EB-2020-0043
|
dec_order_Cost Awards_North Bay Hydro_20211025
|
Decision and Order on Cost Awards
|
2021-10-25
|
|
2021-10-25
|
EB-2020-0043
|
SEC_Cost Claim_North Bay_Signed Affidavit_20211005
|
Cost Claim
|
|
2021-10-05
|
2021-10-05
|
EB-2020-0043
|
CCC_Cost Claim_North Bay_20211004_signed
|
Cost Claim
|
|
2021-10-04
|
2021-10-04
|
EB-2020-0043
|
SEC_Cost Claim_NBHDL_20210930
|
Cost Claim
|
|
2021-10-01
|
2021-10-01
|
EB-2020-0043
|
CCC_Cost Claim_North Bay_202100930
|
Cost Claim
|
|
2021-10-01
|
2021-10-01
|
EB-2020-0043
|
VECC_Cost Claim_NBHDL CoS_20210929
|
Cost Claim
|
|
2021-09-29
|
2021-09-29
|
EB-2020-0043
|
NBHDL_Response Ltr of Comment_S W Kidd_20210927
|
Correspondence
|
|
2021-09-27
|
2021-09-27
|
EB-2020-0043
|
dec_rate_order_Rev_North Bay Hydro_20210927
|
Rate Order
|
2021-09-27
|
|
2021-09-27
|
EB-2020-0043
|
OEBltr_Errata_North Bay Hydro_20210927
|
Decision and Order
|
2021-09-27
|
|
2021-09-27
|
EB-2020-0043
|
dec_rate_order_Rev_North Bay Hydro_20210927
|
Decision and Order
|
2021-09-27
|
|
2021-09-27
|
EB-2020-0043
|
DDR_Motion_Review Decision_NBHDL_20210923
|
Motion to Review
|
|
2021-09-23
|
2021-09-23
|
EB-2020-0043
|
Dec_Rate Order_North Bay Hydro_20210923
|
Rate Order
|
2021-09-23
|
|
2021-09-23
|
EB-2020-0043
|
Dec_Rate Order_North Bay Hydro_20210923
|
Decision and Order
|
2021-09-23
|
|
2021-09-23
|
EB-2020-0043
|
OEB Staff_Comments_DRO_North Bay Hydro_20210920
|
Comments
|
|
2021-09-20
|
2021-09-20
|
EB-2020-0043
|
North Bay 2021 Foregone Rev Rate Rider_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
NBHDL_2021_Test year Income Tax PILs_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
NBHDL_2021_Tariff Schedule_Bill Impact Model_NO GS 3000-5000_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
NBHDL_2021_Tariff Schedule Bill Impact Model_GS 3000-5000_ONLY_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
NBHDL_2021 Cost Allocation Model_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
NBHDL_2021 Rev Reqt Workform_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
NBHDL_2021 DVA Continuity Schedule_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
NBHDL_DRO_20210915
|
Draft Rate Order
|
|
2021-09-16
|
2021-09-16
|
EB-2020-0043
|
dec_order_North Bay_CoS_20210909
|
Decision and Order
|
2021-09-09
|
|
2021-09-09
|
EB-2020-0043
|
S W Kidd_Ltr of Comment_NBHDL_20210806_Redacted
|
Letter of Comment
|
|
2021-08-06
|
2021-08-06
|
EB-2020-0043
|
NBHDL_ReplyARG_20210728
|
Applicant Reply Argument
|
|
2021-07-29
|
2021-07-29
|
EB-2020-0043
|
CCC_SUB_ARG in Chief of NBHDL_20210715
|
Submission
|
|
2021-07-15
|
2021-07-15
|
EB-2020-0043
|
SEC_SUB_ NBHDL ARG_20210714
|
Submission
|
|
2021-07-15
|
2021-07-15
|
EB-2020-0043
|
VECC_ SUB_ NBHDL ARG_20210714
|
Submission
|
|
2021-07-15
|
2021-07-15
|
EB-2020-0043
|
OEB_Staff_SUB_Unsettled Issues_20210714
|
Submission
|
|
2021-07-14
|
2021-07-14
|
EB-2020-0043
|
DDR_SUB_ARGChief_NBHDL_20210714
|
Submission
|
|
2021-07-14
|
2021-07-14
|
EB-2020-0043
|
NBHDL_UndertakingResp_20210629
|
Undertaking Responses
|
|
2021-06-30
|
2021-06-30
|
EB-2020-0043
|
NBHDL_ARGChief_20210629
|
Applicant Argument in Chief
|
|
2021-06-30
|
2021-06-30
|
EB-2020-0043
|
NBHDL_ORAL HEARING_Exhibit_Undertaking_List_20210622
|
Exhibit List
|
|
|
2021-06-29 at 10:22 AM
|
EB-2020-0043
|
Transcript_Oral Hearing_NBHDL_20210622
|
Transcripts
|
|
2021-06-23
|
2021-06-23
|
EB-2020-0043
|
EXH_K1.3_SEC_Compendium_NBHDL_20210622
|
Exhibits
|
|
2021-06-22
|
2021-06-22
