EB-2019-0018
|
Final Rate Order_Alectra Rates_20200423
|
Rate Order
|
2020-04-23
|
|
2020-04-23
|
EB-2019-0018
|
AlectraUtilities_LTR_ICM Application Update_20200414
|
Correspondence
|
|
2020-04-14
|
2020-04-14
|
EB-2019-0018
|
dec_order_cost awards_Alectra Rates_20200324
|
Decision and Order on Cost Awards
|
2020-03-24
|
|
2020-03-24
|
EB-2019-0018
|
Interim Rate Order_Alectra Rates_20200228
|
Interim rate order
|
2020-02-28
|
|
2020-02-28
|
EB-2019-0018
|
Alectra_ICM Letter_20200227
|
Correspondence
|
|
2020-02-27
|
2020-02-27
|
EB-2019-0018
|
MANA_Response_Alectra_Cost Claim Objection_20200226
|
Cost Claim Objection Reply
|
|
2020-02-26
|
2020-02-26
|
EB-2019-0018
|
MANA_Cost Claim_Alectra Rates_Addl Info_20200224
|
Cost Claim
|
|
2020-02-24
|
2020-02-24
|
EB-2019-0018
|
Alectra_Response_OEB Staff Comments_DRO_20200224
|
Correspondence
|
|
2020-02-24
|
2020-02-24
|
EB-2019-0018
|
Alectra_CostClaimObjection2020EDR_20200220
|
Cost Claim Objection
|
|
2020-02-20
|
2020-02-20
|
EB-2019-0018
|
OEBStaff_Comments_DRO_SUB_Alectra Utilities_20200218
|
Comments
|
|
2020-02-18
|
2020-02-18
|
EB-2019-0018
|
OEB Ltr_BOMA_Alectra Partial Decision and Order_20200218
|
Correspondence
|
2020-02-18
|
|
2020-02-18
|
EB-2019-0018
|
CCC_Cost Claim_Alectra Rates_20200217
|
Cost Claim
|
|
2020-02-17
|
2020-02-17
|
EB-2019-0018
|
BOMA_Ltr_Alectra Rates_20200214
|
Correspondence
|
|
2020-02-14
|
2020-02-14
|
EB-2019-0018
|
AMPCO_Cost Claim_Alectra_20200213
|
Cost Claim
|
|
2020-02-13
|
2020-02-13
|
EB-2019-0018
|
VECC_Cost Claim_Alectra Utilities_20200212
|
Cost Claim
|
|
2020-02-12
|
2020-02-12
|
EB-2019-0018
|
MANA_Cost Claim_Alectra Rates_20200212
|
Cost Claim
|
|
2020-02-12
|
2020-02-12
|
EB-2019-0018
|
SEC_Cost Claim_Alectra Rates_20200211
|
Cost Claim
|
|
2020-02-11
|
2020-02-11
|
EB-2019-0018
|
Alectra_DRO_HRZ 2017 ESM Rate Rider Calculation_20200210
|
Draft Rate Order
|
|
2020-02-10
|
2020-02-10
|
EB-2019-0018
|
Alectra_DRO_2020 RGM HRZ_20200210
|
Draft Rate Order
|
|
2020-02-10
|
2020-02-10
|
EB-2019-0018
|
Alectra_Draft Rate Order_20200210
|
Draft Rate Order
|
|
2020-02-10
|
2020-02-10
|
EB-2019-0018
|
DRC_Cost_Claim_Alectra Rates_20200207
|
Cost Claim
|
|
2020-02-07
|
2020-02-07
|
EB-2019-0018
|
EnergyProbe_Cost Claim_Alectra Rates_20200205
|
Cost Claim
|
|
2020-02-05
|
2020-02-05
|
EB-2019-0018
|
BOMA_Cost Claim_Alectra Rates_20200205
|
Cost Claim
|
|
2020-02-05
|
2020-02-05
|
EB-2019-0018
|
Partial dec_order_Alectra Rates_20200130
|
Decision and Order
|
2020-01-30
|
|
2020-01-30
|
EB-2019-0018
|
Kieran Cunney_Ltr of Comment_Alectra Rates_20200117_Redacted
|
Letter of Comment
|
|
2020-01-17
|
2020-01-17
|
EB-2019-0018
|
OEBltr_Decision Comments_Alectra_20191227
|
Correspondence
|
2019-12-27
|
|
2019-12-27
|
EB-2019-0018
|
Alectra_2020 IRM_RGM ERZ_DRO_20191227
|
Rate Model
|
2019-12-27
|
|
2019-12-27
|
EB-2019-0018
|
Alectra 2020 IRM_RGM PRZ_DRO_20191227
|
Rate Model
|
2019-12-27
|
|
2019-12-27
|
EB-2019-0018
|
Alectra 2020 IRM_RGM HRZ_DRO_20191227
|
Rate Model
|
2019-12-27
|
|
2019-12-27
|
EB-2019-0018
|
Alectra 2020 IRM_RGM GRZ_DRO_20191227
|
Rate Model
|
2019-12-27
|
|
2019-12-27
|
EB-2019-0018
|
Alectra 2020 IRM_RGM BRZ_DRO_20191227
|
Rate Model
|
2019-12-27
|
|
2019-12-27
|
EB-2019-0018
|
Alectra Utilities_Comments Interim Rate Order_20191217
|
Comments
|
|
2019-12-17
|
2019-12-17
|
EB-2019-0018
|
Alectra Utilities_Comments Interim Rate Order_20191217
|
Comments
|
|
2019-12-17
|
2019-12-17
|
EB-2019-0018
|
Partial dec_Interim Rate Order_Alectra_2020 IRM_20191212
|
Interim rate order
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Partial dec_Interim Rate Order_Alectra_2020 IRM_20191212
|
Decision and Order
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra_PRZ-LRAMVA Workform_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra_HRZ-LRAMVA Workform_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra_ERZ-LRAMVA Workform_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra_BRZ-LRAMVA Workform_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra_2020 IRM_RGM ERZ_DRO_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra 2020 IRM_RGM PRZ_DRO_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra 2020 IRM_RGM HRZ_DRO_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra 2020 IRM_RGM GRZ_DRO_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra 2020 IRM_RGM BRZ_DRO_20191212
|
Rate Model
|
2019-12-12
|
|
2019-12-12
|
EB-2019-0018
|
Alectra Utilities_ReplySUB_M-Factor_20191129
|
Submission
|
|
2019-11-29
|
2019-11-29
|
EB-2019-0018
|
Alectra_Rates_ReplySUB_Capitalization Policy_20191128
|
Submission
|
|
2019-11-28
|
2019-11-28
|
EB-2019-0018
|
OEBltr_Alectra_Extn ReplySub_20191121
|
Correspondence
|
2019-11-21
|
|
2019-11-21
|
EB-2019-0018
|
