Search Results for: Records - Case Number=EB-2018-0028 - 378 Records Found
The document result list has reached its limit of 10,000 records. Please refine your search criteria to view more records.
Sorting Your Search Results
The most recent documents automatically show at the top. To sort by different categories (e.g. by Document Type) click the column header. Click it again to switch between ascending/descending order.
Case Information
Click the case number to view details for that proceeding.
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |
---|---|---|---|---|---|---|
EB-2018-0028 | Dec Order_Cost Awards_EnergyPlus_20190820 | Decision and Order on Cost Awards | Energy Plus Inc. - Electricity Distributor | 2019-08-20 | 2019-08-20 | |
EB-2018-0028 | CCC_Ltr_VECC.CostClaim OBJ Reply_EnergyPlus_20190806 | Cost Claim Objection Reply | Energy Plus Inc. - Electricity Distributor | 2019-08-06 | 2019-08-06 | |
EB-2018-0028 | Dec_Final Rate Order_EnergyPlus_20190801 | Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-08-01 | 2019-08-01 | |
EB-2018-0028 | Dec_Final Rate Order_EnergyPlus_20190801 | Decision | Energy Plus Inc. - Electricity Distributor | 2019-08-01 | 2019-08-01 | 2019-08-01 |
EB-2018-0028 | VECC_Ltr_Cost Claim OBJ Reply_EnergyPlus_20190731 | Cost Claim Objection Reply | Energy Plus Inc. - Electricity Distributor | 2019-07-31 | 2019-07-31 | |
EB-2018-0028 | EnergyPlus_CostClaim_Objection Ltr_20190730 | Cost Claim Objection | Energy Plus Inc. - Electricity Distributor | 2019-07-30 | 2019-07-30 | |
EB-2018-0028 | CCC_CostClaim_EnergyPlus_20190724 | Cost Claim | Energy Plus Inc. - Electricity Distributor | 2019-07-24 | 2019-07-24 | |
EB-2018-0028 | VECC_Cost Claim_EnergyPlus_20190723 | Cost Claim | Energy Plus Inc. - Electricity Distributor | 2019-07-23 | 2019-07-23 | |
EB-2018-0028 | SEC_EnergyPlus_CostClaim_20190723 | Cost Claim | Energy Plus Inc. - Electricity Distributor | 2019-07-23 | 2019-07-23 | |
EB-2018-0028 | EnergyPlus_2019_Test_year_Income_Tax_PILs_Workform_V1_xlsm_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_Tariff_Schedule_and_Bill_Impacts_xlsx_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_RTSR_Workform_Harmonized_xlsx_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_RTSR_Workform_CND_xlsm_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_RTSR_Workform_BCP_xlsm_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_Rev_Reqt_Work_Form_xlsm_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_Load Forecast Model_V3_xlsx_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_DVA_Continuity_Schedule_CoS_20180712 - Consolidate_xlsb_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_Cost_Allocation_Model_xlsm_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_Chapter_5_Appendix_2018_08_29_xlsx_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_Chapter_2_Appendices_xlsm_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_Benchmarking_Spreadsheet_Forecast_Model_xlsx_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_2019_ACM_Model_OEB_2019_4_20_II_xlsm_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_DRO_ReplySUB_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | EnergyPlus_DRO_Cvr Ltr_ReplySUB_20190718 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-07-18 | 2019-07-18 | |
EB-2018-0028 | VECC_SUB_Comments re DRO_EnergyPlus_20190709 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-07-09 | 2019-07-09 | |
EB-2018-0028 | OEB staff_SUB_EnergyPlus_DRO_20190709 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-07-09 | 2019-07-09 | 2019-07-09 |
EB-2018-0028 | OEB_Ltr_Reply_Granting Extension Cost Claims_EnergyPlus_20190703 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-07-03 | 2019-07-03 | |
EB-2018-0028 | VECC_Ltr_REQ Costs Claim Extension_EnergyPlus_20190702 | Cost Claim | Energy Plus Inc. - Electricity Distributor | 2019-07-02 | 2019-07-02 | |
EB-2018-0028 | EnergyPlus_2019_Test_year_Income_Tax_PILs_Workform_V1_DRO_.xlsm_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_Tariff Schedule and Bill Impacts_DR_.xlsx_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_RTSR_Workform_Harmonized_DRO_xlsx_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_Rev_Reqt_Work_Form_DRO_xlsm_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_Load Forecast Model_V3_DR_.xlsx_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_DVA_Continuity_Schedule_CoS_20180712_DRO_xlsb_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_Cost_Allocation_Model_DRO_xlsm_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_Chapter2_Appendices_DRO_xlsm_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_2019_ACM_Model_OEB_2019_4_20_II_DRO_xlsm_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_DRO_2019 COS_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | EnergyPlus_DRO_Cover 2019 COS_20190627 | Draft Rate Order | Energy Plus Inc. - Electricity Distributor | 2019-06-27 | 2019-06-27 | |
EB-2018-0028 | OEB Ltr_Errata_Dec_Order_EnergyPlus_20190618 | Decision and Order | Energy Plus Inc. - Electricity Distributor | 2019-06-18 | 2019-06-18 | |
EB-2018-0028 | Dec_Order_EnergyPlus_13June_corrected_20190618 | Decision and Order | Energy Plus Inc. - Electricity Distributor | 2019-06-18 | 2019-06-18 | |
EB-2018-0028 | Dec_Order_EnergyPlus_Jan 1 2019 EDR_20190613 | Decision and Order | Energy Plus Inc. - Electricity Distributor | 2019-06-13 | 2019-06-13 | |
EB-2018-0028 | EnergyPlus_ReplySUB_20190423 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-04-23 | 2019-04-23 | |
EB-2018-0028 | CCC_ReplySUB_EnergyPlus._20190407 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-04-08 | 2019-04-08 | |
EB-2018-0028 | TMMC_ReplySUB_ReplyArg_EnergyPlus_20190405 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-04-05 | 2019-04-05 | |
