Advanced Regulatory Document Search (RDS)

 

Search Results for: Records - Case Number=EB-2012-0064 - 370 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2012-0064 document icon dec_order_cost_awards_THESL_phase2_20140204 Decision and Order on Cost Awards Toronto Hydro-Electric System Limited - Electricity Distributor 2014-02-04 2014-02-04
EB-2012-0064 document icon THESL_Ltr_Response_Interv_Cost Claims_20140121 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2014-01-21 2014-01-21
EB-2012-0064 document icon AMPCO_Cost Claim_additional_info_20140108 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2014-01-08 2014-01-08
EB-2012-0064 document icon AMPCO_Cost Claim_20140107 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2014-01-07 2014-01-07
EB-2012-0064 document icon Energy Probe_Cost Claim_20140108 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2014-01-07 2014-01-07
EB-2012-0064 document icon VECC_Cost Claim_20140107 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2014-01-07 2014-01-07
EB-2012-0064 document icon CCC_Cost Claim_20140106 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2014-01-06 2014-01-06
EB-2012-0064 document icon THESL Phase 2_Draft Settlement Agreement_20131218 Settlement Agreement Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-18 2013-12-18
EB-2012-0064 document icon SEC_Cost Claim_20140105 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2014-01-04 2014-01-04
EB-2012-0064 document icon exhibit_undertaking_list_THESL_Phase2_Tech_Conf_20131127 Exhibit List Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-31 at 11:32 AM
EB-2012-0064 document icon BOMA_Cost Claim_20131219 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-19 2013-12-19
EB-2012-0064 document icon Transcript_THESL_Vol11_20131219 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-19 2013-12-19
EB-2012-0064 document icon THESL_Ltr_Settlement Proposal Status_20131218 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-17 2013-12-17
EB-2012-0064 document icon THESL_Ltr_Settlement_Agr_filing_20131213 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-13 2013-12-13
EB-2012-0064 document icon po9_THESL_Phase2_20131213 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-13 2013-12-13
EB-2012-0064 document icon THESL_Tech_Conf_JT3_8_Correction_20131203 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-03 2013-12-03
EB-2012-0064 document icon THESL_Tech_Conf_Undertaking_Resp_20131202 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2013-12-02 2013-12-02
EB-2012-0064 document icon Transcript_Tech_Conf_THESL_20131127 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-27 2013-11-27
EB-2012-0064 document icon Energy Probe_Ltr_Tech Conf_THESL_Phase2_20131125 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-25 2013-11-25
EB-2012-0064 document icon AMPCO_Ltr_Tech Conf_THESL_Phase2_20131125 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-25 2013-11-25
EB-2012-0064 document icon VECC_Ltr_Tech_Conf_THESL_Phase2_20131125 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-25 2013-11-25
EB-2012-0064 document icon THESL_Phase2_CVs_20131125 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-25 2013-11-25
EB-2012-0064 document icon BdStaff_Tech_Conf_Clarifications_THESL_Phase2_20131125 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-25 2013-11-25
EB-2012-0064 document icon SEC_Ltr_Tech_Conf_THESL Phase2_20131125 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-25 2013-11-25
EB-2012-0064 document icon THESL_IRR_9_AMPCO_20131122 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-22 2013-11-22
EB-2012-0064 document icon THESL_Phase2_T9 Sch B7-8_Corrections_20131121 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-21 2013-11-21
EB-2012-0064 document icon THESL_Phase2_IRR_20131121 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-21 2013-11-21
EB-2012-0064 document icon po8_THESL_Phase2_20131101 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-11-01 2013-11-01
EB-2012-0064 document icon AMPCO_IR_THESL_Phase2_20131031 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-31 2013-10-31
EB-2012-0064 document icon CCC_IR_THESL_Phase2_covltr_20131031 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-31 2013-10-31
EB-2012-0064 document icon CCC_IR_THESL_Phase2_20131031 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-31 2013-10-31
EB-2012-0064 document icon VECC_IR_THESL_Phase2_20131031 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-31 2013-10-31
EB-2012-0064 document icon SEC_IR_THESL_Phase2_20131031 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-31 2013-10-31
EB-2012-0064 document icon SEC_Ltr_Evd_THESL_Phase2_20131031 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-31 2013-10-31
EB-2012-0064 document icon Energy Probe_IR_THESL_Phase2_20131029 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-29 2013-10-29
EB-2012-0064 document icon Energy Probe_IR_THESL_Phase2_covltr_20131029 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-29 2013-10-29
EB-2012-0064 document icon BdStaff_IR_THESL_phase2_20131024 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-24 2013-10-24
EB-2012-0064 document icon THESL_2014UpdatedwCover_Corrections_20131018 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-18 2013-10-18
EB-2012-0064 document icon issues_list_po7_THESL_20131017 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-17 2013-10-17
EB-2012-0064 document icon THESL_ReplySub_phase 2_draft issues list_20131007 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-07 2013-10-07
EB-2012-0064 document icon SEC_ReplySub_THESL_phase2 issues list_20131007 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-10-07 2013-10-07