Exhibit_K1.2_SEC_Alectra Oral Hearing_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
Alectra_Requesting Extn_ReplySUB Date_20191120
|
Correspondence
|
|
2019-11-20
|
2019-11-20
|
EB-2019-0018
|
SEC_FianlARG_Alectra Rates_M-Factor_20191115
|
Final Argument
|
|
2019-11-19
|
2019-11-19
|
EB-2019-0018
|
VECC_ SUB_ Alectra Rates_M-Factor_20191118
|
Submission
|
|
2019-11-18
|
2019-11-18
|
EB-2019-0018
|
AMPCO_SUB_Appendix_Alectra Rates_M-Factor_20191117
|
Submission
|
|
2019-11-18
|
2019-11-18
|
EB-2019-0018
|
AMPCO_SUB_Alectra Rates_M-factor_20191117
|
Submission
|
|
2019-11-18
|
2019-11-18
|
EB-2019-0018
|
CCC_FinalARG_Alectra Rates_20191115
|
Final Argument
|
|
2019-11-15
|
2019-11-15
|
EB-2019-0018
|
OEB Staff_SUB_Alectra_M-Factor_20191115
|
Submission
|
|
2019-11-15
|
2019-11-15
|
EB-2019-0018
|
DRC_SUB_Alectra Rates_M-factor_20191115
|
Submission
|
|
2019-11-15
|
2019-11-15
|
EB-2019-0018
|
PWU_SUB_Alectra Rates_M-Factor_20191115
|
Submission
|
|
2019-11-15
|
2019-11-15
|
EB-2019-0018
|
VECC_ SUB_ Alectra Rates_Capitalization_20191114
|
Submission
|
|
2019-11-14
|
2019-11-14
|
EB-2019-0018
|
EnergyProbe_SUB_Alectra Rates_M-Factor_20191114
|
Submission
|
|
2019-11-14
|
2019-11-14
|
EB-2019-0018
|
MANA_SUB_Alectra Rates_M Factor_20191114
|
Submission
|
|
2019-11-14
|
2019-11-14
|
EB-2019-0018
|
OEB Staff_SUB_Alectra Capitalization Policy_20191114
|
Submission
|
|
2019-11-14
|
2019-11-14
|
EB-2019-0018
|
BOMA_SUB_Alectra Rates Capitalization_20191114
|
Submission
|
|
2019-11-14
|
2019-11-14
|
EB-2019-0018
|
SEC_SUB_Alectra Rates_Capitalization Issue_20191114
|
Submission
|
|
2019-11-14
|
2019-11-14
|
EB-2019-0018
|
OEBStaff_Ltr_Alectra_Reply SUB_20191114
|
Correspondence
|
|
2019-11-14
|
2019-11-14
|
EB-2019-0018
|
dec_confidentiality_Alectra Utilities_20191104
|
Decision
|
2019-11-04
|
|
2019-11-04
|
EB-2019-0018
|
Alectra Utilities_ARGChief_20191101
|
Applicant Argument in Chief
|
|
2019-11-01
|
2019-11-01
|
EB-2019-0018
|
HRZ-Staff-12_Attach 1_Rate Base
|
Interrogatory Response from Applicant
|
|
2019-10-31
|
2019-10-31
|
EB-2019-0018
|
Alectra_Suppl IRR_OEBStaff_Capitalization_20191031
|
Interrogatory Response from Applicant
|
|
2019-10-31
|
2019-10-31
|
EB-2019-0018
|
Alectra_cvrltr_Suppl IRR_Capitalization_20191031
|
Interrogatory Response from Applicant
|
|
2019-10-31
|
2019-10-31
|
EB-2019-0018
|
Alectra Utilities_LTR_Response to OEB re Confidentiality_20191031
|
Correspondence
|
|
2019-10-31
|
2019-10-31
|
EB-2019-0018
|
Additional info re confidential treatment_20191028
|
Correspondence
|
2019-10-28
|
|
2019-10-28
|
EB-2019-0018
|
OEB Staff_Suppl IR_Alectra Rates_20191024
|
Interrogatories to Applicant
|
2019-10-24
|
2019-10-24
|
2019-10-24
|
EB-2019-0018
|
OEBStaff_Suppl IR_Alectra Utilities_20191024
|
Interrogatories to Applicant
|
|
2019-10-24
|
2019-10-24
|
EB-2019-0018
|
Alectra_Undertaking Resp_J3.2_Attach 3_OEB Staff Table Alectra In-Service Additions_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_J3.2_Attach 2_G-Staff-8_2020_ACM_ICM_Model_PRZ_REVISED_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_J3.2_Attach 1_G-Staff-8_2020_ACM_ICM_Model_HRZ_REVISED_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_J3.1_Attach 2_Threshold Capital Expenditure Calculation Summary_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_J3.1_Attach 1_Historical_IPI_Exhibit_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_J2.4_Attach 1_DSP Project Listing_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_J2.1_Attach 1_G-Staff-8_2020_ACM_ICM_Model - GRZ - REVISED_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_J1.2_Attach 1_All Cable Projects_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_Undertaking Resp_Oral Hearing_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Alectra_cvrltr_Undertaking Resp_Oral Hearing_20191023
|
Undertaking Responses
|
|
2019-10-23
|
2019-10-23
|
EB-2019-0018
|
Decision on Motion by SEC_from_Transcript Vol 1 pg 87-88_20191015
|
Decision on Motion
|
2019-10-15
|
|
2019-10-15
|
EB-2019-0018
|
Transcript_Alectra_Oral Hearing_Vol 3_20191018
|
Transcripts
|
|
2019-10-18
|
2019-10-18
|
EB-2019-0018
|
EnergyProbe_Compendium_Capital Spend Asset Renewal and Reliability_2012-2024_EP Summary V3_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
EnergyProbe_Compendium_Alectra Utilities System Reliability Trends_Summary_v3_20191007
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
EnergyProbe_Compendium_Capital Spend Asset Renewal and Reliability_2012-2024_Summary V3_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
OEB staff_Compendium_Alectra_20191017
|
Exhibits
|
|
2019-10-17
|
2019-10-17
|
EB-2019-0018
|
Transcript_Alectra_Oral Hearing_Vol 2_20191017
|
Transcripts
|
|
2019-10-17
|
2019-10-17
|
EB-2019-0018
|