EB-2018-0028 | SEC_ReplySUB_ReplyARG_EnergyPlus_20190405 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-04-05 | 2019-04-05 | |
EB-2018-0028 | VECC_ReplySUB_20190405 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-04-05 | 2019-04-05 | |
EB-2018-0028 | HONI_ReplySUB_ReplyARG_20190405 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-04-05 | 2019-04-05 | |
EB-2018-0028 | OEB staff_ReplySUB_EnergyPlus_20190405 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-04-05 | 2019-04-05 | |
EB-2018-0028 | OEB staff_SUB_EnergyPlus_20190329 | Submission | 2019-04-01 | 2019-04-01 | ||
EB-2018-0028 | SEC_SUB_Arg_Energy Plus_20190329 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-03-29 | 2019-03-29 | |
EB-2018-0028 | TMMC_SUB_Final_ARG_EnergyPlus_20190329 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-03-29 | 2019-03-29 | |
EB-2018-0028 | VECC_ SUB_EnergyPlus_20190329 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-03-29 | 2019-03-29 | |
EB-2018-0028 | CCC_SUB_ARG_EnergyPlus_20190329 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-03-29 | 2019-03-29 | |
EB-2018-0028 | HONI_SUB_ReplyARG_EnergyPlus_20190329 | Submission | Energy Plus Inc. - Electricity Distributor | 2019-03-29 | 2019-03-29 | |
EB-2018-0028 | Ex K2-1_SEC_Cross-examination compendium for TMMC_20190308 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-08 | 2019-03-08 | |
EB-2018-0028 | Ex K1-7_HONI_compendium_20190307 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | Ex K1-6_SEC_Appendix A Bill Impact Scenarios_20190307 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | Ex K1-5_SEC_Cross-examination compendium for EnergyPlus_20190307 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | Ex K1-4_VECC compendium_20190307 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | Ex K1-3_EnergyPlus_Ltr_Witnesses CV_20190307 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | Ex K1-2 TMMC_Ltr to OEB_CVs_dated March 6 2019_20190307 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | Ex K1-1_TMMC Ltr to OEB Witness panel dated March 5 2019_20190307 | Exhibits | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | TMMC_Response_Undertaking_J2.2_20190318 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-03-18 | 2019-03-18 | |
EB-2018-0028 | TMMC_Response_Undertaking_J2._120190318 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-03-18 | 2019-03-18 | |
EB-2018-0028 | TMMC_RESPONSES_UNDERTAKINGS_J2.1-J24_20190318 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-03-18 | 2019-03-18 | |
EB-2018-0028 | TMMC_CovLet_Responses to Oral Hearing Undertakings_20190318 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-03-18 | 2019-03-18 | |
EB-2018-0028 | EnergyPlus_ARGChief_20190315 | Applicant Argument in Chief | Energy Plus Inc. - Electricity Distributor | 2019-03-15 | 2019-03-15 | |
EB-2018-0028 | EnergyPlus_URR_EnergyPlus_J 1-1 to J 1-5_20190313 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-03-13 | 2019-03-13 | |
EB-2018-0028 | Transcripts_Vol 2_Energy Plus_20180308 | Transcripts | Energy Plus Inc. - Electricity Distributor | 2019-03-08 | 2019-03-08 | |
EB-2018-0028 | REDACTED_Transcripts_Vol 1_Energy+_20180307 | Transcripts | Energy Plus Inc. - Electricity Distributor | 2019-03-07 | 2019-03-07 | |
EB-2018-0028 | EnergyPlus_Ltr_20190306 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-03-06 | 2019-03-06 | |
EB-2018-0028 | EnergyPlus_Ltr_Comment_20190306 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2019-03-06 | 2019-03-06 | |
EB-2018-0028 | TMMC_CovLtr_Witness CVs_Witness Resp_20190306 | Cross Examination Material | Energy Plus Inc. - Electricity Distributor | 2019-03-06 | 2019-03-06 | |
EB-2018-0028 | TMMC_Ltr_C and I Rate Design_EnergyPlus_220190305 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-03-05 | 2019-03-05 | |
EB-2018-0028 | Exhibit and Undertaking List_EnergyPlus_TC_Jan 23_updated_20190215 | Exhibit List | Energy Plus Inc. - Electricity Distributor | 2019-01-15 | 2019-01-15 | 2019-01-15 |
EB-2018-0028 | EnergyPlus_Witness CVs_20190305 | Cross Examination Material | Energy Plus Inc. - Electricity Distributor | 2019-03-05 | 2019-03-05 | |
EB-2018-0028 | Dec_EnergyPlus_Embedded Distributor Cost Allocation_20190304 | Decision | Energy Plus Inc. - Electricity Distributor | 2019-03-04 | 2019-03-04 | |
EB-2018-0028 | TMMC_OEBStaff_6c_EnergyPlus_20190301 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | TMMC_IRR_VECC_IRQ12-2_EnergyPlus_20190302 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | TMMC_Evd_jp_Schedule JP-11 Revised_EnergyPlus_20190301 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | TMMC_Updated Evidence_JP_ ERRATA_20190301 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | REDACTED_TMMC_Clarification Updated EVD_JP_EnergyPlus_20190301 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | REDACTED_TMMC Response to OEB Staff_IR_TMMC_Updated_Evidence_20190301 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | TMMC_CovLtr_Revised Updated EVD of JP and IRRS on Updated Evd_20190301 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | REDACTED TMMC Response to VECC IRQ2_TMMC_Updated_Evidence_EnergyPlus_20190301 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-03-01 | 2019-03-01 | |
EB-2018-0028 | HONI_Ltr_EnergyPlus_20190228 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-28 | 2019-02-28 | |
EB-2018-0028 | EnergyPlus_Ltr_Response to Staff Ltr_20190227 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-27 | 2019-02-27 | |
EB-2018-0028 | CCC_Ltr_EnergyPlus_Issues_20190225 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-26 | 2019-02-26 | |
EB-2018-0028 | VECC _Ltr_reply re Letter cost Allocation_20190225 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-25 | 2019-02-25 | |