EB-2012-0064 document icon Energy Probe_Sub_THESL_phase2_20130930 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-30 2013-09-30
EB-2012-0064 document icon VECC_Sub_THESL_phase2_Issues List_20130930 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-30 2013-09-30
EB-2012-0064 document icon THESL_Sub_Phase 2_Issues List_20130930 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-30 2013-09-30
EB-2012-0064 document icon SEC_Sub_THESL_Phase2_IssuesList_20130930 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-30 2013-09-30
EB-2012-0064 document icon Board_Staff_SUB_THESLIssuesList_20130930 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-30 2013-09-30 2013-09-30
EB-2012-0064 document icon E2_Incremental Capital Proj Worksheet_Updated_9AUG2013_B_20130920 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-20 2013-09-20
EB-2012-0064 document icon THESL_E1_Incremental Capital Proj Worksheet_Updated_1AUG201_1_20130920 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-20 2013-09-20
EB-2012-0064 document icon po6_THESL_phase2_20130920 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-20 2013-09-20
EB-2012-0064 document icon THESL_2-04_2014_1IRMRateGenerator_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2014UpdatewCover_part3_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2014UpdatewCover_part2_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2-08_2014_SharedTaxSavings_DaysOfService_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2-07_2014_IRMTaxSharingModel_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2-06_2014_RTSRModel_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2-05_2014_DeferralVarianceDetails_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2-03_2014_BillImpactTables_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_D4_2014_ICMThreshold_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_D3_2014_ICMRateAdder_DaysOfService_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_D2_2014_IncrementalCapitalWkform_withoutCopeland_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_D1_2014_IncrementalCapitalWkform_withCopeland_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon THESL_2014UpdatewCover_part1_20130819 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-08-19 2013-08-19
EB-2012-0064 document icon corrected_dec_order_cost_awards_THESL_20130719 Decision and Order on Cost Awards Toronto Hydro-Electric System Limited - Electricity Distributor 2013-07-19 2013-07-19
EB-2012-0064 document icon corrected_dec_order_cost_awards_THESL_covltr_20130719 Decision and Order on Cost Awards Toronto Hydro-Electric System Limited - Electricity Distributor 2013-07-19 2013-07-19
EB-2012-0064 document icon Energy Probe_Ltr_cost awards_THESL_20130717 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-07-17 2013-07-17
EB-2012-0064 document icon AMPCO_Ltr_THESL_Decision_20130716 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-07-17 2013-07-17
EB-2012-0064 document icon VECC_replyltr_cost_awards_THESL_20130710 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-07-10 2013-07-10
EB-2012-0064 document icon dec_order_cost_awards_THESL_20130705 Decision and Order on Cost Awards Toronto Hydro-Electric System Limited - Electricity Distributor 2013-07-05 2013-07-05
EB-2012-0064 document icon SEC_Cost_Claim_THESL_20130502 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-03 2013-05-03
EB-2012-0064 document icon BOMA_Cost_Caim_time docket_THESL_20130613 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-06-13 2013-06-13
EB-2012-0064 document icon THESL_Ltr_Cost Claim_Obj_20130523 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-23 2013-05-23
EB-2012-0064 document icon AMPCO_Cost Claim_Teleconference_receipt_THESL_20130606 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-06-06 2013-06-06
EB-2012-0064 document icon Environmental_Defence_ReplyLtr_THESL_Sub_Cost Claim_20130530 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-30 2013-05-30
EB-2012-0064 document icon BOMA_Cost_Claim_THESL_20130530 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-30 2013-05-30
EB-2012-0064 document icon AMPCO_Cost_Claim_THESL_20130516 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-17 2013-05-17
EB-2012-0064 document icon AMPCO_Cost_Claim_Additional Pages_THESL_20130524 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-24 2013-05-24
EB-2012-0064 document icon THESL_Cost_Claim_Obj_20130523 Cost Claim Objection Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-24 2013-05-24
EB-2012-0064 document icon CCC_Cost_Claim_THESL_20130522 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-22 2013-05-22
EB-2012-0064 document icon VECC_Cost_Claim_THESL_20130517 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-17 2013-05-17
EB-2012-0064 document icon Energy Probe_Cost_Claim_THESL_20130516 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-17 2013-05-17
EB-2012-0064 document icon Environmental_Defence_Cost_Claim_THESL_20130516 Cost Claim Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-16 2013-05-16
EB-2012-0064 document icon dec_rate_order_THESL_20130509 Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-09 2013-05-09
EB-2012-0064 document icon dec_rate_order_THESL_20130509 Decision Toronto Hydro-Electric System Limited - Electricity Distributor 2013-05-09 2013-05-09
EB-2012-0064 document icon THESL_ReplySub_DRO_Comments_20130426 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-26 2013-04-26
EB-2012-0064 document icon BdStaff_DRO_Comments_20130419 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-19 2013-04-19
EB-2012-0064 document icon SEC_DRO_Comments_THESL_20130419 Comments Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-19 2013-04-19
EB-2012-0064 document icon THESL_DRO_Corrections_20130417 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-18 2013-04-18