PO4_Alectra Utilities_Capitalization_20191017
|
Procedural Order
|
2019-10-17
|
|
2019-10-17
|
EB-2019-0018
|
AMPCO_Compendium_Alectra_20191017
|
Exhibits
|
|
2019-10-17
|
2019-10-17
|
EB-2019-0018
|
Alectra_Updated_EVD_Threshold Capital Expenditure Calculation Summary_20191017
|
Application and Evidence
|
|
2019-10-17
|
2019-10-17
|
EB-2019-0018
|
Alectra_EVD_Updated_G-Staff-8_Attach 5_V5_2020_ACM_ICM_Model_GRZ_REVISED _20191017
|
Application and Evidence
|
|
2019-10-17
|
2019-10-17
|
EB-2019-0018
|
Alectra_IRR_SEC Motion_Financial Plan_20191016
|
Interrogatory Response from Applicant
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
OEBStaff_Exhibit_Alectra In-Service Additions_Alectra_20191016
|
Exhibits
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
OEB Staff_Exhibit_M-Factor_Sensitivity_Analysis_IPI2_15_Alectra_20191016
|
Exhibits
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
OEB Staff_Exhibit_M-Factor_Sensitivity_Analysis_IPI1_74_Alectra OH_20191016
|
Exhibits
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
OEBStaff_Exhibit_Historical_IPI_Exhibit_20191016
|
Exhibits
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
SEC_Exhibit_DSP vs. Financial Plan_Alectra OH_20191016
|
Exhibits
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
DRC_Compendium_Alectra Hearing_20191016
|
Exhibits
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
Alectra_IRR_BOD_A4.1.2_Pres_5-Yr Fin Plan_2019-2023_20191016
|
Interrogatory Response from Applicant
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
Alectra_IRR_BOD A4.1.2_Cover_2019-23_Draft Financial Plan_20191016
|
Interrogatory Response from Applicant
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
Alectra_IRR_BOD A4.1.2 2019-2023_Financial Plan_20191016
|
Interrogatory Response from Applicant
|
|
2019-10-16
|
2019-10-16
|
EB-2019-0018
|
Transcript_Alectra_Oral Hearing_Vol 1_20191015
|
Transcripts
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
EnergyProbe_Compendium_Copy of Revised Alectra Utilities System Reliability Trends EP_Summary_v3_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
EnergyProbe_Compendium 2_Alectra Hearing_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
VECC_Compendium_Alectra_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
EnergyProbe_Compendium_Alectra_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
SEC_Compendium_Exh K1.1_Attach 2_Predecessor Reliability Results_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
SEC_Compendium_Exhibit K1.1_Attach 1_Predecessor Reliability Results_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
Exhibit K1.1_SEC_Motion Compendium_20191015
|
Exhibits
|
|
2019-10-15
|
2019-10-15
|
EB-2019-0018
|
Alectra_Undertaking Resp_JT2.2 Q6 Attach 3_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
Alectra_Undertaking Resp_JT2.2 Q3 Attach 2_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
Alectra_Undertaking Resp_JT2.2 Q1 Attach 1_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
Alectra_Undertaking Resp_JT1.6_Attach 1_Threshold Capital Expenditure Calculation_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
Alectra_Undertaking Resp_Tech Conf_JT1.2_Attach 1_Reliability Metrics_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
Alectra_Response_SEC Questions_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
Alectra_Undertaking Resp_tech Conf_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
Alectra_cvrltr_Undertaking Resp_Tech Conf_20191011
|
Undertaking Responses
|
|
2019-10-11
|
2019-10-11
|
EB-2019-0018
|
SEC_Notice of Motion_Alectra Rates_20191009
|
Motion
|
|
2019-10-09
|
2019-10-09
|
EB-2019-0018
|
Transcript_Alectra_Tech Conf_Day 2_20191008
|
Transcripts
|
|
2019-10-08
|
2019-10-08
|
EB-2019-0018
|
Alectra_IRR_SEC-66_Attach 2_HRZ 2018 ESM Model Excluding Capitalization_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_SEC-66_Attach 1_HRZ 2018 ESM Model_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_SEC-65_Attach 1_HRZ 2017 ESM Model Excluding Capitalization_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_SEC-64_Attach 1_HRZ 2017 ESM Model_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_HRZ-Staff-3 Attach 1_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_HRZ-Staff-2_Attach 6_2018 ESM with Year 2016 OMA_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_HRZ-Staff-2_Attach 5_2018 ESM with 5 year average OMA_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_HRZ-Staff-2_Attach 4_2018 ESM revised 3 year average OMA_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_HRZ-Staff-2_Attach 3_2017 ESM with Year 2016 OMA_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_HRZ-Staff-2_Attach 2_2017 ESM with 5 year average OMA_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_HRZ-Staff-2_Attach 1_2017 ESM revised 3 year average OMA_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_G-Staff-3_Attach 1_Capitalization Policy Impact Model_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_SEC_Capitalization_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_OEBStaff_Capitalization_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_EnergyProbe_Capitalization_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_BOMA_Capitalization_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Alectra_IRR_cvrltr_Capitalization_20191007
