EB-2016-0201
|
OEBltr_Class B Pricing Consultation_20201214
|
Correspondence
|
2020-12-14
|
|
2020-12-14
|
EB-2016-0201
|
OEBltr_Oshawa_Accepting Final Results Report_20201019
|
Correspondence
|
2020-10-19
|
|
2020-10-19
|
EB-2016-0201
|
OEBltr_CustomerFirst_Accpt_Final Results_20200826
|
Correspondence
|
2020-08-26
|
|
2020-08-26
|
EB-2016-0201
|
Supplemental_dec_order_cost awards_GA Pricing_20200624
|
Decision and Order on Cost Awards
|
2020-06-24
|
|
2020-06-24
|
EB-2016-0201
|
QMA_Cost Claim_MDMcL_Time Sheet_20200615
|
Cost Claim
|
|
2020-06-15
|
2020-06-15
|
EB-2016-0201
|
QMA_Cost Claim_RPP Road Map_Service Invoice_20200615
|
Cost Claim
|
|
2020-06-15
|
2020-06-15
|
EB-2016-0201
|
QMA_Cost Claim Form_RPP Road Map_Consultation_20200615
|
Cost Claim
|
|
2020-06-15
|
2020-06-15
|
EB-2016-0201
|
QMA_Cost Claim_RPP Roadmap_20200615
|
Cost Claim
|
|
2020-06-15
|
2020-06-15
|
EB-2016-0201
|
QMA_Cost Claim_cvrltr_RPP Roadmap_20200615
|
Cost Claim
|
|
2020-06-15
|
2020-06-15
|
EB-2016-0201
|
CME_Cost Claim_GA Pricing_20200430
|
Cost Claim
|
|
|
2020-06-08 at 3:15 PM
|
EB-2016-0201
|
London_Reply_OEB_RPP Road Map_20200520
|
Correspondence
|
|
2020-05-20
|
2020-05-20
|
EB-2016-0201
|
LH_RPP_App J_Extended Analysis_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP Pilot_App K_Extended Analysis_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_App H_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_App I_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_Appendix F_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_App G_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP Pilot_Final Evaluation Report_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_App C_Global Outputs_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_App B_London Hydro EMV Metrics_20191218
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_App E_CPP Event Demand Impacts_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
LH_RPP_App D_Energy Impact Outputs_20200421
|
Correspondence
|
|
2020-04-21
|
2020-04-21
|
EB-2016-0201
|
OEBltr_London Hydro_Final Results Report_20200421
|
Correspondence
|
2020-04-21
|
|
2020-04-21
|
EB-2016-0201
|
dec_order_cost awards_GA Pricing Program_20200327
|
Decision and Order on Cost Awards
|
2020-03-27
|
|
2020-03-27
|
EB-2016-0201
|
RPP Pilot Interim Report_Addendum May 2019_20200313
|
Correspondence
|
|
|
2020-03-13 at 2:30 PM
|
EB-2016-0201
|
AMPCO_CostClaim_GA Pricing Paper Consultation_20200309
|
Cost Claim
|
|
2020-03-09
|
2020-03-09
|
EB-2016-0201
|
SEC_Cost Claim_GA Pricing Program_20200228
|
Cost Claim
|
|
2020-02-28
|
2020-02-28
|
EB-2016-0201
|
LPMA_Cost Claim_GA Pricing Program_20200227
|
Cost Claim
|
|
2020-02-27
|