EB-2012-0064 document icon THESL_DRO_AppB_Sch04_2013 IRM Shared Tax Savings Wkform_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppB_Sch03_2012 IRM Shared Tax Savings Wkform_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppB_Sch02_2013 RTSR_Adjustment Wkform_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppB_Sch01_2012-13 IRM Foregone Rev Rate Rider_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppC_Sch05_2013 ICM_Bremner Rate Riders_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppC_Sch04_2013 ICM Model - Bremner Only_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppC_Sch03_2013 ICM Wkform without Bremner_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppC_Sch02_2013 ICM Threshold Calc_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppC_Sch01_2012 ICM Threshold Calc_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppB_Sch08_2013 Deferral-Variance Acct Rate Rider - Fixed_ Variable_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppB_Sch07_2013 Deferral-Variance Acct Rate Rider - Variable_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_AppB_Sch06_2013IRMRateGenerator_corrected_20130417 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-18 2013-04-18
EB-2012-0064 document icon THESL_DRO_AppB_Sch05_2012_2013 Shared Tax Savings Rate Rider_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon THESL_DRO_20130412 Draft Rate Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-12 2013-04-12
EB-2012-0064 document icon po5_THESL_20130408 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-08 2013-04-08
EB-2012-0064 document icon THESL_ltr_DRO filing date_20130405 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-05 2013-04-05
EB-2012-0064 document icon partial dec_order_THESL_20130402 Decision and Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-02 2013-04-02
EB-2012-0064 document icon OEB Ltr_THESL Lockup IRM Phase I Decision_20130328 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-28 2013-03-28
EB-2012-0064 document icon Toronto Hydro_ltr_update_evid_20130312 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-12 2013-03-12
EB-2012-0064 document icon THESL_Email_ReplyArg_Reference Revision_20130305 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-05 2013-03-05
EB-2012-0064 document icon Transcript_oral hearing_Vol10_20130304 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-04 2013-03-04
EB-2012-0064 document icon SEC_Ref_Sub_20130301 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-01 2013-03-01
EB-2012-0064 document icon THESL_ltr_SEC_evidentiary_ref_20130301 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-01 2013-03-01
EB-2012-0064 document icon Transcript_oral hearing_Vol9_20130301 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-01 2013-03-01
EB-2012-0064 document icon CCC_Sub_THESL_20130228 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-01 2013-03-01
EB-2012-0064 document icon Environmental Defence_Sub_THESL_20130228 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-03-01 2013-03-01
EB-2012-0064 document icon BOMA_Factum_THESL_20130228 Factum Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-28 2013-02-28
EB-2012-0064 document icon THESL_Updated_Undertaking Resp_J6_6_20130228 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-28 2013-02-28
EB-2012-0064 document icon Environmental Defence_ltr_confidentiality_20130226 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-26 2013-02-26
EB-2012-0064 document icon THESL_Undertaking Resp_J6_6_redacted_20130222 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-25 2013-02-25
EB-2012-0064 document icon THESL_Undertaking Resp_20130221 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-21 2013-02-21
EB-2012-0064 document icon Transcript_Oral Hearing_Vol8_20130221 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-21 2013-02-21
EB-2012-0064 document icon Environmental Defence_Undertaking Resp_J7_4_20130221 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-21 2013-02-21
EB-2012-0064 document icon THESL_Undertaking Resp_20130220 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-21 2013-02-21
EB-2012-0064 document icon Transcript_Oral Hearing_Vol7_20130220 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-20 2013-02-20
EB-2012-0064 document icon SEC_Compendium_20130220 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-20 2013-02-20
EB-2012-0064 document icon Environmental Defence_CDM Proj_HRBach_Cross Exam_20130219 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-20 2013-02-20
EB-2012-0064 document icon Transcript_Oral hearing_Vol6_20130219 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-19 2013-02-19
EB-2012-0064 document icon OPA_TO Map_20130218 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-19 2013-02-19
EB-2012-0064 document icon OPA_CV_JToneguzzo_20130218 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-19 2013-02-19
EB-2012-0064 document icon OPA_CVs_CFarmer_20130218 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-19 2013-02-19
EB-2012-0064 document icon Environmental Defence_Cross-Exam_Ref_Book_20130215 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-19 2013-02-19
EB-2012-0064 document icon THESL_CV_AJamal_20130215 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-19 2013-02-19
EB-2012-0064 document icon OPA_Evid_20130214 Intervenor Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-14 2013-02-14
EB-2012-0064 document icon Bd_replyltr_OPA_20130212 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-12 2013-02-12
EB-2012-0064 document icon Environmental Defence_ltr_OPA_20130211 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-11 2013-02-11
