-08
|
EB-2015-0029
|
FRPO_COST CLAIM_0049_20160204
|
Cost Claim
|
|
2016-02-05
|
2016-02-05
|
EB-2015-0029
|
SEC_ltr_Union_EGDI DSM_20160205
|
Correspondence
|
|
2016-02-05
|
2016-02-05
|
EB-2015-0029
|
CCC CostClaim DSM Combined_20160205
|
Cost Claim
|
|
2016-02-05
|
2016-02-05
|
EB-2015-0029
|
Energy Probe Costs Submission_20160204
|
Cost Claim
|
|
2016-02-04
|
2016-02-04
|
EB-2015-0029
|
VECC Cost Claim Union - EGDI_20160204
|
Cost Claim
|
|
2016-02-04
|
2016-02-04
|
EB-2015-0029
|
CME_Cost Claim_20160205
|
Cost Claim
|
|
2016-02-03
|
2016-02-03
|
EB-2015-0029
|
IGUA_Cost Claim_20160203
|
Cost Claim
|
|
2016-02-03
|
2016-02-03
|
EB-2015-0029
|
EGDI_Comments_DAO_20160203
|
Correspondence
|
|
|
2016-02-04 at 11:48 AM
|
EB-2015-0029
|
UNION_Ltr_2015-2020 DSM Plan Written Comments_20160203
|
Correspondence
|
|
2016-02-03
|
2016-02-03
|
EB-2015-0029
|
APPrO_Cost Claim_20160203
|
Cost Claim
|
|
2016-02-03
|
2016-02-03
|
EB-2015-0029
|
ED_Cost Claim_20160203
|
Cost Claim
|
|
2016-02-03
|
2016-02-03
|
EB-2015-0029
|
IGUA_Cost Claim_20160203
|
Cost Claim
|
|
2016-02-03
|
2016-02-03
|
EB-2015-0029
|
OSEA_CostClaim_20160203
|
Cost Claim
|
|
2016-02-03
|
2016-02-03
|
EB-2015-0029
|
LIEN_Cost Claim_20160201
|
Cost Claim
|
|
2016-02-01
|
2016-02-01
|
EB-2015-0029
|
UNION_Ltr_Request for Clarification_20160125
|
Correspondence
|
|
2016-01-25
|
2016-01-25
|
EB-2015-0029
|
LPMA_COSTS_20160122
|
Cost Claim
|
|
2016-01-22
|
2016-01-22
|
EB-2015-0029
|
BOMA_CostClaim_20160121
|
Cost Claim
|
|
2016-01-22
|
2016-01-22
|
EB-2015-0029
|
GEC_Cost Claim_20160121
|
Cost Claim
|
|
2016-01-21
|
2016-01-21
|
EB-2015-0029
|
Decision_and_Order_Enbridge_Union _DSM_20160120
|
Decision and Order
|
2016-01-20
|
|
2016-01-20
|
EB-2015-0029
|
APPrO_Ltr_Intvr Change in Counsel_20151110
|
Correspondence
|
|
2015-11-10
|
2015-11-10
|
EB-2015-0029
|
UNION_ReplyArgument_2015-2020 DSM Plan_20151023
|
Applicant Reply Argument
|
|
2015-10-23
|
2015-10-23
|
EB-2015-0029
|
EGDI_undertaking response_J5.3_updated_20151019
|
Undertaking Responses
|
|
2015-10-19
|
2015-10-19
|
EB-2015-0029
|
EX_K7.1_20150828
|
Exhibits
|
|
|
2015-10-16 at 9:07 AM
|
EB-2015-0029
|
HVAC_ltr_correspondence_20151015
|
Correspondence
|
|
2015-10-15
|
2015-10-15
|
EB-2015-0029
|
OSEA_LtrComment_corresp_20151009
|
Correspondence
|
|
2015-10-09
|
2015-10-09
|
EB-2015-0029
|
CCC finalargument GAS DSM_20151007
|
Intervenor Argument
|
|
2015-10-07
|
2015-10-07
|
EB-2015-0029
|
BrdStaff_Sub_EGD Union_2015-2020 DSM Plans_20150210
|
Submission
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
Letter_OEBStaffSubmission_20151002
|
Submission
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
VECC_intrv_ARG_DSM_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
IGUA_intrv_ARG__20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
Energy Probe Argument_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
Energy Probe_intrv_ARG_Ltr_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
SEC_intrv_Argument_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
APPrO_intrv_ARG_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
GEC_intrv_ARGUMENT_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
LPMA_intrv_ARG_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
OSEA_ARG_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
CME_intrv_ARG_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
LIEN_ARG_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
ED_ARG_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
FRPO_ARG_DSM_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
OGVG_ARG_20151002
|
Intervenor Argument
|
|
2015-10-02
|
2015-10-02
|
EB-2015-0029
|
BOMA_IntrvARG_20150929
|
Intervenor Argument
|
|
2015-09-29
|
2015-09-29
|
EB-2015-0029
|
EX_K9.4_APPrO_OSEA_Cross_Compendium_20150831
|
Exhibits
|
|
2015-09-17
|
2015-09-17
|
EB-2015-0029
|
OEB_ltr_CCC_Extension_Request_20150916
|
Correspondence
|
2015-09-16
|
|
2015-09-16
|
EB-2015-0029
|
EX_K14.1_Union Gas Limited Argument In Chief Compendium_20150911
|
Exhibits
|
|
2015-09-11
|
2015-09-11
|
EB-2015-0029
|
Ex K10.2_Energy Probe_GEC Panel_Compendium_20150831
|
Exhibits
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Ex K10.1_ED_CrossMaterials_GECandBoard_20150831
|
Exhibits