|
Interrogatory Response from Applicant
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
Transcript_Alectra_Tech Conf _Day 1_20191007
|
Transcripts
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
OEBStaff_Exhibit_Tech Conf_KT1.1_Excel Table_20191007
|
Exhibits
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
OEBStaff_Exhibit_Tech Conf_KT1.1_20191007
|
Exhibits
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
OEBStaff_Exhibit KT1.1_Alectra_20191007
|
Exhibits
|
|
2019-10-07
|
2019-10-07
|
EB-2019-0018
|
dec_Confidentiality_Alectra Utilities_20191007
|
Decision
|
2019-10-07
|
|
2019-10-07
|
EB-2019-0018
|
MANA_Ltr_Attendance at Tech Conf_Alectra_20191004
|
Correspondence
|
|
2019-10-04
|
2019-10-04
|
EB-2019-0018
|
AMPCO_TC_Topics_Alectra_20190927
|
Correspondence
|
|
2019-09-27
|
2019-09-27
|
EB-2019-0018
|
Alectra Utilities_ReplySUB_Confidentiality_IRR_M-Factor_20190930
|
Submission
|
|
2019-09-30
|
2019-09-30
|
EB-2019-0018
|
MANA_Ltr_Tech Conf_Topics_Alectra_20190927
|
Correspondence
|
|
2019-09-27
|
2019-09-27
|
EB-2019-0018
|
OEBStaff_Tech Conf Topics_Alectra_20190927
|
Correspondence
|
|
2019-09-27
|
2019-09-27
|
EB-2019-0018
|
VECC_Tech Conf Topics_Alectra_20190927
|
Correspondence
|
|
2019-09-27
|
2019-09-27
|
EB-2019-0018
|
BOMA_Topics_Tech Conf_Alectra_20190927
|
Correspondence
|
|
2019-09-27
|
2019-09-27
|
EB-2019-0018
|
MANA_Ltr_Tech Conf_Topics_20190927
|
Correspondence
|
|
2019-09-27
|
2019-09-27
|
EB-2019-0018
|
EnergyProbe_Questions_Tech Conf_Alectra M-factor_20190927
|
Correspondence
|
|
2019-09-27
|
2019-09-27
|
EB-2019-0018
|
OEB Ltr_MANA_IntrvEvd_Alectra_20190926
|
Correspondence
|
2019-09-26
|
|
2019-09-26
|
EB-2019-0018
|
DRC_Ltr_Tech Conf_Topics_20190926
|
Correspondence
|
|
2019-09-26
|
2019-09-26
|
EB-2019-0018
|
Alectra_Reply SUB_IRM_Attach 3_RGM HRZ_20190923
|
Submission
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
Alectra_Reply SUB_IRM_Attach 2_LRAM VAWF HRZ_20190923
|
Submission
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
Alectra_Reply SUB_IRM_Attach 1_RGM ERZ_20190923
|
Submission
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
Alectra_ReplySUB_IRM_20190924
|
Submission
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
EnergyProbe_IR_Alectra Utilities_Capitalization20190924
|
Interrogatories to Applicant
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
MANA_Response_Alectra_IntrvEVD_20190924
|
Comments
|
|
2019-09-24
|
2019-09-24
|
EB-2019-0018
|
OEBStaff_IR_Alectra Utilities_Capitalization_20190923
|
Interrogatories to Applicant
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
SEC_SUB_Alectra Utilities_Confidentiality_20190923
|
Submission
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
SEC_letter_MANA Evidence_20190923
|
Correspondence
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
SEC_IR_Alectra Utilities_Capitalization_20190923
|
Interrogatories to Applicant
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
OEBStaff_Sub_Alectra Utilities Confidentiality_20190923
|
Submission
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
Alectra Utilities_LTR_MANA Evidence_20190923
|
Correspondence
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
BOMA_IR_Alectra Utilities_Capitalization_20190923
|
Interrogatories to Applicant
|
|
2019-09-23
|
2019-09-23
|
EB-2019-0018
|
MANA_Ltr_IntrvEVD2_20190920
|
Correspondence
|
|
2019-09-20
|
2019-09-20
|
EB-2019-0018
|
BOMA_SUB_Alectra Rates_20190919
|
Submission
|
|
2019-09-19
|
2019-09-19
|
EB-2019-0018
|
OEBLtr_Alectra Utilities_Tech Conf_20190919
|
Correspondence
|
2019-09-19
|
|
2019-09-19
|
EB-2019-0018
|
PO3_Alectra Utilities_M-Factor_20190917
|
Procedural Order
|
2019-09-17
|
|
2019-09-17
|
EB-2019-0018
|
Alectra Utilities_SUB_Capitalization Policy_20190916
|
Submission
|
|
2019-09-16
|
2019-09-16
|
EB-2019-0018
|
SEC_SUB_Alectra Utilities IRM_20190916
|
Submission
|
|
2019-09-16
|
2019-09-16
|
EB-2019-0018
|
Alectra_IRR_cvrltr_MFactor_Revised_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-16
|
2019-09-16
|
EB-2019-0018
|
Alectra_IRR_SEC_55_Long Term Planned SR Capital_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