EB-2012-0064 document icon OPA_Ltr_Environmental Defence_20130208 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-08 2013-02-08
EB-2012-0064 document icon Bdrepy_ltr_THESL_delay_20130208 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-02-08 2013-02-08
EB-2012-0064 document icon THESL_ReplyArg_20130129 Applicant Reply Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-30 2013-01-30
EB-2012-0064 document icon THESL_ltr_decision_req_20130129 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-29 2013-01-29
EB-2012-0064 document icon po4_THESL_20130124 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-24 2013-01-24
EB-2012-0064 document icon THESL_ltr_Bremner_hearing_20130121 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-21 2013-01-21
EB-2012-0064 document icon Environmental_Defence_ltr_THESL_20130117 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-17 2013-01-17
EB-2012-0064 document icon Energy_Probe_Final_Arg_Capital_ISAs updated_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-16 2013-01-16
EB-2012-0064 document icon Energy_Probe_Final_Arg_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-16 2013-01-16
EB-2012-0064 document icon Energy_Probe_Final_Arg_covltr_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-16 2013-01-16
EB-2012-0064 document icon AMPCO_Final_Arg_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-16 2013-01-16
EB-2012-0064 document icon SEC_Final_Arg_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-16 2013-01-16
EB-2012-0064 document icon BOMA_Final_Arg_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-16 2013-01-16
EB-2012-0064 document icon VECC_Final_Arg_THESL_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-15 2013-01-15
EB-2012-0064 document icon City_of_Toronto_Sub_THESL_20130115 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-15 2013-01-15
EB-2012-0064 document icon CCC_Final_Arg_20130115 Final Argument Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-15 2013-01-15
EB-2012-0064 document icon THESL_ltr_Bremner_Procedure_20130114 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-14 2013-01-14
EB-2012-0064 document icon BdStaff_Sub_THESL_20130110 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-11 2013-01-11
EB-2012-0064 document icon Environmental_Defence_amended_IRR_THESL_20130109 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-09 2013-01-09
EB-2012-0064 document icon Environmental_Defence_IRR_THESL_20130109 Interrogatory Response from Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-09 2013-01-09
EB-2012-0064 document icon THESL_Capital Prog Comparison_20120104 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2013-01-04 2013-01-04
EB-2012-0064 document icon THESL_IRR_CCC 19_20121005 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-05 2012-10-05
EB-2012-0064 document icon exhibit_undertaking_list_THESL_20121210 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-28 at 11:02 AM
EB-2012-0064 document icon exhibit_undertaking_list_THESL_20130301 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2013-04-26 at 2:57 PM
EB-2012-0064 document icon THESL_IR_Environmental Defence_20121221 Interrogatories to Intervenor Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-21 2012-12-21
EB-2012-0064 document icon THESL_ARG in Chief_20121221 Applicant Argument in Chief Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-21 2012-12-21
EB-2012-0064 document icon THESL_AICwCover_20121221 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-21 2012-12-21
EB-2012-0064 document icon THESL_BremnerInterrogatoriestoEDwCover_20121221 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-21 2012-12-21
EB-2012-0064 document icon THESL_OHUndertakingResponses3-4-5wCover_20121221 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-21 2012-12-21
EB-2012-0064 document icon Transcript_oral hearing_Vol 5_20121214 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon THESL_UndertakingsDay1-2-3_20121213 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon BOMA_No. 6_Compendium_Panel 3 Cross examination_20121214 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon BOMA_No. 5_Compendium_Panel 3 Cross examination_20121214 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon BOMA_No. 4_Compendium_Panel 3 Cross examination_20121214 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon BOMA_No. 3_Compendium_Panel 3 Cross examination_20121214 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon BOMA_No. 2_Compendium_Panel 3 Cross examination_20121214 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon BOMA_Compendium_Panel 3 Cross examination_20121214 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-14 2012-12-14
EB-2012-0064 document icon BOMA_Compendium_INDEX_Panel 3_20121213 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-13 2012-12-13
EB-2012-0064 document icon Transcript_oral hearing_Vol 4_20121213 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-13 2012-12-13
EB-2012-0064 document icon Transcript_oral hearing_Vol 3_20121213 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-13 2012-12-13
EB-2012-0064 document icon THESL_Active Excel Examination Material_20121213 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-13 2012-12-13
EB-2012-0064 document icon SEC_Compendium Panel 3_20121213 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-13 2012-12-13
EB-2012-0064 document icon BOMA_Compendium_4_Capital Plan 2012-2021_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon BOMA_Compendium_3_pp face pg_11-12_Settlement Agr_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon BOMA_Compendium_2_ pp_face pg 8-18 of Decision_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon BOMA_Compendium_1_pp face pg 12-13_Settlement Agr_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon BOMA_Compendium_Index_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon City_of_Toronto_Compendium_Panel3_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon City_of_Toronto_Compendium_Panel3_covltr_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon AMPCO_Compendium Panel 2B_20121212 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-12 2012-12-12