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
EGDI_Argument_In_Chief_20150911
|
Applicant Argument in Chief
|
|
2015-09-11
|
2015-09-11
|
EB-2015-0029
|
EX_14.2_EGDI_ARGChief_Compendium_20150911
|
Exhibits
|
|
2015-09-11
|
2015-09-11
|
EB-2015-0029
|
EGDI_Letter_Argument_20150911
|
Applicant Argument in Chief
|
|
2015-09-11
|
2015-09-11
|
EB-2015-0029
|
Union Enbridge DSM_ARG_Vol 14_20150911
|
Transcripts
|
|
2015-09-11
|
2015-09-11
|
EB-2015-0029
|
EGDI_undertaking response_J6.6_20150903
|
Undertaking Responses
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
CCC argument extension GASDSM ltr_20150910
|
Correspondence
|
|
2015-09-10
|
2015-09-10
|
EB-2015-0029
|
GEC_Undertakings_J10.3_J10.5_20150909
|
Undertaking Responses
|
|
2015-09-09
|
2015-09-09
|
EB-2015-0029
|
GEC_Undertakings_J10.1_J10.2_J10.4_J10.6_20150908
|
Undertaking Responses
|
|
2015-09-08
|
2015-09-08
|
EB-2015-0029
|
EGDI_UndertakingResp_J6.10_J8.1_J8.15_J9.5_J9.8_J9.9_J5.3 cor_20150904
|
Undertaking Responses
|
|
2015-09-04
|
2015-09-04
|
EB-2015-0029
|
OEB Staff_Expert_UndertakingResp_Union_Enbridge_20150904
|
Undertaking Responses
|
|
2015-09-04
|
2015-09-04
|
EB-2015-0029
|
OEB Staff_Expert_UndertakingResp_Union_Enbridge_covltr_20150904
|
Undertaking Responses
|
|
2015-09-04
|
2015-09-04
|
EB-2015-0029
|
Ex K12.7_Doc from IESO_IAP_20150904
|
Exhibits
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
Ex K12.6_Union Compendium for Synapse Panel_20150902
|
Exhibits
|
|
2015-09-02
|
2015-09-02
|
EB-2015-0029
|
Ex K12.2_Doc entitled Benefits On-Bill Financing_20150903
|
Exhibits
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
Transcript_Vol13_Union Enbridge DSM_20150904
|
Transcripts
|
|
2015-09-04
|
2015-09-04
|
EB-2015-0029
|
Transcript_Vol12_Union Enbridge DSM_20150903
|
Transcripts
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
EGDI_Undertaking Resp_part 2_20150903
|
Undertaking Responses
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
EGDI_Undertaking Resp_20150903
|
Undertaking Responses
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
ExK12.4_Energy Probe Exhibit K X_20150903
|
Exhibits
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
Ex K12.5_APPrO_Materials_for_Synapse_Cross_20150903
|
Exhibits
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
Ex K11.1_FRPO_Cross Exam Compendium_GEC Panel_20150902
|
Exhibits
|
|
2015-09-02
|
2015-09-02
|
EB-2015-0029
|
Ex K11.3_Union Gas_Compendium_GEC Panel_20150902
|
Exhibits
|
|
2015-09-02
|
2015-09-02
|
EB-2015-0029
|
Ex K12.8_EGDI_Compendium_Synapse Panel_20150902
|
Exhibits
|
|
2015-09-02
|
2015-09-02
|
EB-2015-0029
|
Transcript_Vol11_Union Enbridge DSM_20150903
|
Transcripts
|
|
2015-09-03
|
2015-09-03
|
EB-2015-0029
|
Ex K12.1_SEC_Materials for Synapse Cross_20150902
|
Exhibits
|
|
2015-09-02
|
2015-09-02
|
EB-2015-0029
|
EGDI_Undertaking Resp_ J5.2_J6.7_J7.1_J8.2_J8.5 toJ8.8_20150901
|
Undertaking Responses
|
|
2015-09-01
|
2015-09-01
|
EB-2015-0029
|
ED_SupplementaryCrossMaterialsForSynapse_20150901
|
Cross Examination Material
|
|
2015-09-01
|
2015-09-01
|
EB-2015-0029
|
EGDI_Undertaking Resp_J5.3_20150901
|
Undertaking Responses
|
|
2015-09-01
|
2015-09-01
|
EB-2015-0029
|
Transcript_Vol10_Union Enbridge DSM_20150901
|
Transcripts
|
|
2015-09-01
|
2015-09-01
|
EB-2015-0029
|
UNION_Undertaking Resp_J2.1_20150901
|
Undertaking Responses
|
|
2015-09-01
|
2015-09-01
|
EB-2015-0029
|
Ex K11.2_EGDI_Compendium_GEC Panel_20150831
|
Exhibits
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
EGDI_cvr ltr_GEC Compendium_20150831
|
Cross Examination Material
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
EGDI_Undertaking Resp_J5.1_J5.5B_J6.1_J6.4_J7.2_J8.10_20150831
|
Undertaking Responses
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Ex K12.3_Energy Probe_GEC Synapse Panel_Compendium_20150831
|
Exhibits
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Energy Probe_GEC Panel_Compendium_20150831
|
Cross Examination Material
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
UNION_Undertaking Resp_J1.5_20150831
|
Undertaking Responses
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Ex K9.3_ExcerptTranscript Vol 8 pg 77_20150831
|
Exhibits
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Ex K9.2_Addendum Mr. Young Resume_20150831
