Advanced Regulatory Document Search (RDS)

 

Search Results for: Records - Case Number=EB-2019-0032 - 157 Records Found

sort icon Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.



info iconCase Information
Click the case number to view details for that proceeding.

Filter on Search Results:
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received
EB-2019-0032 document icon dec_costs_EnWin_20200107 Decision and Order on Cost Awards EnWin Utilities Ltd. - Electricity Distributor 2020-01-07 2020-01-07
EB-2019-0032 document icon AMPCO_Cost Claim_20191210 Cost Claim EnWin Utilities Ltd. - Electricity Distributor 2019-12-10 2019-12-10
EB-2019-0032 document icon CCC_CostClaim_20191209 Cost Claim EnWin Utilities Ltd. - Electricity Distributor 2019-12-09 2019-12-09
EB-2019-0032 document icon VECC_Cost Claim_20191209 Cost Claim EnWin Utilities Ltd. - Electricity Distributor 2019-12-09 2019-12-09
EB-2019-0032 document icon SEC_ENWIN_CostClaim_20191206 Cost Claim EnWin Utilities Ltd. - Electricity Distributor 2019-12-06 2019-12-06
EB-2019-0032 document icon Final_rate order_EnWin Utilities_2020 CoS_20191205 Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-12-05 2019-12-05
EB-2019-0032 document icon OEB Staff_SUB_DRO_EnWin Uitlities_2020 CoS_20191128 Submission EnWin Utilities Ltd. - Electricity Distributor 2019-11-28 2019-11-28
EB-2019-0032 document icon ENWIN 2020 COS Cost_Allocation_Model_DRO_ 20191121 Draft Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-21 2019-11-21
EB-2019-0032 document icon ENWIN 2020 COS PILs_Workform_DRO_20191121 Draft Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-21 2019-11-21
EB-2019-0032 document icon ENWIN 2020 COS Rev_Reqt_Work_Form_DRO_20191121 Draft Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-21 2019-11-21
EB-2019-0032 document icon ENWIN 2020 COS_ Chapter 2_Appendices_DRO_20191121 Draft Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-21 2019-11-21
EB-2019-0032 document icon ENWIN 2020 COS_DVA_Continuity_Schedule_DRO_20191121 Draft Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-21 2019-11-21
EB-2019-0032 document icon ENWIN 2020 COS_Tariff_Schedule_and_Bill_Impact_Model_DRO_20191121 Draft Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-21 2019-11-21
EB-2019-0032 document icon ENWIN_DRF_RO_20191121 Draft Rate Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-21 2019-11-21
EB-2019-0032 document icon dec_order_Enwin Utilities_2020 CoS_20191114 Decision and Order EnWin Utilities Ltd. - Electricity Distributor 2019-11-14 2019-11-14
EB-2019-0032 document icon ENWIN_Reply_Sub_20191025 Applicant Reply Argument EnWin Utilities Ltd. - Electricity Distributor 2019-10-25 2019-10-25
EB-2019-0032 document icon dec_order_ENWIN_Settlement Proposal_20191017 Decision and Order EnWin Utilities Ltd. - Electricity Distributor 2019-10-17 2019-10-17
EB-2019-0032 document icon AMPCO_SUB_EnWin_revised_20191017 Submission EnWin Utilities Ltd. - Electricity Distributor 2019-10-17 2019-10-17
EB-2019-0032 document icon OEB Staff_sub_EnWin Utilities 2020 CoS _20191016 Submission EnWin Utilities Ltd. - Electricity Distributor 2019-10-16 2019-10-16
EB-2019-0032 document icon ENWIN_ARGChief_20191004 Applicant Argument in Chief EnWin Utilities Ltd. - Electricity Distributor 2019-10-04 2019-10-04
EB-2019-0032 document icon OEBStaff_sub_settlement_20191001 Submission EnWin Utilities Ltd. - Electricity Distributor 2019-10-01 2019-10-01
EB-2019-0032 document icon po4 _Dec Confidentiality_Enwin Utilities_20190930 Procedural Order EnWin Utilities Ltd. - Electricity Distributor 2019-09-30 2019-09-30
EB-2019-0032 document icon ENWIN_2020_Tariff_Schedule_and_Bill_Impact_Model_Partial - 3TS and FA Scenario - 20190904_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_2020_Rev_Reqt_Work_Form_Updated_Partial - 3TS and FA Scenario - 20190904_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_2020_Cost_Allocation_Model_Updated_Partial - 3TS and FA Scenario - 20190904_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_2020_COS_Bill Impact Summary_Two Scenarios_Settlement_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_VECC-58 Pre-Settlement Clarification Q10-2020_Cost_Allocation_Model-Uncombined Class_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon VECC-50 Pre-Settlement Clarification Q-Attachment 1 - Persistent CDM Savings per Rate Class_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_VECC - 54b Pre-Settlement Clarification Q 6-Reconciliation of 2017 Savings - 