EB-2012-0064 document icon THESL_Undertaking_Resp_1 and 2_20121211 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-11 2012-12-11
EB-2012-0064 document icon Transcript_oral hearing_Vol 2_20121211 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-11 2012-12-11
EB-2012-0064 document icon Transcript_oral hearing_Vol 1_20121210 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-10 2012-12-10
EB-2012-0064 document icon Energy_Probe_Compendium_Witness Panels_2B part 1_20121209 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-10 2012-12-10
EB-2012-0064 document icon Energy_Probe_Compendium_Witness Panels 2A_20121209 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-10 2012-12-10
EB-2012-0064 document icon THESL_SEC_Compendium_Panel1A_20121210 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-10 2012-12-10
EB-2012-0064 document icon THESL_Ltr_Settlement Conference_20121210 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-10 2012-12-10
EB-2012-0064 document icon Energy_Probe_Compendium_Witness Panel 1A_20121207 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-10 2012-12-10
EB-2012-0064 document icon THESL_Ltr_Closing_Arg_20121207 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-07 2012-12-07
EB-2012-0064 document icon Environmental Defence_Evid_Bremner Station_20121207 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-07 2012-12-07
EB-2012-0064 document icon City_of_Toronto_Bell Canada v Canada (CRTC)_20121207 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-07 2012-12-07
EB-2012-0064 document icon THESL_Examination Materials_20121206 Cross Examination Material Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-07 2012-12-07
EB-2012-0064 document icon THESL_TCEvidence_20121206 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-06 2012-12-06
EB-2012-0064 document icon THESL_CorrectionT4SchB7App3pg20_JT1_15_20121206 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-06 2012-12-06
EB-2012-0064 document icon THESL_OralHearingWitnessPanel_20121206 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-06 2012-12-06
EB-2012-0064 document icon THESL_Sched B-Revised_Detailed_Continuity Sched for Acct_1_20121204 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-12-04 2012-12-04
EB-2012-0064 document icon THESL_combined_Undertaking_Resp_Tech_Conf_20121130 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-30 2012-11-30
EB-2012-0064 document icon THESL_Corrected_undertaking_resp_JT1_6_20121130 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-30 2012-11-30
EB-2012-0064 document icon THESL_additional_Undertaking_Resp_Tech_Conf_20121128 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-28 2012-11-28
EB-2012-0064 document icon THESL_undertaking_resp_JT2_6_attach_T05_M_PILS_2002-2006 Summary - Corrected Nov 27 2012_20121128 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-28 2012-11-28
EB-2012-0064 document icon OPA_ReplyLtr_Environmental Defence_THESL_20121128 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-28 2012-11-28
EB-2012-0064 document icon THESL_Undertaking_Resp_Tech_Conf_20121127 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-28 2012-11-28
EB-2012-0064 document icon THESL_undertaking_resp_T07_JT2_03_SEC_2_2_01_BStaff_031 b Table1_20121127 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-28 2012-11-28
EB-2012-0064 document icon THESL_undertaking_resp_T07_JT2_03_SEC_2_2_01_BStaff_031 a Table1_20121127 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-28 2012-11-28
EB-2012-0064 document icon THESL_undertaking_resp_T07_JT1_15_EnvironmentalDef_20121127 Undertaking Responses Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-28 2012-11-28
EB-2012-0064 document icon dec_order_confidentiality_THESL_20121126 Decision and Order Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-26 2012-11-26
EB-2012-0064 document icon Transcript_Tech_Conf_Day 2_rev_20121123 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-23 2012-11-23
EB-2012-0064 document icon City_of_Toronto_ltr_tech conf_questions_20121119 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-19 2012-11-19
EB-2012-0064 document icon THESL_Index rev_Witnesses_CV_20121120 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-20 2012-11-20
EB-2012-0064 document icon Transcript_Tech_Conf_Day 1_rev_20121121 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-30 at 2:45 PM
EB-2012-0064 document icon Environmental Defence_ltr_info_req_20121122 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-22 2012-11-22
EB-2012-0064 document icon AMPCO_Tech_Conf_Questions_20121120 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-20 2012-11-20
EB-2012-0064 document icon CUPE Local One_Email_contact_change_20121120 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-20 2012-11-20
EB-2012-0064 document icon SEC_ltr_Tech_Conf_20121119 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-19 2012-11-19
EB-2012-0064 document icon VECC_Tech_Conf_Questions_20121119 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-19 2012-11-19
EB-2012-0064 document icon BdStaff_Tech_Conf_questions_20121119 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-19 2012-11-19
EB-2012-0064 document icon Energy Probe_Tech_Conf_questions_20121119 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-19 2012-11-19