|
Exhibits
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Ex K9.1_IGUA Compendium_Enbridge Panel 3_20150831
|
Exhibits
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Ex K7.4_GEC Compendium_Cross Exam Enbridge Panel 4_20150827
|
Exhibits
|
|
2015-08-27
|
2015-08-27
|
EB-2015-0029
|
ED_CrossMaterials_GECandBoard_20150831
|
Cross Examination Material
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
M.GEC_IRR_APPrO.4_Updated_20150831
|
Interrogatory Response from Intervenor
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
Transcript_Vol 9_Union Enbridge DSM_20150831
|
Transcripts
|
|
2015-08-31
|
2015-08-31
|
EB-2015-0029
|
UNION_Undertaking Resp_J1.2_J1.3_J1.6_J1.11_J3.4_J3.17_J3.18_J4.7_20150828
|
Undertaking Responses
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
Ex K8.2_VECC Compendium Cross Exam EGDI Panel 2_20150828
|
Exhibits
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
Ex K8.1_Navigant Natural Gas Study_20150828
|
Exhibits
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
Ex K5.4_EP Spreadsheet JT1.36_20150825
|
Exhibits
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
EGDI_Undertaking Resp_J5.5A_J5.7_J6.3_J6.8_J6.9_20150828
|
Undertaking Responses
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
Transcript_Vol 8_Union Enbridge DSM_20150828
|
Transcripts
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
GEC_Undertaking response_JT3.1_20150828
|
Undertaking Responses
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
EX_K7.5_20150827
|
Exhibits
|
|
2015-08-27
|
2015-08-27
|
EB-2015-0029
|
EX_K7.3_20150827
|
Exhibits
|
|
2015-08-27
|
2015-08-27
|
EB-2015-0029
|
EX_K7.2_20150827
|
Exhibits
|
|
2015-08-27
|
2015-08-27
|
EB-2015-0029
|
EX_K6.4_20150826
|
Exhibits
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
EX_K6.3_20150826
|
Exhibits
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
EX_K6.2_20150826
|
Exhibits
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
EX_K6.1_20150826
|
Exhibits
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
EX_K5.5_20150825
|
Exhibits
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
EX_K4.3_20150824
|
Exhibits
|
|
2015-08-24
|
2015-08-24
|
EB-2015-0029
|
EX_K4.2_20150824
|
Exhibits
|
|
2015-08-24
|
2015-08-24
|
EB-2015-0029
|
UNION_Undertakings_J1.4_J1.9_J2.4_J3.6_J3.12-J3.16_J4.2_20150827
|
Undertaking Responses
|
|
2015-08-27
|
2015-08-27
|
EB-2015-0029
|
Letter_OEB_Expert_TC_Undertakings_20150828
|
Undertaking Responses
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
JT4.1_Synapse TC Undertaking respnse_20150828
|
Undertaking Responses
|
|
2015-08-28
|
2015-08-28
|
EB-2015-0029
|
Union Enbridge DSM_transcript_Volume 7_20150827
|
Transcripts
|
|
2015-08-27
|
2015-08-27
|
EB-2015-0029
|
UNION_Undertakings_J1.1_J3.2_J3.8_J3.9_J3.11_J3.14_J3.14_J4.3-4.6_J4.8_20150826
|
Undertaking Responses
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
CME correspondence_20150826
|
Correspondence
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
Union Enbridge DSM_transcript_Volume 6_20150826
|
Transcripts
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
Ex5.2_GEC_Cross Exam_EGDI Panel1_20150825
|
Exhibits
|
|
2015-08-26
|
2015-08-26
|
EB-2015-0029
|
EGDI_Evidence In Chief_Panel 4_20150825
|
Cross Examination Material
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
ED_CrossMaterials_DSMvsCDM_20150825
|
Cross Examination Material
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
OSEA_EX_JT3.10_TranscriptUndertakings_20150825
|
Undertaking Responses
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
K5.3_EP Compendium_EGDI Panels 1, 2 4_20150825
|
Exhibits
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
K5.1_EGDI_ Multi Year DSM Plan Overview Presentation_20150825
|
Exhibits
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
Union Enbridge_DSM_Transcript_Vol 5_rev_20150825
|
Transcripts
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
SEC Compendium Enbridge Panels_20150825
|
Cross Examination Material
|
|
2015-08-25
|
2015-08-25
|
EB-2015-0029
|
GEC_TUs_JT3.2-3.9_20150824
|
Undertaking Responses
|
|
2015-08-24
|
2015-08-24
|
EB-2015-0029
|
UNION_Undertakings_J1.7_J1.8_J1.10_J1.12_J2.2_J2.3_J3.1_J3.3_J3.5_J3.7_J3.10_20150824