OEBStaff_SUB_Alectra Utilities IRM_20190913
|
Submission
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_SEC-55_LongTermPlannedSRCapital_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_G-Staff-8_Attach 1 M-factor Revenue Requirement_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_G-Staff-8_Attach 2 V5_2020_ACM_ICM_Model - PRZ_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_G-Staff-8_Attach 3 V5_2020_ACM_ICM_Model - BRZ_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_G-Staff-8_Attach 4 V5_2020_ACM_ICM_Model - ERZ_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_G-Staff-8_Attach 5 V5_2020_ACM_ICM_Model - GRZ_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_G-Staff-8_Attach 6 V5_2020-ACM_ICM Model - HRZ_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_SEC-54_Attach 1_Annual Capital Investment_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_SEC-53_Attach 1_XLPE Cable by Type_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_AMPCO-61_Attach 1_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_AMPCO-60_Attach 1_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_AMPCO-57_Attach 1_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_AMPCO-29_Attach 1_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_AMPCO-28_Attach 1_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_AMPCO-26_Attach 1_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_MANA_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_OEBStaff_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_EnergyProbe_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_CCC_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_AMPCO_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_DRC_MFactor_Part 2_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_DRC_MFactor_Part 1_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra Utilities_LTR_IRR_M-Factor_Confidentiality Request_20190913
|
Correspondence
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_VECC_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_SEC_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_PWU_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_VECC_MFactor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
Alectra_IRR_BOMA_M Factor_20190913
|
Interrogatory Response from Applicant
|
|
2019-09-13
|
2019-09-13
|
EB-2019-0018
|
dec_order_Alectra Utilities_20190905
|
Decision and Order
|
2019-09-05
|
|
2019-09-05
|
EB-2019-0018
|
Alectra_ARG Chief_Addendum_IRM_Attach 1_RGM_GRZ_20190905
|
Applicant Argument in Chief
|
|
2019-09-05
|
2019-09-05
|
EB-2019-0018
|
Alectra_ARG Chief_Addendum_IRM_20190905
|
Applicant Argument in Chief
|
|
2019-09-05
|
2019-09-05
|
EB-2019-0018
|
dec_Confidentiality_Alectra Utilities_20190830
|
Decision
|
2019-08-30
|
|
2019-08-30
|
EB-2019-0018
|
Alectra Utilities_ReplySUB_Confidentiality_IRR_IRM_20190828
|
Submission
|
|
2019-08-28
|
2019-08-28
|
EB-2019-0018
|
Alectra_ARG Chief_IRM_20190826
|
Applicant Argument in Chief
|
|
2019-08-26
|
2019-08-26
|
EB-2019-0018
|
OEBStaff_SUB_Confidentiality_Alectra Utilities_20190826
|
Submission
|
|
2019-08-26
|
2019-08-26
|
EB-2019-0018
|
DRC_Declaration and Undertaking_Alectra Utilities_20190822
|
Declaration and Undertakings
|
|
2019-08-22
|
2019-08-22
|
EB-2019-0018
|
PWU_dec_Undertaking_AB_Alectra Rates_20190821
|
Declaration and Undertakings
|
|
2019-08-22
|
2019-08-22
|
EB-2019-0018
|
PWU_DEC_Undertaking_BK_Alectra Rates20190821
|
Declaration and Undertakings
|
|
2019-08-22
|
2019-08-22
|
EB-2019-0018
|
PWU_DEC_Undertaking_RS_Alectra Rates_20190822
|
Declaration and Undertakings
|
|
2019-08-22
|
2019-08-22
|
EB-2019-0018
|
PWU_Ltr Dec_Undertaking_Alectra Rates_20190822
|
Declaration and Undertakings
|
|
2019-08-22
|
2019-08-22
|
EB-2019-0018
|
MANA_ltr_Alectra Utilities_IR_20190821
|
Correspondence
|
|
2019-08-21
|
2019-08-21
|
EB-2019-0018
|
OEB Reply_EGI Intrv REQ_Alectra_20190820
|
Correspondence
|
2019-08-20
|
|
2019-08-20
|
EB-2019-0018
|
Alectra_Ltr_MANA IR_Response_20190820
|
Correspondence
|
|
2019-08-20
|
2019-08-20
|
EB-2019-0018
|
PO2_Alectra Utilities_Rates_20190820
|
Procedural Order
|
2019-08-20
|
|
2019-08-20
|
EB-2019-0018
|
CCC_IR_Alectra_MFactor_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
DRC_IR_Alectra_MFactor_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