|
EB-2020-0043
|
EXH_K1.6_OEB_Staff_Compendium_Attachment_NBHDL_20210621
|
Exhibits
|
|
2021-06-21
|
2021-06-21
|
EB-2020-0043
|
EXH_K1.5_OEB_staff_Compendium_North_Bay_20210621
|
Exhibits
|
|
2021-06-21
|
2021-06-21
|
EB-2020-0043
|
EXH_K1.4_VECC_Compendiun_NBHDL_20210621
|
Exhibits
|
|
2021-06-21
|
2021-06-21
|
EB-2020-0043
|
EXH_K1.2_NBHDL_Summary of Opening Remarks_20210618
|
Exhibits
|
|
2021-06-18
|
2021-06-18
|
EB-2020-0043
|
EXH_K1.1_NBHDL_CVs_Witness Panel_20210621
|
Exhibits
|
|
2021-06-18
|
2021-06-18
|
EB-2020-0043
|
EXH_K1.9_DDR_Exhibit_Data Comparison_North Bay_20210618
|
Exhibits
|
|
2021-06-18
|
2021-06-18
|
EB-2020-0043
|
EXH_K1.10_DDR_FaceBook Home Page Postings_North Bay_20210618
|
Exhibits
|
|
2021-06-18
|
2021-06-18
|
EB-2020-0043
|
EXH_K1.8_DDR_Exhibit_Consultation and Efficiencies_North Bay_20210618
|
Exhibits
|
|
2021-06-18
|
2021-06-18
|
EB-2020-0043
|
EXH_K1.7_DDR_Exhibit_Lean Organization_North Bay_20210618
|
Exhibits
|
|
2021-06-18
|
2021-06-18
|
EB-2020-0043
|
DDR_Exhibits_cvrltr_North Bay_20210618
|
Exhibits
|
|
2021-06-18
|
2021-06-18
|
EB-2020-0043
|
NBHDL_Addl IRR_20210614
|
Interrogatory Response from Applicant
|
|
2021-06-14
|
2021-06-14
|
EB-2020-0043
|
NBHDL_Updated_Appl_EVD_Benchmarking_20210614 - REVISED
|
Interrogatory Response from Applicant
|
|
2021-06-14
|
2021-06-14
|
EB-2020-0043
|
NBHDL_Ltr_Response to PO3_20210604
|
Correspondence
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0043
|
SEC_Addl IR_NorthBay_20210604
|
Interrogatories to Applicant
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0043
|
SEC_IR_OM A Comparisons 2019_North Bay_20210604
|
Interrogatories to Applicant
|
|
2021-06-04
|
2021-06-04
|
EB-2020-0043
|
dec_PO3_North Bay Hydro_20210531
|
Procedural Order
|
2021-05-31
|
|
2021-05-31
|
EB-2020-0043
|
dec_PO3_North Bay Hydro_20210531
|
Decision
|
2021-05-31
|
|
2021-05-31
|
EB-2020-0043
|
NBHDL_Updated_Appl_EVD_Benchmarking_20210528
|
Application and Evidence
|
|
2021-05-28
|
2021-05-28
|
EB-2020-0043
|
NBHDL_cvrltr_Appl_EVD Updated_20210528
|
Application and Evidence
|
|
2021-05-28
|
2021-05-28
|
EB-2020-0043
|
OEB Ltr_North Bay_SettlementP_Presentation_Cancel_20210525
|
Correspondence
|
2021-05-25
|
|
2021-05-25
|
EB-2020-0043
|
OEB Staff_SUB_SettlementP_North Bay_20210521
|
Submission
|
|
2021-05-21
|
2021-05-21
|
EB-2020-0043
|
NBHDL_SettlementP_Response to Clarification_20210517
|
Settlement Proposal
|
|
2021-05-17
|
2021-05-17
|
EB-2020-0043
|
NBHDL_SettlementP_Clarification Response_VECC-55_20210518
|
Settlement Proposal
|
|
2021-05-17
|
2021-05-17
|
EB-2020-0043
|
NBHDL_2021_Test year Income Tax PILs_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021_Tariff Schedule_Bill Impact Model_NO GS 3000-5000_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021_Tariff Schedule Bill Impact Model_GS 3000-5000_ONLY_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021 Rev Reqt Workform_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021 LRAMVA_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021 DVA Continuity Schedule_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021 Cost Allocation Model_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021_Ch2_Appendices_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021 Load Profile Data for Cost Allocation_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_2021 Load Forecast Model_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
NBHDL_SettlementP_20210514
|
Settlement Proposal