|
Undertaking Responses
|
|
2015-08-24
|
2015-08-24
|
EB-2015-0029
|
EX_K4.1_20150824
|
Exhibits
|
|
2015-08-24
|
2015-08-24
|
EB-2015-0029
|
Union Enbridge DSM_transcript_Volume 4_20150824
|
Transcripts
|
|
2015-08-24
|
2015-08-24
|
EB-2015-0029
|
APPrO_Cross Materials for Union_20150821
|
Cross Examination Material
|
|
2015-08-21
|
2015-08-21
|
EB-2015-0029
|
UNION_Undertakings_J2.5_20150821
|
Undertaking Responses
|
|
2015-08-21
|
2015-08-21
|
EB-2015-0029
|
ED_CrossMaterialsForEnbridge_20150824
|
Cross Examination Material
|
|
2015-08-24
|
2015-08-24
|
EB-2015-0029
|
EX_K3.1_20150821
|
Exhibits
|
|
2015-08-21
|
2015-08-21
|
EB-2015-0029
|
Union Enbridge DSM_transcript_Volume 3_20150821
|
Transcripts
|
|
2015-08-21
|
2015-08-21
|
EB-2015-0029
|
Union Enbridge DSM_transcript_Volume 2_20150820
|
Transcripts
|
|
2015-08-21
|
2015-08-21
|
EB-2015-0029
|
EX_K2.1_20150820
|
Exhibits
|
|
2015-08-20
|
2015-08-20
|
EB-2015-0029
|
EX_K2.2_20150820
|
Exhibits
|
|
2015-08-20
|
2015-08-20
|
EB-2015-0029
|
EX_K2.3_20150820
|
Exhibits
|
|
2015-08-20
|
2015-08-20
|
EB-2015-0029
|
EX_K2.4_20150820
|
Exhibits
|
|
2015-08-20
|
2015-08-20
|
EB-2015-0029
|
EGDI_WitnessPanels_Revised_20150820
|
Correspondence
|
|
2015-08-20
|
2015-08-20
|
EB-2015-0029
|
SEC_Compendium Union Panel 2_20150820
|
Cross Examination Material
|
|
2015-08-20
|
2015-08-20
|
EB-2015-0029
|
EX_K2.1_20150820
|
Exhibits
|
|
2015-08-20
|
2015-08-20
|
EB-2015-0029
|
Enbridge_Union_DSM_Undertakings List_Oral Hearing_20150915
|
Undertaking List
|
|
|
2015-09-15 at 3:15 PM
|
EB-2015-0029
|
EX_K1.2_20150819
|
Exhibits
|
|
2015-08-19
|
2015-08-19
|
EB-2015-0029
|
EX_K1.1_20150819
|
Exhibits
|
|
2015-08-19
|
2015-08-19
|
EB-2015-0029
|
Enbridge_Union_DSM_exhibit list_oral hearing_20150911
|
Exhibit List
|
|
|
2015-09-14 at 10:44 AM
|
EB-2015-0029
|
Union Enbridge DSM_transcript_Volume 1_20150819
|
Transcripts
|
|
2015-08-19
|
2015-08-19
|
EB-2015-0029
|
ED_CrossMaterialsForUnion_20150819
|
Cross Examination Material
|
|
2015-08-19
|
2015-08-19
|
EB-2015-0029
|
EX_KT4.3_20150818
|
Exhibits
|
|
2015-08-18
|
2015-08-18
|
EB-2015-0029
|
EX_KT4.2_20150818
|
Exhibits
|
|
2015-08-18
|
2015-08-18
|
EB-2015-0029
|
EX_KT4.1_20150818
|
Exhibits
|
|
2015-08-18
|
2015-08-18
|
EB-2015-0029
|
Enbridge_Union_DSM_exhibit list_20150819
|
Exhibit List
|
|
|
2015-08-19 at 11:22 AM
|
EB-2015-0029
|
Union Enbridge DSM_transcript_TC_vol4_20150818
|
Transcripts
|
|
2015-08-18
|
2015-08-18
|
EB-2015-0029
|
Union Enbridge DSM_transcript_ TC_vol3_20150817
|
Transcripts
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
Enbridge_Union_undertakings list_TC_20150828
|
Undertaking List
|
|
|
2015-08-28 at 3:06 PM
|
EB-2015-0029
|
Woolf_HearingFormA_20150817
|
Pre-Hearing Material
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
Takahashi_HearingFormA_20150817
|
Pre-Hearing Material
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
Letter_OEB_Expert_FormA_20150817
|
Pre-Hearing Material
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
GEC_IRR_clarifications_20150815
|
Interrogatory Response from Intervenor
|
|
2015-08-15
|
2015-08-15
|
EB-2015-0029
|
Mowat Centre - Ontario Made_20150817
|
Pre-Hearing Material
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
Mowat Centre - Ontario Made - Excerpt_20150816
|
Pre-Hearing Material
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
Enercare - Furnace_20150816
|
Pre-Hearing Material
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
ED_LTR_20150816
|
Correspondence
|
|
2015-08-17
|
2015-08-17
|
EB-2015-0029
|
OGVG_Time Est_Tech Conf_EGDI_Union DSM_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
EnergyProbe_Time Est._Tech Conf_EGDI_Union DSM_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
APPrO_Ltr_Tech Conf Time_Questions_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
GEC_Ltr_Tech Conf TIme_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
UNION_LTR_Tech Conf Time Est_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
EGDI_Ltr_Tech Conf_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
LIEN_LTR_Participation_Technical_Conference_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
OGVG_SUB_REP_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