2020-02-27
|
EB-2016-0201
|
NoH_Cost Awards_GA Pricing Paper_20200224
|
Notice of Hearing
|
2020-02-26
|
|
2020-02-26
|
EB-2016-0201
|
Cost Claim_Form_GA Consultation_20200226
|
Notice of Hearing
|
2020-02-26
|
|
2020-02-26
|
EB-2016-0201
|
OEBltr_IESO Acceptance of CustomerFirst RPP Pilot Interim Results Report_20200218
|
Correspondence
|
2020-02-18
|
|
2020-02-18
|
EB-2016-0201
|
OEB_ltr of Acceptance_CustomerFirst RPP Pilot Interim Results Report_20200218
|
Correspondence
|
2020-02-18
|
|
2020-02-18
|
EB-2016-0201
|
dec_order_Board costs_RPP Roadmap_20191220
|
Decision and Order on Cost Awards
|
2019-12-20
|
|
2019-12-20
|
EB-2016-0201
|
Oshawa PUC RPP Pilot Mid Year Results Report_20190920
|
Submission
|
2019-10-25
|
|
2019-10-25
|
EB-2016-0201
|
Letter to Oshawa PUC confirming acceptance of Interim Results Report_20191024
|
Correspondence
|
2019-10-24
|
|
2019-10-24
|
EB-2016-0201
|
OEB letter to IESO acceptance of Oshawa PUC Interim Results Report_20191024
|
Correspondence
|
2019-10-24
|
|
2019-10-24
|
EB-2016-0201
|
OEBltr_Alectra_acceptance_EV Logger Proposal_20190909
|
Correspondence
|
2019-09-09
|
|
2019-09-09
|
EB-2016-0201
|
OEBltr_Final Results Report_RPP Pilot Proponents_20190731
|
Correspondence
|
2019-07-31
|
|
2019-07-31
|
EB-2016-0201
|
CME_Industrial Electricity Rate Consultation Response_Final_APG_20190615
|
Comments
|
|
2019-07-17
|
2019-07-17
|
EB-2016-0201
|
CME_Comments_Class B Consumers Staff Report_20190717
|
Comments
|
|
2019-07-17
|
2019-07-17
|
EB-2016-0201
|
OEB ltr_London Hydro_Interim Results Report_20190531
|
Correspondence
|
2019-05-31
|
|
2019-05-31
|
EB-2016-0201
|
OEB ltr_IESO_London Hydro_Interim Results Report_20190531
|
Correspondence
|
2019-05-31
|
|
2019-05-31
|
EB-2016-0201
|
OEB ltr_IESO_Alectra_extension_20190531
|
Correspondence
|
2019-05-31
|
|
2019-05-31
|
EB-2016-0201
|
Approved_RPP Pilot Structures Prices_20190530
|
Correspondence
|
2019-05-30
|
|
2019-05-30
|
EB-2016-0201
|
OEBltr_LDC_RPP Roadmap Pilot Price Extn_20190530
|
Correspondence
|
2019-05-30
|
|
2019-05-30
|
EB-2016-0201
|
OEBltr_Alectra_Approving Dynamic Extension_20190530
|
Correspondence
|
2019-05-30
|
|
2019-05-30
|
EB-2016-0201
|
Alectra_RPP Extension Proposal_cvrltr_20190509
|
Correspondence
|
|
2019-05-09
|
2019-05-09
|
EB-2016-0201
|
Alectra_RPP Extension Proposal_20190509
|
Correspondence
|
|
2019-05-09
|
2019-05-09
|
EB-2016-0201
|
LH_RPP_Pilot Interim Evaluation Summer 2018 Report V04_20190524
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH_RPP_Appendix I_Final_20190524
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH_RPP_Appendix H_20190524
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH RPP Appendix G 20190524