|
|
2021-05-14
|
2021-05-14
|
EB-2020-0043
|
SEC_Contact Info Change_20210505
|
Correspondence
|
|
2021-05-07
|
2021-05-07
|
EB-2020-0043
|
Interim Rate Order_North Bay CoS_20210427
|
Interim rate order
|
2021-04-27
|
|
2021-04-27
|
EB-2020-0043
|
dec_issues list_North_Bay CoS_20210419
|
Decision
|
2021-04-20
|
|
2021-04-20
|
EB-2020-0043
|
CCC_SUB_ Disputer Issue_North Bay CoS_20210419
|
Submission
|
|
2021-04-19
|
2021-04-19
|
EB-2020-0043
|
VECC_SUB_Issues List_North Bay Hydro CoS_20210416
|
Submission
|
|
2021-04-16
|
2021-04-16
|
EB-2020-0043
|
SEC_SUB_Issues List_North Bay CoS_20210415
|
Submission
|
|
2021-04-16
|
2021-04-16
|
EB-2020-0043
|
NBHDL_SUB_Issues List_20210415
|
Submission
|
|
2021-04-15
|
2021-04-15
|
EB-2020-0043
|
dec_Confidentiality_North Bay CoS_20210415
|
Decision
|
2021-04-15
|
|
2021-04-15
|
EB-2020-0043
|
PO2_North Bay Hydro CoS_20210412
|
Procedural Order
|
2021-04-12
|
|
2021-04-12
|
EB-2020-0043
|
OEB Staff_SUB_Proposed Issues List_North Bay Hydro_20210409
|
Submission
|
|
2021-04-09
|
2021-04-09
|
EB-2020-0043
|
NBHDL_IRR_VECC 27B_LRAMVA 20201116_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_OEB Staff 14_2ZA_2ZB_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_Ch2 Appendices_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_2021 Test Year Income Tax PiLs_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_Tariff Schedule and Bill Impact Model_NO GS 3000-5000_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_Tariff Schedule and Bill Impact Model_GS 3000-5000_ONLY_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_RTSR Workform_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_Rev Reqt Workform_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_2021 LRAMVA_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_Cost Allocation Model_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRRVECC 27B_Project Analysis_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_CCC 20A and C_Table 02_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_2021 DVA Continuity Schedule_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
NBHDL_IRR_CoS_20210401
|
Interrogatory Response from Applicant
|
|
2021-04-01
|
2021-04-01
|
EB-2020-0043
|
OEB Ltr_Granting_Ext_North Bay_20210331
|
Correspondence
|
2021-03-31
|
|
2021-03-31
|
EB-2020-0043
|
VECC_No Obj_Extn to IRR_North Bay_20210330_EMAIL
|
Correspondence
|
|
2021-03-30
|
2021-03-30
|
EB-2020-0043
|
NBHDL_IRR_Extension_Req_20210330
|
Correspondence
|
|
2021-03-30
|
2021-03-30
|
EB-2020-0043
|
SEC_IR_North Bay Hydro_20210315
|
Interrogatories to Applicant
|
|
2021-03-15
|
2021-03-15
|
EB-2020-0043
|
DDR_IR_North Bay Hydro_20210312
|
Interrogatories to Applicant
|
|
2021-03-12
|
2021-03-12
|
EB-2020-0043
|
VECC_IR_North Bay CoS_20210312
|
Interrogatories to Applicant
|
|
2021-03-12
|
2021-03-12
|
EB-2020-0043
|
CCC_IR_North Bay CoS_20210310
|
Interrogatories to Applicant
|
|
2021-03-10
|
2021-03-10
|
EB-2020-0043
|
OEB Staff_IR_North_Bay CoS_20210308
|
Interrogatories to Applicant
|
|
2021-03-08
|
2021-03-08
|
EB-2020-0043
|
NBHDL_2021_Tariff_Schedule_and_Bill_Impact_Model_NO GS 3000-5000_20210308
|
Interrogatories to Applicant
|
|
2021-03-08
|
2021-03-08
|
EB-2020-0043
|
NBHDL_2021_Tariff_Schedule_and_Bill_Impact_Model_GS 3000-5000_ONLY_20210308
|
Interrogatories to Applicant
|
|
2021-03-08
|
2021-03-08
|
EB-2020-0043
|
DD Rennick_ReplytoNorthBayLTR_20210221
|
Correspondence
|
|
2021-02-22
|
2021-02-22
|
EB-2020-0043