EB-2018-0028 | SEC_EnergyPlus_Comment_corr_20190225 | Comments | Energy Plus Inc. - Electricity Distributor | 2019-02-25 | 2019-02-25 | |
EB-2018-0028 | OEB Ltr_EnergyPlus_Granting_Extension_20190225 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-25 | 2019-02-25 | |
EB-2018-0028 | EnergyPlus_TMMC_Clarification_Questions_Appendix_A_20190222 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-22 | 2019-02-22 | |
EB-2018-0028 | Redacted_EnergyPlus_TMMC_Clarification_Questions_20190222 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-22 | 2019-02-22 | |
EB-2018-0028 | EnergyPlus_CovLtr_TMMC_Clarification_Questions_20190222 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-22 | 2019-02-22 | |
EB-2018-0028 | OEB_Ltr_EnergyPlus_ED Cost Allocation_20190222 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-22 | 2019-02-22 | 2019-02-22 |
EB-2018-0028 | VECC_IRQ2_TMMC_ EnergyPlus_20190222 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-22 | 2019-02-22 | |
EB-2018-0028 | OEB Staff_IR_TMMC_Updated_Evidence_20190222 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-22 | 2019-02-22 | 2019-02-22 |
EB-2018-0028 | EnergyPlus_Ltr_Update re PO_No8_20190221 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-21 | 2019-02-21 | |
EB-2018-0028 | OEB Ltr_EnergyPlus_update REQ_20190219 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-02-19 | 2019-02-19 | |
EB-2018-0028 | TMMC_TCQ_Updated_IRR_SEC-TC2_20190215 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-15 | 2019-02-15 | |
EB-2018-0028 | TMMC_TCQ_Updated_IRR_OEBStaff-TC1_20190215 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-15 | 2019-02-15 | |
EB-2018-0028 | TMMC_TCQ_Updated_IRR_EnergyPlus_TC 2-4 8-10_20190215 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-02-15 | 2019-02-15 | |
EB-2018-0028 | TMMC_CovLTR_to_UpdatedEVDJCP_TCQIRR_20190215 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2019-02-15 | 2019-02-15 | |
EB-2018-0028 | Redacted_TMMC_Updated_Evidence_JCPollock_20190215 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2019-02-15 | 2019-02-15 | |
EB-2018-0028 | REDACTED_TMMC_REVISED_IRR_EVD_OEBStaff-TMMC-3_020619 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-06 | 2019-02-06 | |
EB-2018-0028 | REDACTED_TCQ_UR_JCT 1-9 to JCT 1-14_TMMC_20190206 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-06 | 2019-02-06 | |
EB-2018-0028 | TMMC_CovLtr_UR_REV_RESP_STAFF TMMC_3_20190206 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-06 | 2019-02-06 | |
EB-2018-0028 | TMMC_CovLtr_Confidentiality REQ_TCQ_Response_EnergyPlus-20190128 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-01-28 | 2019-01-28 | |
EB-2018-0028 | EnergyPlus_UR_JTC 1-8_BCP_OEB LRAMVA work form v3-53_20190205 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-05 | 2019-02-05 | |
EB-2018-0028 | 2019 EnergyPlus_UR_JTC 1-4_RTSR_Workform_BCP20190205 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-05 | 2019-02-05 | |
EB-2018-0028 | 2019 EnergyPlus_UR_JTC 1-4_RTSR_Workform_Harmonized_20190205 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-05 | 2019-02-05 | |
EB-2018-0028 | 2019 EnergyPlus - Appendix TCQ SEC 11_20190205 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-05 | 2019-02-05 | |
EB-2018-0028 | EnergyPlus_ 2019 TCQ_Undertaking_Responses_20190205 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-05 | 2019-02-05 | |
EB-2018-0028 | EnergyPlus_ 2019 CvrLtr_ TCQ_Undertaking_Responses_20190205 | Undertaking Responses | Energy Plus Inc. - Electricity Distributor | 2019-02-05 | 2019-02-05 | |
EB-2018-0028 | PO8_EnergyPlus_20190128 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2019-01-28 | 2019-01-28 | |
EB-2018-0028 | Transcripts_EB-2018-0028 Energy Plus_Technical Conference_rev 2_20190123 | Transcripts | Energy Plus Inc. - Electricity Distributor | 2019-01-23 | 2019-01-23 | |
EB-2018-0028 | K1-1_EnergyPlus_Response to TCQ_20190122_Part 2_20190122.pdf | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | K1-1_EnergyPlus_Response to TCQ_20190122_Part 1_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus Load Forecast Model_V3 VECC 66_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus Streetlight technology - Staff TC 5_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model TMMC 2_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus TMMC Direct Allocation_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model VECC 69_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model VECC 72a_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model VECC 72c_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model VECC 75a_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model VECC 75c_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model VECC 76_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Rev_Reqt_Work_Form VECC 69_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Rev_Reqt_Work_Form VECC 72a_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Rev_Reqt_Work_Form VECC 72c_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | 2019 EnergyPlus_Rev_Reqt_Work_Form VECC 76_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | K1-1_EnergyPlus_Ltr_ConfidentialityREQ_TCQ_Response_Filing_20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | K1-2_REDACTED_CONFIDENTIAL_TMMC_TCQ_Response_EnergyPlus-20190122 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | K1-2_TMMC_TCQ_Response_SEC_20190122 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | K1-2_TMMC_TCQ_Response_OEBStaff_20190122 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | K1-2_TMMC_TCQ_Response_VECC_20190122 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-22 | 2019-01-22 | |