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH RPP Appendix F 20190524
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH RPP Appendix E CPP Event Demand Impacts 20190301
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH RPP Appendix D Energy Impact Outputs 20190308
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH RPP Appendix C Global Outputs 20190404
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
LH RPP Appendix B London Hydro EMV Metrics 20190524
|
Correspondence
|
|
2019-05-24
|
2019-05-24
|
EB-2016-0201
|
CFIB_Comments_Staff Paper_Class B Global Cost_20190418
|
Comments
|
|
2019-05-18
|
2019-05-18
|
EB-2016-0201
|
AMPCO_Comments_20190418
|
Comments
|
|
2019-04-18
|
2019-04-18
|
EB-2016-0201
|
QMA_Comments_Alternative Price Designs_20190425.pdf
|
Comments
|
|
2019-04-25
|
2019-04-25
|
EB-2016-0201
|
QMA_Corres_OEB_20190425.pdf
|
Correspondence
|
|
2019-04-25
|
2019-04-25
|
EB-2016-0201
|
OEB Ltr_rpp-roadmap-pilot-price-update_20190423
|
Notice
|
2019-04-23
|
|
2019-04-23
|
EB-2016-0201
|
PeakPower_Comments_Class B Global Cost_20190418
|
Comments
|
|
2019-04-18
|
2019-04-18
|
EB-2016-0201
|
CanSIA_Comments_GA Pricing_Class B final paper_20190418
|
Comments
|
|
2019-04-18
|
2019-04-18
|
EB-2016-0201
|
EDA_Comments_GA Pricing_ClassB final paper_20190418
|
Comments
|
|
2019-04-18
|
2019-04-18
|
EB-2016-0201
|
CLD_Comments_GA Pricing_2019 RPP Roadmap_20190418
|
Comments
|
|
2019-04-18
|
2019-04-18
|
EB-2016-0201
|
SEC_Comments_GA Pricing_nonRPPClassB_20190418
|
Comments
|
|
2019-04-18
|
2019-04-18
|
EB-2016-0201
|
LPMA_Comments_GA Pricing_20190418
|
Comments
|
|
2019-04-18
|
2019-04-18
|
EB-2016-0201
|
suppl_dec_cost eligibility_Staff Research Paper_20190411
|
Decision
|
2019-04-11
|
|
2019-04-11
|
EB-2016-0201
|
OEBLtr_IESO_Alectra Utilities_Accp Interim Results Report_20190408
|
Correspondence
|
2019-04-08
|
|
2019-04-08
|
EB-2016-0201
|
OEBLtr_Alectra_Accp Interim Results Report_20190408
|
Correspondence
|
2019-04-08
|
|
2019-04-08
|
EB-2016-0201
|
Alectra Utilities_cvrltr_Revised_RPP Interim Report_20190329
|
Correspondence
|
|
2019-03-29
|
2019-03-29
|
EB-2016-0201
|
Alectra_Revised_RPP Interim Report_20190329
|
Correspondence
|
|
2019-03-29
|
2019-03-29
|
EB-2016-0201
|
CME_ParticipationREQ_Class B Global Cost_20190325
|
Participation Request Letter
|
|
2019-04-01
|
2019-04-01
|
EB-2016-0201
|
CanSIA_ParticipationREQ_Class B Pricing_20190326
|
Participation Request Letter
|
|
2019-03-27
|
2019-03-27
|
EB-2016-0201
|
BOMA_ParticipationREQ_20190326
|
Cost Eligibility Request
|
|
2019-03-26
|
2019-03-26
|
EB-2016-0201
|
PeakPower_ParticipREQ_Remuneration_ClassB_20190325
|
Participation Request Letter
|
|
2019-03-25
|
2019-03-25