20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_VECC - 54b Pre-Settlement Clarification Q 6-Supplemental 2017-2018 Persistence Report_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_VECC - 54a Pre-Settlement Clarification Q 6 Attachment-Reconciliation of 2018 Savings-20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_VECC - 52 Pre-Settlement Clarification Q 4 Attachment 2006-2018 Persistence Report_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_OEBstaff Pre-Settlement Clarification Question 15b - Attachment 3- 20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_OEBstaff Pre-Settlement Clarification Q 15-PILs model pre Bill C-97 - Attachment 1 - 20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_OEBStaff Pre-Settlement Clarification Q15 - PILs model post Bill C-97 - Attachment 2_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_Responses to Pre-Settlement Conference Clarification Questions_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_EVD_Cover Letter_20190924 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_2020 Benchmarking-Spreadsheet-Forecast-Model_Settlement_20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN 2020 COS_Tariff_Schedule_and_Bill_Impact_Model_Settlement_20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN 2020 COS_RTSR_Workform_Settlement_20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN 2020 COS_DVA_Continuity_Schedule_Settlement_20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN 2020 COS_ Chapter 2_Appendices_Settlement_20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN 2020 COS Rev_Reqt_Work_Form _Settlement_20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN 2020 COS PILs_Workform_Settlement_ 20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN 2020 COS Cost_Allocation_Model_Settlement_ 20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon ENWIN_Settlement_Proposal_20190924 Settlement Proposal EnWin Utilities Ltd. - Electricity Distributor 2019-09-25 2019-09-25
EB-2019-0032 document icon po3_EnWin_20190917 Procedural Order EnWin Utilities Ltd. - Electricity Distributor 2019-09-17 2019-09-17
EB-2019-0032 document icon ENWIN_ Ltr_Req for Extn_Settlement Proposal_20190917 Correspondence EnWin Utilities Ltd. - Electricity Distributor 2019-09-17 2019-09-17
EB-2019-0032 document icon dec_order_Confidentiality_EnWin_20190911 Decision and Order EnWin Utilities Ltd. - Electricity Distributor 2019-09-11 2019-09-11
EB-2019-0032 document icon AMPCO_LTR_EnWin_Confidentiality_20190827 Correspondence EnWin Utilities Ltd. - Electricity Distributor 2019-08-27 2019-08-27
EB-2019-0032 document icon OEBStaff_Sub Enwin Utilities Confidentiality_20190827 Submission EnWin Utilities Ltd. - Electricity Distributor 2019-08-27 2019-08-27
EB-2019-0032 document icon Dec on Issues List_PO2 _Enwin Utilities_ 20190820 Decision EnWin Utilities Ltd. - Electricity Distributor 2019-08-20 2019-08-20
EB-2019-0032 document icon PO2 _Dec on Issues List_Enwin Utilities_ 20190820 Procedural Order EnWin Utilities Ltd. - Electricity Distributor 2019-08-20 2019-08-20
EB-2019-0032 document icon ENWIN_LTR_Ford Letter of Support_20190819 Correspondence EnWin Utilities Ltd. - Electricity Distributor 2019-08-19 2019-08-19
EB-2019-0032 document icon OEBStaff_Issues List_20190814 Correspondence EnWin Utilities Ltd. - Electricity Distributor 2019-08-14 2019-08-14
EB-2019-0032 document icon AMPCO_Declaration_Undertaking_ENWIN_20190807 Declaration and Undertakings EnWin Utilities Ltd. - Electricity Distributor 2019-08-07 2019-08-07
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 107 - Attachment 5 Suppl 2017-2018 Persistence Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 107 - Attachment 4 Suppl 2017-2018 Persistence Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 107 - Attachment 3 Participation and Cost Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 107 - Attachment 2 2011-2018 Persistence Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 107 - Attachment 1 2017 Final Verified Results Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 87 - Attch 1 Remaining CFF projects - As of 22072019 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_AMPCO 32 - Attachment 2c Table 3 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_AMPCO 32 - Attachment 1a Table 1 