GEC_INTRV_EVIDENCE1_CORRECTED_20150813
|
Intervenor Evidence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
GEC_EVD_corrected_Letter_L GEC 1_20150813
|
Intervenor Evidence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
BOMA_Questions_20150813
|
Correspondence
|
|
2015-08-13
|
2015-08-13
|
EB-2015-0029
|
GEC_EVD_corrected_Letter_L GEC 2_20150812
|
Intervenor Evidence
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
SEC_timelines correspondence_20150812
|
Correspondence
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC_INTRV_EVIDENCE2_CORRECTED_20150812
|
Intervenor Evidence
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC.IRR._EVD_EGDI.15b Attachment 1_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC.IRR_EVD_APPrO.6 Attachment 1_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC.IRR_EVD_APPrO_5-7_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC.IRR_EVD_EGDI_11-29_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC.IRR_EVD_UNION_6-7_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC.IRR_EVD_FRPO_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
Exhibit M Staff UNION 18 Att1_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
OEB_Staff_IRRs_Expert_Evidence_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
Cover_Letter_OEB_Staff_IRRs_Expert_Evidence_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
UNION_LTR_Intervenor Evidence_2050812
|
Correspondence
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
OSEA_IRR_EVD_VECC_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
OSEA_IRR_EVD_OGVG_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
OSEA_IRR_EVD_GEC_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
OSEA_IRR_EVD_Enbridge_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
OSEA_IRR_EVD_APPrO_20150812
|
Interrogatory Response from Intervenor
|
|
2015-08-12
|
2015-08-12
|
EB-2015-0029
|
GEC.IRR_EVD_UNION_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_STAFF.1 Attachment 1_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_STAFF_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_IGUA_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_EP.12d_Attachment 1_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_EP_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_EGDI_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_ED_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-10
|
2015-08-10
|
EB-2015-0029
|
GEC.IRR_EVD_APPrO_20150810
|
Interrogatory Response from Intervenor
|
|
2015-08-11
|
2015-08-11
|
EB-2015-0029
|
OGVG_CROSS EST_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
GEC_correspondence_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
FRPO_CROSS EST_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
EP_Cross Time Estimates- Ltr_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
TRIM: FW: EB-2015-0029/EB2015-0049- GAS DSM PLANS - Consumers Council of Canada Cross Examination Estimates
|
Correspondence
|
|
2015-08-06
|
2015-08-06
|
EB-2015-0029
|
EGDI_IR_EVD_GEC2_20150807
|
Interrogatories to Intervenor
|
|
2015-08-07
|
2015-08-07
|
EB-2015-0029
|
Board_Staff_IRs_GEC2_20150805
|
Interrogatories to Intervenor
|
|
2015-08-07
|
2015-08-07
|
EB-2015-0029
|
Cover_Letter_Board_Staff_IRs_GEC2_20150807
|
Interrogatories to Intervenor
|
|
2015-08-07
|
2015-08-07
|
EB-2015-0029
|
IGUA_IR2_EVD_GEC_20150806
|
Interrogatories to Intervenor
|
|
2015-08-06
|
2015-08-06
|
EB-2015-0029
|
IGUA_IR_EVD_GEC_20150806
|
Interrogatories to Intervenor
|
|
2015-08-06
|
2015-08-06
|
EB-2015-0029
|
OGVG_IR_Board Staff_20150803
|
Interrogatories to Intervenor
|
|
2015-08-03
|
2015-08-03
|
EB-2015-0029
|
OGVG_IR_OSEA_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
OSEA_IR_EVD_OEB_Union_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
APPrO_Ltr_Cross Time Estimates_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
IGUA_Ltr_Cross_Exam_Time_Estimates_20150806
|
Correspondence
|
|
2015-08-06
|
2015-08-06
|
EB-2015-0029
|
VECC_IR_OSEA_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
APPrO_IR_EVD_GEC_20150807
|
Interrogatories to Intervenor
|
|
2015-08-07
|
2015-08-07
|
EB-2015-0029
|
UNION_IR_EVD_GEC_2_20150807
|
Interrogatories to Intervenor
|
|
2015-08-07
|
2015-08-07