|
EB-2016-0201
|
dec_cost eligibiity_Staff Discussion Paper_20190321
|
Decision
|
2019-03-21
|
|
2019-03-21
|
EB-2016-0201
|
SEC_ParticipationREQ_Class B Research Paper_20190313
|
Participation Request Letter
|
|
2019-03-13
|
2019-03-13
|
EB-2016-0201
|
AMPCO_REQ_Costs_Alt Price Designs_20190312
|
Cost Eligibility Request
|
|
2019-03-12
|
2019-03-12
|
EB-2016-0201
|
QMA_Cost Elg_IntrvREQ_20190312
|
Cost Eligibility Request
|
|
2019-03-12
|
2019-03-12
|
EB-2016-0201
|
LPMA_Cost Elg_IntrvREQ_20190304
|
Cost Eligibility Request
|
|
2019-03-04
|
2019-03-04
|
EB-2016-0201
|
OEBltr_Class B Research Paper_20190228
|
Staff Paper
|
2019-02-28
|
|
2019-02-28
|
EB-2016-0201
|
OEB Staff_Research Paper_RPP Roadmap_20190228
|
Staff Paper
|
2019-02-28
|
|
2019-02-28
|
EB-2016-0201
|
OEBltr_IESO_Oshawa PUC_RPP Pilot_Revised Timelines_20190215
|
Correspondence
|
2019-02-15
|
|
2019-02-15
|
EB-2016-0201
|
OEBltr_IESO_CustomerFirst RPP Pilot_Rev Budget_Schedule Correction_20190215
|
Correspondence
|
2019-02-15
|
|
2019-02-15
|
EB-2016-0201
|
OEBltr_Alectra_Extn Appproval_20190215
|
Correspondence
|
2019-02-15
|
|
2019-02-15
|
EB-2016-0201
|
OEBltr_CustomerFirst_Pilot Modifications_Schedule B_20190122
|
Correspondence
|
2019-01-22
|
|
2019-01-22
|
EB-2016-0201
|
OEBltr_IESO_CustomerFirst_Timelines and Budget Revisions_20190122
|
Correspondence
|
2019-01-22
|
|
2019-01-22
|
EB-2016-0201
|
OEBltr_RPP Pilot Participants_Interim_Final Results Reports_20181114
|
Correspondence
|
2018-11-14
|
|
2018-11-14
|
EB-2016-0201
|
LondonHydro_Ltr_RPP_20181024
|
Correspondence
|
|
2018-10-24
|
2018-10-24
|
EB-2016-0201
|
OEBltr_IESO_Oshawa PUC_RPP Pilot_Revised Timelines_20181024
|
Correspondence
|
2018-10-24
|
|
2018-10-24
|
EB-2016-0201
|
dec_order_on Board Costs_RPP Roadmap_20180920
|
Decision and Order
|
2018-09-20
|
|
2018-09-20
|
EB-2016-0201
|
OEBLtr_CustomerFirst_pilot modifications_20180912
|
Correspondence
|
2018-09-12
|
|
2018-09-12
|
EB-2016-0201
|
OEBltr_HONI_Deferral account_20180809
|
Correspondence
|
2018-08-09
|
|
2018-08-09
|
EB-2016-0201
|
OEBltr_London Hydro_Funding Request_RPP_20180731
|
Correspondence
|
2018-07-31
|
|
2018-07-31
|
EB-2016-0201
|
HONI_ltr_withdrawal_RPPPricing pilot_20180622
|
Correspondence
|
|
2018-06-22
|
2018-06-22
|
EB-2016-0201
|
OEBltr_IESO_HONI RPP Pilot_Revised Dates_20180425
|
Correspondence
|
2018-04-25
|
|
2018-04-25
|
EB-2016-0201
|
approved-rpp-pilot-structures-prices-20180423
|
Correspondence
|
2018-04-23
|
|
2018-04-23
|
EB-2016-0201
|
OEB Ltr_rpp-roadmap-pilot-price-update_20180423
|
Correspondence
|
2018-04-23
|
|
2018-04-23
|
EB-2016-0201
|
OEBltr_CustomerFirst_Date Change_RPP Pilot_20180413
|
Correspondence
|
2018-04-13
|
|
2018-04-13