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020_Rev_Reqt_Work_Form_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020_Income_Tax_PILs_Workform_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020_DVA_Workform_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020_Cost_Allocation_Model_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020_Bill Impacts_Model_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020 RTSR_Workform_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020 Load Forecast Model_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_2020 Chapter_2_Appendices_Updated_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_CCC_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_AMPCO_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_ IRR_Cvr Ltr_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_VECC 15 - Attachment 6 Persistent CDM Savings per Rate Class Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_VECC 15 - Attachment 5 2017 Final Verified Results_EWU_Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_VECC 15 - Attachment 4 Final Verified 2016 Annual LDC CDM Results Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_VECC 15 - Attachment 3 Final 2015 Annual Verified Results Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_VECC 15 - Attachment 2 2011-2014 Final Results Report Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_VECC 15 - Attachment 1 2006-2010 Final OPA CDM Results Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_SEC 30 - Attachment 1 Affiliate Shared Services Allocation Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_SEC 24 - Attachment 1 Normalized OMA Costs Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 118 - Attachment 1 GA Analysis Workform_Updated Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_OEB Staff 111 - Attachment 1 LRAMVA_Work_Form Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_SEC_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon ENWIN_IRR_VECC_20190801 Interrogatory Response from Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-08-01 2019-08-01
EB-2019-0032 document icon CCC_IR_ENWIN_20190715 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-15 2019-07-15
EB-2019-0032 document icon AMPCO_IR_Enwin_20190715 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-15 2019-07-15
EB-2019-0032 document icon VECC_IR_Enwin_20190712 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-12 2019-07-12
EB-2019-0032 document icon SEC_IR_Enwin_20190712 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-12 2019-07-12
EB-2019-0032 document icon Appendix 2_2020_IR 4-Staff-112_Test_year_Income_Tax_PILs final_20190712 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-12 2019-07-12
EB-2019-0032 document icon Appendix 1_IR 3-Staff-81_Figure 1 OEB Staff Analysis_20190712 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-12 2019-07-12
EB-2019-0032 document icon OEB Staff_ IRs_EnWin_20190712 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-12 2019-07-12
EB-2019-0032 document icon OEB Staff_covltr_ IRs_EnWin_20190712 Interrogatories to Applicant EnWin Utilities Ltd. - Electricity Distributor 2019-07-12 2019-07-12
EB-2019-0032 document icon dec_confidentiality_EnWin_20190710 Decision EnWin Utilities Ltd. - Electricity Distributor 2019-07-10 2019-07-10
EB-2019-0032 document icon EnWin_Reply_Confidentiality_20190704.pdf Submission EnWin Utilities Ltd. - Electricity Distributor 2019-07-04 2019-07-04
EB-2019-0032 document icon OEBStaff_Sub EnWin Utilities Confidentiality_20190626 Submission EnWin Utilities Ltd. - Electricity Distributor 2019-06-26 2019-06-26
EB-2019-0032 document icon po1_EnWin_20190621 Procedural Order EnWin Utilities Ltd. - Electricity Distributor 2019-06-21 2019-06-21
EB-2019-0032 document icon ENWIN_Ex 9_EVD_Update_20190611 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-06-11 2019-06-11
EB-2019-0032 document icon CCC_IntrvREQ_20190610 Intervenor Request Letter EnWin Utilities Ltd. - Electricity Distributor 2019-06-10 2019-06-10
EB-2019-0032 document icon SEC_IntrvREQ_20190607 Intervenor Request Letter EnWin Utilities Ltd. - Electricity Distributor 2019-06-07 2019-06-07
EB-2019-0032 document icon AMPCO_IntrvREQ_20190607 Intervenor Request Letter EnWin Utilities Ltd. - Electricity Distributor 2019-06-07 2019-06-07
EB-2019-0032 document icon VECC_IntrvREQ_20190606 Intervenor Request Letter EnWin Utilities Ltd. - Electricity Distributor 2019-06-06 2019-06-06
EB-2019-0032 document icon Enwin_Affidavit_20190529 Affidavits of Service EnWin Utilities Ltd. - Electricity Distributor 2019-05-29 2019-05-29