|
PO1_North Bay Hydro_20210218
|
Procedural Order
|
2021-02-18
|
|
2021-02-18
|
EB-2020-0043
|
Intervenor List_North Bay_20210218
|
Intervention List
|
2021-02-18
|
|
2021-02-18
|
EB-2020-0043
|
NBHDL_Response_OEB Staff Questions_Attach 3_20210218
|
Correspondence
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0043
|
NBHDL_Response_OEB Staff Questions_Attach 2_20210218
|
Correspondence
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0043
|
NBHDL_Response_OEB Staff Questions_Attach 1_20210218
|
Correspondence
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0043
|
NBHD_2021_Response_Filing_Requirements_Chapter2_Appendices_20210218
|
Correspondence
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0043
|
NBHDL_Response_OEB Staff Questions_attachment 4_20210218
|
Correspondence
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0043
|
NBHDL_Response_OEB Staff Questions_20210218
|
Correspondence
|
|
2021-02-18
|
2021-02-18
|
EB-2020-0043
|
CCC_IntrvREQ_North Bay Cos_20210209
|
Intervenor Request Letter
|
|
2021-02-09
|
2021-02-09
|
EB-2020-0043
|
North Bay_ltr_Response to IntrvREQ_D Rennick_20210205
|
Correspondence
|
|
2021-02-05
|
2021-02-05
|
EB-2020-0043
|
VECC_IntrvREQ_North Bay CoS_20210205
|
Intervenor Request Letter
|
|
2021-02-05
|
2021-02-05
|
EB-2020-0043
|
Stephen Hamilton_Ltr of Comment_North Bay CoS_20210204_Redacted
|
Letter of Comment
|
|
2021-02-04
|
2021-02-04
|
EB-2020-0043
|
HONI_IntrvREQ_North Bay CoS_20210204
|
Intervenor Request Letter
|
|
2021-02-04
|
2021-02-04
|
EB-2020-0043
|
North Bay_Affidavit of Service_20210129
|
Affidavits of Service
|
|
2021-02-02
|
2021-02-02
|
EB-2020-0043
|
North Bay_Affidavits_Exhibit_20210129
|
Affidavits of Service
|
|
2021-02-02
|
2021-02-02
|
EB-2020-0043
|
DD Rennick_IntrvREQ_North Bay_20210130
|
Intervenor Request Letter
|
|
2021-01-30
|
2021-01-30
|
EB-2020-0043
|
DD Rennick_IntrvREQ_cvrltr_North Bay_20210201
|
Intervenor Request Letter
|
|
2021-01-30
|
2021-01-30
|
EB-2020-0043
|
SEC_IntrvREQ_North Bay_20210129
|
Intervenor Request Letter
|
|
2021-01-29
|
2021-01-29
|
EB-2020-0043
|
Notice_North Bay CoS_Bilingual_20210121
|
Notice
|
2021-01-21
|
|
2021-01-21
|
EB-2020-0043
|
lod_North Bay Cos_20210121
|
Letter of Direction
|
2021-01-21
|
|
2021-01-21
|
EB-2020-0043
|
OEB_Completnessltr_North Bay CoS_20210119
|
Correspondence
|
2021-01-19
|
|
2021-01-19
|
EB-2020-0043
|
NBHDL_2021_GA_Analysis_Workform_20210114
|
Application and Evidence
|
|
2021-01-15
|
2021-01-15
|
EB-2020-0043
|
North Bay_2014 Persistence Savings_20210115
|
Application and Evidence
|
|
2021-01-15
|
2021-01-15
|
EB-2020-0043
|
North Bay_Participation and Cost Report_20210115
|
Application and Evidence
|
|
2021-01-15
|
2021-01-15
|
EB-2020-0043
|
North Bay_2017 Final Verified Annual LDC-CDM-ProgResults_2018062_20210115
|
Application and Evidence
|
|
2021-01-15
|
2021-01-15
|
EB-2020-0043
|
ackltr_North Bay CoS_20210111
|
Acknowledgement Letter
|
2021-01-11
|
|
2021-01-11
|
EB-2020-0043
|