|
EB-2016-0201
|
OEBltr_HONI_Rev Project Timelines_20180405
|
Correspondence
|
2018-04-05
|
|
2018-04-05
|
EB-2016-0201
|
OEBltr_Alectra_Continuation of Overnight Program_20180328
|
Correspondence
|
2018-03-28
|
|
2018-03-28
|
EB-2016-0201
|
OEBltr_HONI_Contract execution_Project timelines_20180313
|
Correspondence
|
2018-03-13
|
|
2018-03-13
|
EB-2016-0201
|
OEBltr_Alectra_approving change_20180301
|
Correspondence
|
2018-03-01
|
|
2018-03-01
|
EB-2016-0201
|
OEBLtr_London Hydro_Price Protection Period_20180205
|
Correspondence
|
2018-02-05
|
|
2018-02-05
|
EB-2016-0201
|
OEBltr_IESO_London Hydro change in dates_20180205
|
Correspondence
|
2018-02-05
|
|
2018-02-05
|
EB-2016-0201
|
OEB_ltr_IESO_RPP Pilot_Customer First_Lead distributor_20180131
|
Correspondence
|
2018-01-31
|
|
2018-01-31
|
EB-2016-0201
|
Approved_RPP Pilot_Structures Prices_20180130
|
Correspondence
|
2018-01-30
|
|
2018-01-30
|
EB-2016-0201
|
OEBltr_RPP_Roadmap_Approved Suppl Price Structure_20180130
|
Correspondence
|
2018-01-30
|
|
2018-01-30
|
EB-2016-0201
|
OEBltr_Customerfirst_Approved Pilot Price Structure_20180130
|
Correspondence
|
2018-01-30
|
|
2018-01-30
|
EB-2016-0201
|
OEB_Ltr_IESO_Alectra_RPP Pilot_20180122
|
Correspondence
|
2018-01-22
|
|
2018-01-22
|
EB-2016-0201
|
OEB_ltr_rev_CustomerFirst_RPP Pilot Project Approval_20171227
|
Correspondence
|
2017-12-27
|
|
2017-12-27
|
EB-2016-0201
|
Updated Project Timeline_Alectra RPP Pilot_20171221
|
Correspondence
|
|
2017-12-21
|
2017-12-21
|
EB-2016-0201
|
London Hydro_Response_Date Change Approval_20171221
|
Correspondence
|
|
2017-12-21
|
2017-12-21
|
EB-2016-0201
|
ltr_London Hydro_approving start date_20171219
|
Correspondence
|
2017-12-19
|
|
2017-12-19
|
EB-2016-0201
|
OEBltr_Alectra_Date Change_20171213
|
Correspondence
|
2017-12-13
|
|
2017-12-13
|
EB-2016-0201
|
OEB_ltr_CustomerFirst_RPP Pilot Project Approval_20171208
|
Correspondence
|
2017-12-08
|
|
2017-12-08
|
EB-2016-0201
|
OEB corresp_IESO HONI RPP pilot_20171205
|
Correspondence
|
2017-12-05
|
|
2017-12-05
|
EB-2016-0201
|
letter-rpp-roadmap-approved-supplementary-price-structure-20171031.pdf
|
Correspondence
|
2017-10-31
|
|
2017-10-31
|
EB-2016-0201
|
approved-rpp-pilot-structures-prices-20171031.pdf
|
Correspondence
|
2017-10-31
|
|
2017-10-31
|
EB-2016-0201
|
HONI_RPP_Roadmap Pilot_20171026
|
Submission
|
|
2017-10-26
|
2017-10-26
|
EB-2016-0201
|
OEBltr_HONI_RPP Pilot Project Approval_20171023
|
Correspondence
|
2017-10-23
|
|
2017-10-23
|
EB-2016-0201
|
OEBltr_Approved Supplementary Price and Structure for Electricity Pricing Pilot_20171003
|
Correspondence
|
2017-10-03
|
|
2017-10-03
|
EB-2016-0201
|
Approved RPP Pilot Structure_20171003
|
Correspondence