PWU_IR_Alectra_MFactor_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_PRZ-Staff-7 -Attach 1_LRAMVA Workform PRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_PRZ-Staff-2_Attach 1_GA Workform PRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_HRZ-Staff-8_Attach 1_ LRAMVA Workform HRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_HRZ-Staff-4_Attach 2_RGCRP Rate Rider Calculation_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_HRZ-Staff-4_Attach 1_RGCRP HRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_HRZ-Staff-3_Attach 1_ GA Workform HRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-6_Attach 1_2017 CDM Final Verified Results_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-6 Attach 2_2017 CDM Trueup_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1-Attach 10-Tariff-PRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1-Attach 9-Tariff-HRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1-Attach 8-Tariff-GRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1-Attach 7-Tariff-ERZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1-Attach 6-Tariff-BRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1_Attach 5_RGM PRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1_Attach 4_RGM HRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1_Attach 3_RGM GRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1_Attach 2_RGM ERZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_ERZ-Staff-5_Attach 1_LRAMVA Workform ERZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_G-Staff-1_Attach 1_RGM BRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_GRZ-Staff-5_Attach 1_GA Workform GRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_ERZ-Staff-1_Attach 1_GA Workform ERZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_BRZ-Staff-7_Attach 1_RGCRP_BRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_BRZ-Staff-6_Attach 1_LRAMVA Workform BRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_BRZ-Staff-4_Attach 1_GA Workform BRZ_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
VECC_IR_Alectra M-Factor_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
OEBStaff_IR_Alectra Utilities_Mfactor_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_IRR_OEB Staff_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_IRR_EnergyProbe_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra_IRR_BOMA_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra Utilities_IRR_cvrltr_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
Alectra Utilities_Ltr_IRR_IRM_Confidentiality Request_20190816
|
Interrogatory Response from Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
AMPCO_IR_61_Attachment 1_Alectra Rates_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
AMPCO_IR_60 _Attachment 1_Alectra Rates_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
AMPCO_IR_58 Appendix A._20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
AMPCO_IR_M-Factor_Alectra Rates_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
PWU_IR_M Factory_Alectra Rates_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
MANA_Suppl IR_Alectra MFactor_20190816
|
Interrogatories to Applicant
|
|
2019-08-16
|
2019-08-16
|
EB-2019-0018
|
BOMA_Dec_Undertaking_Alectra_20190815
|
Declaration and Undertakings
|
|
2019-08-15
|
2019-08-15
|
EB-2019-0018
|
BOMA_IR_Alectra_M Factor_20190815
|
Interrogatories to Applicant
|
|
2019-08-15
|
2019-08-15
|
EB-2019-0018
|
SEC_IR_Alectra_M Factor_GS over 50 Impacts_20190813
|
Interrogatories to Applicant
|
|
2019-08-13
|
2019-08-13
|
EB-2019-0018
|
SEC_IR_Alectra_M Factor_20190813
|
Interrogatories to Applicant
|
|
2019-08-13
|
2019-08-13
|
EB-2019-0018
|
Enbridge_LTR_Late IntrvREQ_20190812
|
Intervenor Request Letter
|
|
2019-08-12
|
2019-08-12
|
EB-2019-0018
|
OEB_reply_DRC_Intervention_20190812
|
Correspondence
|
2019-08-12
|
|
2019-08-12
|
EB-2019-0018
|
Alectra Utilities_ReplySUB_Capitalization Policy_20190809
|
Submission
|
|
2019-08-09
|
2019-08-09
|
EB-2019-0018
|
DRC_Ltr_Intrv Obj_Reply_20190807
|
Intervenor Request Objection
|
|
2019-08-07
|
2019-08-07
|
EB-2019-0018
|
Transcript_Alectra Presentation_20190807
|
Transcripts
|
|
2019-08-07
|
2019-08-07
|
EB-2019-0018
|
Alectra_Presentation Slides_KP1.1_20190807
|
Application and Evidence
|
|
2019-08-07
|
2019-08-07
|
EB-2019-0018
|
Alectra_Response_DRC IntrvREQ_20190802
|
Intervenor Request Objection
|
|
2019-08-02
|
2019-08-02
|
EB-2019-0018
|
CCC_SUB_Alectra Capitalization Issue_20190730
|
Submission
|
|
2019-07-31
|
2019-07-31
|
EB-2019-0018
|
OEB Reply_DRC Intrv Obj Reply_20190730
|
Correspondence
|
2019-07-30
|
|
2019-07-30
|
EB-2019-0018
|
EnergyProbe_SUB_Capitalization Issue_Alectra_20190729
|
Submission
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
SEC_SUB_Capitalization_Alectra_20190729
|
Submission
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
VECC_SUB_Alectra Utilities_20190729
|
Submission
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
MANA_IR_Alectra Utilities_20190729
|
Interrogatories to Applicant
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
Energy Probe_IR_Alectra Utilities_20190729
|
Interrogatories to Applicant