EB-2019-0032 document icon notice_Enwin_20190523_FR Notice EnWin Utilities Ltd. - Electricity Distributor 2019-05-23 2019-05-23
EB-2019-0032 document icon notice_Enwin_20190523 Notice EnWin Utilities Ltd. - Electricity Distributor 2019-05-23 2019-05-23
EB-2019-0032 document icon lod_Enwin_20190523 Letter of Direction EnWin Utilities Ltd. - Electricity Distributor 2019-05-23 2019-05-23
EB-2019-0032 document icon OEB ltr_completeness_EnWin_20190522 Correspondence EnWin Utilities Ltd. - Electricity Distributor 2019-05-22 2019-05-22
EB-2019-0032 document icon ENWIN_2018 RRR Reconciliation with 2018 AFS_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon ENWIN_2018 Audited Financial Statements_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon Enwin_2020 Load Forecast_Model_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon ENWIN_Exh 9_DVA_COS APPL_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon ENWIN_IESO Letter of Comment_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon ENWIN_2020 Chapter_2_Appendices_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon ENWIN_Exh1_Administration_COS_APPL_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon ENWIN_Cvr Ltr_Reply to Incomplete Letter_20190517 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-05-17 2019-05-17
EB-2019-0032 document icon Incomplete_ltr_ENWIN_20190513 Correspondence EnWin Utilities Ltd. - Electricity Distributor 2019-05-13 2019-05-13
EB-2019-0032 document icon ackltr_ENWIN_20190430 Acknowledgement Letter EnWin Utilities Ltd. - Electricity Distributor 2019-04-30 2019-04-30
EB-2019-0032 document icon ENWIN_Cvr Ltr_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 4_Operating Expense_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 2_Rate Base_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 9_DVA_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 8_Rate Design_COS APPL_20190426v2 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 7_Cost Allocation_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 6_Revenue Requirement_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 5_Cost of Capital_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 3_Revenues_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Ex 1_Administration_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Cvr Ltr_COS APPL_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_LRAMVA Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_GA Analysis Workform 2018 Balances_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Rev_Reqt_Work_Form_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Income_Tax_PILs_Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Filing_Checklist_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Cost_Allocation_Model_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Bill Impacts_Model_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_1595_Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020 RTSR_Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020 Chapter_2_Appendices_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020 Benchmarking-Spreadsheet-Forecast-Model_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Exh 3_AttachmentD_Final CDM Plan Aug 8 2018_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Exh 3_AttachmentD_CDM Plan Resub Summary of Key Updates_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_Exh 3_AttachmentD_CDMCost Effectiveness_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_LRAMVA Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_GA Analysis Workform 2018 Balances_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Filing_Checklist_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020 Benchmarking-Spreadsheet-Forecast-Model_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Rev_Reqt_Work_Form_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Income_Tax_PILs_Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Cost_Allocation_Model_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020 RTSR_Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020 Chapter_2_Appendices_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_Bill Impacts_Model_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020_1595_Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
EB-2019-0032 document icon ENWIN_2020 DVA_Workform_20190426 Application and Evidence EnWin Utilities Ltd. - Electricity Distributor 2019-04-26 2019-04-26
Case Number File Name Document Type Applicant Issued By OEB Received By OEB Date Issued/Received