NBHDL_Exhibit 8 Rate_Design_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 6 Calc_of_Revenue_Deficiency_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 3 Operating Revenue_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 2 Rate Base_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 1 Adminstration_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 9 Deferral and Variance Accounts_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 7 Cost_Allocation_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 5 Cost of Capital and Rates of Return_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Exhibit 4 Operating Expenses_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Cover Letter_COS 2021_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_LRAMVA 2021_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Appendix IB_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Test_year_Income_Tax_PILs_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Tariff_Schedule_and_Bill_Impact_Model_NO GS 3000-5000_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Tariff_Schedule_and_Bill_Impact_Model_GS 3000-5000_ONLY_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_RTSR_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_LRAMVA 2021_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Appendix IB_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Appendix 2-JA_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_Appendix 2-JA_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Test_year_Income_Tax_PILs_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Tariff_Schedule_and_Bill_Impact_Model_NO GS 3000-5000_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Tariff_Schedule_and_Bill_Impact_Model_GS 3000-5000_ONLY_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_RTSR_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Rev_Reqt_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_GA_Analysis_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_GA_Analysis_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_DVA_Continuity_Schedule_CoS_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_DVA_Continuity_Schedule_CoS_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Cost_Allocation_Model_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Cost_Allocation_Model_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_COS_Checklist_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021 Load Forecast Model_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021 Load Forecast Model_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_1595_External_Analysis_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_1595_External_Analysis_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_1595_Analysis_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHD_2021_Filing_Requirements_Chapter2_Appendices_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Rev_Reqt_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Filing_Requirements_Chapter2_Appendices_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_Filing_Requirements_Chapter2_Appendices_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021_COS_Checklist_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021 Load Profile Data for Cost Allocation_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_2021 Load Profile Data for Cost Allocation_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
NBHDL_1595_Analysis_Workform_20210105
|
Application and Evidence
|
|
2021-01-05
|
2021-01-05
|
EB-2020-0043
|
OEB_ltr_North Bay Extension_20201119
|
Correspondence
|
2020-11-19
|
|
2020-11-19
|
EB-2020-0043
|
North Bay Hydro_Req Extn to Filing CoS Appl_20201117
|
Correspondence
|
|
2020-11-18
|
2020-11-18
|
EB-2020-0043
|
OEBltr_North Bay_Extn_Filing CoS_20200903
|
Correspondence
|
2020-09-03
|
|
2020-09-03
|
EB-2020-0043
|
North Bay Hydro_Deferral of CoS Filing_20200831
|
Correspondence
|
|
2020-08-31
|
2020-08-31
|