EB-2018-0028 | VECC_TCQ_EnergyPlus_Revised_20190121 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-21 | 2019-01-21 | |
EB-2018-0028 | TMMC_Revised Redaction_Evd_M Collis_EnergyPlus_0190121 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2019-01-21 | 2019-01-21 | |
EB-2018-0028 | TMMC_CovLtr_Revised Redaction_Evd_M Collis_EnergyPlus_20190121 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2019-01-21 | 2019-01-21 | |
EB-2018-0028 | TMMC_TCQ_EnergyPlus_20190118 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-18 | 2019-01-18 | |
EB-2018-0028 | TMMC_TCQ_CovLtr_20190118 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-18 | 2019-01-18 | |
EB-2018-0028 | Hydro One_Ltr_EnergyPlus_Technical Conference_20190116 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | VECC_TCQ_TMMC_EnergyPlus_20190116 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | VECC_TCQ_EnergyPlus_20190116 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | SEC_TCQ_TMMC_EnergyPlus_20190116 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | 2019-01-16 |
EB-2018-0028 | SEC_TCQ_EnergyPlus_Additional_2019116 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | TMMC_TCQ_EnergyPlus_20190116 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | TMMC_TCQ_CovLtr_EnergyPlus_20190116 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | EnergyPlus_TCQ_TMMC_20190116 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | EnergyPlus_CovLtr_TMMC_TCQ_20190116 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | |
EB-2018-0028 | OEB Staff_TCQ_TMMC_EnergyPlus_20180116 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | 2019-01-16 |
EB-2018-0028 | OEB Staff_TCQ_EnergyPlus_20180116 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-16 | 2019-01-16 | 2019-01-16 |
EB-2018-0028 | SEC_TCQ_EnergyPlus_10c_20190111 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0028 | SEC_TCQ_EnergyPlus_20190111 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-11 | 2019-01-11 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model_No Standby_TMMC_4_20190109 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-09 | 2019-01-09 | |
EB-2018-0028 | EnergyPlus_IRResponse to TMMC_Clarification Question_3_cor_20190109 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-09 | 2019-01-09 | |
EB-2018-0028 | EnergyPlus_Appendix IR-TMMC-14 Hourly Data_Response 1 2 5 _2018_08_30_20190109 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-09 | 2019-01-09 | |
EB-2018-0028 | EnergyPlus_IRResponse to TMMC IRR_12_13_14_20190109 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-09 | 2019-01-09 | |
EB-2018-0028 | EnergyPlus_IRR_Filing of Info_ Confidentiality_20190109 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2019-01-09 | 2019-01-09 | |
EB-2018-0028 | Dec_Confidentiality Request_20181221 | Decision | Energy Plus Inc. - Electricity Distributor | 2018-12-21 | 2018-12-21 | |
EB-2018-0028 | po7_EnergyPlus_20181221 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2018-12-21 | 2018-12-21 | |
EB-2018-0028 | OEB Staff_SUB_EnergyPlus_Settlement Proposal_20181219 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-12-19 | 2018-12-19 | 2018-12-19 |
EB-2018-0028 | EnergyPlus_APPL_2019 EvidenceUpdate_20181212 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-12-13 | 2018-12-13 | |
EB-2018-0028 | EnergyPlus_APPL_2019 Additional Evidence Letter_20181212 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-12-13 | 2018-12-13 | |
EB-2018-0028 | 2019 EnergyPlus Load profile model 2006 Hydro One data for 2019_Settle_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Test_year_Income_Tax_PILs_Workform_V1 - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Tariff_Schedule_Model-CND - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Tariff_Schedule_Model-BCP - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Rev_Reqt_Work_Form - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Load Forecast Model - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus GA-Analysis-Workform - Consolidated - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus DVA Continuity_Schedule_CoS - Consolidated - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Cost_Allocation_Model - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Chapter2_Appendices - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Chapter 5 Appendix - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus Benchmarking-Spreadsheet-Forecast-Model - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019 EnergyPlus ACM_Model_OEB - Settlement_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019_EnergyPlus Settlement_Proposal_Appendix_E_Redacted_EB_2018_0028_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | 2019_EnergyPlus Settlement Proposal_EB_2018_0028_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | EnergyPlus_Settlement Agreement Cover Letter EB_2018_0028_20181212 | Settlement Proposal | Energy Plus Inc. - Electricity Distributor | 2018-12-12 | 2018-12-12 | |
EB-2018-0028 | EnergyPlus_Ltr_Settlement Update_No3_20181130 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-11-30 | 2018-11-30 | |
EB-2018-0028 | OEB Ltr_Settlement Process_EnergyPlus_20181130 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-11-30 | 2018-11-30 | |
EB-2018-0028 | Dec_Interim Rates_PO6_EnergyPlus_20181127 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2018-11-27 | 2018-11-27 | |
EB-2018-0028 | Dec_Interim Rates_PO6_EnergyPlus_20181127 | Interim rate order | Energy Plus Inc. - Electricity Distributor | 2018-11-27 | 2018-11-27 | |
EB-2018-0028 | TMMC_Response to OEB Staff SUB_Request for Confidentiality_20181126 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-11-26 | 2018-11-26 | |