|
2017-10-03
|
|
2017-10-03
|
EB-2016-0201
|
OEB_ltr_IESO_RPP Pilot_London Hydro_revised schedule_20171002
|
Correspondence
|
2017-10-02
|
|
2017-10-02
|
EB-2016-0201
|
dec_order_HONI Acctng Order Deferral_Extension_20170928
|
Decision and Order
|
2017-09-28
|
|
2017-09-28
|
EB-2016-0201
|
OEBltr_IESO_Alectra Utilities_RPP Pilot revised dates_20170922
|
Correspondence
|
2017-09-22
|
|
2017-09-22
|
EB-2016-0201
|
OEB_ltr_IESO_Oshawa PUC_RPP Pilot_Revised Timelines_20170922
|
Correspondence
|
2017-09-22
|
|
2017-09-22
|
EB-2016-0201
|
OEB ltr_London Hydro_RPP Pilot Prices_20170824
|
Correspondence
|
2017-08-24
|
|
2017-08-24
|
EB-2016-0201
|
OEB ltr_RPP Pilot Prices_Oshawa PUC_20170824
|
Correspondence
|
2017-08-24
|
|
2017-08-24
|
EB-2016-0201
|
OEB Ltr_RPP Pilot Prices_Alectra Utilities_20170824
|
Correspondence
|
2017-08-24
|
|
2017-08-24
|
EB-2016-0201
|
RPP Pilot Prices_Approved Prices and Structures_Web Posting_20170824
|
Correspondence
|
2017-08-24
|
|
2017-08-24
|
EB-2016-0201
|
Aug 24, 2017 - Ltr to Minister re RPP Roadmap_Electricity Pricing Pilots(OSB)
|
Correspondence
|
2017-08-24
|
|
2017-08-24
|
EB-2016-0201
|
OEB letter_IESO_Oshawa_RPP Pilot_20170731
|
Correspondence
|
2017-07-31
|
|
2017-07-31
|
EB-2016-0201
|
dec_order_HONI Acctng Order Deferral_Extension_20170728
|
Decision and Order
|
2017-07-28
|
|
2017-07-28
|
EB-2016-0201
|
OEB_Approval Letter_Oshawa PUC_RPP Pilot_20170727
|
Correspondence
|
2017-07-27
|
|
2017-07-27
|
EB-2016-0201
|
HONI_RPPRoadmapPilot_DeferralAccountExtension_20170726
|
Correspondence
|
|
2017-07-26
|
2017-07-26
|
EB-2016-0201
|
OEB_ltr_ IESO_Alectra Utilities_RPP Pilot_Revised Scope_20170714
|
Correspondence
|
2017-07-14
|
|
2017-07-14
|
EB-2016-0201
|
OEB Ltr_Alectra_RPP Pilot Project_Revised Scope_20170712
|
Correspondence
|
2017-07-12
|
|
2017-07-12
|
EB-2016-0201
|
OEBltr_ IESO_Alectra Utilities_RPP Pilot_20170615
|
Correspondence
|
2017-06-15
|
|
2017-06-15
|
EB-2016-0201
|
OEB_ltr_IESO_RPP Pilot Funding_IESO_20170531
|
Correspondence
|
|
2017-05-31
|
2017-05-31
|
EB-2016-0201
|
OEB_ltr to IESO_RPP Pilot_London Hydro_20170526
|
Correspondence
|
2017-05-26
|
|
2017-05-26
|
EB-2016-0201
|
OEB_ltr_IESO_RPP Pilot Funding_20170526
|
Correspondence
|
2017-05-26
|
|
2017-05-26
|
EB-2016-0201
|
London Hydro_RPP Project Timeline Rev_20170428
|
Correspondence
|
|
2017-04-28
|
2017-04-28
|
EB-2016-0201
|
dec_order_HONI Acctng Order Deferral_Extension_20170427
|
Decision and Order
|
2017-04-27
|
|
2017-04-27
|
EB-2016-0201
|
HONI_RPPRoadmapPilot_DeferralAccount_Extension_20170425
|
Correspondence
|
|
2017-04-25
|
2017-04-25
|
EB-2016-0201
|
OEBltr_Alectra_RPP Pilot Project_20170425
|
Correspondence
|
2017-04-25
|
|