|
EB-2015-0029
|
ED_IRs_for_GEC_PC_20150807
|
Interrogatories to Intervenor
|
|
2015-08-07
|
2015-08-07
|
EB-2015-0029
|
Energy Probe IRs on GEC Evidence (2)_20150804
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
Energy Probe IRs on GEC Evidence (1) _20150804
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
Energy Probe IRs GEC EvidencePart 1 Part 2 - Ltr OEB_20150804
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
Energy Probe IRs Board StaffEvidence - Ltr OEB_20150804
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
Energy Probe IRs Board Staff Evidence_20150804
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
VECC_LTR_CrossEstimates_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
FRPO_IR_20150807
|
Interrogatories to Intervenor
|
|
2015-08-07
|
2015-08-07
|
EB-2015-0029
|
APPrO OSEA IRs updated_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
APPrO_IR_EVD_OSEA_Corrected_20150804
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
Board_Staff_IRs_GEC1_20150805
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
Cover_Letter_Board_Staff_IRs_GEC1_20150805
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
Letter_OEB_Staff_Time_Estimates_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
UNION_Ltr_2015-2020 DSM_Cross Examination Time Estimates_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
UNION_IR_EVD_GEC_1__20150805
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
LIEN_Ltr_TimeEstimates_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
GEC_correspondence_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
EGDI_Letter_IR_Intervenor_20150804
|
Correspondence
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
EGDI_IR_OSEA_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
EGDI_IR_EVD_GEC1_20150805
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
EGDI_IR_Board Staff_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
EGD_LTR_CrossExamination Time Estimates_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
ED_LTR_Time_Estimates_20150806
|
Correspondence
|
|
2015-08-06
|
2015-08-06
|
EB-2015-0029
|
ED_IRs_for_GEC_Neme_20150805
|
Interrogatories to Intervenor
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
CME Time Estimates_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
APPrO_IR_EVD_OSEA_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
APPrO_IR_EVD_GEC_20150805
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
APPrO_IR_EVD_Board Staff_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
GEC_IR_Evid_OSEABoardStaff_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
BOMA_correspondence_20150805
|
Correspondence
|
|
2015-08-05
|
2015-08-05
|
EB-2015-0029
|
LIEN_IR_EVD_OEB_UnionGas_20150804
|
Interrogatories to Applicant
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
UNION_IR_EVD_Board Staff_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
OSEA_ltr_correspondence_20150804
|
Correspondence
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
OSEA_IR_Board Staff_20150804
|
Interrogatories to Intervenor
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
CME_ltetter_IRR to applicant_20150804
|
Interrogatories to Applicant
|
|
2015-08-04
|
2015-08-04
|
EB-2015-0029
|
GEC_intrv_evidence2_20150731
|
Intervenor Evidence
|
|
2015-07-31
|
2015-07-31
|
EB-2015-0029
|
EGDI_WitnessPanels_20150731
|
Correspondence
|
|
2015-07-31
|
2015-07-31
|
EB-2015-0029
|
UNION_LTR_Witness Panels_2015-2020 DSM Plan_20150731
|
Correspondence
|
|
2015-07-31
|
2015-07-31
|
EB-2015-0029
|
OSEA_ltr_Expert_Witness_Panel_20150731
|
Correspondence
|
|
2015-07-31
|
2015-07-31
|
EB-2015-0029
|
GEC_correspondence_20150731
|
Correspondence
|
|
2015-07-31
|
2015-07-31
|
EB-2015-0029
|
Letter_OEB_Staff_Expert_Witness_Panel_20150730
|
Correspondence
|
|
2015-07-30
|
2015-07-30
|
EB-2015-0029
|
GEC_INTRV_EVIDENCE1_20150729
|
Intervenor Evidence
|
|
2015-07-30
|
2015-07-30
|
EB-2015-0029
|
OEB_Staff_Expert_Evidence_cvr ltr_20150727
|
Submission
|
|
2015-07-27
|
2015-07-27
|
EB-2015-0029
|
OEB_Staff_Evidence_20150727
|
Submission
|
|
2015-07-27
|
2015-07-27
|
EB-2015-0029
|
OSEA_intrv_evidence_20150727
|
Intervenor Evidence
|
|
2015-07-27
|
2015-07-27
|
EB-2015-0029
|
OEB_ltr_GEC_Expert_Evidence_20150724