EB-2018-0028 | EnergyPlus_Response to Sub Confidentiality_20181123 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-11-23 | 2018-11-23 | |
EB-2018-0028 | EnergyPlus_Ltr_Settlement Update_No2_20181123 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-11-23 | 2018-11-23 | |
EB-2018-0028 | PO5_EnergyPlus_20181116 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2018-11-16 | 2018-11-16 | |
EB-2018-0028 | EnergyPlus_Ltr_Settlement Update_20181115 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-11-15 | 2018-11-15 | |
EB-2018-0028 | OEBStaff_SUB_Confidentiality_EnergyPlus_TMMC_20181113 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-11-13 | 2018-11-13 | 2018-11-13 |
EB-2018-0028 | OEBStaff_CovLtr_SUB_Confidentiality_EnergyPlus_TMMC_20181113 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-11-13 | 2018-11-13 | 2018-11-13 |
EB-2018-0028 | Girvin CCC_Declaration and Undertaking_EnergyPlus_scanned_20181107 | Declaration and Undertakings | Energy Plus Inc. - Electricity Distributor | 2018-11-07 | 2018-11-07 | |
EB-2018-0028 | REDACTED_CONF_TMMC_REVISED_EVD-JP20181101 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2018-11-01 | 2018-11-01 | |
EB-2018-0028 | TMMC_Cov Ltr_REVISED_EVD-JP_20181101 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2018-11-01 | 2018-11-01 | |
EB-2018-0028 | PO4_Dec_Issues List_EnergyPlus_cor_20181031 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2018-10-31 | 2018-10-31 | |
EB-2018-0028 | PO4_Dec_Issues List_EnergyPlus_cor_20181031 | Decision and Order | Energy Plus Inc. - Electricity Distributor | 2018-10-31 | 2018-10-31 | |
EB-2018-0028 | REDACTED TMMC_IRR_EVD_OEBStaff 1b_20181029 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-29 | 2018-10-29 | |
EB-2018-0028 | TMMC_Cvr Ltr_TMMC IRR_BOARDSTAFF1b_20181029 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-29 | 2018-10-29 | |
EB-2018-0028 | TMMC_clarrification questions to EnergyPlus_20180917 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-17 | 2018-09-17 | |
EB-2018-0028 | OEB Staff_Ltr_EnergyPlus_Proposed Issues List_20181026 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-10-26 | 2018-10-26 | 2018-10-26 |
EB-2018-0028 | TMMC_IRR_EVD_SEC_20181025 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-25 | 2018-10-25 | |
EB-2018-0028 | REDACTED TMMC_IRR_EVD_VECC_20181025 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-25 | 2018-10-25 | |
EB-2018-0028 | REDACTED TMMC_IRR_EVD_EnergyPlus20181025 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-25 | 2018-10-25 | |
EB-2018-0028 | REDACTED TMMC_IRR_EVD_OEBStaff20181025 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-25 | 2018-10-25 | |
EB-2018-0028 | TMMC_IRR_EVD CovLtr_20181025 | Interrogatory Response from Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-25 | 2018-10-25 | |
EB-2018-0028 | REDACTED_TMMC_Revised Confidential EVD_JP_20181025 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2018-10-24 | 2018-10-24 | |
EB-2018-0028 | TMMC_CvrLtr_Revised Confidential EVD-JP_20181024 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2018-10-24 | 2018-10-24 | |
EB-2018-0028 | OEB_Ltr_TMMC Extension Request_20181024 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-10-24 | 2018-10-24 | |
EB-2018-0028 | TMMC_Request_Ltr_Late filing of Response Staff-TMMC_1b_20181023 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-10-23 | 2018-10-23 | |
EB-2018-0028 | TMMC_ReplySUB_EnergyPlus_OEB Staff_SEC_20181023 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-10-23 | 2018-10-23 | |
EB-2018-0028 | EnergyPlus_Ltr_SUB_Confidentiality_20181019 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-10-19 | 2018-10-19 | |
EB-2018-0028 | EnergyPlus_Stebbing_LTR of Comment Reply_20181017 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-10-17 | 2018-10-17 | |
EB-2018-0028 | SEC_SUB__Ltr_EnergyPlus_TMMC Evd_Confidentiality_20181016 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-10-16 | 2018-10-16 | |
EB-2018-0028 | OEBStaff_SUB_Confidentiality_20181016 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-10-16 | 2018-10-16 | |
EB-2018-0028 | OEBSTaff_CvrLtr_SUB_Confidentiality_20181016 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-10-16 | 2018-10-16 | |
EB-2018-0028 | SEC_IR_EVD_TMMC_20181011 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-11 | 2018-10-11 | |
EB-2018-0028 | REDACTED_EnergyPlus_IR_TMMC_20181011 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-11 | 2018-10-11 | |
EB-2018-0028 | VECC_IR_EVD_TMMC_20181011 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-11 | 2018-10-11 | |
EB-2018-0028 | OEB Staff_IR_EVD_TMMC_20181011 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-11 | 2018-10-11 | 2018-10-11 |
EB-2018-0028 | OEB Staff_IR CvrLtr_EVD_TMMC_20181011 | Interrogatories to Intervenor | Energy Plus Inc. - Electricity Distributor | 2018-10-11 | 2018-10-11 | 2018-10-11 |
EB-2018-0028 | William Harper_Declaration and Undertaking_EnergyPlus_20181009 | Declaration and Undertakings | Energy Plus Inc. - Electricity Distributor | 2018-10-09 | 2018-10-09 | |
EB-2018-0028 | PO3_EnergyPlus_20181005 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2018-10-05 | 2018-10-05 | |
EB-2018-0028 | TMMC_Ltr_Request for confidentiality_Sch_JP-5_ErngyPlus_20181001 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-10-01 | 2018-10-01 | |
EB-2018-0028 | EnergyPlus_Ltr_Confidentiality Undertaking_20181001 | Declaration and Undertakings | Energy Plus Inc. - Electricity Distributor | 2018-10-01 | 2018-10-01 | |
EB-2018-0028 | EnergyPlus_Ltr_Confidentiality Undertaking_20181001 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-10-01 | 2018-10-01 | |
EB-2018-0028 | John Vellone_Declaration and Undertaking_EnergyPlus_20180928 | Declaration and Undertakings | Energy Plus Inc. - Electricity Distributor | 2018-09-28 | 2018-09-28 | |