2017-04-25
|
EB-2016-0201
|
OEBltr_London Hydro_RPP Pilot_20170413
|
Correspondence
|
2017-04-13
|
|
2017-04-13
|
EB-2016-0201
|
HONI_Appendix A_AmendedRPPRoadMap_20170403
|
Submission
|
|
2017-04-03
|
2017-04-03
|
EB-2016-0201
|
HONI_AmendedRPPRoadmapPilot_20170403
|
Submission
|
|
2017-04-03
|
2017-04-03
|
EB-2016-0201
|
dec_order_Board Costs_RPP Roadmap_20170331
|
Decision and Order on Cost Awards
|
2017-03-31
|
|
2017-03-31
|
EB-2016-0201
|
Standard Supply Service Code_Amendments RPP Roadmap Pilot_20170315
|
Notice of Amendment to a Code - Rule
|
2017-03-15
|
|
2017-03-15
|
EB-2016-0201
|
Notice_Amend SSSC Code_20170315
|
Notice of Amendment to a Code - Rule
|
2017-03-15
|
|
2017-03-15
|
EB-2016-0201
|
Notice of Proposal_Amend the SSSC_20170126
|
Notice of Proposal to Amend a Code - Rule
|
2017-01-26
|
|
2017-01-26
|
EB-2016-0201
|
dec_order_HONI_Acctng Order Deferral Acct_20161117
|
Decision and Order
|
2016-11-17
|
|
2016-11-17
|
EB-2016-0201
|
5_Application Instructions_Hydro One_20161028
|
Correspondence
|
|
2016-10-28
|
2016-10-28
|
EB-2016-0201
|
4_CV_Hydro One_20161028
|
Correspondence
|
|
2016-10-28
|
2016-10-28
|
EB-2016-0201
|
HONI_RPP_PilotPropsal_AppendixA_20161028
|
Correspondence
|
|
2016-10-28
|
2016-10-28
|
EB-2016-0201
|
HONI_RPP_Pilot_Proposal_CvrLtr_20161028
|
Correspondence
|
|
2016-10-28
|
2016-10-28
|
EB-2016-0201
|
HONI_ Reply_SGF Deferral Account_20161027
|
Submission
|
|
2016-10-27
|
2016-10-27
|
EB-2016-0201
|
OEB staff_SUB_HONI Draft Accounting Order_20161020
|
Submission
|
|
2016-10-20
|
2016-10-20
|
EB-2016-0201
|
HONI_RPP_Draft Accounting Order_20161007
|
Submission
|
|
2016-10-07
|
2016-10-07
|
EB-2016-0201
|
dec_order_HONI_Acctng Order Deferral Acct_20160923
|
Decision and Order
|
2016-09-23
|
|
2016-09-23
|
EB-2016-0201
|
Horizon_RPP Pilot Application_20160823
|
Correspondence
|
|
2016-08-23
|
2016-08-23
|
EB-2016-0201
|
Horizon_RPP Pilot Application_covltr_20160823
|
Correspondence
|
|
2016-08-23
|
2016-08-23
|
EB-2016-0201
|
London_RPP_Information Provision_20160823
|
Correspondence
|
|
2016-08-23
|
2016-08-23
|
EB-2016-0201
|
Oshawa PUC_RPP_Pilot Application_20160822
|
Correspondence
|
|
2016-08-22
|
2016-08-22
|
EB-2016-0201
|
London Hydro_RPP_Quick Ramp CPP_20160822
|
Correspondence
|
|
2016-08-22
|
2016-08-22
|
EB-2016-0201
|
PowerStream_Comments_Roadmap Pilot Program_20160822
|
Comments
|
|
2016-08-22
|
2016-08-22
|
EB-2016-0201
|
HONI_RPP_RoadmapPilot_20160819
|
Submission
|
|
2016-08-19
|
2016-08-19
|
EB-2016-0201
|
CustomerFirst_RPP Pricing Pilot Application_20160819
|
Correspondence
|
|
2016-08-19
|
2016-08-19
|
EB-2016-0201
|
OEBltr_RPP Pilot Annoucement_20160718
|
Correspondence
|
2016-07-18
|
|
2016-07-18
|