|
Correspondence
|
2015-07-24
|
|
2015-07-24
|
EB-2015-0029
|
GEC_correspondence_20150723
|
Correspondence
|
|
2015-07-23
|
2015-07-23
|
EB-2015-0029
|
EGDI_Corrected_Exhibits_20150722
|
Exhibits
|
|
2015-07-22
|
2015-07-22
|
EB-2015-0029
|
EGDI_Undertaking Resp_JT1.20 updated_20150717
|
Undertaking Responses
|
|
2015-07-17
|
2015-07-17
|
EB-2015-0029
|
EGDI_Undertaking Resp_JT1.34_20150717
|
Undertaking Responses
|
|
2015-07-17
|
2015-07-17
|
EB-2015-0029
|
EGDI_Undertaking Resp_JT1.30_20150717
|
Undertaking Responses
|
|
2015-07-17
|
2015-07-17
|
EB-2015-0029
|
EGDI_ltr_Undertaking Resp_20150717
|
Undertaking Responses
|
|
2015-07-17
|
2015-07-17
|
EB-2015-0029
|
I T9 EGDI GEC 30 corrected 20150708
|
Undertaking Responses
|
|
2015-07-09
|
2015-07-09
|
EB-2015-0029
|
I T9 EGDI FRPO 4 corrected 20150708
|
Undertaking Responses
|
|
2015-07-09
|
2015-07-09
|
EB-2015-0029
|
I T5 EGDI LIEN 2 corrected 20150708
|
Undertaking Responses
|
|
2015-07-09
|
2015-07-09
|
EB-2015-0029
|
I T13 EGDI GEC 2 updated 20150706
|
Undertaking Responses
|
|
2015-07-09
|
2015-07-09
|
EB-2015-0029
|
Enbridge Gas Distribution Inc. - 2015-2020 Multi-Year Plan - Undertaking Responses and Corrected Exhibits
|
Undertaking Responses
|
|
2015-07-09
|
2015-07-09
|
EB-2015-0029
|
EGDI_undertaking response_JT1 36_attachment_20150713
|
Undertaking Responses
|
|
2015-07-13
|
2015-07-13
|
EB-2015-0029
|
EGDI_undtkg_resp_JT1.15-17_JT1.20-23_JT1.25-26_JT1.29_JT1.31_JT1.33_JT1.35_JT1.38_JT1.41_20150714
|
Undertaking Responses
|
|
2015-07-14
|
2015-07-14
|
EB-2015-0029
|
PO3_Union_Enbridge_DSM_Plans_20150713
|
Procedural Order
|
2015-07-15
|
|
2015-07-15
|
EB-2015-0029
|
EGDI_undertaking response_JT1 36_20150713
|
Undertaking Responses
|
|
2015-07-13
|
2015-07-13
|
EB-2015-0029
|
EGDI_Undertaking_Responses_JT1.1_JT1.3_JT1.4_JT1.7-14_JT1.18_JT1.27_JT1.28_JT1.32_JT1.36_JT1.39_JT1.40_JT1.42_JT1.43_20150710
|
Undertaking Responses
|
|
2015-07-13
|
2015-07-13
|
EB-2015-0029
|
Union_undertaking responses_JT2.16_20150710
|
Undertaking Responses
|
|
2015-07-10
|
2015-07-10
|
EB-2015-0029
|
Union_undertaking responses_JT2.14_20150710
|
Undertaking Responses
|
|
2015-07-10
|
2015-07-10
|
EB-2015-0029
|
Union_undertaking responses_JT2.2_JT2.4_JT2.6_JT2.9-12_JT2.14-23_20150710
|
Undertaking Responses
|
|
2015-07-10
|
2015-07-10
|
EB-2015-0029
|
Union_undertaking responses_JT2.1_JT2.3_JT2.5_JT2.7_JT2.8_JT2.13_20150709
|
Undertaking Responses
|
|
2015-07-09
|
2015-07-09
|
EB-2015-0029
|
Energy Probe Cost Effectiveness $ perCCM 2014-2020 2015 Targets Updated_20150707
|
Pre-Hearing Material
|
|
2015-07-07
|
2015-07-07
|
EB-2015-0029
|
Energy Probe Technical Conference Questions for Written Response_20150707
|
Pre-Hearing Material
|
|
2015-07-07
|
2015-07-07
|
EB-2015-0029
|
EGDI_Letter_corrected IRR exhibits_20150708
|
Interrogatory Response from Applicant
|
|
2015-07-08
|
2015-07-08
|
EB-2015-0029
|
EGDI_IRR_corrected exhibits_20150708
|
Interrogatory Response from Applicant
|
|
2015-07-08
|
2015-07-08
|
EB-2015-0029
|
EGDI_undertaking resp_JT1.2_JT1.5_JT1.6_JT1.19_JT1.24_JT1.37_JT1.44_JT1.45_JT1.46_20150708
|
Undertaking Responses
|
|
2015-07-08
|
2015-07-08
|
EB-2015-0029
|
EGDI_Letter_undertaking responses_20150708
|
Undertaking Responses
|
|
2015-07-08
|
2015-07-08
|
EB-2015-0029
|
EGDI_IRR_UPDATED_20150708
|
Interrogatory Response from Applicant
|
|
2015-07-08
|
2015-07-08
|
EB-2015-0029
|
Union Enbridge DSM_TC_vol2_20150707
|
Transcripts
|
|
2015-07-07
|
2015-07-07
|
EB-2015-0029
|
Union_IRR_corrected_20150707
|
Interrogatory Response from Applicant
|
|
2015-07-07
|
2015-07-07
|
EB-2015-0029
|
EX_KT1.1_20150706
|
Exhibits
|
|
2015-07-06
|
2015-07-06
|
EB-2015-0029
|
Enbridge_Union_DSM_undertakings list_20150706
|
Undertaking List
|
|
2015-07-06
|
2015-07-06
|
EB-2015-0029
|
Enbridge_Union_DSM_exhibit list_20150706
|
Exhibit List
|
|
|
2015-07-07 at 9:37 AM
|
EB-2015-0029
|
Union Enbridge_transcript_TC_vol1_20150706
|
Transcripts
|
|
2015-07-06
|
2015-07-06
|
EB-2015-0029
|
Energy Probe Cost Effectiveness $ per CCM 2014-2020 2015 Targets_20150706
|
Cross Examination Material
|
|
2015-07-06
|
2015-07-06
|
EB-2015-0029
|
UNION_IRR_Corrected Exhibit B.T5.Union.GEC.50 and Exhibit B.T13.Union.GEC.1_20150703.pdf
|