EB-2012-0064 document icon Energy Probe_Tech_Conf_questions_covltr_20121119 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-19 2012-11-19
EB-2012-0064 document icon Environmental Defence_Tech_Conf_questions_20121119 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-19 2012-11-19
EB-2012-0064 document icon THESL_Additional_Updated IRR_20121116 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-16 2012-11-16
EB-2012-0064 document icon THESL_T05_Schedule G- Revised 2005 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule F-Revised 2004 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule E-Revised 2003 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule D-Revised 2002 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule B-Revised Detailed Continuity Schedules for Account 1562_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule A-Revised Summary Continuity Schedule for Account 1562_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T03_D_2012RTSRModel_rev20121005_BdStaff 4_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T02_Appendix1_REV2012OCT31_2011 Capex Unfunded_IRM_2012-02-21 V4.0_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule G- Revised 2005 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule F-Revised 2004 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule E-Revised 2003 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule D-Revised 2002 SIMPIL Model_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule B-Revised Detailed Continuity Schedules for Account 1562_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T05_Schedule A-Revised Summary Continuity Schedule for Account 1562_REV05OCT2012_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T03_D_2012RTSRModel_rev20121005_BdStaff 4_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon THESL_T02_Appendix1_REV2012OCT31_2011 Capex Unfunded_IRM_2012-02-21 V4.0_20121113 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-13 2012-11-13
EB-2012-0064 document icon SEC_Sub_THESL_Confidentiality_CCC IRR19_20121114 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-14 2012-11-14
EB-2012-0064 document icon SEC_JShepherd_declaration_undertaking_20121112 Declaration and Undertakings Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-12 2012-11-12
EB-2012-0064 document icon SEC_MRubenstein_declaration_undertaking_20121112 Declaration and Undertakings Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-12 2012-11-12
EB-2012-0064 document icon BOMA_TBrett_declaration_undertaking_20121112 Declaration and Undertakings Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-12 2012-11-12
EB-2012-0064 document icon po3_THESL_20121108 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-08 2012-11-08
EB-2012-0064 document icon Environmental Defence_ltr_IntervReq_20121105 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-05 2012-11-05
EB-2012-0064 document icon THESL_Ltr re PProbe&ED status_20121102 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-02 2012-11-02
EB-2012-0064 document icon THESL_CorrectionsUpdatesDeferredIRs_format_20121031 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T03_C02-1_2013_Rate_Generator_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T03_C02-2_2013_Bill Impact_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T03_F_IRM Los Revenue_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E01-1_Incremental Capital Workform_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E01-2_2012_Threshold_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E01-3_Days of Service_2012 ICM Rates Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E-1-4_Lost Revenue 2012_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E0202_2013_Threshold_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E02-3_Days of Service_2013_ICM Rates_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E02-1_2013_Incremental Capital Workform_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_2.4_11_VECC_115_AppendixA_2012_ICM_Alternate Model_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_2.4_11_VECC_115_AppendixB_2012_Threshold_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_2.4_11_VECC_115_AppendixC_2012_Days of Service_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_2.4_11_VECC_115_AppendixD_2013_ICM_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_2.4_11_VECC_115_AppendixE_2013_Theshold_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_2.4_11_VECC_115_AppendisF_2013_Days of Service_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T03_Co2-1_2013_Rate Generatory_20121031 Exhibits Toronto Hydro-Electric System Limited - Electricity Distributor 2012-11-01 2012-11-01
EB-2012-0064 document icon THESL_T04_E02-3_2013_Days of Service_2013 ICM Rates_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E02-2_2013 Threshold_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E01-4_LostRevenue2012_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T04_E01-3_Days of Service_2012 ICM Rates_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T03_F_IRM Loss Revenue_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_T03_C02-2_2013_BILL IMPACT_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_CorrectionsUpdatesDeferredIRs_20121031 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon THESL_update_work plan_20121031 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-31 2012-10-31
EB-2012-0064 document icon PollutionProbe_ltr_corr_reasons for withdrawal_20121030 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-30 2012-10-30
EB-2012-0064 document icon Environmental Defence_IntervReq_20121026 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-26 2012-10-26
EB-2012-0064 document icon Bdltr_pollution probe_withdrawal_20121026 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-26 2012-10-26