EB-2018-0028 | Bruce Bacon_Declaration and Undertaking_EnergyPlus_20180928 | Declaration and Undertakings | Energy Plus Inc. - Electricity Distributor | 2018-09-28 | 2018-09-28 | |
EB-2018-0028 | Redacted_TMMC_EVD_Evidence of M Collis_EnergyPlus_ 20180927 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2018-09-27 | 2018-09-27 | |
EB-2018-0028 | Redacted_TMMC_EVD_Evidence of J Pollock _EnergyPlus_20180927 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2018-09-27 | 2018-09-27 | |
EB-2018-0028 | TMMC CvrLtr_EVD_EnergyPlus_Written_Evidence_Confidentiality Request_ 20180927 | Intervenor Evidence | Energy Plus Inc. - Electricity Distributor | 2018-09-27 | 2018-09-27 | |
EB-2018-0028 | REDACTED_Stebbing_LtrComment_EnergyPlus_20180924 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2018-09-24 | 2018-09-24 | |
EB-2018-0028 | ATTACH 3_SUB_EnergyPlus_Ex2_DSP_Appendix D_CBRE June Update_20180921 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-09-21 | 2018-09-21 | |
EB-2018-0028 | ATTACH 2_SUB_EnergyPlus to TMMC Response April 23 2018_20180921 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-09-21 | 2018-09-21 | |
EB-2018-0028 | ATTACH 1_SUB_TMMC Letter to EnergyPlus April 19 Letter_20180921 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-09-21 | 2018-09-21 | |
EB-2018-0028 | EnergyPlus_SUB_Ltr_Confidentiality REQ_ 20180921 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-09-21 | 2018-09-21 | |
EB-2018-0028 | EnergyPlus EB_2018_0028_Response to Clarification Question TMMC_5_20180920 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-20 | 2018-09-20 | |
EB-2018-0028 | PO2_EnergyPlus_20180920 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2018-09-20 | 2018-09-20 | |
EB-2018-0028 | EnergyPlus_2019 Letter Confidential Clarification Questions_20180919 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-19 | 2018-09-19 | |
EB-2018-0028 | EnergyPlus_ 2019 CvrLtr_ Responses to TMMC Clarification Questions_20180919 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-19 | 2018-09-19 | |
EB-2018-0028 | Redacted_EnergyPlus Response to TMMC_Clarification Questions_20180919 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-19 | 2018-09-19 | |
EB-2018-0028 | TMMC_Ltr_Req_for Extension_Revised Clarification Questions_EnergyPlus_20180919 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-19 | 2018-09-19 | |
EB-2018-0028 | 9_Staff_97_Response b_GA_Analysis_Workform_Questions_2018071_CND_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-18 | 2018-09-18 | |
EB-2018-0028 | 9_Staff_97_Response b_GA_Analysis_Workform_Questions_20180713_BCP_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-18 | 2018-09-18 | |
EB-2018-0028 | EnergyPlus_LTR_Clarification Questiond Reply_EnergyPlus_20180918 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-18 | 2018-09-18 | |
EB-2018-0028 | SEC_EnergyPlus_Declaration Undertaking_MR_20180918 | Declaration and Undertakings | Energy Plus Inc. - Electricity Distributor | 2018-09-18 | 2018-09-18 | |
EB-2018-0028 | TMMC_LTR_Intention_to_file_Written_Evid_EnergyPlus_20180917 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-09-17 | 2018-09-17 | |
EB-2018-0028 | EnergyPlus_CvrLtr_2019 Confidential Filing IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | Redacted_EnergyPlus_IRR_TMMC_20180914Final_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_CvrLtr_2019 IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Load Forecast Model__3 VECC 19 c_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Load Forecast Model__3 VECC 19 a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Benchmarking-Spreadsheet-Forecast-Model_IR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2006-2010 Final OPA CDM Results Brant County Power Inc 3-VECC-21 a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus ACM Model-IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2006-2010 Final OPA CDM Results Brant County Power Inc 3-VECC-21 a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Chapter2 Appendices Updated for June 30_18 YTD_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Load Forecast Model__3 VECC 19 a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Load Forecast Model__3 VECC 19 c_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Load profile model 2006 Hydro One data for 2019_IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus Proposed Embedded Dist Charge Calculation_IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus_Cost_Allocation_Model 7 Staff 76 b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus_Rev_Reqt_Work_Form_1 Staff 2_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_RTSR_Workform_20180712-CND-8-Staff-87a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_RTSR_Workform_20180712-CND_2017 RRR-8-Staff-87b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_RTSR_Workform_20180712-BCP-8-Staff-87a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_RTSR_Workform_20180712-BCP_2017 RRR-8-Staff-87b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_EnergyPlus_RTSR_Harmonized-8-Staff-87a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_EnergyPlus_Chapter 5 Appendix_IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_EnergyPlus_Chapter 2 Appendices_IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_DVA_Continuity_Schedule_CoS_20180712 - Consolidate-9-Staff-96b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_DVA_Continuity_Schedule_CoS_20180712 - CND-9-Staff-96b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019_DVA_Continuity_Schedule_CoS_20180712 - BCP-9-Staff-96b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2019 EnergyPlus_Test_year_Income_Tax_PILs_Workform_V1 _4 Staff 74 