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
OEBStaff_Sub_Alectra Utilities_Capitalization Policy_20190729
|
Submission
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
BOMA_SUB_PRELIM_QUESTIONS_Alectra Utilities_20190729
|
Submission
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
OEBStaff_IR_Alectra Utilities_20190729
|
Interrogatories to Applicant
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
BOMA_IR_Alectra Rates_20190729
|
Interrogatories to Applicant
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
DRC_LTR_Intrv_Obj_Reply_20190726
|
Correspondence
|
|
2019-07-26
|
2019-07-26
|
EB-2019-0018
|
PWU_SUB_Alectra Rates_20190729
|
Submission
|
|
2019-07-29
|
2019-07-29
|
EB-2019-0018
|
OEB Ltr_Presentation Day_Alectra_20190726
|
Correspondence
|
2019-07-26
|
|
2019-07-26
|
EB-2019-0018
|
OEB Ltr_MANA_IntrvEvd_Alectra_20190725
|
Correspondence
|
2019-07-25
|
|
2019-07-25
|
EB-2019-0018
|
B Kemp_Letter of Comment_20190714_Redacted
|
Letter of Comment
|
|
2019-07-14
|
2019-07-14
|
EB-2019-0018
|
dec_Confidentiality_Alectra Utilities_20190724
|
Decision
|
2019-07-24
|
|
2019-07-24
|
EB-2019-0018
|
Peter Eline Homan_Ltr of Comment_Alectra Rates_20190719_Redacted
|
Letter of Comment
|
|
2019-07-19
|
2019-07-19
|
EB-2019-0018
|
OEB Reply_PWU_Late IntrvREQ_Alectra_20190723
|
Correspondence
|
2019-07-23
|
|
2019-07-23
|
EB-2019-0018
|
MANA_LTR_IntervenorEvidence_20190722
|
Correspondence
|
|
2019-07-22
|
2019-07-22
|
EB-2019-0018
|
AlectraUtilities_SUB_Capitalization Policy_20190719
|
Submission
|
|
2019-07-19
|
2019-07-19
|
EB-2019-0018
|
Alectra_ReplySUB_Confidentiality_20190717
|
Submission
|
|
2019-07-17
|
2019-07-17
|
EB-2019-0018
|
OEBStaff_Sub_Alectra Utilities Confidentiality_20190710.pdf
|
Submission
|
2019-07-10
|
2019-07-10
|
2019-07-10
|
EB-2019-0018
|
PWU_INT_REQ_Alectra Rates_20190710
|
Intervenor Request Letter
|
|
2019-07-10
|
2019-07-10
|
EB-2019-0018
|
PO1_Alectra Rates_20190709
|
Procedural Order
|
2019-07-09
|
|
2019-07-09
|
EB-2019-0018
|
CCC_INT_REQ_20190702
|
Intervenor Request Letter
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
A D Silva_Letter of Comment__REDACTED_20190626
|
Letter of Comment
|
|
2019-06-26
|
2019-06-26
|
EB-2019-0018
|
T Makhoul_Letter of Comment_REDACTED_20190626
|
Letter of Comment
|
|
2019-06-26
|
2019-06-26
|
EB-2019-0018
|
S Smith_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
S Smith_Letter of Comment_2_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
S Ali_Letter of Comment_REDACTED_20190703
|
Letter of Comment
|
|
2019-07-03
|
2019-07-03
|
EB-2019-0018
|
P Tretter_Letter of Comment_REDACTED_20190628
|
Letter of Comment
|
|
2019-06-28
|
2019-06-28
|
EB-2019-0018
|
P Jacome_Letter of Comment__REDACTED_20190704
|
Letter of Comment
|
|
2019-07-04
|
2019-07-04
|
EB-2019-0018
|
N Scotland_Letter of Comment_REDACTED_20190627
|
Letter of Comment
|
|
2019-06-27
|
2019-06-27
|
EB-2019-0018
|
M Liu_Letter of Comment_REDACTED_20190626
|
Letter of Comment
|
|
2019-06-26
|
2019-06-26
|
EB-2019-0018
|
L Kannan_Letter of Comment_REDACTED__20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
JP Schoch_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
J Frangella_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
J Bruce_Letter of Comment_REDACTED_20190628
|
Letter of Comment
|
|
2019-06-28
|
2019-06-28
|
EB-2019-0018
|
J Bruce_Letter of Comment_2_REDACTED_20190628
|
Letter of Comment
|
|
2019-06-28
|
2019-06-28
|
EB-2019-0018
|
J Abbey_Letter of Comment_REDACTED_20190627
|
Letter of Comment
|
|
2019-06-27
|
2019-06-27
|
EB-2019-0018
|
H Raufie_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
E Mohotoo_Letter of Comment_REDACTED_20190627
|
Letter of Comment
|
|
2019-06-27
|
2019-06-27
|
EB-2019-0018
|
E Gow_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
D Melling_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
D McMillan_Letter of Comment_REDACTED_20190628
|
Letter of Comment
|
|
2019-06-28
|
2019-06-28
|
EB-2019-0018
|
B Lalonde_Letter of Comment_REDACTED_20190706
|
Letter of Comment
|
|
2019-07-06
|
2019-07-06
|
EB-2019-0018
|
A Witham_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
A Sumano_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
A Sefton_Letter of Comment_REDACTED_20190702
|
Letter of Comment
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
AlectraUtilities_LTR_Presentation Day Request_20190529.pdf
|
Correspondence
|
|
2019-05-29
|
2019-05-29
|
EB-2019-0018
|
MANA_Corres_INT_REQ_RESP_20190703
|
Correspondence
|
|
2019-07-03
|
2019-07-03
|
EB-2019-0018
|
Alectra Utilities_Corres_Intervenor Requests_20190703
|
Correspondence
|
|
2019-07-03
|
2019-07-03
|
EB-2019-0018
|
Alectra_Affidavit_20190702.pdf
|
Affidavits of Service