EB-2012-0064 document icon Pollution Probe_withdrawal Ltr_THESL_20121023 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-24 2012-10-24
EB-2012-0064 document icon THESL_Ltr_update_20121022 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-22 2012-10-22
EB-2012-0064 document icon THESL_Appendix1_REV05Oct2012_for1.3_07_EP_07_20121005 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-05 2012-10-05
EB-2012-0064 document icon THESL_APPENDIX3_REV COMPARATIVE REVENUE REQUIREMENTS_noNotes_REV08AUG2012_20121005 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-05 2012-10-05
EB-2012-0064 document icon THESL_IRswLetters_20121005_part4 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-05 2012-10-05
EB-2012-0064 document icon THESL_IRswLetters_20121005_part3 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-05 2012-10-05
EB-2012-0064 document icon THESL_IRswLetters_20121005_part2 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-05 2012-10-05
EB-2012-0064 document icon THESL_IRR_Letters_20121005_part1 Interrogatory Response from Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-10-05 2012-10-05
EB-2012-0064 document icon THESL_ltr_evid_updated_20120913 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-21 2012-09-21
EB-2012-0064 document icon CUPE_updated_IR_THESL_covltr_20120919 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-19 2012-09-19
EB-2012-0064 document icon AMPCO_IR_THESL_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-17 2012-09-17
EB-2012-0064 document icon CUPE_IR_THESL_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-17 2012-09-17
EB-2012-0064 document icon Energy Probe_IR_THESL_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-14 2012-09-14
EB-2012-0064 document icon Energy Probe_IR_THESL_covltr_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-14 2012-09-14
EB-2012-0064 document icon VECC_IR_THESL_20120917 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-17 2012-09-17
EB-2012-0064 document icon CCC_IR_THESL_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-14 2012-09-14
EB-2012-0064 document icon BdStaff_IR_THESL_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-14 2012-09-14
EB-2012-0064 document icon Pollution Probe_IR_THESL_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-14 2012-09-14
EB-2012-0064 document icon SEC_IR_THESL_20120914 Interrogatories to Applicant Toronto Hydro-Electric System Limited - Electricity Distributor 2012-09-14 2012-09-14
EB-2012-0064 document icon THESL_Ltr_Notice_Abandonment_Appeal_20120830 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-30 2012-08-30
EB-2012-0064 document icon AMPCO_SUB_Draft_IssuesList_20120809 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-10 2012-08-10
EB-2012-0064 document icon po2_THESL_20120820 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-22 2012-08-22
EB-2012-0064 document icon THES_Ltr_motion_appeal_20120820 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-20 2012-08-20
EB-2012-0064 document icon issues_list_dec_THESL_20120816 Decision Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-16 2012-08-16
EB-2012-0064 document icon Transcript_Issues Day_THESL_20120813 Transcripts Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-13 2012-08-13
EB-2012-0064 document icon Intervention List_THESL_20130923 Intervenor List Toronto Hydro-Electric System Limited - Electricity Distributor 2013-09-23 at 3:06 PM
EB-2012-0064 document icon Energy Probe_Sub_Issues List_20120809 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-10 2012-08-10
EB-2012-0064 document icon THESL_Index_Corrections_covltr_20120808 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-09 2012-08-09
EB-2012-0064 document icon THESL_Sub_Issues List_20120809 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-09 2012-08-09
EB-2012-0064 document icon CCC_Sub_Issues List_20120809 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-09 2012-08-09
EB-2012-0064 document icon Pollution Probe_Sub_Issues List_20120809 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-09 2012-08-09
EB-2012-0064 document icon VECC_Sub_issues list_20120808 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-08 2012-08-08
EB-2012-0064 document icon CityofToronto_Sub_Issues List_20120802 Submission Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-02 2012-08-02
EB-2012-0064 document icon Intervention List_THESL_Appendix A_PO1_20120731 Intervenor List Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-31 2012-07-31
EB-2012-0064 document icon PO1_THESL_intvr list_issues list_20120731 Procedural Order Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-31 2012-07-31
EB-2012-0064 document icon City_of_Toronto_IntervReq_rev_20120709 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-09 2012-07-09
EB-2012-0064 document icon SEC_IntervReq_20120709 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-09 2012-07-09
EB-2012-0064 document icon Pollution Probe_IntervReq_20120706 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-09 2012-07-09
EB-2012-0064 document icon AMPCO_IntervReq_20120706 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-06 2012-07-06
EB-2012-0064 document icon VECC_IntervReq_20120705 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-06 2012-07-06
EB-2012-0064 document icon BOMA_IntervReq_20120705 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-05 at 12:08 PM
EB-2012-0064 document icon CCC_IntervReq_20120705 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-05 2012-07-05
EB-2012-0064 document icon Energy Probe_IntervReq_email_20120704 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-05 2012-07-05
EB-2012-0064 document icon OPG_IntervReq_20120704 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-04 2012-07-04