a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | Account-1595-Workform-20180718-EnergyPlus-Consolidated-9-Staff-100a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | Account-1595-Workform-20180718-EnergyPlus-CND-9-Staff-100b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | Account-1595-Workform-20180718-EnergyPlus-BCP-9-Staff-100b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 20180516 APPROVED CDM Plan Amendment 4.0 March 2018 REV-V.2.2_IRR_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_2019_Tariff_Schedule_Model-BCP-1-Staff-3_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_2017 Final Verified Annual LDC CDM Program Results_20180629_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_2016 Final Verified Annual LDC CDM Program Results_20170630_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2011-2014 Final Results Report_HC CNDHI 3-VECC-21 b_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2006-2010 Final OPA CDM Results CNDHI 3-VECC-21 a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | 2006-2010 Final OPA CDM Results Brant County Power Inc 3-VECC-21 a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | Appendix 2-Staff-15h EnergyPlus Class D Breakdown by Area - 2018 09 06_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | GA-Analysis-Workform - Consolidated-9-Staff-97cii_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | GA-Analysis-Workform - CND-9-Staff-97a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | GA-Analysis-Workform - BCP-9-Staff-97a_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_CND_OEB LRAMVA workform v3.52_1 Staff 64_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_BCP_OEB LRAMVA work form v3.52_1 Staff 64_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_Response_Letters of Comment_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_IRR_OEB Staff_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_IRR_SEC_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_IRR_HYDRO ONE_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_IRR_CCC_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_IRR_BPI_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | Dec_Confidentiality Request_EnergyPlus_20180914 | Decision | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | EnergyPlus_IRR_VECC_20180914 | Interrogatory Response from Applicant | Energy Plus Inc. - Electricity Distributor | 2018-09-14 | 2018-09-14 | |
EB-2018-0028 | OEBStaff_IR_EnergyPlus_20180815 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-15 | 2018-08-15 | |
EB-2018-0028 | cvr ltr_OEBStaff_IR_EnergyPlus_20180815 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-15 | 2018-08-15 | |
EB-2018-0028 | TMMC_IR_EnergyPlus_20180820 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-21 | 2018-08-21 | |
EB-2018-0028 | CCC_IR_EnergyPlus2019_20180821 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-21 | 2018-08-21 | |
EB-2018-0028 | Brantford_Energyplus_IR_20180820 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-20 | 2018-08-20 | |
EB-2018-0028 | SEC_IR_EnergyPlus_20180820 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-20 | 2018-08-20 | |
EB-2018-0028 | VECC_IR_EnergyPlus_20180820 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-20 at 1:27 PM | ||
EB-2018-0028 | HONI_IR_EnergyPlus_20180817 | Interrogatories to Applicant | Energy Plus Inc. - Electricity Distributor | 2018-08-17 | 2018-08-17 | |
EB-2018-0028 | Community_Meeting_Summary_EnergyPlus_20180813 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-08-13 | 2018-08-13 | |
EB-2018-0028 | TMMC_Sub_Confidentialty_filings_EnergyPlus_20180809 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-08-09 at 2:32 PM | ||
EB-2018-0028 | EnergyPlus_ReplySub_Confidentiality filings_20180803 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-08-03 | 2018-08-03 | |
EB-2018-0028 | CCC_Sub_EnergyPlus_Confidential filings_20180801 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-08-01 | 2018-08-01 | |
EB-2018-0028 | SEC_Sub_EnergyPlus_Confidential filings_20180731 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-07-31 | 2018-07-31 | |
EB-2018-0028 | OEB Staff_Sub_EnergyPlus_Confidential filings_20180731 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-07-31 | 2018-07-31 | |
EB-2018-0028 | VECC_Sub_obj_EnergyPlus_Confidential filings_20180731 | Submission | Energy Plus Inc. - Electricity Distributor | 2018-07-31 | 2018-07-31 | |
EB-2018-0028 | po1_EnergyPlus_20180726 | Procedural Order | Energy Plus Inc. - Electricity Distributor | 2018-07-26 | 2018-07-26 | |
EB-2018-0028 | EnergyPlus_Exh1_Resp_Additional Cust Questions_April10 2018_Redacted_20180716 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-07-16 | 2018-07-16 | |
EB-2018-0028 | EnergyPlus_Exh1_Resp_Additional Cust Questions_April102018_covltr_20180716 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-07-16 | 2018-07-16 | |
EB-2018-0028 | LDrew_Ltr_Comment_EnergyPlus_redacted_20180711 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2018-07-11 | 2018-07-11 | |
EB-2018-0028 | BSmith_Ltr_Comment_EnergyPlus_redacted_20180711 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2018-07-11 | 2018-07-11 | |
EB-2018-0028 | MMitchell_Ltr_Comment_EnergyPlus_redacted_20180704 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2018-07-04 | 2018-07-04 | |
EB-2018-0028 | SHill_Ltr_Comment_EnergyPlus_redacted_20180704 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2018-07-04 | 2018-07-04 | |
EB-2018-0028 | EnergyPlus_Resp_APPrO_Cost Eligibility_20180704 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-07-04 | 2018-07-04 | |
EB-2018-0028 | APPrO_ReplyLtr_Cost Eligibility_EnergyPlus_20180628 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-06-28 | 2018-06-28 | |