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
DRC_IntrvREQ_CostREQ_REV_Alectra Rates_20190703
|
Intervenor Request Letter
|
|
2019-07-03
|
2019-07-03
|
EB-2019-0018
|
AMPCO_INT REQ_Alectra_20190702.pdf
|
Intervenor Request Letter
|
|
2019-07-02
|
2019-07-02
|
EB-2019-0018
|
MANA_INT_REQ_Alectra_20190702
|
Intervenor Request Letter
|
|
2019-06-28
|
2019-06-28
|
EB-2019-0018
|
VECC_INT_REQ_Alectra_20190625
|
Intervenor Request Letter
|
|
2019-06-25
|
2019-06-25
|
EB-2019-0018
|
SEC_INT_REQ_Alectra Rates_20190624
|
Intervenor Request Letter
|
|
2019-06-24
|
2019-06-24
|
EB-2019-0018
|
BOMA_INT REQ_CostEligREQ_Alectra Rates_20190621
|
Intervenor Request Letter
|
|
2019-06-21
|
2019-06-21
|
EB-2019-0018
|
EP_INT_REQ_Alectra Rates_20190620
|
Intervenor Request Letter
|
|
2019-06-20
|
2019-06-20
|
EB-2019-0018
|
NoA_dated_Alectra Rates_20190620
|
Notice
|
|
2019-06-20
|
2019-06-20
|
EB-2019-0018
|
NoA_dated_Alectra Rates_20190620_FR
|
Notice
|
|
2019-06-20
|
2019-06-20
|
EB-2019-0018
|
NoA_Alectra Rates_20190618_FR
|
Notice of Application
|
2019-06-18
|
|
2019-06-18
|
EB-2019-0018
|
NoA_Alectra Rates_20190618
|
Notice of Application
|
2019-06-18
|
|
2019-06-18
|
EB-2019-0018
|
LoD_Alectra Rates_20190618
|
Letter of Direction
|
2019-06-18
|
|
2019-06-18
|
EB-2019-0018
|
Complete Letter_Alectra_2020 Rates_20190611
|
Correspondence
|
2019-06-11
|
|
2019-06-11
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 40 1595 Workform GRZ_20190611
|
Application and Evidence
|
|
2019-06-11
|
2019-06-11
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 39 1595 Workform BRZ_20190611
|
Application and Evidence
|
|
2019-06-11
|
2019-06-11
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 38 1595 workform HRZ_20190611
|
Application and Evidence
|
|
2019-06-11
|
2019-06-11
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 37 GA Workform GRZ_20190611
|
Application and Evidence
|
|
2019-06-11
|
2019-06-11
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 35 GA Workform HRZ_20190611
|
Application and Evidence
|
|
2019-06-11
|
2019-06-11
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 36 GA Workform BRZ_20190611
|
Application and Evidence
|
|
2019-06-11
|
2019-06-11
|
EB-2019-0018
|
Ackltr_Alectra Rates_20190530
|
Acknowledgement Letter
|
2019-05-30
|
|
2019-05-30
|
EB-2019-0018
|
AlectraUtilities_LTR_Confidentiality Request_20190529
|
Correspondence
|
|
2019-05-29
|
2019-05-29
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 33 LRAMVA WorkForm ERZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 32 LRAMVA WorkForm PRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 31 LRAMVA WorkForm BRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 30 LRAMVA WorkForm HRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 29 RGCRP GRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 28 RGCRP ERZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 27 RGCRP PRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 26 RGCRP BRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 25 RGCRP HRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 24 1595 Workform ERZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 23 GA Workform ERZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 22 GA Workform PRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 16 IRM Model GRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 15 IRM Model ERZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 14 IRM Model PRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 13 IRM Model BRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 12 IRM Model HRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 11 Table of Allocations 2018 HRZ ESM_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 10 ESM Rate Rider Model HRZ_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 09 Table of Allocations 2017 HRZ ESM_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
Alectra_APPL_Ex 5_Attach 03 M-factor Revenue Requirement_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
AlectraUtilities_APPL_Ex 5-Attach 1-34_v. 7 of 7_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
AlectraUtilities_APPL_Ex 4-Apx L-P_v. 6 of 7_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
AlectraUtilities_APPL_Ex 4-Apx G-K_v. 5 of 7_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
AlectraUtilities_APPL_Ex 4-Apx F_v. 4 of 7_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
AlectraUtilities_APPL_Ex 4-Apx B-E_v. 3 of 7_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
AlectraUtilities_APPL_Ex 4-Apx A_ v. 2 of 7_20190528
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|
EB-2019-0018
|
AlectraUtilities_APPL_Ex 1-3_v. 1 of 7_20190528.
|
Application and Evidence
|
|
2019-05-28
|
2019-05-28
|