Interrogatory Response from Applicant
|
|
2015-07-03
|
2015-07-03
|
EB-2015-0029
|
Union_appl_correction_20150703
|
Application and Evidence
|
|
2015-07-03
|
2015-07-03
|
EB-2015-0029
|
TRIM: FW: EB-2015-0029 and EB-2015-0049 - SEC T/C Topics and Estimate
|
Correspondence
|
|
2015-07-03
|
2015-07-03
|
EB-2015-0029
|
CME_ltr_correspondence_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
CCC GAS DSM TechConf areas_20150703
|
Correspondence
|
|
2015-07-03
|
2015-07-03
|
EB-2015-0029
|
EP_Tech Conference Clarification Topics_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
Energy Probe ClarificationAreas_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
VECC_Correspondence_Enbridge_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
LPMA_Correspondence_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
FRPO_Tech Conf_Sub_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
OGVG_Tech Conf_Sub_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
Letter_OEB_Staff_Technical_Conference_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
ED_LTR_TechnicalConferenceQuestionAreas_150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
APPrO_Ltr_Tech Conference_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
LIEN_correspondence_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
GEC_correspondence_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
OSEA_correspondence_20150702
|
Correspondence
|
|
2015-07-02
|
2015-07-02
|
EB-2015-0029
|
BOMA_correspondence_20150630
|
Correspondence
|
|
2015-06-30
|
2015-06-30
|
EB-2015-0029
|
B T8 Union GEC 44 Excel Attachment 1_20150630
|
Interrogatory Response from Applicant
|
|
2015-06-30
|
2015-06-30
|
EB-2015-0029
|
A-1-1 updated 20150623
|
Application and Evidence
|
|
2015-06-26
|
2015-06-26
|
EB-2015-0029
|
A-2-5_20150626
|
Application and Evidence
|
|
2015-06-26
|
2015-06-26
|
EB-2015-0029
|
B-1-6 Corrected 20150626
|
Application and Evidence
|
|
2015-06-26
|
2015-06-26
|
EB-2015-0029
|
B-2-3 corrected 20150626
|
Application and Evidence
|
|
2015-06-26
|
2015-06-26
|
EB-2015-0029
|
EGD Letter - Corrections _evidence_20150626
|
Application and Evidence
|
|
2015-06-26
|
2015-06-26
|
EB-2015-0029
|
EGDI_EVIDENCE_UPDATED_20150626
|
Application and Evidence
|
|
2015-06-26
|
2015-06-26
|
EB-2015-0029
|
I T2 EGDI GEC 41_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC#39 - Navigant Consulting - Enbridge Potential Study - Appendix C Measure Characterization - January 15 2015_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC#34 2011 DSM Results_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC#34 - 2010 DSM Results_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC#34 - 2009 DSM Results_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC#34 - 2008 DSM Results_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC #8 - 2014 DSM Results_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC #8 - 2013 DSM Results_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC #8 - 2012 DSM Results_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
GEC # 40 Navigant Consulting - Enbridge Detailed DSMSim Results - January 15 2015_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T6.Union.GEC.4 Excel Attachment 3 - 2014 Audit Too_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T6.Union.GEC.4 Excel Attachment 2 - 2013 Audit Too_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T6.Union.GEC.4 Excel Attachment 1 - 2012 Audit Too_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
Exhibit B.T9.Union.FRPO.5 Excel Attachment 1_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T2.Union.GEC.6 Excel Attachment 13_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T2.Union.GEC.6 Excel Attachment 12_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T2.Union.GEC.6 Excel Attachment 11_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T2.Union.GEC.6 Excel Attachment 10_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T2.Union.GEC.6 Excel Attachment 9_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T2.Union.GEC.6 Excel Attachment 8_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|
EB-2015-0029
|
B.T2.Union.GEC.6 Excel Attachment 6_20150623
|
Interrogatory Response from Applicant
|
|
2015-06-23
|
2015-06-23
|