EB-2018-0028 | RPhillips_Ltr_Comment_EnergyPlus_Redacted_20180601 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2018-06-01 | 2018-06-01 | |
EB-2018-0028 | TSorrentino_Ltr_Comment_EnergyPlus_redacted_20180601 | Letter of Comment | Energy Plus Inc. - Electricity Distributor | 2018-06-01 | 2018-06-01 | |
EB-2018-0028 | EnergyPlus_Ltr_APPrO_Cost Award Eligibility_20180627 | Cost Claim Objection | Energy Plus Inc. - Electricity Distributor | 2018-06-26 | 2018-06-26 | |
EB-2018-0028 | APPrO_IntrvREQ_EnergyPlus_20180619 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-19 | 2018-06-19 | |
EB-2018-0028 | EnergyPlus_Brant County_OEB LRAMVA_Work Form_v3_1_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | CCC_IntrvREQ_EnergyPlus_2019 Rates_20180620 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-20 | 2018-06-20 | |
EB-2018-0028 | CME_IntervReq_EnergyPlus_20180618 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-18 | 2018-06-18 | |
EB-2018-0028 | Brantford Power_IntervReq_EnergyPlus_20180618 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-18 | 2018-06-18 | |
EB-2018-0028 | TMMC_IntervReq_EnergyPlus20180618 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-18 | 2018-06-18 | |
EB-2018-0028 | VECC_IntervReq_EnergyPlus_20180613 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-13 | 2018-06-13 | |
EB-2018-0028 | EnergyPlus_Affidavit 20180606 | Affidavits of Service | Energy Plus Inc. - Electricity Distributor | 2018-06-06 | 2018-06-06 | |
EB-2018-0028 | SEC_IntervReq_EnergyPlus_20180605 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-05 | 2018-06-05 | |
EB-2018-0028 | HONI_IntervReq_EnergyPlus_20180601 | Intervenor Request Letter | Energy Plus Inc. - Electricity Distributor | 2018-06-01 | 2018-06-01 | |
EB-2018-0028 | Notice_EnergyPlus_2019 Cos_20180528 | Notice of Application | Energy Plus Inc. - Electricity Distributor | 2018-05-28 | 2018-05-28 | |
EB-2018-0028 | LoD_EnergyPlus_2019 Cos_20180528 | Letter of Direction | Energy Plus Inc. - Electricity Distributor | 2018-05-28 | 2018-05-28 | |
EB-2018-0028 | EnergyPlus_2016 Annual_LDC_CDM Program Results_Report_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh2_APP 2-1_DSP_Pt2_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | AckLtr_EnergyPlus_20180502 | Acknowledgement Letter | Energy Plus Inc. - Electricity Distributor | 2018-05-02 | 2018-05-02 | |
EB-2018-0028 | EnergyPlus_Ltr_filing_2019 CoS_APPL_20180221 | Correspondence | Energy Plus Inc. - Electricity Distributor | 2018-02-27 | 2018-02-27 | |
EB-2018-0028 | EnergyPlus_Final 2015 Annual Verified Results Report-Annual Persistence_Cambridge_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Final 2015 Annual Verified Results Report - Annual Persistence_Brant County_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_CND OEB LRAMVA workform v3_1_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019_Tariff_Schedule_Model-CND_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Tariff_Schedule_Model-BCP_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 RTSR_Workform CND_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019_RTSR_Workform BCP_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 RTSR_Harmonized_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 DVA_Continuity_Schedule_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Chapter2_Appendices_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Test_year_Income_Tax_PILs_Workform_V1_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019_Rev_Reqt_Work_Form_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019_Filing_Checklist_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Cost_Allocation_Model_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019_Proposed Embedded Dist Charge Calculation_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Load profile model 2006 Hydro One data for 2019_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019_Load Forecast Model_V3_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Bill Impact_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Benchmarking-Spreadsheet-Forecast-Model_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 ACM_Model_OEB_2019_4_20_II_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 Account 1555 and 1557 Rate Rider_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnegyPlus_2011-2014 Persistence Report_Brant County Power_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2011-2014 Final Results Report_HCCambridge and North Dumfries Hydro Inc_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_01_2018 Participation and Cost Report_DEC_2018 01_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 9_DVA_CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 8_Rate Design_CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 7_Cost Allocation_CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 6_Revenue Requirement_CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 5_Cost of Capital _CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 4_OMA_CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 3_Revenues_CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_Exh 2_Excl_ APP 2-1 DSP_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPLus_Exh 1_Admin_CoS APPL_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 CoS_Master_Table of Contents_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 CoS_covltr_redacted exhibits_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
EB-2018-0028 | EnergyPlus_2019 CoS_covltr_20180430 | Application and Evidence | Energy Plus Inc. - Electricity Distributor | 2018-04-30 | 2018-04-30 | |
Case Number | File Name | Document Type | Applicant | Issued By OEB | Received By OEB | Date Issued/Received |