EB-2012-0064 document icon CUPE Local One_intervReq_20120703 Intervenor Request Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-07-03 2012-07-03
EB-2012-0064 document icon noah_THESL_IRM_FR_20120627 Notice of Application and Notice of Hearing Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-27 2012-06-27
EB-2012-0064 document icon noah_THESL_IRM_20120627 Notice of Application and Notice of Hearing Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-27 2012-06-27
EB-2012-0064 document icon lod_THESL_IRM_20120627 Letter of Direction Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-27 2012-06-27
EB-2012-0064 document icon Bdltr_THESL_IRM_20120627 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-27 2012-06-27
EB-2012-0064 document icon SEC_Ltr_IRM_ICM_20120621 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-21 2012-06-21
EB-2012-0064 document icon THESL_Ltr_IRM_ICM_20120620 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-20 2012-06-20
EB-2012-0064 document icon CCC_Corresp_20120613 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-13 2012-06-13
EB-2012-0064 document icon ackltr_THESL_IRM_20120612 Acknowledgement Letter Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-12 2012-06-12
EB-2012-0064 document icon THESL_APPL_T05_Sched A-Summary Continuity Sched for Acct 1562_20120607 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-07 2012-06-07
EB-2012-0064 document icon THESL_APPL_T05_Sched B-Detailed Continuity Sched for Acct 1562_20120607 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-07 2012-06-07
EB-2012-0064 document icon THESL_AdditionalPILsEvid_Schedule H-N_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_Consolidated_IRM_APPL_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_APPL_T05_M_PILsRecoveries_2002-2006 Summary_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_APPL_T05_L2_2005 Ram Model_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_APPL_T05_L1_2005 PILs proxy model_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_APPL_T05_K1_2004 Ram Model staff adjusted_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_APPL_T05_I2_2002 Ram Model_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_APPL_T05_I1_2002 PILs proxy model_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_APPL_T05_H1_2001 PILs proxy model_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_AdditionalPILsEvid_4_rev_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_AdditionalPILsEvid_3_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_AdditionalPILsEvid_2_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_AdditionalPILsEvid_1_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_PILs_Evid_Index_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon THESL_PILs_Evid_covltr_20120601 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-06-01 2012-06-01
EB-2012-0064 document icon interim_rate_order_THESL_20120530 Interim rate order Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-30 2012-05-30
EB-2012-0064 document icon THESL_APPL_T05_Schedule G-2005 SIMPIL Model_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T05_Schedule F-2004 SIMPIL Model_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T05_Schedule E-2003 SIMPIL Model_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T05_Schedule D-2002 SIMPIL Model_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T05_Schedule C-2001 SIMPIL Model_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T04_E03-1_2014 IRM3 IncrementalCapitalWkform_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T04_E02-1_2013 IRM3 IncrementalCapitalWkform_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T04_E01-1_2012 IRM3 IncrementalCapitalWkform_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T03_E01_2012_IRM3_Shared_Tax_Savings_Wkform_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T03_D_2012 RTSR MODEL_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T03_C03-1_2014_IRM_Rate_Generator_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_T03_C02-1_2013_IRM_Rate_Generator_rev_20120808 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-08 2012-08-08
EB-2012-0064 document icon THESL_APPL_T03_C01-1_2012_IRM_Rate_Generator_rev_20120808 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-08 2012-08-08
EB-2012-0064 document icon THESL_APPL_Incremental Capital Proj Wksheet_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-16 2012-05-16
EB-2012-0064 document icon THESL_APPL_Pt3_2_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-10 2012-05-10
EB-2012-0064 document icon THESL_APPL_Pt3_1_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-10 2012-05-10
EB-2012-0064 document icon THESL_APPL_Pt2_2_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-10 2012-05-10
EB-2012-0064 document icon THESL_APPL_Pt2_1_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-10 2012-05-10
EB-2012-0064 document icon THESL_APPL_Pt1_2_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-10 2012-05-10
EB-2012-0064 document icon THESL_APPL_Pt1_1_updated_20120808 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-08-08 2012-08-08
EB-2012-0064 document icon THESL_APPL_Pt4_4_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-10 2012-05-10
EB-2012-0064 document icon THESL_APPL_CovLtr_20120510 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-05-10 2012-05-10
EB-2012-0064 document icon THESL_Ltr_Interim Rates_20120424 Correspondence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-04-24 2012-04-24
EB-2012-0064 document icon THESL_APPL_InterimRates_20120416 Application and Evidence Toronto Hydro-Electric System Limited - Electricity Distributor 2012-04-16 2012-04-16
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received